SELI OVERSEAS S.p.A. Via silvio D’Amico, 53 00145 Roma Tel. +39 06 81168500 www.selioverseas.com Project name: COCIV Val Lemme Tunnel Client: CO.CI.V. (Consorzio Collegamenti Integrati Veloci) Contract: Realizzazione delle opere civili di linea e relative opere connesse da pk 16+275 a pk 19+700 (Lotto Val Lemme) Contract amount: 216.837.722,94 EUR (lavori) 4.936.357,43 EUR ( sicurezza) Start: November 2017 Completion: December 2020 Works performed by: SELI Overseas S.p.A. MAJOR WORKS Excavation of the Cornering Camber with a total length of 180.00 meters in traditional, digging di- ameter of 16.29 m, finished internal diameter of 12.63 m. Coating of the AC tunnel cast in place. Excavation tunnel evacuation with a total length of 1,500.00 meters in traditional, excavation diameter of 7.82 m, finished internal diameter of 6.32 m. Coating of the AC tunnel cast in place. Excavation of the Twins Metro Tunnel of total length of 6,849.00 meters in traditional, exca- vation diameter of 10.18 m, finished internal diameter of 7.50 m. Coating of the AC tunnel cast in place. Excavation of by-pass tunnels and niches in traditional method. CONSTRUCTION METHOD AND EQUIPMENT Tunnel Excavation Traditional method: Consolidation of the cluster with injected VTR tubes Excavation in traditional with Hammer, diameter 10,18 m Pre-coating with Metal Covers and Spritz Beton Reinforced Fibro List of the main machinery-equipment: HITACHI ZX 470-3 EXCAVATOR with HAMMER ATLAS COPCO HB 3000 DUST S2 / 137012 ATEX HITACHI ZX 350-3 EXCAVATOR with HAMMER COCIV Val Lemme Tunnel

COCIV Val Lemme Tunnel - Seli Overseas · 2019. 4. 15. · Tunnel lining • Coated AC tunnel lining, 90cm thick. GEOLOGY The route crosses a heterogeneous set of structural geological

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COCIV Val Lemme Tunnel - Seli Overseas · 2019. 4. 15. · Tunnel lining • Coated AC tunnel lining, 90cm thick. GEOLOGY The route crosses a heterogeneous set of structural geological

SELI OVERSEAS S.p.A.Via silvio D’Amico, 53

00145 RomaTel. +39 06 81168500

www.selioverseas.com

Project name: COCIV Val Lemme TunnelClient: CO.CI.V. (Consorzio Collegamenti Integrati Veloci)Contract: Realizzazione delle opere civili di linea e relative opere connesse da pk 16+275 a pk 19+700 (Lotto Val Lemme)Contract amount: 216.837.722,94 EUR (lavori) 4.936.357,43 EUR ( sicurezza)Start: November 2017Completion: December 2020Works performed by: SELI Overseas S.p.A.

MAJOR WORKS

• Excavation of the Cornering Camber with a total length of 180.00 meters in traditional, digging di-ameter of 16.29 m, finished internal diameter of 12.63 m. Coating of the AC tunnel cast in place.

• Excavation tunnel evacuation with a total length of 1,500.00 meters in traditional, excavation diameter of 7.82 m, finished internal diameter of 6.32 m. Coating of the AC tunnel cast in place.

• Excavation of the Twins Metro Tunnel of total length of 6,849.00 meters in traditional, exca-vation diameter of 10.18 m, finished internal diameter of 7.50 m. Coating of the AC tunnel cast in place.

• Excavation of by-pass tunnels and niches in traditional method.

CONSTRUCTION METHOD AND EQUIPMENT

Tunnel Excavation

Traditional method:

• Consolidation of the cluster with injected VTR tubes

• Excavation in traditional with Hammer, diameter 10,18 m

• Pre-coating with Metal Covers and Spritz Beton Reinforced Fibro

List of the main machinery-equipment:

• HITACHI ZX 470-3 EXCAVATOR with HAMMER ATLAS COPCO HB 3000 DUST S2 / 137012 ATEX

• HITACHI ZX 350-3 EXCAVATOR with HAMMER

COCIV Val Lemme Tunnel

Page 2: COCIV Val Lemme Tunnel - Seli Overseas · 2019. 4. 15. · Tunnel lining • Coated AC tunnel lining, 90cm thick. GEOLOGY The route crosses a heterogeneous set of structural geological

SELI OVERSEAS S.p.A.Via silvio D’Amico, 53

00145 RomaTel. +39 06 81168500

www.selioverseas.com

ATLAS COPCO HB 4100 ATEX• SOILMEC POSITIONER SM605 DT-AV ATEX• CRANES OFF ROAD LOCATELLI GRIL 830• HITACHI ZW220 WHEEL LOADER ATEX • SHOVEL JCB SKILOADER 190• TEREX GTH 4018SR TELESCOPIC LIFT• DIECI PEGASUS 40 17 TELESCOPIC LIFT

ATEX• PUTZMEISTER BRF1408 TRUCK PUMP ATEX • PUMP SPRITZ 3 CSS3• PUMP SPRITZ CIFA PAS 307F / E 6 • LAYING RIBS CAVATTONI MODEL CAV 3A

ATEX• TRUCK ASTRA BM 64.36T WITH ATEX• TRAILER BERTOJA BT 18S ATEX

Tunnel lining

• Coated AC tunnel lining, 90cm thick.

GEOLOGY

The route crosses a heterogeneous set of structural geological units: it is in fact the area of contact be-tween the ends of the Alpine mountain to the west and the northern Apennine mountain to the east.This area, known as the Sestri-Voltaggio, is bounded on the west by the Voltri Group and on the east by theLigurian units. These macro tectonic units are, finally, bounded by succession to the north sedimentary from the Ligurian-Piedmontese Tertiary Basin and from the deposits of the Po Valley, too interested in the project line.