7/23/2019 Delivery and Lifting Plan Tass
1/14
PSDS DELIVERY &
EQUIPMENT LIFTING PLANFOR
TAMAN SUNTEX STATION
PACKAGE S6 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND
OTHER ASSOCIATED WORKS AT TAMAN SUNTEX, TAMAN CUEPACS AND BANDAR
TUN HUSSIEN ONN
7/23/2019 Delivery and Lifting Plan Tass
2/14
ACCESS AND ENTRANCE
ENTRANCE TO SB ENTRANCE TO NB
7/23/2019 Delivery and Lifting Plan Tass
3/14
LIST OF EQUIPMENT
7/23/2019 Delivery and Lifting Plan Tass
4/14
MACHINERY
PACKAGE S6 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND
OTHER ASSOCIATED WORKS AT TAMAN SUNTEX, TAMAN CUEPACS AND BANDAR
TUN HUSSIEN ONN
7/23/2019 Delivery and Lifting Plan Tass
5/14
CRANE POSITION
SB NB
7/23/2019 Delivery and Lifting Plan Tass
6/14
CRANE POSITION AT SB
SB NB
7/23/2019 Delivery and Lifting Plan Tass
7/14CRANE POSITION AT NB
SB NB
7/23/2019 Delivery and Lifting Plan Tass
8/1480 TONNE CRANE - CALCULATOR
Max load To lift
At Platform
Max horizontal
distance from
centre crane
SIZE OF CRANE
7/23/2019 Delivery and Lifting Plan Tass
9/1480 TONNE CRANE TYPE
VARIOUS TYPE OF 100 TONNE CRANE
7/23/2019 Delivery and Lifting Plan Tass
10/14
LOGISTIC PLAN
PACKAGE S6 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND
OTHER ASSOCIATED WORKS AT TAMAN SUNTEX, TAMAN CUEPACS AND BANDAR
TUN HUSSIEN ONN
7/23/2019 Delivery and Lifting Plan Tass
11/14NORTH BOUND CONCOURSE & PLATFORM
WALL OPENING
2.8M X 2.0M
TEMPORARY
PLATFORM 9M
HEIGHT
7/23/2019 Delivery and Lifting Plan Tass
12/14SOUTH BOUND CONCOURSE & PLATFORM
WALL OPENING
2.8M X 2.0M
TEMPORARY PLATFORM
9M HEIGHT
7/23/2019 Delivery and Lifting Plan Tass
13/14TEMPORARY PLATFORM
STEEL PLATE + SHEET
PILE AS A LOAD
TRANSFER FROM
JACK BASE TO GROUND
I BEAM + STEEL PLATEAS A TEMPORARY
PLATFORM
7/23/2019 Delivery and Lifting Plan Tass
14/14
DELIVERY DATE
PACKAGE S6 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND
OTHER ASSOCIATED WORKS AT TAMAN SUNTEX, TAMAN CUEPACS AND BANDAR
TUN HUSSIEN ONN
TWO SESSIONFIRST LIFT SOUTH BOUND ROOM (CONCOURSE & PLATFORM)
IN ONE (1) DAY
NEXT TWO WEEK NORTH BOUND ROOM (CONCOURSE &PLATFORM) IN ONE (1) DAY
TENTATIVE DATE; NB 14/9/2015 & SB 28/9/2015