Distribution Hand Book

  • View
    32

  • Download
    1

Embed Size (px)

DESCRIPTION

Distribution Power Systems

Transcript

  • ,

    56

    * 33 "23

  • Copyright 2003by Pacific Gas and Electric Company.

    All rights reserved.

    No part of this publication may be reproduced, stored in a retrieval system, or transmitted inany form or by any means, electronic, mechanical, photocopying, recording, or otherwise,

    without the prior written permission of Pacific Gas and Electric Company. For information,address:

    Pacific Gas and Electric CompanyTechnical Document Management

    Mail Code H11HP.O. Box 770000

    San Francisco, CA 94177

  • Distribution Interconnection Handbook

    May 1, 2003 i

    Acknowledgements

    The working group that wrote the Distribution Interconnection Handbook (DIH) iscomprised of several departments.

    Thanks to these team members:

    Distribution Planning: Satvir Nagra, Sherry King, Jim Sanborn

    Field Metering: Bill Tirona, Young Nguyen

    Interconnection Services: John Vardanian (Rule 21), David Ore (ENET),Art McAuley

    Service Planning: Dave Evans

    System Operations: Wolfgang Hase, Mike Badet

    Technical Support: Jim Sprecher, Jeff Goh, Dan Pearson

    Software Support for Interconnection Study: Bob Hartwell

    Rate & Tariffs: Jerry Jackson, Dylan Savidge

    Communication: Larry Duba

    Interconnection ServicesTransmission Handbook: Bill Gravellis

    Support: Kris Buchholz

  • Distribution Interconnection Handbook

    May 1, 2003ii

    This Page Intentionally Left Blank

  • Distribution Interconnection Handbook

    May 1, 2003 iii

    Table of Contents

    Contents Page

    Section 1 General information

    1.1. Purpose 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2. Retail (Under CPUC Jurisdiction) 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3. Time Frames and Fees 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.4. Single Point of Contact 1-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Section 2 Standard E-NET Interconnection

    2.1. Introduction 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.2. Purpose 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3. Standard E-NET Eligibility 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4. Application and Agreements 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.1. Application Form and Fees 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.2. E-NET Forms and Application Process 2-2. . . . . . . . . . . . . . . . . .

    2.4.2.1. Completed Application Form 2-2. . . . . . . . . . . . . . . . . .

    2.4.2.2. Single-Line Diagram and Project Details 2-2. . . . . . . . .

    2.4.2.3. Signed Agreement 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.2.4. Proof of Insurance Coverage 2-4. . . . . . . . . . . . . . . . . .

    2.4.2.5. Approved Building Permit 2-4. . . . . . . . . . . . . . . . . . . .

    2.4.2.6. Electric Vehicles 2-4. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.2.7. Timeline 2-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5. Requirements 2-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.1. Protective Devices 2-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.2. Manual Disconnect Switch 2-5. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.3. Single-Line Drawing or Schematics 2-6. . . . . . . . . . . . . . . . . . . . .

  • Distribution Interconnection Handbook

    Table of Contents

    May 1, 2003iv

    Contents Page

    2.5.4. Subdivision 2-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.5. Metering Requirements 2-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.6. Telemetering Requirements 2-9. . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.7. Operation Requirements 2-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5.8. Other Technical Requirements 2-10. . . . . . . . . . . . . . . . . . . . . . . .

    2.5.8.1. Preparallel Inspection 2-10. . . . . . . . . . . . . . . . . . . . . . .

    Section 3 Expanded E-NET Interconnection

    3.1. Introduction 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2. Purpose 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.3. Expanded E-NET Eligibility 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4. Application and Agreements 3-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.1. Application Form/Fees 3-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2. Expanded E-NET Forms and Process 3-2. . . . . . . . . . . . . . . . . . .

    3.4.2.1. Completed Application Form 3-2. . . . . . . . . . . . . . . . . .

    3.4.2.2. Single-Line Diagram and Project Details 3-2. . . . . . . . .

    3.4.2.3. Signed Agreement 3-3. . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2.4. Proof of Insurance Coverage 3-3. . . . . . . . . . . . . . . . . .

    3.4.2.5. Approved Building Permit 3-3. . . . . . . . . . . . . . . . . . . .

    3.4.2.6. Electric Vehicles 3-3. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2.7. Preparallel Inspection 3-4. . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2.8. Timeline 3-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2.9. Application Completeness 3-5. . . . . . . . . . . . . . . . . . . .

    3.4.2.10. Initial Review 3-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2.11. Supplemental Review 3-5. . . . . . . . . . . . . . . . . . . . . . . .

    3.4.2.12. Interconnection Study 3-6. . . . . . . . . . . . . . . . . . . . . . . .

  • Distribution Interconnection Handbook

    Table of Contents

    May 1, 2003 v

    Contents Page

    3.5. Requirements 3-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.5.1. Interconnection Requirements 3-6. . . . . . . . . . . . . . . . . . . . . . . . .

    3.5.2. Protection and Control Requirements 3-6. . . . . . . . . . . . . . . . . . . .

    3.6. Manual Disconnect Switch 3-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.6.1. General 3-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.6.2. Specifications 3-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.6.3. Low-Voltage Disconnects (0 to 600 Volts) 3-9. . . . . . . . . . . . . . . .

    3.6.4. Medium-Voltage Disconnects (600 Volts to 25 kV) 3-9. . . . . . . . .

    3.7. Review and Study Requirements 3-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.8. Inverter-Based Generating System 3-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.9. Machine-Based Generation 3-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.10. Testing and Maintenance Requirements 3-11. . . . . . . . . . . . . . . . . . . . . . . . .

    3.11. Reliability and Redundancy 3-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.12. Relay Grades 3-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.12.1. Industrial-Grade Relays 3-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.12.2. Utility-Grade Relays 3-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.13. System-Fault Detection And Protection 3-13. . . . . . . . . . . . . . . . . . . . . . . . .

    3.14. Protection and Control for Generating Facilities 3-14. . . . . . . . . . . . . . . . . .

    3.14.1. Phase Overcurrent 3-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.14.2. Over/Undervoltage Relay 3-16. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.14.3. Over/Underfrequency Relay 3-16. . . . . . . . . . . . . . . . . . . . . . . . . .

    3.14.4. Ground-Fault-Sensing Scheme 3-16. . . . . . . . . . . . . . . . . . . . . . . .

    3.14.5. Overcurrent Relay with Voltage Restraint or Voltage Control 3-17

    3.14.6. Fault-Interrupting Devices 3-18. . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.14.6.1. Circuit Breakers 3-18. . . . . . . . . . . . . . . . . . . . . . . . . . .

  • Distribution Interconnection Handbook

    Table of Contents

    May 1, 2003vi

    Contents Page

    3.14.6.2. Fuses 3-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.15. Direct Telephone Service 3-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.16. Metering Requirements 3-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.17. Telemetering Requirements 3-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.18. Ground Potential Rise 3-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.19. Communication 3-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.20. Operation Requirements 3-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.20.1. Normal Voltage Operating Range 3-27. . . . . . . . . . . . . . . . . . . . . .

    3.20.2. L