PRASAD DPR Toolkit
Indicative Table of Contents for
submission of Detailed Project
Report under PRASAD scheme
Table of Contents for DPR under the PRASAD Scheme
Sample Table of Contents for DPR under the PRASAD Scheme
PART A
1 Introduction
1.1 1 Background 1.1.1 National Mission on Pilgrimage Rejuvenation and Spiritual Augmentation Drive (“PRASAD”)
1.2 2 Approaches to the Study 2 Introductions to the City 2.1 1 Introduction 2.2 History 2.3 3 Art 2.4 Culture 2.5 Location and Regional Setting 2.6 Connectivity 2.7 Demography 2.8 Economy 2.9 Physiography and Climate 2.10 Flora and Fauna
3 Overview of Concerned City –Pilgrimage Assets 3.1 1 Introduction 3.2 Key Tourist Destinations of Historical and Religious Importance
3.2.1 Tourism Assets in City and Context Areas 3.2.2 Visitor Footfall at Key Destinations
3.2.2.1 Annual Footfall 3.2.2.2 Monthly Footfall 3.2.2.3 Procession Day Tourist Footfall 3.2.2.4 Future Expected Trend in Footfalls
3.3 Projects and Site identification 3.3.1 Project Initiatives by various stakeholders at Project Site
(State Govt., Local Govt., various schemes), if any 3.2.2.1 Existing 3.2.2.2 Proposed
3.3.2 Funding Pattern and Status of these projects at the Site, if any
3.4 Key Strengths and Opportunities 4 Assessment of the Identified Pilgrimage Assets 4.1 1 Introduction 4.2 Mapping of Heritage and Pilgrimage Assets 4.3 3 Assessment and Evaluation of Pilgrimage Asset
4.3.1 Present status of Asset Linked Infrastructure Tourism Infrastructure
Physical Infra. - Water, Drainage, Sewage, Cleanliness1, Power and Telecommunication Social Infra. - Sarai, Dharamshala, Eco- Lodges et al Transport infra. - Approach Road, Road Inventory et al
4.3.2 Need based Gap Analysis 4.3.3 Assessment of proposed Improvements required at the Assets
5 Infrastructure Development Plan for Assets and Context Areas 5.1 1 Introduction
1 Please refer to Swachh Bharat Guidelines (Annexure 3) for outline on general cleanliness.
Table of Contents for DPR under the PRASAD Scheme
5.2 2 Aims & Objectives 5.3 Development Proposals
5.3.1 Development and Rejuvenation of Project Site 5.3.1.1 Sub Project I 5.3.1.2 Sub Project II
5.3.2 Development Proposals for Proposed Sites 6 Investment Plan and source of Funding 6.1 Project Cost Estimation
(Detailed Cost estimates/Plans /Drawings to be provided as annex, Basis of estimation/Quotations to be submitted / mentioned)
6.2 2 Allocation of Funds under PRASAD Scheme 6.3 Potential Interventions under PPP format, if any 6.3.1 Project Name 6.3.1.1 Project Concept
7. Project Implementations Framework and O & M
7.1 Role of different Stakeholders 7.2 Project implementation schedule (Attach MS Project based schedule) 7.3 Proposed framework for O & M.
8. Risk Analysis & Mitigation Framework
8.1 Project development/Construction risk 8.2 Operation period risk 8.3 3 Risk Management/ Mitigation Plan
9. Project Impact
9.1 Projected Social & Cultural Impact 9.2 Projected Economic Impact 9.3 Projected Environmental Impact 9.4 Conclusion
PART B
1. Project Cost Abstract (Please mention adopted schedule of rates)
2. Detailed Bill of Quantities
3. Quotations – For non-schedule items
4. Detailed Drawings
5. Annexures
4.1 Forms & Undertakings (As provided below)
4.1.1 General Information
4.1.2 Form A
4.1.3 Form B
4.1.4 Form C
4.1.5 Undertakings
Sample Table of Contents for DPR under the PRASAD Scheme
Annexure 1
Sample Template to Assess the Tourism Infrastructure Coverage for identified assets
Asset Linked Infrastructure Tourism Asset 1 Tourism Asset 2 Tourism Asset 3
Approach Road Condition
Directional Signage
Information Signage
Parking Area
Ticketing Counter
Tourist Information Kiosk
Tourist Shelter / Relaxation Area
Queue Complex
Drinking Water facility
Public Convenience
Eating outlets / Cafeteria
Retails Shops / Kiosks
Lighting & Illumination
Landscaping / Plantation
CCTV Surveillance
Boundary Wall / Fencing
Locker Room / Cloak Room
Shoe Stand
Dustbins
Legend
Not Applicable / Not Required
Not-Available
Needs Improvement
Available / Adequate
Sample Table of Contents for DPR under the PRASAD Scheme
Annexure 2
Tourism infrastructure inventory
The pilgrimage site- wise detailed tourism infrastructure inventory is an important part of the DPR so as to
get the idea of the existing tourism infrastructure, its adequacy and envisaged tourist flow in the future and
the necessary action required to mitigate the infrastructure gap. The table is an indicative list of the
infrastructure gap analysis conducted at each site. Other categories/particulars can also be added depending
on project-specific basis.
Category Particular Current Status/Description
General
Resource Category
Location
Accessibility (Quality of Road, Local
Transport etc.)
Closeness to other spots
Special Features
Segment oriented to if any
Quality
Present condition
Space Quality
Environmental Quality
Solid Waste Management
Level of Littering
Current Activity & Usage
Tourist
Infrastructure
Management
Signage & Information
Eating Outlets
Drinking Water
Toilets
Security
Organized Parking
Aesthetic / Architecture
Timing of entry
Entry Charges
Maintenance
Constraints for Planning
Improvement Plan
Sample Table of Contents for DPR under the PRASAD Scheme
Annexure 3
Model outline on General Cleanliness in accordance to Swachh Bharat Guidelines.
Project report shall have detailed assessment & infrastructure gap study to ensure general cleanliness in & around location. Various components that shall form part of the section are as under:-
1. Background & rationale of Section. 2. Analysis of existing cleaning procedures (of core destination, its vicinity and approach). 3. Identification of involved agencies & their responsibilities (institutional framework in place). 4. Identification of bottlenecks in functioning and suggesting ways of overcoming the same through
stakeholder consultation & research. 5. Assessing the current waste generation and examining adequacy of current provisions:-
5.1. Adequacy of garbage bins, their placement. 5.2. Adequacy of toilet blocks- gender based, accessible & bio degradable etc. 5.3. Adequacy of garbage collection vehicles. 5.4. Examining provisions of segregation of bio degradable & non-biodegradable waste, solid waste
management. 5.5. Adequacy of Manpower. 5.6. Adequacy of frequency of cleaning.
6 Identification of requirements in terms of additional components as well as existing components and cost estimates of the same.
7 Feasibility of roping in an adopter for cleanliness of the area. 8 Possibility of signing MoU between different agencies. Identifying the nodal agency which may be
designated as the overseer of the execution of the MoU. 9 Assessing the future waste generation (3-5 Years) in prospects of development of the area and assessing
the preparedness of the destination for handling the same. 10 Identification of the future requirements of different components and their year-wise phasing of the
same and cost estimates.
Sample Table of Contents for DPR under the PRASAD Scheme
MINISTRY OF TOURISM
Proposal Submission for PRASAD
General Information
For Office Use Only:
Financial Year _ File No.
Application Date: (In dd/mm/yyyy format)
Processing Agency:
Scheme: PRASAD SCHEME
Project Name:
Project Details:
Duration for Project Completion (In Months) :
Primary Implementation Agency:
Primary Site Address:
City/Town:
State:
District(s):
Project Coordinator:
Sl. No.
Project Components
(I) To be funded by the Central Government
A) Ministry of Tourism
Total (A)
B) To be funded by the other schemes of the Central Govt. (Details of each individual scheme to be given separately)
Total (B)
Total- I (A +B)
Sample Table of Contents for DPR under the PRASAD Scheme
(II) To be funded by the State Govt.
Total- II
(III) To be taken up under PPP
Total- III
(IV) To be taken up under CSR of CPSU/SPSUs and Private Sector ( Please specify)
Total- IV
(V) Any other source (please specify)
Total- V
Total (I+II+III+IV+V)
Consultancy fees
Contingencies
Total Project cost:
Signatures of the Authorized Signatory with
seal
Sample Table of Contents for DPR under the PRASAD Scheme
MINISTRY OF TOURISM
Proposal Submission for PRASAD
General Information
Tourism Sector :
Category Sub-Category
State Govt. Letter No. Date XX/xx/20xx
Project Cost Details (Provide Value in Lakhs)
Total Project Cost: Rs.
Sent hard copy of the proposal along with all necessary enclosures: Yes/No
Authorized Signatory:
Annexure: 1. Form A 2. Form B 3. Form C 4. Undertaking from the State Govt. 5. Form H-1 6. Form H-2 7. Certificate of Schedule of Rates 8. Land Availability Certificate (LAC)/ Land Possession Certificate(LPC)
Signatures of the Authorized Signatory with seal
Sample Table of Contents for DPR under the PRASAD Scheme
MINISTRY OF TOURISM
PRASAD FORM – (A)
Project Location Details:
Locations: Table `A’
Nearest Connectivity Particulars
Airport
Railway Station
Sea Port
Bus Stand
No. of Tourists Visited for Previous Years: Table `B’
Year visited Domestic Visitors Foreign Visitors Total Nos. of Visitors
2010
2011
2012
2013
Component Details:
Table `C’
S. No. Description Amount
(in Rs Lakh)
Net Amount
Grand Total
Note: Details in Table A, B & C to be given separately for each destination to be developed under the circuit.
Signatures of the Authorized Signatory with seal
Sample Table of Contents for DPR under the PRASAD Scheme
MINISTRY OF TOURISM
PRASAD FORM – B
Details of Existing Facilities at the destinations falling in the circuits (Destination wise):
Name of Existing Facility
Year of purchases
No. of equipment
Present condition of Existing Equipment/machinery
Required addition
Remarks/justification
Signatures of the Authorized Signatory with seal
Sample Table of Contents for DPR under the PRASAD Scheme
MINISTRY OF TOURISM
PRASAD FORM – C
Details of arrangements made for Operation and Management of assets created under the Scheme:
Name of product/ facility/assets to be developed/created under the scheme
Estimated Operation and Maintenance Cost
State/Private Agency responsible for Operation/Maintenance
Jist of the Agreement/MoU signed with the Public/Pvt. Agency
Signatures of the Authorized Signatory with seal
Date:
UNDERTAKINGS
The Government of gives the following undertakings in the respect of the above mentioned project
proposals.
1. That the State Government/ UT Administration of is committed to implementation of the
Scheme PRASAD.
2. That adequate land free of encumbrance to accommodate all the features of the project is available
and is in possession of Tourism Department.
3. That for the components proposed for public funding, the cost estimates are based on schedule of
rates prescribed by the Central/State PWD.
4. That it will bear the expenditure on account of approach road, external electrifications, external water
supply, sewerage lines and other items.
5. That the specific milestones to be achieved under the scheme (as per the DPR) and the works to be
undertaken in physical and financial terms are as follows:
12 months - _% completion of the project
24 months - _% completion of the project
36 months - _% completion of the project
Note: Above completion timelines are subject to timely release of funds from MoT.
6. The State Government/ UT Administration of will operate and manage the project directly
or by selecting and appointing an agency, and will bear/be responsible for all operational expenditure.
7. That the State Government/ UT Administration of will be solely responsible for sustainable
operation and maintenance of the identified/ developed projects under the scheme. It will have
necessary arrangements/ agreements/ with the public/private agencies for operation/repairs/
maintenance of the assets created under the scheme, details of which are furnished in form ‘C’.
8. That it will bear all the expenditure on recruitment, training and salary of staff employed for operation
of the project.
9. That it will complete the project within the estimated cost indicated in the DPR and any cost over runs
will be borne by the State Government itself and
10. That it will forward monthly detailed physical and financial progress reports of the project to the
Ministry of Tourism, Government of India.
11. That it will ensure all statutory clearances in place before execution.
12. That it will ensure there is no duplication of components proposed under any other Scheme / Funding
arrangement.
Signatures of the Authorized Signatory with seal
Date:
Sample Table of Contents for DPR under the PRASAD Scheme
FORM H-1 (For Construction Project)
Name of Project:
This is to certify that barrier free environment for differently abled tourists has been incorporated in the design of the built-up areas of this project in accordance with relevant building bye-laws of the State/Ministry of Urban Development’s notification dated 28th
August, 2002
Signatures of the Authorized Signatory with seal
Date:
Sample Table of Contents for DPR under the PRASAD Scheme
FORM H-2 (For Construction Project)
Name of Project:
This is to certify that the built-up areas of this project will be implemented in accordance
with relevant building bye-laws of the State/Ministry of Urban Development notification
dated 28th August 2002 barrier free environment for persons with disability.
Signatures of the Authorized Signatory with seal
Date:
Sample Table of Contents for DPR under the PRASAD Scheme
CERTIFICATE OF SCHEDULE OF RATES
Name of Project:
This is to certify that the Detailed Cost Estimate for the above project has been prepared based
on Schedule of Rates prescribed by the Central/State PWD.
Rates for items that are not included in the above Schedule of Rates are decided based on the
quotation received from the market by following the standard codal formalities.
Signatures of the Authorized Signatory with seal
Date:
Sample Table of Contents for DPR under the PRASAD Scheme
LAND AVAILABILITY CERTIFICATE
Name of Project:
This is to certify that adequate land, free of encumbrance to accommodate all the features of the above
project is available and is in possession of Tourism Development Board.
# Project Component Land Ownership Remarks
Owned / Long term lease
Signatures of the Authorized Signatory with seal
Date: