- Site Inspection Report – 30th March 2016
Nila Sewana Housing Projects
Acknowledgement
8/18/2019 Galle -Final (Repaired)
2/19
Table of Contents
8/18/2019 Galle -Final (Repaired)
3/19
List of Figures
8/18/2019 Galle -Final (Repaired)
4/19
List of Tables
8/18/2019 Galle -Final (Repaired)
5/19
Site Inspection Report –Nila Sewana Housing ProjectsSite inspection was carried out on 30th March 2016, with the participation of the
following participants.
Mrs. Srimathi Weerasinghe (General Manager !"#$%Mr. &an'an a)awardana (*ngineer !"#$%Mr. Mahinda #e Sil+a (#M Galle%Mr.Sumith Senana)aa (*ngineer - Galle%
8/18/2019 Galle -Final (Repaired)
6/19
Miss hamini "indurangala (/. $rchitect%
Location – Habaraduwa and Wakunagoda, Galle
Background o t!e projects
!ila Sewana pro'ect is indicated to the tripartite signed ) Ministr) of ulic
$dministration "ome $airs, 4oards of in+estment Sri 5ana and Wincon
#e+elopment 5ana (+t% 5td on 1.11.2003 at olomo./he pro'ect consists
of two phases where the second phase of the pro'ect is awarded to the same
construction compan) onl) upon the success of the phase one.$s the phase
construction of the Waunugoda "aaraduwa pilot pro'ects started.
7undasale "ousing ro'ect is proposed as a second phase. /he criteria for
measuring success of the pilot pro'ect is the construction of housing units )
Wincon 5td in accordance with the agreed standards and speci8cation and
their capailit) to entre in to sales agreements for selling 90: of the housingunits in pilot pro'ects.$s per the clause !o. 3.;( e% of agreement onstruction
ompan) is oliged to complete construction within 36 months of handing
o+er of +acant possession of the site or within such further period to e
mutuall) agreed ) parties.
Wekunugoda Housing Project
Introduction
Waunugoda "ousing pro'ect is located in &ichmond "ill ,in the +icinit) of
Galle /own. /his pro'ect e
8/18/2019 Galle -Final (Repaired)
7/19
/ale 1.1= articulars of "ousing pro'ect Weunugoda
Present Situation
Wincon #e+elopment 5ana (+t% transited ) M/# Walers 5 in anuar)
201>.4akunugoda refurbishment work is commenced in 5anuary *+1. !ow/ Final stage is
carrying out. Apartments will be ready for occupation in April *+1-.Although/ 12+ units ha'e
already reser'ed/ and the refurbishment work is not in the e#pected le'el due to below listed
shortcomings.
1. Proposed parking area to Apartment building is too distant.
*. 6uality of the material used in the construction is not in the e#pected le'el
). Finishing works is not sufficient.
"#7 8alcony handrails are not gal'ani9ed.
.:entilatin and lighting problems
.
"etails o Housing Projects
Habaraduwa
Location # Situated at close to t!e coast acing Galle$%olo&bo Hig!wa'
()tent o Land # *+* Hectares
-'pe o t!e
Houses
No o
!ouses
()tent o
.oor
area/s0+t1
Price/Rs+12 3atPublic Pri4at
e
8/18/2019 Galle -Final (Repaired)
8/19
Law Inco&e 567 89 5,:*9,
78;
7,5,
;;;d&inistration late 7;5*, ?nder Hon+
8/18/2019 Galle -Final (Repaired)
9/19
8/18/2019 Galle -Final (Repaired)
10/19
Pa4e&ents
also cracked
Wall %racks
Wall %racks and
water &arks
8/18/2019 Galle -Final (Repaired)
11/19
>ll "oor and
window ra&es corroded dut' closed to t!e beac! side
Present situation o
roo
%orroded $ Handrail
Roo &aterials and
ot!er construction
&aterials were not
suitable or t!e
en4iron&ental setting+
>s t!is site closed to
beac! side, t!at t!e
proble&s all steel and
Now t!is roo &aterial
are re&o4ing as not suit
t!e en4iron&ental
settings
/all roo s!eets slag1
8/18/2019 Galle -Final (Repaired)
12/19
Ser4ices Proble&s – Not well planed inrastructures and ser4ices
/sewerage A rain water pipeA waterA (lectricit' and telep!one
nl' !a4e Lou4ered
ndow panel
8/18/2019 Galle -Final (Repaired)
13/19
"eecting Hand Rails and ser4ices
ducts
>ll corridors – No
and 4entilations
rain water co&e to
inside
Balcon' area also cant
used in rain ti&e
8/18/2019 Galle -Final (Repaired)
14/19
Was! basing – also corroded
Was! roo&
>rea $C)*C6D eet
/>rea not suEcient1 No was! basin onl'
!a4e bit tap
8/18/2019 Galle -Final (Repaired)
15/19
"etails o t!e Housing Projects
Wekunugoda Housing Projects
Bed roo&
ne bed roo&
>rea $6C=D)9Ceet
/>rea not suEcient1
Li4ing area $7=C =D ) 6C
8/18/2019 Galle -Final (Repaired)
16/19
Location # Situated at Ric!&ond Hill, Wekunugoda, Galle
()tent o Land # : >cres
%o&pleted project
Sales are conducted at t!e &o&ent, so ar 57: units or Go4ern&ent
Sector F 7 units or Pri4ate sector+
;7 blocks included 5; storied
;7 blocks included ;8 storied
Present situation
Waunagoda refurishment wor commenced in anuar) 201> and
refurishment wor in progress le+el 10 units ha+e alread) reser+ed.
$lso we oser+e that the refurishment as not ha+e een super+ise )?uali8ed professionals.
Proble&s
>de0uate parking spaces /-!e' !a4e proposed t!e parking
area as ar awa'1 Ha4e proble&s o &aterial usage /Balcon' !and rails etc 1
Pro4ide ;7 lits o one block w!ic! is not co&pl' ?">
regulations 3entilation and Lig!ting proble&s
>ter reno4ation"ining area and pantr' area and 4isuall' seen entrance
-!e' are onl' treat internal spaces / use urniture, wall
!angers++ect1 as gi4en good appearance
8/18/2019 Galle -Final (Repaired)
17/19
Bed Roo& and Li4ing area
Re$)ed ser
ducts
/Separate
electricit'
telep!one
connections per
regulations1
odi' t!e bat! roo& area
d re&o4ed lou4ered
ndow and )ed >lu&inu&
a&ed window
oble& – can see t!e water
arks on t!e wall not water
8/18/2019 Galle -Final (Repaired)
18/19
&ecommendations
-o obtain detail report ro& no&inated proessionals
@ro&$ Institute o >rc!itecture
8/18/2019 Galle -Final (Repaired)
19/19
Institute o (ngineer
Institute o uantit' sur4e'