14
GWR Engineering, P.C. Consulting Engineers 130 Quarter Mile Rd Charlotte, VT 05445 Tel: (802) 425-2825 [email protected] USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional CHAMPLAIN VALLEY UNION HIGH SCHOOL ADMINISTRATION ERU SCOPE OF WORK MARCH 31, 2021 The following describes the scope of work and installation details for ADDING AN ERU TO THE OUTSIDE AIR SERVING ADMINISTRATION AHU. PROJECT OBJECTIVE SUMMARY & INFORMATION: The CHAMPLAIN VALLEY UNION SCHOOL, looking to increase energy efficiency and improve IAQ, desires to add Energy Recovery to the existing Administration HVAC AHU. This scope of work addresses specific system installations to achieve this result. The existing AHU is a 1993 installation. Controls were upgraded in 2004 with building renovations and then again in 2016, operating on the current school’s FMCS (by TCV). This is a 2500‐cfm supply and return ducted system with fixed OA ducted (12x8) to the return of the unit duct system. An existing MOD opens and closes base on occupancy scheduling for the unit. The owner desires to add an ERU with approximately 500 cfm capacity to achieve 20% OA for the Administration areas served. This new unit would reuse existing OA duct, detaching it from the current AHU RA connection and extending it for OA connection to ERU. Fresh Air from the ERU (tempered thru core) would be fed back into the Admin AHU Return Air duct (as OA was before). A new tap from the existing AHU RA would be required to feed RA to the ERU and a new EA duct will need to be installed, connecting to existing EA duct (for larger AHU) near exterior louver connection (25 feet east). The proposed unit’s size was selected to fit up through the pulldown stair access to this space on the upper level. Unit would be floor mounted on isolation pads. Power from existing panel “MP” in office directly below space will be required for the new ERU. New ERU would operate on current schedule used by Admin AHU for occupancy and reuse the existing OA MOD (add MOD for EA).

GWR Engineering, P.C. Consulting Engineers

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GWR Engineering, P.C. Consulting Engineers

GWR Engineering, P.C. Consulting Engineers

130 Quarter Mile Rd Charlotte, VT 05445 Tel: (802) 425-2825 [email protected]

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

 CHAMPLAIN VALLEY UNION HIGH SCHOOL 

ADMINISTRATION ERU  SCOPE OF WORK MARCH 31, 2021 

 The  following  describes  the  scope  of work  and  installation  details  for  ADDING  AN  ERU  TO  THE OUTSIDE AIR SERVING ADMINISTRATION AHU.   PROJECT OBJECTIVE SUMMARY & INFORMATION:  The CHAMPLAIN VALLEY UNION SCHOOL,  looking to  increase energy efficiency and improve IAQ, desires  to  add  Energy  Recovery  to  the  existing  Administration  HVAC  AHU.  This  scope  of  work addresses specific system installations to achieve this result. The existing AHU is a 1993 installation. Controls were upgraded in 2004 with building renovations and then again in 2016, operating on the current school’s FMCS (by TCV). This is a 2500‐cfm supply and return ducted system with fixed OA ducted  (12x8)  to the return of  the unit duct system. An existing MOD opens and closes base on occupancy scheduling for the unit. The owner desires to add an ERU with approximately 500 cfm capacity to achieve 20% OA for the Administration  areas  served.  This  new unit would  reuse  existing OA duct,  detaching  it  from  the current AHU RA connection and extending  it  for OA connection  to ERU. Fresh Air  from  the ERU (tempered thru core) would be fed back into the Admin AHU Return Air duct (as OA was before).  A new tap from the existing AHU RA would be required to feed RA to the ERU and a new EA duct will need to be installed, connecting to existing EA duct (for larger AHU) near exterior louver connection (25 feet east). The proposed unit’s size was selected to fit up through the pulldown stair access to this space on the upper level. Unit would be floor mounted on isolation pads. Power from existing panel “MP” in office directly below space will be required for the new ERU. New ERU would operate on current  schedule used by Admin AHU  for occupancy and  reuse  the existing OA MOD (add MOD for EA).     

Page 2: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 2

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

SCOPE OF WORK SUMMARY:  

Furnish & install NEW ERU (as specified below). Field verify best location for ductwork configuration. There are 2 options for unit location that provide adequate accessibility. Final location can be at the discretion  of  the  contractor  to  best  suit  their  duct  run  priorities.  Connect  OA  to  existing  OA, bypassing existing unit connection. Install new ductwork for ERU RA, EA & SA. See details below.  

Access for existing ductwork is in open space as shown in the photo on the cover of this document. Field coordination for new DUCTWORK, ELECTRICAL WIRING AND CONTROLS will be required. No detailed duct or electrical plans will be provided by GWR, only conceptual pathways based on 2004 plans  and  site  photos  contained  in  this  document.  Bids  shall  include  all  work  for  a  completely installation with new and reconnected duct, controls and wiring system. 

Insulate new EA ductwork from ERU to exterior wall.  Insulate ALL OA ductwork; new extended to ERU  and  existing  12x8  back  to  louver  (Approximately  25’).  RA  &  SA  ductwork  does  not  require insulation. All new ductwork to be sealed airtight. Seal ductwork before insulation. 

ONLY TCV IS ALLOWED FOR CONTROL WORK ON THIS PROJECT. Their work will be directly to CVUHS and not part of the mechanical scope of work (except coordination as required and installation of EA MOD)  REUSE  –  EXTEND  AHU  controls  to  accommodate  new  ERU  controls  and  functions  where practicable and possible. Reuse controllers as appropriate, add new as required  for new unit and sequence of operation. Some temperature sensing is added. All new points to be set up on FMCS graphics with trending capabilities; modify existing ADMIN AHU graphics adding new equipment and control  points.  Provide  ADD ALTERNATE  2  TO ADD NEW AFS  for measuring OA &  EA  as  part  of controls for new unit. TAB shall measure and verify accuracy.  

Furnish and install new electrical power wiring for the new ERU. Integral disconnect will be provided with new ERU. Unit to be tied into Admin AHU duct smoke shut down, to mimic AHU. 

This unit will not require condensate drainage. 

Start‐up units and complete startup documentation. 

TAB for air flow profiles (+unit profile) of the ERU and all AHU OA/RA/SA & AHU PROFILE DATA. AHU results to be evaluated by GWR to determine extent of possible unit changes to achieve or exceed the  total  2500  cfm  (to  2004  design  values)  –  or  IF  needed.  ADD  ALTERNATE  1:  TAB  to  carry BREAKOUT cost for all administration termination TAB. Refer to  last 2 pages of this document for Mechanical plans of  those areas  to be  covered. ADD ALTERNATE 2: NEW AFS  for measuring and reporting OA & EA shall be installed as part of controls for new unit. TAB shall measure and verify accuracy. 

Provide Commissioning support with Engineer verifying installation and operation to these contract documents. 

Training & Documentation. Provide training on maintenance of new unit. Provide O&M Manuals for unit  and  controls.  Documentation  to  include  AS‐BUILT  CONTROL  Drawings  and  SEQUENCES  OF OPERATION for equipment installed. 

Warrantee  the  installation  for  1  year  from date of  Cx Verification  the UPGRADED  system  is  fully functional and approved for owner turnover (ALL ISSUES LOG ITEMS CLEARED!) 

 

 

Page 3: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 3

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

DETAILED SCOPE OF WORK: 

1 – BUILDING USE & SCHEDULE This work needs to be completed by AUGUST 20, 2021. Space is available for construction activity on JUNE 21, 2021  [coordinate with owner]. Work will  be  contained primarily  to  the Mechanical  space above office area. There will not be any students or faculty activity in these areas during this period. Building access will be controlled by the school’s facility personnel. All work activities on site must be coordinated  and  approved  by  the  school.  Social  distancing may  still  be  in  effect  therefore multiple trades in one space MAY not be allowed. Scheduling to achieve these limitations will be required by the Mechanical Contractor, the prime bidder for this project. 

The existing Administration AHU system shall be maintained in operation as much as possible during this work. Coordinate with owner on unit  shutdown  to perform cut  in work  for new ducts or other work. The AHU serving  the ADMIN cannot be shutdown without notice and approval of  the owner! AHU is NOT recommended to be OFF if space is occupied with more than 4 or 5 occupants for more than 2 to 3 hours, assuming all occupants immunized (COVID), all others appropriately masked. 

2 ‐ DEMOLITION: Remove the connection to AHU RA of the existing 12x8 OA duct [connected to north louver].  The 12x8 duct to be continued over and down to the ERU OA connection.  

 

VIEW LOOKING UP FROM FLOOR. ARROW POINTS SOUTH, AROUND, OVER, AND DOWN TO ERU 

 

Page 4: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 4

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

IT  IS  THE  CONTRACTOR’S  RESPONSIBILITY  TO  FULLY  REVIEW  THE  SITE  CONDITIONS  BEFORE SUBMITTING THIS BID.  

3 – NEW ERU INSTALLATION: Furnish & Install ONE (1) new RENEWAIRE Model # EV450IN ERU AS SPECIFIED BELOW. Location is in mechanical space on floor (below) beside the AHU, above office, options shown below. 

Furnish & Install specified ERU. Provide 1” thick neoprene vibration floor mounting pads. Final location and duct routing must be reviewed and approved by GWR & the owner. Obtain approval before fabrication order. See note in photo below concerning minimizing flow resistance with duct layout. 

Furnish & Install all required ductwork for ERU OA, EA, RA & SA. Flex‐connection to unit. Seal new duct joints. 

 

2 OPTIONS FOR UNIT LOCATION SHOWN ABOVE. FLOOR MOUNT ON VIBRATION ISOLATION PADS 

 

Page 5: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 5

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

 

Cut new 12x8 or equivalent size duct into the existing RA duct approximately where shown above and run to new ERU RA connection. A VD is not anticipated to be needed in this duct run as fan speed should be able to be adjusted, as necessary. However, furnish and install one in the ductwork. 

Provide new 12x8 OR 12” diameter EA ductwork from unit up & through wall EAST to connect to EA duct @ louver on east exterior wall (approx 25’ east, 12’ up). Contractor shall review site before bid and carry all necessary labor, methods and duct fittings and duct to complete this connection. Duct sealed. Install MOD provided by TCV. Locate in Mechanical space, accessible. Insulate all EA duct from ERU to louver plenum conn.. FIELD SKETCH OF DUCT AT LOUVER PLENUM SHOWN: 

 

CIRCLED AREA APPROXIMATE LOCATION FOR CONNECTION OF 12x8 OR 12” DIA EA DUCT. 

Page 6: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 6

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

ACCESS TO THIS DUCT AREA IS THROUGH A SMALL HOLE ABOVE WHERE ERU TO BE LOCATED: 

 

EA DUCT IS LOWER DUCT, RUNS THRU WALL AND ABOUT 25’ TO LOUVER CONNECTION. THIS IS EA DUCT FROM A DIFFERENT UNIT WITH A DIFFERENT SCHEDULE FOR OPERATION.  

RUN NEW 12” DIA OR 12X8 DUCT THRU THIS WALL SO AS NOT TO BLOCK THIS ACCESS. 

Reuse existing OA duct connected to AHU RA. Break duct connection just past MOD before connection to AHU RA duct. Extend OA as new duct to ERU connection; 12X8 OR 12” diameter or equal.  

 

Page 7: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 7

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

Furnish and install new 12” duct from ERU SA connection to AHU RA duct connection. See concept on marked up photo above. 

Insulate new outside & exhaust air ducts with 2” rigid or batt. RA & ERU SA ductwork to AHU ductwork connections does not require insulation. All ductwork to be sealed air tight. 

Provide power as detailed below.  

Provide controls as detailed below. 

 

ERU SPECIFICATION: 

 

Page 8: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 8

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

 MAINTAIN UNIT MAINTENANCE CLEARANCES WHEN LOCATING AND DUCTING UNIT. 

 

 

CONTRACTOR TO DETERMINE IF 12X8 FLANGES OR 10” BEST SUITS THEIR INSTALLATION. NOTE:

Page 9: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 9

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

4 – ELECTRICAL SCOPE  PROVIDE  NEW  208V/  1  PH  POWER  TO NEW  ERU  FROM  PANEL  “MP”  LOCATED  IN WALL  OF  OFFICE DIRECTLY BELOW UNIT LOCATION. TWO SPARE SLOTS AVAILABLE IN THIS PANEL. IDENTIFY CIRCUIT DATA AT ERU DISCONNECT WITH PERMANENT LABEL. UPDATE PANEL SCHEDULE APPROPRIATELY. 

    

5 – NEW CONTROLS:  Note: Existing building FMCS is an Automated Logic system provided by TCV. Only TCV is approved to bid on  this  project,  no  alternates  allowed.  Only  TCV  shall  furnish  and  install  new  control  hardware  and software. TCV WILL WORK DIRECTLY FOR CVUHS ON THIS PROJECT. 

Web CTRL FMCS software is to be modified as required to provide new control functions to achieve final sequence of operations. 

Furnish and install all control hardware and software for FMCS operation, trending, and alarming of the new ERU to achieve compliance with the new sequence of operation. 

Upgrade existing graphics screen to  include all  controlled and monitored parameters  for  the new unit SYSTEM. 

Page 10: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 10

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

ERU SEQUENCE OF OPERATION:         [subject to expansion based on reviews with TCV] 

SCHEDULED OPERATION:  

ERU  SHALL  OPERATE  IN  PARALLEL  WITH  THE  AHU  FOR  THE  ADMINISTRATION.  LINK  TO EXISTING SCHEDULING, NO CHANGES 

OCCUPIED MODE: 

ERU OA & EA MOD’S SHALL OPEN 

ERU FANS SHALL BE ENABLED ON TO SPEED SET THRU TAB TO ACHIEVE 500 CFM. 

MONITOR  ERU  OA,  EA,  RA  &  SA  TEMPERATURES  FOR  TRENDING  AND  ERU  EFFECTIVENESS CALCULATION. 

DISPLAY  ERU  CALCULATED  EFFECTIVENESS  ON  GRAPHICS  SCREEN  BASED  ON  CALCULATED RESULT  FROM  TEMPERATURE  PROFILES.  THIS  EFFECTIVENESS  IS  ONLY  VALID  WITH  UNIT RUNNING (ADD THIS NOTE TO SCREEN).  

 

MONITOR/TREND/ALARM FAN CMD & STATUS; MOD CMD 

MONITOR TREND AFS ON OA/EA AS ADD ALTERNATE 

UNOCCUPIED MODE: 

SAME AS AHU, MOD’S CLOSE & FANS ARE DISABLED. IN UNOCCUPIED MODE, SHOULD AHU BE CALLED ON FOR HEATING, ERU SHALL REMAIN DISABLED.  

DAT CONTROL: 

o THERE IS NONE, IT IS ONLY MONITORED. ALARM AND SHUT DOWN UNIT IF DAT FORM ERU DROPS BELOW 38F. 

FREE COOLING: 

THERE IS NO BYPASS ON THIS INSTALLATION. IT IS POSSIBLE TO DISABLE EA FAN SHOULD FREE COOLING BECOME AVAILABLE. HOWEVER, WITH A 500 TO 2500 RATIO, THE EFFECTIVENESS OF SUCH ID DEEM TOO LOW TO VALIDATE THE COST TO PROGRAM IN A FREE COOLING CYCLE AT THIS TIME. PROVIDE OWNER A COST TO DO SUCH SO IT CAN BE EVALUATED. 

SAFETIES & ALARMS: 

ALARM ON LOSS OF FAN STATUS AS ‘ON’ WITH ENABLE CMD 

ALARM IF DAT DROPS BELOW 38F WEN ERU IS ENABLED. 

TIE ERU FAN MOTOR ENABLE/POWER TO AHU SMOKE SHUT DOWN SIGNAL TO SHUT DOWN ERU SHOULD AHU BE SHUT DOWN ON DUCT SMOKE ALARM 

TRENDING POINTS SET UP FOR COLLECTION AND TRENDS FOR 1 YEAR ON: 

ALL 4 ERU TEMPERATURE PROFILES 

ERU EFFECTIVENESS 

Page 11: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 11

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

SA & EA FAN CMD & STATUS 

MOD CMD 

AFS CFM AS ADD ALTERNATE 

ADDITIONAL POINTS/SEQUENCES MAY BE ADDED AS REVIEWED THRU SHOP DRAWING PROCESS. 

 

6 – STARTUP & COMMISSIONING:  GWR Engineering proposes to oversee the implementation of this work and commission the system to verify their operation to the intent of this scope of work. Prepare the unit for startup and perform and document the startup following the installation manual and noted as follows: 

PREFUNCTIONAL checks ‐  Installation verification: When the unit  installation is completed and the contractor is ready to perform startup, contact the owner & engineer for verification of installation. DO NOT PERFORM STARTUP without this verification. 

Once  installation review has been made, any non‐conformances or deficiencies  identified shall be corrected. Notify the engineer and owner of their corrections for final verification of installation and authorization to perform startup. 

Once authorization for startup has been given, startup systems and controls (may be separate times) in coordination with engineer & owner on site following the installation/startup manual procedures. 

The  contractor  shall  complete  (and  provide  the  owner  with  a  copy)  a  startup  report  that  shall document the systems checks and functional operation verifications.  

The  contractor  shall  review  with  the  owner  all  specific  startup  procedures  and  operations  that involve the installed systems that may be of importance in operation or maintenance.  

The owner shall sign off on an acceptance of installation form provide by the contractor indicating the date this review was performed and who the attending parties were on site for this procedure. 

 

7 – CLOSEOUT & OWNER TURNOVER REQUIREMENTS:  

Contractor to provide the following: 

Documentation on the startup and owner acceptance of an operational demonstration. 

Provide a complete set of Operations & Maintenance Manuals for all installed systems. 

Contractor  shall  review  the  maintenance  procedures  on  all  equipment,  devices  and  systems installed. 

The  contractor  shall warrantee  the work  for  a period of  1  year  from  the date of  the acceptance document noted above. The contractor shall provide the owner with this warrantee document. 

CONTROL  SYSTEM  shall  have  a  complete  review  and  verification  of  the  required  sequences  of operation  by  GWR  Engineering.  Any  deficiencies  or  Issues  identified  shall  be  corrected  to  the satisfaction of GWR Engineering before final payment on this project is made. 

 

Page 12: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 12

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

8 – BIDDING:  

The school will be providing a bid document that WILL IDENTIFY THE REQUIREMENTS FOR INSURANCE AND SITE WORKING CONDITIONS.  

BIDS  WILL  BE  DUE  ON  APRIL  16,  2021  @  2:30  PM  (SEE  SCHOOL  DISTRICT  BIDDING REQUIREMENT DOCUMENTS ASSOCIATED WITH THIS SCOPE OF WORK). ALL BIDS TO BE EMAILED TO Bill Root, CHRIS GIARD & TOM MONGEON. 

THE BOARD WILL AWARD CONTRACT ON APRIL 23, 2021 based on compliance to bidding documents and pricing. 

Provide a base bid that includes all work as identified above. There are no add alternates on this project currently. 

IF  the  contractor wishes  to provide additional work outside  this  scope,  all  these  items must be  listed separately for independent evaluation by the engineer and school. 

9 – QUESTIONS:  

Bill  Root,  PE  at  GWR  can  be  contacted  if  there  are  technical  questions,  need  for  clarifications  or explanation of anything in this scope of work.  

 

10 – SITE VISIT: REQUIRED 

SITE VISIT IS SCHEDULED FOR APRIL 7, 2021 @ 2:30.     Respectfully submitted,

Bill Gordon (Bill) W. Root, Jr., P.E., HBDP, LEED AP, President

ASHRAE High-Performance Building Design Certified Professional

GWR Engineering, PC 130 Quarter Mile Rd Charlotte VT 05445 [email protected] 802-425-2825

Page 13: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 13

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

ADMINISTRATION OFFICES – CFM TAB DATA FOR COST BREAKOUT

Page 14: GWR Engineering, P.C. Consulting Engineers

CVUHS ADMIN ERU -- March 31, 2021 Page 14

USGBC LEED Accredited & ASHRAE High-Performance Building Design Certified Professional

SECOND FLOOR PLAN – ASSUME 100 CFM EACH OUTLET

[Need to review 1993 plans to get these cfm values to match original design]