    Building Information - Riverside Local Local SD (47894) - Hadden Elementary

    Program Type Expedited Local Partnership Program (ELPP)

    Setting Small City

    Assessment Name Copy of Hadden Elementary - F inal

    Assessment Date 2008-03-11

    Cost Set: 2007

    Building Name Hadden Elementary

    Building IRN 14811

    Building Address 1800 Mentor Ave

    Building City Painesville

    Building Zipcode 44077

    Building Phone 440-354-4414

    Acreage 10

    Current Grades K-5

    Teaching Stations 16

    Number of Floors 2

    Student Capacity 266

    Current Enrollment 311

    Enrollment Date 2007-08-23

    Enrollment Date is the date in which the current enrollment was taken.

    Number of Classrooms 14

    Historical Register NO

    Buildings Principal Mr. Tim St. Clair

    Building Type Elementary

    Next Page

    Report Generated at 26 Aug 2008 16Building Information - Riverside Local Local SD (47894) - Hadden Elementary Page 1

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    2/48

    Building Pictures - Riverside Local Local SD(47894) - Hadden Elementary(14811)

    North elevation photo: East elevation photo:

    South elevation photo: West elevation photo:

    GENERAL DESCRIPTION

    33,231 Total Existing Square Footage

    1932,1942,1952,1994 Building Dates

    K-5 Grades

    311 Current Enrollment

    16 Teaching Stations

    10 Site Acreage

    Hadden Elementary School is a two (2) story structure totaling 33,231 s.f. The original facility of 19,184 s.f. was constructed in 1932. A small classroom wing and kitchen additioof 3,527 s.f. were constructed in 1942. A classroom wing addition of 5,698 s.f. was constructed in 1952. The media center addition totaling 4,822 s.f . was constructed in 1994. Thfacility contains one (1) gymnasium of 3,499 s.f. which also serves as student dining, one (1) kitchen of 778 s.f. and one (1) media center of 1,259 s.f. Hadden Elementarycurrently provides space for grades K-5. The complex provides partial accessibility, but does not fully conform to the provisions of the Americans with Disabilities Act Guidelines.The second floor of the school facili ty is not accessible except by a stairway lift . Typical classrooms throughout the complex are undersized and do not conform to the current

    standards established by the State of Ohio. The school facility is located on a 10 acre site in a residential area. School buses load/unload along the main entry drive which shareaccess with the vehicular traffic. The existing structure is constructed with load bearing masonry walls with supported deck and slab on grade construction. The structure isoutfitted with a motion sensor security system and a fire alarm system with manual pull stations. The complex does not contain a suppression system. A portion of the 1994addition is equipped with an air conditioning system.

    Previous Page

    Next Page

    Report Generated at 26 Aug 2008 16Building Pictures - Riverside Local Local SD(47894) - Hadden Elementary(14811) Page 2

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    3/48

    Building Construction Information - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Name Year Handicapped Access Floors Square Feet

    Original Building 1932 no 2 19,184

    Classroom/Kitchen Addition 1942 no 2 3,527

    Classroom Wing Addition 1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Previous Page

    Next Page

    Report Generated at 26 Aug 2008 16Building Construction Information - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 3

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    4/48

    Building Component Information - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    AdditionAuditorium

    FixedSeating

    CorridorsAgriculturalEducation

    Lab

    PrimaryGymnasium

    MediaCenter

    VocationalSpace

    StudentDining

    Kitchen NatatoriumIndoorTracks

    AdultEducation

    BoardOffices

    OutsideAgencies

    AuxiliaryGymnasiu

    Original Building(1932)

    4032 3499

    Classroom/KitchenAddition (1942)

    778

    Classroom WingAddition (1952)

    1716

    Media Center Addition

    (1994) 770 1259

    Master Planning Considerations

    Previous Page

    Next Page

    Report Generated at 26 Aug 2008 16Building Component Information - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 4

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    5/48

    Existing CT Programs for AssessmentNext Page

    Previous Page

    Program Type Program Name Related Space Square Feet

    No Records Found

    Legend:

    Not in current design manual

    In current design manual but missing from assessment

    Report Generated at 26 Aug 2008 16: Page 5

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    6/48

    Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Building Summary - Hadden Elementary (14811)

    District: Riverside Local Local SD

    Name: Hadden Elementary

    Address: 1800 Mentor Ave

    Painesville,OH 44077

    Bldg. IRN: 14811

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Tim St. Clair

    Phone: 440-354-4414

    Date Prepared: 2008-03-11 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades K-5 Acreage: 10

    Proposed Grades N/A Teaching Stations: 16

    Current Enrollment 311 Classrooms: 14

    Projected Enrollment N/A

    Addition Date HA Number ofFloors

    Current SquareFeet

    Original Building 1932 no 2 19,184

    Classroom/KitchenAddition

    1942 no 2 3,527

    Classroom Wing Addition 1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Total 33,231

    *HA = Handicapped Access

    *Rat ing =1 Sat isfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $963,699.00 -

    B. Roofing 3 $118,687.00 -

    C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $523,388.25 -

    E. Plumbing and Fixtures 3 $189,231.50 -

    F. Windows 3 $113,795.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $100,840.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $524,958.00 -

    K. Interior Lighting 3 $166,155.00 -

    L. Security Systems 3 $83,077.50 -

    M. Emergency/Egress Lighting 3 $33,231.00 -

    N. Fire Alarm 3 $49,846.50 -

    O. Handicapped Access 3 $322,940.90 -

    P. Site Condition 3 $292,852.50 -

    Q. Sewage System 1 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $24,000.00 -

    T. Hazardous Material 3 $22,800.00 -

    U. Life Safety 3 $263,000.75 -

    V. Loose Furnishings 3 $113,636.00 -

    W. Technology 3 $354,907.08 -

    - X. Construction Contingency /Non-Construction Cost

    - $1,036,882.93 -

    Total $5,297,928.91

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 162 81% Satisfacto

    2.0Structural and Mechanical Features 400 270 68% Borderl

    3.0Plant Maintainability 200 128 64% Borderl

    4.0Building Safety and Security 400 294 74% Satisfacto

    5.0Educational Adequacy 400 244 61% Borderl

    6.0Environment for Education 400 266 67% Borderl

    Commentary

    Total 2000 1364 68% Borderl

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $5,518,322

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Previous Page

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 6

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    7/48

    Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Original Building (1932) Summary

    District: Riverside Local Local SD

    Name: Hadden Elementary

    Address: 1800 Mentor Ave

    Painesville,OH 44077

    Bldg. IRN: 14811

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Tim St. Clair

    Phone: 440-354-4414

    Date Prepared: 2008-03-11 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades K-5 Acreage: 10

    Proposed Grades N/A Teaching Stations: 16

    Current Enrollment 311 Classrooms: 14

    Projected Enrollment N/A

    Addition Date HA Number ofFloors

    Current SquareFeet

    Original Building 1932 no 2 19,184

    Classroom/KitchenAddition

    1942 no 2 3,527

    Classroom Wing Addition 1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Total 33,231

    *HA = Handicapped Access

    *Rat ing =1 Sat isfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $556,336.00 -

    B. Roofing 3 $52,439.00 -

    C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $302,148.00 -

    E. Plumbing and Fixtures 3 $156,944.00 -

    F. Windows 3 $71,060.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $65,010.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $360,268.00 -

    K. Interior Lighting 3 $95,920.00 -

    L. Security Systems 3 $47,960.00 -

    M. Emergency/Egress Lighting 3 $19,184.00 -

    N. Fire Alarm 3 $28,776.00 -

    O. Handicapped Access 3 $292,818.40 -

    P. Site Condition 3 $210,274.00 -

    Q. Sewage System 1 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $16,000.00 -

    T. Hazardous Material 3 $22,800.00 -

    U. Life Safety 3 $112,348.00 -

    V. Loose Furnishings 3 $76,736.00 -

    W. Technology 3 $204,885.12 -

    - X. Construction Contingency /Non-Construction Cost

    - $655,048.53 -

    Total $3,346,955.05

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 162 81% Satisfacto

    2.0Structural and Mechanical Features 400 270 68% Borderl

    3.0Plant Maintainability 200 128 64% Borderl

    4.0Building Safety and Security 400 294 74% Satisfacto

    5.0Educational Adequacy 400 244 61% Borderl

    6.0Environment for Education 400 266 67% Borderl

    Commentary

    Total 2000 1364 68% Borderl

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $3,486,188

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 7

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    8/48

    Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Classroom/Kitchen Addition (1942) Summary

    District: Riverside Local Local SD

    Name: Hadden Elementary

    Address: 1800 Mentor Ave

    Painesville,OH 44077

    Bldg. IRN: 14811

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Tim St. Clair

    Phone: 440-354-4414

    Date Prepared: 2008-03-11 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades K-5 Acreage: 10

    Proposed Grades N/A Teaching Stations: 16

    Current Enrollment 311 Classrooms: 14

    Projected Enrollment N/A

    Addition Date HA Number ofFloors

    Current SquareFeet

    Original Building 1932 no 2 19,184

    Classroom/KitchenAddition

    1942 no 2 3,527

    Classroom Wing Addition 1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Total 33,231

    *HA = Handicapped Access

    *Rating =1Satisfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $102,283.00 -

    B. Roofing 3 $19,943.00 -

    C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $55,550.25 -

    E. Plumbing and Fixtures 3 $12,344.50 -

    F. Windows 3 $20,625.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $8,455.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $51,141.50 -

    K. Interior Lighting 3 $17,635.00 -

    L. Security Systems 3 $8,817.50 -

    M. Emergency/Egress Lighting 3 $3,527.00 -

    N. Fire Alarm 3 $5,290.50 -

    O. Handicapped Access 3 $18,452.70 -

    P. Site Condition 3 $21,390.50 -

    Q. Sewage System 1 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $2,000.00 -

    T. Hazardous Material 3 $0.00 -

    U. Life Safety 3 $96,462.75 -

    V. Loose Furnishings 3 $14,108.00 -

    W. Technology 3 $37,668.36 -

    - X. Construction Contingency /Non-Construction Cost

    - $120,622.31 -

    Total $616,316.87

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 162 81% Satisfacto

    2.0Structural and Mechanical Features 400 270 68% Borderl

    3.0Plant Maintainability 200 128 64% Borderl

    4.0Building Safety and Security 400 294 74% Satisfacto

    5.0Educational Adequacy 400 244 61% Borderl

    6.0Environment for Education 400 266 67% Borderl

    Commentary

    Total 2000 1364 68% Borderl

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $641,955

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary isrequested from a Master Plan.

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 8

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    9/48

    Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Classroom Wing Addition (1952) Summary

    District: Riverside Local Local SD

    Name: Hadden Elementary

    Address: 1800 Mentor Ave

    Painesville,OH 44077

    Bldg. IRN: 14811

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Tim St. Clair

    Phone: 440-354-4414

    Date Prepared: 2008-03-11 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades K-5 Acreage: 10

    Proposed Grades N/A Teaching Stations: 16

    Current Enrollment 311 Classrooms: 14

    Projected Enrollment N/A

    Addition Date HA Number ofFloors

    Current SquareFeet

    Original Building 1932 no 2 19,184

    Classroom/KitchenAddition

    1942 no 2 3,527

    Classroom WingAddition

    1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Total 33,231

    *HA = Handicapped Access

    *Rating =1Satisfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $165,242.00 -

    B. Roofing 3 $12,551.00 -

    C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $89,743.50 -

    E. Plumbing and Fixtures 3 $19,943.00 -

    F. Windows 3 $22,110.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $15,655.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $82,621.00 -

    K. Interior Lighting 3 $28,490.00 -

    L. Security Systems 3 $14,245.00 -M. Emergency/Egress Lighting 3 $5,698.00 -

    N. Fire Alarm 3 $8,547.00 -

    O. Handicapped Access 3 $10,469.80 -

    P. Site Condition 3 $33,441.00 -

    Q. Sewage System 1 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $0.00 -

    T. Hazardous Material 3 $0.00 -

    U. Life Safety 3 $38,518.50 -

    V. Loose Furnishings 3 $22,792.00 -

    W. Technology 3 $60,854.64 -

    - X. Construction Contingency /Non-Construction Cost

    - $153,528.42 -

    Total $784,449.86

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 162 81% Satisfacto

    2.0Structural and Mechanical Features 400 270 68% Borderl

    3.0Plant Maintainability 200 128 64% Borderl

    4.0Building Safety and Security 400 294 74% Satisfacto

    5.0Educational Adequacy 400 244 61% Borderl

    6.0Environment for Education 400 266 67% Borderl

    Commentary

    Total 2000 1364 68% Borderl

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $817,082

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary isrequested from a Master Plan.

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 9

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    10/48

    Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Media Center Addition (1994) Summary

    District: Riverside Local Local SD

    Name: Hadden Elementary

    Address: 1800 Mentor Ave

    Painesville,OH 44077

    Bldg. IRN: 14811

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Tim St. Clair

    Phone: 440-354-4414

    Date Prepared: 2008-03-11 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades K-5 Acreage: 10

    Proposed Grades N/A Teaching Stations: 16

    Current Enrollment 311 Classrooms: 14

    Projected Enrollment N/A

    Addition Date HA Number ofFloors

    Current SquareFeet

    Original Building 1932 no 2 19,184

    Classroom/KitchenAddition

    1942 no 2 3,527

    Classroom Wing Addition 1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Total 33,231

    *HA = Handicapped Access

    *Rating =1Satisfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $139,838.00 -

    B. Roofing 3 $33,754.00 -

    C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $75,946.50 -

    E. Plumbing and Fixtures 3 $0.00 -

    F. Windows 3 $0.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $11,720.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $30,927.50 -

    K. Interior Lighting 3 $24,110.00 -

    L. Security Systems 3 $12,055.00 -

    M. Emergency/Egress Lighting 3 $4,822.00 -

    N. Fire Alarm 3 $7,233.00 -

    O. Handicapped Access 3 $1,200.00 -

    P. Site Condition 3 $27,747.00 -

    Q. Sewage System 1 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $6,000.00 -

    T. Hazardous Material 3 $0.00 -

    U. Life Safety 3 $15,671.50 -

    V. Loose Furnishings 3 $0.00 -

    W. Technology 3 $51,498.96 -

    - X. Construction Contingency /Non-Construction Cost

    - $107,683.66 -

    Total $550,207.12

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 162 81% Satisfacto

    2.0Structural and Mechanical Features 400 270 68% Borderl

    3.0Plant Maintainability 200 128 64% Borderl

    4.0Building Safety and Security 400 294 74% Satisfacto

    5.0Educational Adequacy 400 244 61% Borderl

    6.0Environment for Education 400 266 67% Borderl

    Commentary

    Total 2000 1364 68% Borderl

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $573,095

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary isrequested from a Master Plan.

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 10

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    11/48

    Facility Assessment

    A. Heating System

    Description: The existing system for the original building, the 1942 addition and the 1952 addition is a gas fired low pressure steam boiler system. The boilerinstallations were updated in 1993. The existing system for the media center addition is a hot water boiler system which is original to date ofconstruction. A limited portion of the 1994 addition is equipped with air conditioning. Typical classrooms throughout the complex are equippedwith unit ventilators.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of the entire heating/ventilation and cooling system throughout the entire complex due to condition, use of

    dated equipment and lack of proper ventilation and ai r conditioning. Convert to fully ducted system to conform to OSDM standards and currentventilation requirements.

    Item Cost Unit WholeBuilding

    OriginalBuilding(1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    HVAC SystemReplacement:

    $22.00sq.ft. Required Required Required Required $731,082.00(includes demo of existing system andreconfiguration of piping layout and new controair conditioning)

    Convert To DuctedSystemReplacement

    $7.00sq.ft. Required Required Required Required $232,617.00(includes cost for vert. & horz. chases, cutopenings, soffits, etc. Must be used in additionHVAC System Replacement if the existing HVAsystem is non-ducted)

    Sum: $963,699.00 $556,336.00 $102,283.00 $165,242.00 $139,838.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 11

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    12/48

    Facility Assessment

    B. Roofing

    Description: The existing roof assembly for the entire complex is comprised of various roofing systems inclusive of slate and modified bituminous. Thesystems range in date of installation from 1932-1994. The majority of the existing system installations exceed 15 years of age. District officialsnoted the roof was actively leaking.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of the existing roof systems due to condition and extent of dated system installations. Provide an OSDMcompliant membrane system at all low slope areas. Replace the original slate shingle system with a new asphalt shingle system.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom Wing Addition(1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comments

    Asphalt Shingle: $2.85sq.ft.(Qty)

    4,940 Required $14,079.00

    Membrane (alltypes):

    $7.00sq.ft.(Qty)

    5,480 Required 2,849 Required 1,793 Required 4,822 Required $104,608.00(unless under 10,0sq.ft.)

    Sum: $118,687.00 $52,439.00 $19,943.00 $12,551.00 $33,754.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 12

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    13/48

    Facility Assessment

    C. Ventilation / Air Conditioning

    Description: A limited portion of the complex is equipped with air conditioning. The technology lab and the media center at the 1994 addition are equipped withair conditioning provided by roof mounted equipment. Window cooling units are provided in a few areas. The majority of the complex is notprovided with an air conditioning system.

    Rating: 1 Satisfactory

    Recommendations: Provide an air conditioning system throughout the entire complex to conform to OSDM standards. Provisions identified in Plate A.

    Item CostUnitWhole BuildingOriginal Building (1932)19,184 ft

    Classroom/Kitchen Addition (1942)3,527 ft

    Classroom Wing Addition (1952)5,698 ft

    Media Center Addition (1994)4,822 ft

    SumComments

    Sum: $0.00 $0.00 $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 13

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    14/48

    Facility Assessment

    D. Electrical Systems

    Description: The electrical system for the complex is a split-phase (3 wire, single-phase) 208/120v 400 amp service. A separate 3 phase service l ine wasextended to serve the roof mounted condensing unit at the 1994 addition. Dated equipment remains in service in many areas.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of the electrical system due to age, condition, and lack of distribution capacity. Provide a 3 phase servicethroughout the entire complex.

    Item Cost Unit WholeBuilding

    OriginalBuilding(1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    ClassroomWing Addition(1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    SystemReplacement:

    $15.75sq.ft. Required Required Required Required $523,388.25(Includes demo of existing system. Includes generatofor life safety systems. Does not include telephone ordata cable or equipment) (Use items below ONLY whthe entire system is NOT being replaced)

    Sum: $523,388.25 $302,148.00 $55,550.25 $89,743.50 $75,946.50

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 14

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    15/48

    Facility Assessment

    E. Plumbing and Fixtures

    Description: The school facility contains 6 group restrooms (3 girls, 3 boys) and 2 single occupancy toilet rooms. Fixtures are a combination of newer andolder equipment. Water closets/toilets are typically floor mounted. The majority of the toilet facilities are not accessible and do not conform to theprovisions of the ADA. The restrooms at the 1994 addition provide accessible accommodations. The lavatory installations are lacking pipeinsulation. Domestic supply piping is a combination of copper and galvanized pipe. A portion of the toilet facilities at the 1932 addition wererenovated to provide accessible accommodations. However, the modifications are incomplete and/or are an inappropriate application of the ADAguidelines. A portion of the urinals are equipped with a continual flush system.

    Rating: 3 Needs Replacement

    Recommendations: Provide for replacement of all wall and floor mounted fixtures at the 1932 and 1942 additions due to age, condition, and/or OSDM requirements.Replace domestic supply piping at dated portions of the complex. The restrooms at the 1994 addition are satisfactory.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom Wing Addition(1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comments

    Domestic SupplyPiping:

    $3.50sq.ft. Required Required Required $99,431.50(remove / replace)

    Toilet: $3,800.00unit 14 Required $53,200.00(new)

    Urinal: $3,800.00unit 7 Required $26,600.00(new)

    Sink: $2,500.00unit 4 Required $10,000.00(new)

    Sum: $189,231.50 $156,944.00 $12,344.50 $19,943.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 15

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    16/48

    Facility Assessment

    F. Windows

    Description: The window assemblies at the 1932, 1942, and 1952 additions were updated in approximately 1994 with thermally efficient window asemblieswith double pane glazing. Inset panels at the 1942 and 1952 additions reduced daylight quantities. Distr ict officials noted the assemblies at the1932 structure were prone to leaking. The 1994 media center addition is equipped with thermally efficient window assemblies with insulatedglazing. The window installations are operable and cannot be equipped with integral blinds.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of all window assemblies at the 1932, 1942, and 1952 structures to conform to OSDM standards and include

    integral blinds. The window installations at the media center addition are satisfactory.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom Wing Addition(1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comments

    InsulatedGlass/Panels:

    $55.00sq.ft.(Qty)

    1,292 Required 375 Required 402 Required $113,795.00(includesblinds)

    Sum: $113,795.00 $71,060.00 $20,625.00 $22,110.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 16

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    17/48

    Facility Assessment

    G. Structure: Foundation

    Description: The existing complex contains a masonry/concrete foundation system. There were no significant areas of deterioration, cracking, or settlement.

    Rating: 1 Satisfactory

    Recommendations: No work is required at this time.

    Item CostUnitWhole BuildingOriginal Building (1932)

    19,184 ft

    Classroom/Kitchen Addition (1942)

    3,527 ft

    Classroom Wing Addition (1952)

    5,698 ft

    Media Center Addition (1994)

    4,822 ft

    SumComments

    Sum: $0.00 $0.00 $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 17

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    18/48

    Facility Assessment

    H. Structure: Walls and Chimneys

    Description: The existing structure is constructed with masonry bearing wall assemblies with brick exteriors. There are several areas of deterioration,especially at the 1932 addition. The 1994 addition is equipped with control joints.

    Rating: 2 Needs Repair

    Recommendations: Provide masonry cleaning, tuckpointing, masonry repairs, and sealing. Replace deteriorated wood trim and paint existing cornice panels andwood trim.

    Item Cost Unit WholeBuilding

    OriginalBuilding (1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    Tuckpointing: $7.50sq.ft.(Qty)

    1,600 Required 405 Required 716 Required $20,407.50(wall surface)

    Exterior MasonryCleaning:

    $1.50sq.ft.(Qty)

    6,396 Required 2 ,025 Required 3,582 Required 4,488 Required $24,736.50(wall surface)

    Exterior MasonrySealing:

    $1.00sq.ft.(Qty)

    6,396 Required 2 ,025 Required 3,582 Required 4,488 Required $16,491.00(wall surface)

    Exterior Caulking: $2.50ln.ft. 68 Required 142 Required 100 Required 200 Required $1,275.00(removing and replacing)

    Replace Brick VeneerSystem:

    $30.00sq.ft.(Qty)

    100 Required 36 Required $4,080.00(total removal and replacemincluding pinning and shoring

    Masonry LintelReplacement:

    $250.00ln.ft. 30 Required $7,500.00(total removal and replacemincluding pinning and shoring

    Sill Replacement: $45.00ln.ft. 30 Required $1,350.00(remove and replace)

    Other: Replace woodtrim and paint

    $25,000.00allowance Required $25,000.00Replace deteriorated woodtrim and provide exterior

    paintingSum: $100,840.00 $65,010.00 $8,455.00 $15,655.00 $11,720.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 18

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    19/48

    Facility Assessment

    I. Structure: Floors and Roofs

    Description: The floor construction for the entire complex is slab on grade construction and steel joist system. The roof system is a steel joist system and awood truss assembly over concrete decking. There was no significant evidence of deterioration.

    Rating: 1 Satisfactory

    Recommendations: No work is required at this time.

    Item CostUnitWhole BuildingOriginal Building (1932)19,184 ft Classroom/Kitchen Addition (1942)3,527 ft Classroom Wing Addition (1952)5,698 ft Media Center Addition (1994)4,822 ft SumComments

    Sum: $0.00 $0.00 $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 19

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    20/48

    Facility Assessment

    J. General Finishes

    Description: The current finishes at the 1932, 1942, and 1952 buildings are dated. Casework is wood and worn. The majority of the complex is lackinglockers/cubbies. The corridors are equipped with coat hooks. Distr ict officials did not provide the specific date of kitchen equipment but noted themajority of the equipment was updated except for the range hood. The majority of the finishes at the 1994 addition are satisfactory.

    Rating: 3 Needs Replacement

    Recommendations: Provide for replacement of all finishes, casework, and lockers/cubbies due to age/condition and extent of renovation work at the 1932, 1942, and1952 additions. Replace the existing kitchen exhaust hood. Replace/repair finishes disturbed by proposed renovation work at the 1994 addition.

    Replace deteriorated carpeting at the media center.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    Paint: $2.00sq.ft. Required $9,644.00(partial finish - floorarea/prep and installation

    Acoustic Ceiling: $3.50sq.ft.(Qty)

    4,822 Required $16,877.00(partial finish - tear out anreplace per area)

    Carpet: $3.50sq.ft.(Qty)

    1,259 Required $4,406.50(partial finish - tear-out anreplace per area)

    Complete Replacement ofFinishes and Casework:

    $14.30sq.ft. Required Required Required $406,248.70(elementary, per buildingarea, with removal ofexisting)

    Toilet Partitions: $1,000.00perstall

    14 Required $14,000.00(removing and replacing)

    Toilet AccessoryReplacement

    $0.20sq.ft. Required Required Required $5,681.80(per building area)

    Kitchen Exhaust Hood: $68,100.00perunit

    1 Required $68,100.00

    Sum: $524,958.00 $360,268.00 $51,141.50 $82,621.00 $30,927.50

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 20

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    21/48

    Facility Assessment

    K. Interior Lighting

    Description: The entire complex contains fluorescent and incandescent lighting. Lighting levels are: student dining/gymnasium 16.6 FC, art/music classroom44.4 FC, media center 72.5 FC, and typical classrooms 40-46.1 FC.

    Rating: 3 Needs Replacement

    Recommendations: Provide complete replacement of lighting due to addition of suppression system, HVAC system, and under illuminated spaces.

    Item Cost Unit WholeBuilding Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    Complete Building LightingReplacement

    $5.00sq.ft. Required Required Required Required $166,155.00Includes demo ofexisting fixtures

    Sum: $166,155.00 $95,920.00 $17,635.00 $28,490.00 $24,110.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 21

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    22/48

    Facility Assessment

    L. Security Systems

    Description: The current security system is a motion sensor security system with magnetic lock controlled entry. Site lighting is provided by a combination ofbuilding mounted and a few pole mounted fixtures. The provisions provide limited illumination of the exterior site.

    Rating: 3 Needs Replacement

    Recommendations: Provide upgrade of the current security system and exterior lighting to conform to OSDM standards.

    Item Cost Unit WholeBuilding Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom Wing Addition(1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comments

    Security System: $1.50sq.ft. Required Required Required Required $49,846.50(complete, area ofbuilding)

    Exterior SiteLighting:

    $1.00sq.ft. Required Required Required Required $33,231.00building

    Sum: $83,077.50 $47,960.00 $8,817.50 $14,245.00 $12,055.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 22

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    23/48

    Facility Assessment

    M. Emergency/Egress Lighting

    Description: The complex is equipped with exit signs and emergency egress lighting. The system was updated in the recent past. A portion of the existingfixture installations are ceiling mounted and will be disturbed by recommended renovation work.

    Rating: 3 Needs Replacement

    Recommendations: Provide complete replacement of the emergency/egress lighting due to addition of sprinkler and HVAC systems.

    Item Cost Unit WholeBuilding Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comments

    Emergency/EgressLighting:

    $1.00sq.ft. Required Required Required Required $33,231.00(complete, area ofbuilding)

    Sum: $33,231.00 $19,184.00 $3,527.00 $5,698.00 $4,822.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 23

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    24/48

    Facility Assessment

    N. Fire Alarm

    Description: The complex is equipped with a fire alarm system with manual pull stations with zoned detection and horn/strobe signals. The existing system islacking horn/strobe signals in a portion of the occupiable rooms/space. The media center addition is equipped with smoke detectors. A portion ofequipment is ceiling mounted and will be disturbed by recommended renovation work.

    Rating: 3 Needs Replacement

    Recommendations: Provide complete replacement of the fire alarm system. Provide an addressable system with horn/strobe signals in all occupiable rooms/spacesthroughout the entire complex.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    Fire AlarmSystem:

    $1.50sq.ft. Required Required Required Required $49,846.50(complete new system, includingremoval of existing)

    Sum: $49,846.50 $28,776.00 $5,290.50 $8,547.00 $7,233.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 24

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    25/48

    Facility Assessment

    O. Handicapped Access

    Description: The existing complex provides partial accessibility but does not fully conform to the provisions of the ADA guidelines in all areas. A portion of thetoilet rooms/restrooms at the 1932 addition were renovated to provide accessible accommodations. However, the modifications are incompleteand/or are an inappropriate application of the ADA guidelines. A portion of the existing door assemblies do not provide the required maneuveringclearances. The majority of the existing door installations are equipped with lever hardware but a portion of the existing doors are dated. A portionof the facilitys means of egress door assemblies are not accessible due to interior and exterior level changes. An exterior ramp assembly iswood. A portion of drinking fountains are accessible but do not provide multi -height accommodations. A stair assembly at the 1932 addition isequipped with a lift to provide access to the second floor. The 1994 addition was designed to provide accessible accommodations but the existingtoilet room lavatories are lacking pipe insulation protection and accessible faucet assemblies. The 1994 addition is equipped with a lift at a crosscorridor stair assembly.

    Rating: 3 Needs Replacement

    Recommendations: Provide for full accessibility throughout the entire complex in conformance with the provisions of the ADA and OSFC requirements. Replace theexisting stair lift at the 1932 structure with an elevator. Replace the wood ramp assembly with a permanent ramp installation.

    Item Cost Unit WholeBuilding

    OriginalBuilding(1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    ClassroomWing Addition(1952)5,698 ft

    Media CenterAddition(1994)4,822 ft

    Sum Comments

    Signage: $0.10sq.ft. Required Required Required $2,840.90(per building area)

    Ramps: $40.00sq.ft.(Qty)

    570 Required $22,800.00(per ramp/interior-exterior complete)

    Lifts: $15,000.00unit 3 Required $45,000.00(complete)

    Elevators: $50,000.00each 2 Required $100,000.00(per stop, $100,000 minimum)

    Electric WaterCoolers:

    $1,800.00unit 4 Required $7,200.00(replacement double ADA)

    Toilet/Urinals/Sinks: $3,800.00unit 10 Required 2 Required $45,600.00(new ADA)

    Toilet Partitions: $1,000.00stall 4 Required $4,000.00(ADA - grab bars, accessories included)

    ADA Assist Door &Frame:

    $7,500.00unit 1 Required $7,500.00(openers, electrical, patching, etc)

    Replace Doors: $1,100.00leaf 24 Required 5 Required 9 Required $41,800.00(standard 3070 wood door, HMframe-classroom door/light, includes hardwar

    Replace Doors: $5,000.00leaf 2 Required 1 Required $15,000.00(rework narrow opening to provide 3070 woodoor, HM frame, door/light, includes hardwar

    Replace Doors: $5,000.00leaf 6 Required $30,000.00(rework opening and corridor wall toaccommodate ADA standards when dooropening is set back from edge of corridor andcannot accommodate a wheelchair.)

    Other: Replacevalves/faucets

    $500.00perunit

    2 Required $1,000.00Replace valves/faucets

    Other: Insulate Pipes $100.00perunit

    2 Required $200.00Insulate Pipes

    Sum: $322,940.90 $292,818.40 $18,452.70 $10,469.80 $1,200.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 25

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    26/48

    Facility Assessment

    P. Site Condition

    Description: Buses load/unload at the main entry to the school complex and share a common path of travel with vehicular traffic. Asphalt pavements displaysevere signs of deterioration. Sidewalks are cracked and raised in several locations. An exterior stair assembly at the main entry is lacking aguardrail/handrail system. Playground equipment was updated in the recent past. The site was covered with snow at the time of the site visit,hindering the full assessment of site conditions.

    Rating: 3 Needs Replacement

    Recommendations: Replace deteriorated walks and pavement. Provide a dedicated bus loading/unloading zone.

    Item Cost Unit WholeBuilding

    OriginalBuilding(1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    ClassroomWing Addition(1952)5,698 ft

    Media CenterAddition(1994)4,822 ft

    Sum Comments

    Replace Existing AsphaltPaving:

    $30.00sq. yard 2,116Required

    401 Required 620 Required 511 Required $109,440.00(including drainage / tear out forlight or heavy duty asphalt)

    Bus Drop-Off for Elementary $110.00perstudent

    400 Required $44,000.00(Number of students should berounded up to the nearest 100.$5500 per bus; 40 students perbus; 80% of elementary schoolstudents riding)

    Concrete Curb: $15.00ln.ft. 348 Required 66 Required 102 Required 84 Required $9,000.00(new)

    Concrete Sidewalk: $4.00sq.ft.(Qty)

    4,062Required

    770 Required 1,191Required

    981 Required $28,016.00(5 in exterior slab)

    Exterior Hand / Guard Rails: $42.50ln.ft. 60 Required $2,550.00

    Base Sitework Allowance for

    Unforeseen Circumstances

    $50,000.00allowance Required $50,000.00Include this and one of the next

    two. (Applies for whole building, sonly one addition should have thitem)

    Sitework Allowance forUnforeseen Circumstancesfor buildings between 0 SFand 100,000 SF

    $1.50sq.ft. Required Required Required Required $49,846.50Include this one or the next. (Eacaddition should have this item)

    Sum: $292,852.50 $210,274.00 $21,390.50 $33,441.00 $27,747.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 26

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    27/48

    Facility Assessment

    Q. Sewage System

    Description: The complexs sanitary piping system is served by the local municipal system. School off icials noted the system functioned satisfactorily.

    Rating: 1 Satisfactory

    Recommendations: No work is required at this time.

    Item CostUnitWhole BuildingOriginal Building (1932)

    19,184 ft

    Classroom/Kitchen Addition (1942)

    3,527 ft

    Classroom Wing Addition (1952)

    5,698 ft

    Media Center Addition (1994)

    4,822 ft

    SumComments

    Sum: $0.00 $0.00 $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 27

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    28/48

    Facility Assessment

    R. Water Supply

    Description: The complexs water supply piping is a combination of copper and galvanized pipe. The facility is served by the local municipal system. Districtofficials noted the system was adequate to serve the needs of the facility.

    Rating: 1 Satisfactory

    Recommendations: Work is identified in Plate E.

    Item CostUnitWhole BuildingOriginal Building (1932)19,184 ft Classroom/Kitchen Addition (1942)3,527 ft Classroom Wing Addition (1952)5,698 ft Media Center Addition (1994)4,822 ft SumComments

    Sum: $0.00 $0.00 $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 28

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    29/48

    Facility Assessment

    S. Exterior Doors

    Description: The existing door assemblies are a combination of newer and dated installations. A portion of the assemblies are deteriorated and/or containsingle pane glazing. The storefront door assemblies at the media center addition contain single pane glazing.

    Rating: 3 Needs Replacement

    Recommendations: Provide for replacement of dated/deteriorated door assemblies. Replace door assemblies equipped with single pane glazing with thermallyefficient installations.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    Door Leaf/Frame andHardware:

    $2,000.00perleaf

    8 Required 1 Required 3 Required $24,000.00(includes removal oexisting)

    Sum: $24,000.00 $16,000.00 $2,000.00 $0.00 $6,000.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 29

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    30/48

    Facility Assessment

    T. Hazardous Material

    Description: District officials have provided information identifying hazardous materials in this facility.

    Rating: 3 Needs Replacement

    Recommendations: Remove all hazardous materials as identified by the Hazardous Materials Consultant. A full EEHA will be required to verify the informationprovided by the District.

    Item Cost Unit WholeBuilding Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comme

    Environmental Hazards Form EHA Form

    Resilient Flooring Removal,Including Mastic

    $3.00sq.ft.(Qty)

    7,600 Required $22,800.00See J

    Sum: $22,800.00 $22,800.00 $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 30

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    31/48

    Facility Assessment

    U. Life Safety

    Description: The entire complex is not equipped with an automatic fire suppression system. A portion of the interior stairways are not enclosed and thehandrail/guardrail systems do not conform to current code provisions or ADA accessibility requirements. The 1942 addition is equipped with anunenclosed exteiror egress stair/fire escape.

    Rating: 3 Needs Replacement

    Recommendations: Provide an automated fire suppression system throughout the entire complex. Enclose open stair assemblies and provide a compliant handrailsystem. Provide for the addition of a new exterior stair enclosure.

    Item Cost Unit WholeBuilding

    Original Building(1932)19,184 ft

    Classroom/KitchenAddition (1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media CenterAddition (1994)4,822 ft

    Sum Comments

    Sprinkler / FireSuppression System:

    $3.25sq.ft.(Qty)

    19,184 Required 3 ,527 Required 5,698 Required 4,822 Required $108,000.75(includes increase of servicpiping, if required)

    Interior StairwellClosure:

    $5,000.00perlevel

    4 Required 2 Required $30,000.00(includes associated doorsdoor frames and hardware

    New Exterior StairEnclosure

    $42,500.00perlevel

    2 Required $85,000.00(all inclusive)

    Handrails: $5,000.00level 6 Required 2 Required $40,000.00

    Sum: $263,000.75 $112,348.00 $96,462.75 $38,518.50 $15,671.50

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 31

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    32/48

    Facility Assessment

    V. Loose Furnishings

    Description: Typical classrooms are furnished with a combination of newer and older equipment. The majority of the media center addition is equipped withnewer age furnishings.

    Rating: 3 Needs Replacement

    Recommendations: Provide for furnishing replacement based upon the rating of 5 given for item 6.17 of the attched CEFPI rating.

    Item Cost Unit WholeBuilding Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom Wing Addition(1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comme

    CEFPI Rating 4 to5

    $4.00sq.ft. Required Required Required $113,636.00

    Sum: $113,636.00 $76,736.00 $14,108.00 $22,792.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 32

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    33/48

    Facility Assessment

    W. Technology

    Description: Typical classrooms are equipped with 3-5 data ports for teacher and student use, televisions, ceiling mounted projectors, and smart boards.Classrooms are not equipped with telephones.

    Rating: 3 Needs Replacement

    Recommendations: Replace all wiring due to extensive renovation to be undertaken and to fully conform to OSDM standards.

    Item Cost Unit WholeBuilding Original Building(1932)19,184 ft

    Classroom/Kitchen Addition(1942)3,527 ft

    Classroom WingAddition (1952)5,698 ft

    Media Center Addition(1994)4,822 ft

    Sum Comme

    ES portion of building withtotal SF < 50,000

    $10.68sq.ft.(Qty)

    19,184 Required 3,527 Required 5,698 Required 4,822 Required $354,907.08

    Sum: $354,907.08 $204,885.12 $37,668.36 $60,854.64 $51,498.96

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 33

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    34/48

    Facility Assessment

    X. Construction Contingency / Non-Construction Cost

    Renovation Costs (A-W) $4,261,045.98

    7.00% Construction Contingency $298,273.22

    Subtotal $4,559,319.20

    16.20% Non-Construct ion Costs $738,609.71

    Total Project $5,297,928.91

    Construction Contingency $298,273.22

    Non-Construct ion Costs $738,609.71

    Total for X. $1,036,882.93

    Non-Construction Costs Breakdown

    Land Survey 0.03% $1,367.80

    Soil Borings 0.10% $4,559.32

    Agency Approval Fees 0.15% $6,838.98

    Construction Testing 0.25% $11,398.30

    Printing 0.27% $12,310.16

    Advertising 0.03% $1,367.80

    Builders Risk 0.11% $5,015.25

    Design Professional Compensation 7.50% $341,948.94

    CM Compensation 6.00% $273,559.15

    Commissioning 0.33% $15,045.75

    Maintenance Plan Advisor 0.11% $5,015.25

    Non-Construction Contingency (includes partnering and mediation services) 1.32% $60,183.01

    Total Non-Construction Costs 16.20% $738,609.71

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 34

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    35/48

    School Facility Appraisal

    Name of Appraiser Jeff Tuckerman Date of Appraisal 2008-03-11

    Building Name Hadden Elementary

    Street Address 1800 Mentor Ave

    City/Town, State, Zip Code Painesville, OH 44077

    Telephone Number(s) 440-354-4414

    School District Riverside Local Local SD

    Setting: Small City

    Site-Acreage 10 Building Square Footage 33,231

    Grades Housed K-5 Student Capacity 266

    Number of Teaching Stations 16 Number of Floors 2

    Student Enrollment 311

    Dates of Construction 1932,1942,1952,1994

    Energy Sources: Fuel Oil Gas Electric Solar

    Air Conditioning: Roof Top Windows Units Central Room Units

    Heating: Central Roof Top Individual Unit Forced Air

    Hot Water Steam

    Type of Construction

    Load bearing masonry

    Steel frame

    Concrete frame

    Wood

    Steel Joists

    Exterior Surfacing

    Brick

    Stucco

    Metal

    Wood

    Stone

    Floor Construction

    Wood Joists

    Steel Joists

    Slab on grade

    Structural slab

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:School Facility Appraisal Page 35

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    36/48

    CEFPI Ratings Sheet

    1.0 The School Site

    School Facility Appraisal

    Points Allocated Points

    1.1 Site is large enough to meet educational needs as defined by state and local requirements 25 20

    The building sits on a 10 acre site.

    1.2 Site is easily accessible and conveniently located for the present and future population 20 18

    The site is geographically located to serve the school community.

    1.3 Location is removed from undesirable business, industry, traffic, and natural hazards 10 10

    The site is located in a residential area with little traffic.

    1.4 Site is well landscaped and developed to meet educational needs 10 7

    The site contains mature trees, open lawn, and low shrubbery.

    1.5 ES Well equipped playgrounds are separated from streets and parking areas 10 9

    MS Well equipped athletic and intermural areas are separated from streets and parking

    HS Well equipped athletic areas are adequate with sufficient solid-surface parking

    Playground equipment was updated in the recent past.

    1.6 Topography is varied enough to provide desirable appearance and without steep inclines 5 5

    The site is relatively flat without steep inclines.

    1.7 Site has stable, well drained soil free of erosion 5 5

    There were no significant areas of ponding or erosion.

    1.8 Site is suitable for special instructional needs, e.g., outdoor learning 5 2

    There was no designated area for this activi ty.

    1.9 Pedestrian services include adequate sidewalk with designated crosswalks, curb cuts, and correct slopes 5 3

    Sidewalks were deteriorated in many areas.

    1.10 ES/MS Sufficient on-site, solid surface parking for faculty and staff is provided 5 2

    HS Sufficient on-site, solid surface parking is provided for faculty, students, staff and community

    District officials noted there was inadequate parking at this facility to serve the needs of the school.

    TOTAL - The School Site 100 81

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 36

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    37/48

    CEFPI Ratings Sheet

    2.0 Structural and Mechanical Features

    School Facility Appraisal

    StructuralPoints

    AllocatedPoints

    2.1 Structure meets all barrier-free requirements both externally and internally 15 10

    A portion of the complex provides accessible accommodations, but the provisions do not fully conform to the ADA guidelines.

    2.2 Roofs appear sound, have positive drainage, and are weather tight 15 8

    The roofs are comprised of various roof systems. Installations are a combination of newer and older assemblies. A portion of the roofs are leaking.

    2.3 Foundations are strong and stable with no observable cracks 10 8

    There were no significant signs of deterioration, settlement, or cracking.

    2.4 Exterior and interior walls have sufficient expansion joints and are free of deterioration 10 7

    A portion of the complex was equipped wi th control joints. There were no significant areas of deterioration, except at the 1932 structure.

    2.5 Entrances and exits are located so as to permit efficient student traffic flow 10 8

    The location of exits is adequate for student circulation.

    2.6 Building envelope generally provides for energy conservation (see criteria) 10 8

    The majority of the existing window assemblies were updated with thermally efficient units with double pane glazing.

    2.7 Structure is free of friable asbestos and toxic materials 10 5

    District officials provided a Hazardous Materials Report indicating areas of known asbestos.

    2.8 Interior walls permit sufficient flexibility for a variety of class sizes 10 6

    The majority of the complex was not designed for flexibility of use.

    Mechanical/ElectricalPoints

    AllocatedPoints

    2.9 Adequate light sources are well maintained, and properly placed and are not subject to overheating 15 10

    Lighting levels do not conform to OSDM standards in some areas.

    2.10 Internal water supply is adequate with sufficient pressure to meet health and safety requirements 15 8

    Domestic supply piping is a combination of copper and galvanized. No pressure problems were reported by District officials.

    2.11 Each teaching/learning area has adequate convenient wall outlets, phone and computer cabling for technology applications 15 12

    Typical classrooms are equipped with 3-4 data ports, televisions, projectors, and smart boards.

    2.12 Electrical controls are safely protected with disconnect switches easily accessible 10 8

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 37

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    38/48

    Electrical service panels are located in the mechanical areas.

    2.13 Drinking fountains are adequate in number and placement, and are properly maintained including provisions for thedisabled

    10 8

    A portion of the drinking fountains are accessible, but do not provide multi-height accommodations.

    2.14 Number and size of restrooms meet requirements 10 5

    The majority of the toilet facilities were not accessible and do not conform to the provisions of the ADA.

    2.15 Drainage systems are properly maintained and meet requirements 10 10

    The site is served by the local municipal system.

    2.16 Fire alarms, smoke detectors, and sprinkler systems are properly maintained and meet requirements 10 6

    The facility is not equipped wi th a suppression system. The fire alarm system is lacking horn/strobe signals in some occupiable areas.

    2.17 Intercommunication system consists of a central unit that allows dependable two-way communication between the officeand instructional areas

    10 5

    Classrooms are not equipped with telephones.

    2.18 Exterior water supply is sufficient and available for normal usage 5 3

    A limited quantity of hose bibb connections are provided at the exterior of the structure.

    TOTAL - Structural and Mechanical Features 200 135

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 38

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    39/48

    CEFPI Ratings Sheet

    3.0 Plant Maintainability

    School Facility Appraisal

    Points Allocated Points

    3.1 Windows, doors, and walls are of material and finish requiring minimum maintenance 15 7

    The majority of window installations were updated with thermally efficient units. District officials noted a portion of the assemblies are prone to leak.

    3.2 Floor surfaces throughout the building require minimum care 15 10

    Floor surfaces were terrazzo, carpet, vinyl tile, and wood.

    3.3 Ceilings and walls throughout the building, including service areas, are easily cleaned and resistant to stain 10 7

    Suspended acoustic ceilings are provided in some areas. A portion of ceilings are plaster.

    3.4 Built-in equipment is designed and constructed for ease of maintenance 10 5

    Casework installations are limited. The majority of casework is dated at the 1932, 1942, and 1952 portions of the building.

    3.5 Finishes and hardware, with compatible keying system, are of durable quality 10 9

    The majority of the door assemblies were equipped with lever/ADA compliant hardware.

    3.6 Restroom fixtures are wall mounted and of quality finish 10 7

    The fixtures were a combination of wall and floor mounted units. Original/dated installations remain in some areas.

    3.7 Adequate custodial storage space with water and drain is accessible throughout the building 10 7

    Custodial space is limited.

    3.8 Adequate electrical outlets and power, to permit routine cleaning, are available in every area 10 4

    School officials noted electrical provisions were inadequate to serve the facilitys current needs.

    3.9 Outdoor light fixtures, electrical outlets, equipment, and other fixtures are accessible for repair and replacement 10 8

    Exterior lighting was provided primarily by building mounted fixtures.

    TOTAL - Plant Maintainability 100 64

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 39

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    40/48

    CEFPI Ratings Sheet

    4.0 Building Safety and Security

    School Facility Appraisal

    Site Safety Points Allocated Points

    4.1 Student loading areas are segregated from other vehicular traffic and pedestrian walkways 15 10

    Bus circulation shares a common path of travel with vehicular traffic.

    4.2 Walkways, both on and offsite, are available for safety of pedestrians 10 7

    Walkways are deteriorated in some areas.

    4.3 Access streets have sufficient signals and signs to permit safe entrance to and exit from school area 5 3

    The main ingress/egress drives are not equipped with a signal system.

    4.4 Vehicular entrances and exits permit safe traffic flow 5 3

    Vehicular entrances were not equipped with turning lanes or directional markings.

    4.5 ES Playground equipment is free from hazard 5 5

    MS Location and types of intramural equipment are free from hazard

    HS Athletic field equipment is properly located and is free from hazard

    Playground equipment was updated in the recent past.

    Building Safety Points Allocated Points

    4.6 The heating unit(s) is located away from student occupied areas 20 15

    The boilers were located in the mechanical areas. Classrooms were equipped with unit ventilators.

    4.7 Multi-story buildings have at least two stairways for student egress 15 10

    The facility contains multiple stair assemblies. A portion of the installations were not enclosed in rated assemblies. An exterior egress stair is unenclosed.

    4.8 Exterior doors open outward and are equipped with panic hardware 10 7

    Exterior doors open outward and are equipped with panic devices. A portion of installations are dated.

    4.9 Emergency lighting is provided throughout the entire building with exit signs on separate electrical circuits 10 8

    The facility was equipped with an emergency/egress lighting system.

    4.10 Classroom doors are recessed and open outward 10 7

    A portion of classroom doors are not recessed and open outward.

    4.11 Building security systems are provided to assure uninterrupted operation of the educational program 10 5

    The facility contains a motion sensor security system with magnetic lock controlled access at a portion of the entries.

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 40

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    41/48

    4.12 Flooring (including ramps and stairways) is maintained in a non-slip condition 5 3

    Classrooms/educational areas were equipped with carpet/vinyl tile. Corridors were terrazzo. Asbestos tile is suspected.

    4.13 Stair risers (interior and exterior) do not exceed 6 1/2 inches and range in number from 3 - 16 5 4

    Stair risers do not exceed 7.

    4.14 Glass is properly located and protected with wire or safety material to prevent accidental student injury 5 4

    Safety glazing was identified at some locations.

    4.15 Fixed Projections in the traffic areas do not extend more than eight inches from the corridor wall 5 4

    Drinking fountains project into corridors.

    4.16 Traffic areas terminate at an exit or a stairway leading to an egress 5 4

    Main corridors lead to exits. A portion of exits are not accessible due to level changes.

    Emergency Safety Points Allocated Points

    4.17 Adequate fire safety equipment is properly located 15 13

    Fire extinguishers were provided throughout the facility.

    4.18 There are at least two independent exits from any point in the building 15 13

    Remote means of egress were provided from most areas. The facility is equipped wi th an exterior fire escape.

    4.19 Fire-resistant materials are used throughout the structure 15 10

    Rated assemblies could not be identified at the older portions of the structure. Masonry wall construction may provide equivalence rating.

    4.20 Automatic and manual emergency alarm system with a distinctive sound and flashing light is provided 15 12

    The facility is equipped with a fire alarm system with manual pull stations. A portion of the occupiable spaces are lacking horn/strobe signals.

    TOTAL - Building Safety and Security 200 147

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 41

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    42/48

    CEFPI Ratings Sheet

    5.0 Educational Adequacy

    School Facility Appraisal

    Academic Learning Space Points Allocated Points

    5.1 Size of academic learning areas meets desirable standards 25 20

    Typical classrooms are undersized and do not conform to the current standards established by the State of Ohio.

    5.2 Classroom space permits arrangements for small group activity 15 10

    There is no designated space for this activi ty. Classrooms are undersized at older portions of the school facility.

    5.3 Location of academic learning areas is near related educational activities and away from disruptive noise 10 6

    The media center is remotely loacted in a separate addition. The gymansium is centrally located along the primary corridor.

    5.4 Personal space in the classroom away from group instruction allows privacy time for individual students 10 5

    There is no designated space for this activi ty. Classrooms are undersized at older portions of the facility.

    5.5 Storage for student materials is adequate 10 6

    The majority of the facility is lacking lockers or cubbies for student storage. Corridors are equipped with coat hooks.

    5.6 Storage for teacher materials is adequate 10 5

    Storage space is limited. There is little casework in classrooms in older addition areas.

    Special Learning Space Points Allocated Points

    5.7 Size of special learning area(s) meets standards 15 9

    Classrooms are undersized and do not conform to current standards established by the State of Ohio.

    5.8 Design of specialized learning area(s) is compatible with instructional need 10 7

    Classrooms are undersized and do not conform to current standards established by the State of Ohio.

    5.9 Library/Resource/Media Center provides appropriate and attractive space 10 8

    The media center is a recent addition to the complex.

    5.10 Gymnasium (or covered P.E. area) adequately serves physical education instruction 5 2

    The gymnasium serves as student dining.

    5.11 ES Pre-kindergarten and kindergarten space is appropriate for age of students and nature of instruction 10 7

    MS/HS Science program is provided sufficient space and equipment

    Classrooms are undersized and do not conform to the current standards established by the State of Ohio at older portions of the complex.

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 42

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    43/48

    5.12 Music Program is provided adequate sound treated space 5 3

    Music education takes place in a dedicated classroom. There are limited sound treatments. Area is used for art and science education.

    5.13 Space for art is appropriate for special instruction, supplies, and equipment 5 3

    Art education takes place in a dedicated multi -purpose classroom that is also utilized for music and science education.

    School Facility Appraisal Points Allocated Points

    5.14 Space for technology education permits use of state-of-the-art equipment 5 5

    Technology education takes place in a dedicated classroom in the 1994 addition.

    5.15 Space for small groups and remedial instruction is provided adjacent to classrooms 5 1

    There is no designated space for this activi ty. Desks and tables are located in corridors at older areas of the complex.

    5.16 Storage for student and teacher material is adequate 5 2

    Classroom storage provisions are limited at older areas of the complex. Equipment is being stored in the corridors.

    Support Space Points Allocated Points

    5.17 Teachers lounge and work areas reflect teachers as professionals 10 7

    Accommodations are limited.

    5.18 Cafeteria/Kitchen is attractive with sufficient space for seating/dining, delivery, storage, and food preparation 10 6

    The gymnasium serves as student dining.

    5.19 Administrative offices provided are consistent in appearance and function with the maturi ty of the students served 5 2

    Administrative offices are located near the main entry.

    5.20 Counselors office insures privacy and sufficient storage 5 2

    Office provisions are limited and the area is dated.

    5.21 Clinic is near administrative offices and is equipped to meet requirements 5 2

    The facility is lacking appropriate clinic provisions. An existing restroom is being used as a clinic.

    5.22 Suitable reception space is available for students, teachers, and visitors 5 2

    Administrative areas are undersized and do not conform to the current standards established by the State of Ohio.

    5.23 Administrative personnel are provided sufficient work space and privacy 5 2

    Administrative work space is limited.

    TOTAL - Educational Adequacy 200 122

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 43

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    44/48

    CEFPI Ratings Sheet

    6.0 Environment for Education

    School Facility Appraisal

    Exterior Environment Points Allocated Points

    6.1 Overall design is aesthetically pleasing to age of students 15 10

    Exterior masonry construction is appropriate for educational design. The media center addition is a pleasant design.

    6.2 Site and building are well landscaped 10 7

    The site contains mature trees and open lawn, with few additional amenities.

    6.3 Exterior noise and poor environment do not disrupt learning 10 8

    The site is located in a residential area with light traffic.

    6.4 Entrances and walkways are sheltered from sun and inclement weather 10 5

    The majority of entrances were not equipped with overhangs.

    6.5 Building materials provide attractive color and texture 5 4

    The facility materials are consistent at the older portions of the complex. The media center addition provides a pleasant environment.

    Interior Environment Points Allocated Points

    6.6 Color schemes, building materials, and decor provide an impetus to learning 20 15

    Interior finishes and casework are worn and dated. There was no unified color scheme at the 1932, 1942, and 1952 additions.

    6.7 Year around comfortable temperature and humidity are provided throughout the building 15 5

    The majority of the facility is not equipped with air conditioning. A limited portion of the media center addition is provided with air conditioning.

    6.8 Ventilating system provides adequate quiet circulation of clean air and meets 15cfm VBC requirement 15 10

    The ventilation system does not conform to current OSDM standards at dated portions of the complex.

    6.9 Lighting system provides proper intensity, diffusion, and distribution of illumination 15 12

    Lighting levels are below OSDM standards in some areas.

    6.10 Drinking fountains and restroom facilities are conveniently located 15 10

    The majority of restrooms/toilet rooms do not provide accessible accommodations, except at the media center addition.

    6.11 Communication among students is enhanced by commons area(s) for socialization 10 7

    The gymnasium and media center provide common areas for students.

    6.12 Traffic flow is aided by appropriate foyers and corridors 10 8

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 44

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    45/48

    Corridors are sized for circulation.

    6.13 Areas for students to interact are suitable to the age group 10 7

    The gymnasium and the media center provide areas for interaction.

    6.14 Large group areas are designed for effective management of students 10 6

    The gymnasium serves as student dining.

    6.15 Acoustical treatment of ceilings, walls, and floors provides effective sound control 10 6

    Acoustic ceilings are provided in some areas. A portion of ceilings are plaster.

    6.16 Window design contributes to a pleasant environment 10 8

    Inset panels reduce daylight quantities at the 1932 addition.

    6.17 Furniture and equipment provide a pleasing atmosphere 10 5

    The majority of the existing furniture and equipment is a combination of newer and dated furnishings.

    TOTAL - Environment for Education 200 133

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 45

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    46/48

    Justification for Allocation of Points

    Building Name and Level: Hadden Elementary

    K-5

    Building features that clearly exceed criteria:

    1.

    2.

    3.

    4.

    5.

    6.

    Building features that are non-existent or very inadequate:

    1. The building is not suppressed.

    2. The majority of the complex is not equipped with air conditioning.

    3.

    4.

    5.

    6.

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Justification for Allocation of Points Page 46

    http://-/?-http://-/?-
  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    47/48

    Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811)

    Building Summary - Hadden Elementary (14811)

    District: Riverside Local Local SD

    Name: Hadden Elementary

    Address: 1800 Mentor Ave

    Painesville,OH 44077

    Bldg. IRN: 14811

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Tim St. Clair

    Phone: 440-354-4414

    Date Prepared: 2008-03-11 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades K-5 Acreage: 10

    Proposed Grades N/A Teaching Stations: 16

    Current Enrollment 311 Classrooms: 14

    Projected Enrollment N/A

    Addition Date HA Number ofFloors

    Current SquareFeet

    Original Building 1932 no 2 19,184

    Classroom/KitchenAddition

    1942 no 2 3,527

    Classroom Wing Addition 1952 no 2 5,698

    Media Center Addition 1994 yes 1 4,822

    Total 33,231

    *HA = Handicapped Access

    *Rat ing =1 Sat isfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $963,699.00 -

    B. Roofing 3 $118,687.00 -

    C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $523,388.25 -

    E. Plumbing and Fixtures 3 $189,231.50 -

    F. Windows 3 $113,795.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $100,840.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $524,958.00 -

    K. Interior Lighting 3 $166,155.00 -

    L. Security Systems 3 $83,077.50 -

    M. Emergency/Egress Lighting 3 $33,231.00 -

    N. Fire Alarm 3 $49,846.50 -

    O. Handicapped Access 3 $322,940.90 -

    P. Site Condition 3 $292,852.50 -

    Q. Sewage System 1 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $24,000.00 -

    T. Hazardous Material 3 $22,800.00 -

    U. Life Safety 3 $263,000.75 -

    V. Loose Furnishings 3 $113,636.00 -

    W. Technology 3 $354,907.08 -

    - X. Construction Contingency /Non-Construction Cost

    - $1,036,882.93 -

    Total $5,297,928.91

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 162 81% Satisfacto

    2.0Structural and Mechanical Features 400 270 68% Borderl

    3.0Plant Maintainability 200 128 64% Borderl

    4.0Building Safety and Security 400 294 74% Satisfacto

    5.0Educational Adequacy 400 244 61% Borderl

    6.0Environment for Education 400 266 67% Borderl

    Commentary

    Total 2000 1364 68% Borderl

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $5,518,322

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Previous Page

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - Hadden Elementary (14811) Page 47

  • 8/14/2019 Hadden Elementary - Riverside School District - State Facilities Report

    48/48

    Environmental Hazards - Riverside Local Local SD (47894) - Hadden Elementary (14811) - Original Building

    Environmental Hazards - Riverside Local Local SD (47894) - Hadden Elementary (14811) - Original Building

    Owner: Riverside Local Local SD Bldg. IRN: 14811

    Facility: Hadden Elementary BuildingAdd: Original Building

    Date: Consultant Name:

    A. Asbestos Containing Material (ACM) AFM=Asbestos Free Materia

    ACM Found Status Quantity Unit Cost Estimated Cost

    1. Boiler/Furnace/Breeching Insulation Removal Not Present 0 $10.00 $0.002. Tank/Duct Insulation Removal Not Present 0 $8.00 $0.00

    3. Pipe Insulation Removal Not Present 0 $8.00 $0.00

    4. Pipe Fitting Insulation Removal Not Present 0 $20.00 $0.00

    5. Acoustical Plaster Removal Not Present 0 $7.00 $0.00

    6. Fireproofing Removal Not Present 0 $15.00 $0.00

    7. Hard Plaster Removal Not Present 0 $7.00 $0.00

    8. Gypsum Board Removal Not Present 0 $6.00 $0.00

    9. Acoustical Panel/Tile Ceiling Removal Not Present 0 $3.00 $0.00

    10. Resilient Flooring Removal, Including Mastic Reported Asbestos-Containing Material 7600 $3.00 $22,800.00

    11. Roofing Removal Not Present 0 $2.00 $0.00

    12. (Sum of Lines 1-11) Total Asb. Hazard Abatement Cost for Renovation Work $22,800.00

    13. (Sum of Lines 1-9) Total Asb. Hazard Abatement Cost for Demolition Work $0.00

    B. Removal Of Underground Storage Tanks None Reported

    Tank No. Location Age Product Stored Size Est.Rem.Cost

    1. (Sum of Lines 1-0) Total Cost For Removal Of Underground Storage Tanks $0.00

    C. Lead-Based Paint (LBP) - Renovation Only Addition Constructed after 1980

    1. Estimated Cost For Abatement Contractor to Perform Lead Mock-Ups $0.00

    2. Special Engineering Fees for LBP Mock-Ups $0.00

    3. (Sum of Lines 1-2) Total Cost for Lead-Based Paint Mock-Ups $0.00

    D. Fluorescent Lamps & Ballasts Recycling/Incineration Not Applicable

    Area Of Building Addition Square Feet w/Fluorescent Lamps & Ballasts Unit Cost Total Cost

    1. 19184 0 $0.05 $0.00

    E. Other Environmental Hazards/Remarks None Reported

    Description Cost Estimate

    1. (Sum of Lines 1-0) Total Cost for Other Environmental Hazards - Renovation $0.00

    2. (Sum of Lines 1-0) Total Cost for Other Environmental Hazards - Demolition $0.00

    F. Environmental Hazards Assessment Cost Estimate Summaries

    1. A12, B1, C3, D1, and E1 Total Cost for Env. Hazards Work - Renovation $22,800.002. A13, B1, D1, and E2 Total Cost for Env. Hazards Work - Demolition $0.00

    * INSPECTION ASSUMPTIONS for Reported/Assumed Asbestos-Free Materials (Rep/Asm AFM):

    a. Unless reported otherwise by the District, materials installed after 1980 are assumed to be asbestos-free.

    b. Unless reported otherwise by the District, small quantities (less than 1,000 square feet) of the following materials are assumed to be asbestos free: hard plaster,acoustical plaster and gypsum board systems; acoustical panels and ti les; fireproofing; 12"12" floor tile and mastic.

    c. Unless reported otherwise by the District, all roofing materials are assumed to be asbestos-free.

    THESE MATERIALS SHOULD BE PROPERLY SAMPLED AND ANALYZED FOR ASBESTOS PRIOR TO DISTURBING THEM.