22
Hawkins Construction, Inc. www.hawkinsnet.com Headquarters 1430 L and R Industrial Boulevard Tarpon Springs, Florida 34689 Phone: 727.938.9719 Fax: 727.938.7903 South Florida Office 7777 Glades Road, Suite 202 Boca Raton, Florida 33434 Phone: 561.314.6730 Fax: 561.314.6739 Institutional Experience

Hawkins Construction Institutional Brochure

Embed Size (px)

DESCRIPTION

Institutional Projects Experience

Citation preview

Page 1: Hawkins Construction Institutional Brochure

Hawkins Construction, Inc.

www.hawkinsnet.com

Headquarters 1430 L and R Industrial Boulevard Tarpon Springs, Florida 34689 Phone: 727.938.9719 Fax: 727.938.7903

South Florida Office 7777 Glades Road, Suite 202Boca Raton, Florida 33434 Phone: 561.314.6730 Fax: 561.314.6739

Institutional Experience

Page 2: Hawkins Construction Institutional Brochure
Page 3: Hawkins Construction Institutional Brochure

About Hawkins Construction, Inc.Hawkins Construction, Inc. is a full service General Contractor providing expertise in commercial construction throughout the southeastern United States. Founded in 1975, the firm specializes in commercial construction, including: offices, retail centers, banks, churches, medical facilities and schools. Staffed with over 20 licensed General Contrac-tors, Hawkins responds to our client’s total project needs. With a database of over 7,000 subcontractors who actively pursue work with Hawkins, we are able to insure competitive and timely completion of all of our projects. Hawkins has enjoyed a steady controlled growth since its inception and is currently ranked as a top contractor by Commercial Construction Magazine, Retail Traffic Magazine and Southeast Construction Magazine. Our philosophy of teamwork and attention to detail has enabled the company to prosper and enjoy a long list of repeat clients. All of our employees are dedicated to the same goal - customer satisfaction. To achieve that success, we have built into our construction man-agement philosophy a series of checks and balances to ensure each project progresses on schedule and within budget. Our claim to fame is quite simple. Since our inception we have completed over 2,500 construction projects without missing a budget or schedule. Customer satisfaction is our number one goal and we have developed a solid reputation for achieving that goal. We have a list of satisfied clients with over 75% of our construction volume each year coming from repeat clients. They will tell you “Hawkins does what they say they will do.” The Hawkins Total Management Team is fully involved on every project from start-up through completion by communicating regularly to ensure a project starts on the right track and stays there to its successful delivery to the client.

Page 4: Hawkins Construction Institutional Brochure

LEED-Accredited Professionals

Our commitment to the environment includes a respect for the communities and ecosystems we build in. We are continually seeking ways to save energy, improve efficiency, reduce waste and use sustainable principles as our guide to construc-tion. We encourage our clients to make reductions wherever practical in our consumption of energy, fuel, water and material. Some practices that are easily integrated into projects are:

• Building new stores that are more energy-efficient than existing stores• Reducing energy consumption in existing stores• Minimizing water use while still maintaining the highest standards of sanita-

tion and food safety.• Evaluating the use and sale of alternative fuels wherever practical

We also recommend options for the reduction, reuse, and recycling of materials such as:

• Recycling store-generated material destined for landfills• Working with our suppliers to reduce materials, promote reusable and recycla-

ble materials, and increase the use of recycled content where practical

Page 5: Hawkins Construction Institutional Brochure

ServicesHawkins has 40 years’ experience in the construction industry and is today recognized as a leader in the commercial construction sector. Our ability to work with clients on project solutions is one reason we have never delivered a project behind schedule.

Preconstruction Planning and Consulting:As Consultants, Hawkins Construction provides invaluable services during your projects planning stage including site Investigations, document review, scheduling, budget devel-opment, and permitting assistance.

Construction Management: As Construction Managers, Hawkins Construction becomes your team member through-out the construction delivery process. Whether you choose for Hawkins to become the owner’s agent and you hold all the trade contracts, or as your CM “At Risk” where we become fully responsible for the delivery of your project, we allow you to leverage our expertise in an open book fashion to deliver you value, on time performance, and most importantly quality.

General Contracting:As a General Contractor, Hawkins can join your team in the traditional “design-bid-build” delivery format or as a member of your team on a negotiated basis.

Design/Build Services:As a Design/Builder, Hawkins acts as your single point of contact for total project delivery. This method provides our clients with an efficient way to obtain timely, cost effective project delivery. Post Construction Services:Hawkins Construction believes that our job does not end when we turn over the keys. As your team member, we provide training to your building maintenance staff, timely war-ranty response, and project follow-up.

Page 6: Hawkins Construction Institutional Brochure

Institutional

Page 7: Hawkins Construction Institutional Brochure

Notable Projects• All Saints Catholic Church• Bishop Larkin School Catholic School• Blessed Sacrament• Brooksville Junior High School • Calvary Episcopal Church• Central Catholic School• Church Of The Incarnation• Clay County EOC• Crystal River High School • Curlew Creek Elementary School• Cyprus Woods Elementary School• Elementary School G• Epiphany Catholic Church• Espiritu Santo Catholic Church & School• First Baptist Church of Indian Rocks • Frank Springstead High School • Grace Bible Church• Guardian Angels Catholic School• Heritage Institute• Highlands County Sheriff Office• House of Prayer• Immaculate Conception• Lake St. George Elementary School• Morgan Fitzgerald Middle School• Most Holy Name Catholic Church• Most Holy Redeemer Catholic Church• Nativity Catholic Church• Notre Dame Catholic School• Oakhurst United Methodist Church• Operation PAR and COSA Daycare• Our Lady Of The Rosary• Palm Harbor Middle School• Palm Harbor United Methodist Church• Pope John Paul II School• Spring Hill Elementary School• Spring Hill United Methodist Church• St Clements

• St Frances Cabrini• St Joan Of Arc• St Patrick’s Catholic Church• St Raphael Catholic Church• St. Anne Catholic Church• St. Anthony Padua• St. Anthony’s Catholic Church• St. Brendan’s Catholic Church• St. Cecelia Catholic Church & School• St. Clements Catholic Church• St. Elizabeth Ann Seaton• St. Francis Xavier Cabrini• St. Ignatius Of Antioch• St. James Catholic Church• St. Jerome’s Catholic Church• St. Joseph’s Parish Church• St. Jude Rectory• St. Jude’s School• St. Mark’s The Evangelist• St. Mary’s Episcopal• St. Michael’s - The Archangel• St. Patrick’s Catholic Church & School• St. Scholastica• St. Teresa Catholic Church• St. Thomas Aquinas• St. Thomas Catholic Church• St. Timothy’s Catholic Church• St. Vincent DePaul Rectory• Sutherland Elementary School• Tampa Catholic High School• Temple Terrace Church Of Christ• The Kings Academy Performing Arts• Travelers Rest Missionary Baptist• West Hernando Middle School• Westside Elementary

Page 8: Hawkins Construction Institutional Brochure

Highlands County Sheriff’s Office

Sebring, Florida—Hawkins Construction was chosen to construct this new, 45K SF Law Enforcement Facility for High-lands County. This tilt-up construction project is a FEMA “Hardened Structure” that is High-Velocity Hurricane Resistant. The facility also includes total generator backup power, cutting-edge technology security systems and access control, and a state-of-the-art evidence lab facility.

Page 9: Hawkins Construction Institutional Brochure

The Kings Academy Performing Arts Center

West Palm Beach, Florida—This new 23K SF Center for Performing Arts will provide dedicated space for The Kings Acad-emy’s nationally-recognized Theater, Choir, Band, and Dance programs, after sharing space with the school’s athletic teams for 40 years.

This state-of-the-art auditorium, which includes a professionally designed stage with full fly space, rigging and catwalk, will accommodate more than 15,000 patrons yearly. Guests will be welcomed with an intimate atmosphere that pro-vides comfortable seating for 800 during chapels, meetings and events. It will also allow TKA’s elite band and choir programs a concert hall befitting their dedication to excellence.

Page 10: Hawkins Construction Institutional Brochure

Bishop Larkin Catholic School

Port Richey, Florida—This simple but aesthetically pleasing 43,000 SF elementary school for the Diocese of St. Peters-burg provides an economical school facility for elementary, middle, and day school functions. Constructed using the Construction Management Team Approach with Alexander and Associates, this project team was able to maximize its "bang for the buck.”

A project design was created that incorporates high quality and durable construction materials and methods into a highly functioning facility. This was realized at costs well below what the public sector typically pays for facilities of this caliber. This project has since been used on several other projects as a prototype design scheme.

Page 11: Hawkins Construction Institutional Brochure

Notre Dame Inter-parochial School

Spring Hill, Florida—This project was constructed for the Diocese of St. Petersburg using the Construction Management delivery system. It encompassed a 17,000 SF multi-purpose building and a 13,000 SF classroom facility.

During construction an adjacent elementary and middle school held classes. Care and concern for the safety of the pu-pils were of the highest priority. The extensive pre-construction services yielded high quality construction such as cop-per gutters and down spouts, while maintaining a tight budget. Over 90 value-engineering alternates were addressed, in which over 30 were incorporated into the contract documents.

Page 12: Hawkins Construction Institutional Brochure

Palm Harbor United Methodist Church

Palm Harbor, Florida—With over 2000 members, Palm Harbor United Methodist Church is one of the fastest growing churches in Pinellas County. When they found the need for a new 24,000 SF sanctuary, they chose Hawkins Construc-tion, Inc.

Hawkins Construction was able to propose more cost effective and durable systems, and help guide the construction techniques while obtaining the congregation's overall goals of the facility. One major obstacle that was handled flaw-lessly was Hawkins' ability to work around an active day care center, pre-school and church campus, 7 days a week.

Page 13: Hawkins Construction Institutional Brochure

St. Frances Calibrini Church

Spring Hill, Florida—This project exhibited how well Hawkins Construction can coordinate and communicate with a parish. Hawkins was employed to renovate this church, including re-moving the glass skylight roof, while allowing the parish to continue to hold their services. To make things even more of a challenge, the work was performed during the rainy sea-son.

Hawkins devised special temporary roofing systems to pre-vent the existing interior finishes from being damaged during construction. After the roof replacement, construction con-tinued with the 16,126 SF interior renovation necessary to correct the years of water damage. This project was con-structed ahead of schedule and under budget utilizing the Construction Management approach.

Page 14: Hawkins Construction Institutional Brochure

St. Raphael Catholic Church

Snell Isle, Florida—This is one of many projects that the Diocese of St. Petersburg has chosen Hawkins Construction to manage.

This new 28,000 SF facility was constructed in the beautiful Snell Isle area of St. Petersburg and was designed to blend in with the neighborhood. Site improvements to the existing facility were also completed.

This project endured the 2004 Hurricane season and was com-pleted on schedule for its June 2005 dedication.

Page 15: Hawkins Construction Institutional Brochure

St. Timohty Catholic Church

Tampa, Florida— St. Timothy's Catholic Church included a new 32,000 SF monumental sanctuary, a 20,000 SF parish hall and over 14 acres of campus site improvements. This project was the largest campus worship center constructed by the Diocese of St. Peters-burg in over 10 years.

The conceptual design for this project came in at $2.5 million over budget. Hawkins Con-struction's input during the pre-construction phase was able to guide and direct the design and systems to obtain the Diocese's tight budget constraints on this project. In the pro-cess, Hawkins Construction was able to propose more cost effective and durable systems, and help guide the size and construction techniques while obtaining the parish's over all goals of the facility.

Page 16: Hawkins Construction Institutional Brochure

Tampa Catholic High School

Tampa, Florida— The Science and Technology Center is a High-Tech, 16,875 SF fa-cility that was constructed for the Diocese of St. Petersburg using the Construction Management delivery system.

It includes the Physics and Biology Departments, Computer Science labs, Media Center and offices. In addition, Hawkins reconfigured the main parking lot, con-structed a new Chapel and Palm Court in the Center of campus, and coordinated the relocation of student parking.

All of this took place in the middle of an active High School Campus where the safety of students and faculty was a top priority at all times.

Page 17: Hawkins Construction Institutional Brochure

Temple Terrace Church of Christ

Tampa, Florida— Hawkins Construction was selected as Construction Manager for this project which consists of a new Sanctuary and Classroom space totaling 22,000 SF.

The building footprint was discovered to be located over existing (not visible) sinkholes. It took close to 1,000 cubic yards of soil grout injection to remediate.

Page 18: Hawkins Construction Institutional Brochure

Operation PAR COSA Child Development

Page 19: Hawkins Construction Institutional Brochure

The Learning Center

Jacksonville, Florida Hawkins was selected to construct two new, 10,000 SF Learning Experience Academies for early education. The Learning Experience centers offer contemporary school designs, combined with the best from the fields of learning, early education and development, technology, ergonomics and environmental design.

Utilizing our Value Engineering Process, Hawkins was able to save The Learning Center over $140,000.00.

Page 20: Hawkins Construction Institutional Brochure

Operation PAR

Largo, Florida—When Operation PAR (Parental Awareness and Responsibility) needed to expand they teamed with Hawkins as the Construction Manager and Robert Aude Associates, Inc. as the design team to provide the necessary local experience for this new project. Working with a grant from the Federal Government, the team was able to fulfill the requirements of PAR and the Government while remaining under budget and within the necessary time constraints.

PAR, Phases I (32,724 SF) & II (22,785 SF): Each building is a three-story addiction treatment and mental health educa-tional facility which includes exam rooms, labs, research areas, classrooms, administrative offices, nursing stations and on-site housing for those being treated.

PAR Children of Substance Abusers (COSA) Center (7,854 SF): Child Development and Family Guidance Center that pro-vides services to substance abusing pregnant & parenting women whose infants and preschool children may experience developmental delays. COSA places a special emphasis on serving minority women and their children in Pinellas County.

Page 21: Hawkins Construction Institutional Brochure

Emergency Services Complex

Green Cove Springs, Florida — Hawkins was selected to construct a new $5 Million Emergency Services Complex in Green Cove Springs for Clay County officials. The new 27,000 SF EOC will house the county’s emergency management staff, 911 emergency management communications, Fire/Rescue administration and the Geographic Information Sys-tems (GIS) department.

The new state of the art facility features the latest technology to monitor weather related conditions during emergency situations such as impending hurricanes, tornadoes and flooding. Should a severe emergency situation arise, the ESC will function as the Command Center for county government operations.

Page 22: Hawkins Construction Institutional Brochure

www.hawkinsnet.com

Headquarters 1430 L and R Industrial Boulevard Tarpon Springs, Florida 34689 Phone: 727.938.9719 Fax: 727.938.7903

South Florida Office 7777 Glades Road, Suite 202Boca Raton, Florida 33434 Phone: 561.314.6730 Fax: 561.314.6739