28
PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.: 1 1 LOCATION: CLARK DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE NBP ‐ NATIONAL FOC BACKBONE PROPOSED CABLE ENTRY AT CLARK FREE FORT ZONE NBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC Director IV, National Broadband Program Undersecretary for Digital Philippines PROPOSED HANDHOLE LOCATION PROPOSED LOCATION OF MANHOLE PROPOSED UNDERGROUND FOC 29 METERS UNCONTROLLED WHEN PRINTED OR EMAILED

HIG HG FIIG J

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: CLARK DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT CLARK FREE FORT ZONENBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED HANDHOLELOCATIONPROPOSED LOCATION OF 

MANHOLE

PROPOSED UNDERGROUND FOC 29 METERS

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 2: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BAGUIO CITY, BENGUET DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT BCDA CAMP JOHN HAY BUILDINGNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC 82 METERS

PROPOSED MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 16.402984°LONGTITUDE ‐ 120.616414°

PROPOSED LOCATION MANHOLE

PROPOSED HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 3: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: CAPAS, TARLAC DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT BCDA NEW CLARK CITYNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

UNDERGROUND FOC FROM NGCP CONCEPCION

PROPOSED MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 15.354220°LONGTITUDE ‐ 120.528642°

PROPOSED LOCATION MANHOLE

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 4: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SAN FERNANDO, LA UNION DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT BCDA PORO POINT MANAGEMENT OFFICENBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

FROM DICT SFLU ICLS

PROPOSED MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 16.611590°LONGTITUDE ‐ 120.289991°

PROPOSED LOCATION MANHOLE

PROPOSED UNDERGROUND FOC 94 METERS

PROPOSED HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 5: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BAGUIO CITY, BENGUET DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT DICT BAGUIONBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTICDirector IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC 79 METERS

PROPOSED LOCATION OF MANHOLE

DICT EQUIPMENT ROOM

PROPOSED HANDHOLE LOCATION

PROPOSED MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 16.416589°LONGTITUDE ‐ 120.613919°

PROPOSED HANDHOLE LOCATION

TO NGCP LA TRINIDAD SUBSTATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 6: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BALER, AURORA DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT BALER CABLE LANDING STATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC 21 METERS

PROPOSED MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 17.343018°

PROPOSED HANDHOLELOCATION

PROPOSED LOCATION OF MANHOLE

PROPOSED UNDERGROUND FOC 110 METERS

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 7: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SUBIC, OLONGAPO DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT DICT NGDC‐3 SUBICNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

EXISTING LOCATION OF HANDHOLE

DICT EQUIPMENT ROOM

EXISTING HANDHOLE LOCATION

EXISTING MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 14.784277°LONGTITUDE ‐ 120.295422°

PROPOSED UNDERGROUND FOC TO NGCP SUBIC SUBSTATION

EXISTING LOCATION OF MANHOLE

EXSTING UNDERGOUND TRENCH 10 METERS

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 8: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BRGY. ROCES, QUEZON CITY DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT DICT ROCESNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTICDirector IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC  21 METERS

PROPOSED LOCATION OF MANHOLE

PROPOSED MANHOLE LOCATIONCOORDINATES:LATITUDE ‐ 14.629834°LONGTITUDE ‐ 121.025301°

DICT ROCES BUILDING

PROPOSED HANDHOLE LOCATION

TO NGCP ARANETASUBSTATION

PROPOSED UNDERGROUND FOC  4 METERS

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 9: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SAN FERNANDO, LA UNION DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT DICT SFLU CABLE LANDING STATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

EXISTING UNDERGROUND TRENCH 75 METERS

PROPOSED LOCATION OF MANHOLE

PROPOSED UNDERGROUND FOC TONGCP BAUANG SUBSTATION

EXISTING DICT MANHOLECOORDINATES:LATITUDE ‐ 16.599350°LONGTITUDE ‐ 120.307280°

DICT SFLU CABLE LANDING STATION BUILDING

EXISTING HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 10: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: ARANETA AVE., QUEZON CITY DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP ARANETA SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED MANHOLE LOCATION

NGCP CONTROL ROOM BUILDING

PROPOSED UNDERGROUND FOC 

PROPOSED LOCATION OF MANHOLE

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 11: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BACNOTAN, LA UNION DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

PROPOSED CABLE ENTRTY AT NGCP BACNOTAN SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED MANHOLELOCATION PROPOSED OPEN TRENCH 7m

PROPOSED HANDHOLE LOCATION 

PROPOSED OPEN TRENCH 60m

PROPOSED HANDHOLE LOCATION 

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 12: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: STA. BARBARA, PANGASINAN DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

PROPOSED CABLE ENTRY AT NGCP BALINGUEO SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

NGCP CONTROL ROOMBUILDING

PROPOSED LOCATION OF MANHOLE

PROPOSED UNDERGROUND FOC

PROPOSED MANHOLE LOCATION

EXISTING UNDERGROUND CABLE TRENCH

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 13: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BANTAY, ILOCOS SUR DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP BANTAYSUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC

NGCP CONTROL ROOM BUILDING

PROPOSED MANHOLE LOCATION

PROPOSED LOCATION OF MANHOLE

PROPOSED HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 14: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BAUANG, LA UNION DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

PROPOSED CABLE ENTRY AT NGCP BAUANG SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

EXISTING UNDERGROUND CABLE TRENCH

UNDERGROUND FOC FROM DICT CLS

PROPOSED LOCATION OF MANHOLE

PROPOSED MANHOLE LOCATION

NGCP CONTROL ROOM BUILDING

PROPOSED HANDHOLE

PROPOSED UNDERGROUND FOC

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 15: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: BOLO, PANGASINAN DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

PROPOSED CABLE ENTRY AT NGCP BOLO SUBSTATION

NBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE

Director IV, National Broadband Program

EMMANUEL REY R. CAINTICUndersecretary for Digital Philippines

PROPOSED UNDERGROUND 

85m

DICT PROPOSED MANHOLE/POLE

EXISTING TELCO VAN

USED EXISTING TRENCH

NGCP TOWER

PROPOSED DICT ODF (WALL MOUNTED)

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 16: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: CABANATUAN, NUEVA ECIJA DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP CABANATUAN SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC

PROPOSED MANHOLELOCATION

NGCP CONTROL ROOM BUILDING

PROPOSED MANHOLE LOCATION

PROPOSED HANDHOLE LOCATION

PROPOSED HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 17: HIG HG FIIG J

NOTE:1. UNMANNED SUBSTATION

2 AS OF DATE MAINTAINED AND OPERATED BY

CLARK DEVELOPMENT

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: CLARK FREEPORT ZONE, PAMPANGA DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

PROPOSED CABLE ENTRY AT NGCP CLARK SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERFROUND FOC

NGCP CONTROL ROOM BUILDING

UNDERGROUND FOC FROM BCDA CLARK FREE PORT ZONE

PROPOSED MANHOLE LOCATION

PROPOSED UNDERGROUND FOC

EXISTING UNDERGROUND CABLE TRENCH

PROPOSED HANDHOLE

PROPOSED LOCATION OF MANHOLE

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 18: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: CONCEPCION, TARLAC DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE NBP Technical Team PROPOSED CABLE ENTRY AT NGCP 

CONCEPCION SUBSTATIONEMMANUEL REY R. CAINTIC

Undersecretary for Digital Philippines

LEO CIPRIANO L. URBIZTONDO, JR., PECE

Director IV, National Broadband Program

PROPOSED MANHOLE LOCATION

EXISTING UNDERGROUND CABLE TRENCH

PROPOSED UNDERGROUND FOC

NGCP CONTROL ROOM BUILDING

PROPOSED MANHOLELOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 19: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: HERMOSA, BATAAN DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP HERMOSA SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED MANHOLE LOCATION

PROPOSED UNDERGROUND FOC 

PROPOSED MANHOLELOCATION

NGCP CONTROL ROOM BUILDING

EXISTING UNDERGROUND CABLE TRENCH

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 20: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: LA TRINIDAD, BENGUET DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

NBP Technical Team PROPOSED CABLE ENTRY AT NGCP 

HERMOSA SUBSTATIONEMMANUEL REY R. CAINTIC

Undersecretary for Digital Philippines

LEO CIPRIANO L. URBIZTONDO, JR., PECE

Director IV, National Broadband Program

EXISTING TRENCH

NGCP CONTROL ROOM BUILDING

PROPOSED UNDERGROUND FOC 

PROPOSED LOCATION OFMANHOLE

PROPOSED MANHOLE LOCATION

PROPOSED HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 21: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: LAOAG, ILOCOS NORTE DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP LAOAG SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC 

PROPOSED MANHOLE LOCATION

PROPOSED LOCATION OF MANHOLE

PROPOSED HANDHOLE LOCATION

PROPOSED HANDHOLE LOCATION

NGCP CONTROL ROOM BUILDINGPROPOSED HANDHOLE LOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 22: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: MEXICO, PAMPANGA DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

NBP Technical Team PROPOSED CABLE ENTRY AT NGCP MEXICO 

SUBSTATIONEMMANUEL REY R. CAINTIC

Undersecretary for Digital Philippines

LEO CIPRIANO L. URBIZTONDO, JR., PECE

Director IV, National Broadband Program

EXISTING UNDERGROUND 

PROPOSED MANHOLE LOCATION

PROPOSED MANHOLELOCATION

PROPOSED UNDERFROUND FOC NGCP CONTROL ROOM 

BUILDING

PROPOSED HANDHOLE LOCATION

PROPOSED UNDERFROUND FOC 

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 23: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SAN MANUEL, PANGASINAN DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP NAGSAAG SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

CONTRO

LRO

OM

PROPOSED UNDERGROUND FOC

EXISTING TRENCH

PROPOSED MANHOLE LOCATION

PROPOSED MANHOLE LOCATION

NGCP NAGSAAG CONTROLROOM BUILDING

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 24: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: APPROVED BY: SHEET CONTENTS:

LOCATION: OLONGAPO, ZAMBALES DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

NBP Technical TeamPROPOSED CABLE ENTRY AT NGCP 

OLONGAPO SUBSTATIONEMMANUEL REY R. CAINTIC

Undersecretary for Digital Philippines

LEO CIPRIANO L. URBIZTONDO, JR., PECE

Director IV, National Broadband Program

PROPOSED UNDERGROUND FOC 

PROPOSED MANHOLELOCATION

PROPOSED MANHOLE LOCATION

NGCP CONTROL ROOM BUILDING

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 25: HIG HG FIIG J

SHEET NO.:

1

1

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 26: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SAN ESTEBAN, ILOCOS SUR DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP SAN ESTEBAN SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

CONTR

OL

ROOM

PROPOSED UNDERGROUND FOC 

PROPOSED LOCATION OF MANHOLE

NGCP CONTROL ROOM BUILDING

PROPOSED MANHOLE LOCATION

EXISTING TRENCH

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 27: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: APPROVED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SAN JOSE, BULACAN DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP SAN JOSE SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

PROPOSED UNDERGROUND FOC 

PROPOSED MANHOLE LOCATION

EXISTING UNDERGROUND CABLE TRENCH

NGCP CONTROL ROOM BUILDING

PROPOSED MANHOLELOCATION

UNCONTROLLED W

HEN PRINTED O

R EMAILED

Page 28: HIG HG FIIG J

PROJECT TITLE: PREPARED BY: ENDORSED BY: RECOMMENDED BY: SHEET CONTENTS: SHEET NO.:

1

1LOCATION: SUBIC, ZAMBALES DATE SIGNED: DATE SIGNED: DATE SIGNED: SCALE: NOT TO SCALE

NBP ‐ NATIONAL FOC BACKBONE

 PROPOSED CABLE ENTRY AT NGCP SUBIC SUBSTATIONNBP Technical Team LEO CIPRIANO L. URBIZTONDO, JR., PECE EMMANUEL REY R. CAINTIC

Director IV, National Broadband Program Undersecretary for Digital Philippines

CONTR

OL

ROOM

PROPOSED UNDERGROUND FOC 

PROPOSED MANHOLE LOCATION

NGCP UNMANNED EQUIPMENT BUILDING

PROPOSED LOCATION MANHOLE

CONTROLROOM

SUBIC POWER UNMANNED EQUIPMENT BUILDING

UNCONTROLLED W

HEN PRINTED O

R EMAILED