7
0 100 200 < < < < < < < < < TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 TL4 10000 10100 10200 10300 10400 10500 10600 10700 10800 10900 11000 11100 11200 11300 11400 11500 11600 11700 11800 11900 12000 LEGEND: APPROXIMATE PEAT THICKNESS CONTOUR ROAD ALIGNMENT NON PEAT PEAT PRELOAD AND SURCHARGE EXCAVATE AND REPLACE X BRIDGE STRUCTURES 104 106 108 101 102 103 105 107 109 111 110 KEY PLAN Title: Document ID: Rev. Drawing Plotted: 08 Mar 2012 03:09 p.m. Project:: - Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON NOTES: Status: - MACKAYS TO PEKA PEKA EXPRESSWAY Revision. Approved. Amendment. Date. Drawing No: - - Scale (A3) Original 1:5000 M2PP AEE DWG CV-EW 107 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 7 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE INTERCHANGEABLE AND MAY VARY FROM OPTION SHOWN. 1 AEE LODGEMENT NRN 15.03.12 FOR CONSENTING

MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE

0

100

200

<

<

<

<

<

<

<

<<

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

T

L

4

TL4

TL4

TL4

T

L

4

T

L

4

TL4

TL4

TL4

T

L

4

T

L

4

TL4

T

L

4

T

L

4

T

L

4

T

L

4

TL4

TL4

1

0

0

0

0

1

0

1

0

0

1

0

2

0

0

1

0

3

0

0

1

0

4

0

0

1

0

5

0

0

1

0

6

0

0

1

0

7

0

0

1

0

8

0

0

1

0

9

0

0

1

1

0

0

0

11100

11200

11300

11400

11500

11600

11700

11800

1

1

9

0

0

1

2

0

0

0

LEGEND:APPROXIMATE PEATTHICKNESS CONTOUR

ROAD ALIGNMENT

NON PEAT

PEAT

PRELOAD AND SURCHARGE

EXCAVATE AND REPLACE

X

BRIDGE STRUCTURES

104106 108

101102

103105

107

109

111110

KEY PLAN

Title:

Document ID: Rev.

Drawing Plotted: 08 Mar 2012 03:09 p.m.

Project::

-Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

NOTES:

Status:-

MACKAYS TO PEKA PEKA EXPRESSWAY

Revision. Approved.Amendment. Date.

Drawing No:

- -

Scale (A3)Original

1:5000M2PP AEE DWG

CV-EW 107 1

PEAT THICKNESS CONTOURSAND PEAT TREATMENT

SHEET 7 OF 11

1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE INTERCHANGEABLE AND MAY VARY FROM OPTION SHOWN.

1 AEE LODGEMENT NRN 15.03.12

FOR CONSENTING

Page 2: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE

<

<

<

<

<

<

<

<

<<

TL4

TL4

TL4

T

L

4

T

L

4

TL4

TL4

TL4

T

L

4

T

L

4

11700

11800

1

1

9

0

0

1

2

0

0

0

1

2

1

0

0

1

2

2

0

0

1

2

3

0

0

1

2

4

0

0

1

2

5

0

0

1

2

6

0

0

1

2

7

0

0

12800

12900

13000

13100

13200

13300

1

3

4

0

0

1

3

5

0

0

1

3

6

0

0

1

3

7

0

0

1

3

8

0

0

LEGEND:APPROXIMATE PEATTHICKNESS CONTOUR

ROAD ALIGNMENT

NON PEAT

PEAT

PRELOAD AND SURCHARGE

EXCAVATE AND REPLACE

X

BRIDGE STRUCTURES

104106 108

101102

103105

107

109

111110

KEY PLAN

Title:

Document ID: Rev.

Drawing Plotted: 08 Mar 2012 03:09 p.m.

Project::

-Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

NOTES:

Status:-

MACKAYS TO PEKA PEKA EXPRESSWAY

Revision. Approved.Amendment. Date.

Drawing No:

- -

Scale (A3)Original

1:5000M2PP AEE DWG

CV-EW 108 1

PEAT THICKNESS CONTOURSAND PEAT TREATMENT

SHEET 8 OF 11

1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE INTERCHANGEABLE AND MAY VARY FROM OPTION SHOWN.

1 AEE LODGEMENT NRN 15.03.12

FOR CONSENTING

Page 3: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

1

3

4

0

0

1

3

5

0

0

1

3

6

0

0

1

3

7

0

0

1

3

8

0

0

1

3

9

0

0

1

4

0

0

0

1

4

1

0

0

14200

14300

1

4

4

0

0

14500

14600

14700

14800

14900

15000 15100 15200

15300

15400

15500

LEGEND:APPROXIMATE PEATTHICKNESS CONTOUR

ROAD ALIGNMENT

NON PEAT

PEAT

PRELOAD AND SURCHARGE

EXCAVATE AND REPLACE

X

BRIDGE STRUCTURES

104106 108

101102

103105

107

109

111110

KEY PLAN

Title:

Document ID: Rev.

Drawing Plotted: 08 Mar 2012 03:10 p.m.

Project::

-Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

NOTES:

Status:-

MACKAYS TO PEKA PEKA EXPRESSWAY

Revision. Approved.Amendment. Date.

Drawing No:

- -

Scale (A3)Original

1:5000M2PP AEE DWG

CV-EW 109 1

PEAT THICKNESS CONTOURSAND PEAT TREATMENT

SHEET 9 OF 11

1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE INTERCHANGEABLE AND MAY VARY FROM OPTION SHOWN.

1 AEE LODGEMENT NRN 15.03.12

FOR CONSENTING

Page 4: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE

15300 15400 15500 15600 15700 15800 15900 16000 16100 16200 16300

16400

16500

16600

16700

16800

16900

17000

17100

17200

2

2

2

2

2

2

1

1

1

2

3

3

2

2

2

2

2 1

11

1

1

1

1

1

1

1

1

1

1

1

1 13

3

3

3

3

3

3

4

4

4

441

1

2

2

3

3

4

4

LEGEND:APPROXIMATE PEATTHICKNESS CONTOUR

ROAD ALIGNMENT

NON PEAT

PEAT

PRELOAD AND SURCHARGE

EXCAVATE AND REPLACE

X

BRIDGE STRUCTURES

KEY PLAN

354356 358

351352

353355

357

359

361360

Title:

Document ID: Rev.

Drawing Plotted: 08 Mar 2012 03:11 p.m.

Project::

-Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

NOTES:

Status:-

MACKAYS TO PEKA PEKA EXPRESSWAY

Revision. Approved.Amendment. Date.

Drawing No:

- -

Scale (A3)Original

1:5000M2PP AEE DWG

CV-EW 110 1

PEAT THICKNESS CONTOURSAND PEAT TREATMENT

SHEET 10 OF 11

1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE INTERCHANGEABLE AND MAY VARY FROM OPTION SHOWN.

1 AEE LODGEMENT NRN 15.03.12

FOR CONSENTING

Page 5: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE
Page 6: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE
Page 7: MACKAYS TO PEKA PEKA EXPRESSWAY - NZ Transport ......CV-EW110 1 PEAT THICKNESS CONTOURS AND PEAT TREATMENT SHEET 10 OF 11 1. PROPOSED PEAT TREATMENT OPTIONS SHOWN. THESE METHODS ARE

FINAL EMBANKMENT DESIGNPROFILE

TYPICAL SECTION - STAGE 2 PRELOAD AND SURCHARGE, REMOVAL/ FINAL EMBANKMENT CONSTRUCTIONN.T.S

PREDICTED SETTLEMENT PROFILE

PAVEMENT

FINAL EMBANKMENT DESIGNPROFILE

TYPICAL SECTION - STAGE 1 PRELOAD AND SURCHARGE, EMBANKMENT CONSTRUCTIONN.T.S

ENGINEERED EMBANKMENT FILL

TEMPORARY SURCHARGEEMBANKMENT PROFILE

1.0m

(MIN

)

EXISTING GROUND PROFILEGEOTEXTILE LAYERSTARTER / DRAINAGE LAYERGRANULAR ENGINEERED FILL

S2

SURCHARGE ANDPRELOAD HEIGHT (S2)

S1

TEMPORARY BATTER TO SUIT

SURCHARGE FILL TO BE REMOVEDTO SUBGRADE LEVEL.

XX

13

13

GEOTEXTILE LAYER

R

SETTLEMENT (S1) DEPTH

EXISTING GROUND

EXISTING GROUND

Title:

Document ID: Rev.

Drawing Plotted: 08 Mar 2012 02:56 p.m.

Project::

-Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

NOTES:

Status:-

MACKAYS TO PEKA PEKA EXPRESSWAY

Revision. Approved.Amendment. Date.

Drawing No:

- -

Scale (A3)Original

M2PP AEE DWG

CV-EW 121 1

GEOTECHNICALSURCHARGE EMBANKMENT

TYPICAL SECTIONS

1. THE EMBANKMENT IS CONSTRUCTED ABOVE FINAL SEAL LEVEL. ADDITIONAL HEIGHT ABOVE FINISHEDSEAL LEVEL IS THE SURCHARGE AND THE PRE-LOAD HEIGHT. THE PRE-LOAD HEIGHT IS EQUIVALENT TOTHE EXPECTED SETTLEMENT DEPTH. THE SURCHARGE HEIGHT IS THE ADDITIONAL HEIGHT THAT ISPLACED AND THEN REMOVED FOLLOWING SETTLEMENT.

2. PRELOAD AND SURCHARGE HEIGHT (S2) TYPICALLY VARIES BETWEEN 1.5m TO 3.0m.1 AEE LODGEMENT NRN 15.03.12

FOR CONSENTING