www.marinba.org ◆ [email protected] August 20 , 2013 Vol. 57, Issue #31
This past Monday saw the return of the California State Senate, meaning that both Houses were finally back at work after their staggered summer breaks. With the Legislature set to recess for the year on September 15th, the work load has ramped-up significantly in an effort to meet the forthcoming deadlines. Of course, this also is the time of year when “gut and amends” of legislation also go into full swing, meaning that I’ve got to be extra careful to read ALL amendments going into bills to ensure that someone isn’t trying to “slip” language past me.Stay tuned over the next several weeks as things heat up to their highest levels. So what bills are in-play at the moment? Following are some highlights. Remember that with both houses of the Legislature controlled by the Democrats, it could be a lot worse in terms of onerous provisions in bills, so “count your blessings!”
AB 44 (Buchanan) - AB 44 is an important measure for all contractors, public agencies and the public as well. Currently, prime contractors are not required to list the contractor’s license for their subcontractors on their bids. Consequently, many unlicensed subcontractors end up working on public works projects, because there is no way to catch them unless the public agency physically checks the licenses on their own volition,
which rarely happens. AB 44 will require that primes list their subs’ contractor’s licenses. A prime will have up to 24 business hours after bid time to correct any mistakes made in the license numbers that were listed. This bill will be signed by the governor. It will take effect on July 1, 2014.
AB 302 (Chau) - This bill provides a statutory definition for a “de minimis” public subsidy that does not trigger the requirements of prevailing wage law. Specifically, this bill defines “de minimis” to mean a public subsidy that is both less than $25,000 and less than 1% of the total project cost and will not apply to a project that was advertised for bid, or a contract that was
awarded, before January 1, 2014. This bill is sponsored by the State Building Trades and will likely be signed into law.
AB 1140 (Daly) - This bill provides that changes made to prevailing wage rates apply on their effective date to any contract that is awarded or for which notice to bidders is published on or after January 1, 2014. Specifically, this bill:
1. Provides that if during any semiannual period DIR determines that there has been a change in any prevailing wage rate, the determination shall apply on its effective date to any contract that is awarded or for which notice to bidders is published on or after
January 1, 2014.
2. Provides that specified parties may, within 20 days after publication of a new determination, file with DIR a petition to review the determination on the grounds that the rate has not been determined in accordance with existing law. The petition shall be filed with the awarding body within two days thereafter.
3. Provides that, upon filing of such a petition, DIR shall initiate an investigation or hold a hearing.
4. Provides that within 20 days after the filing of such a petition (or within a longer period agreed to by all interested parties), DIR shall make a determination that is final.
5. States that a determination issued by the Director of DIR is effective 10 days after its issuance. The Director of DIR must include an issue date on the determination. The determination will remain in effect until it is modified, rescinded, or superseded by the Director of DIR.
READ MORE ON PAGE 10
Legislature Returns for Intense Month of Workby Phil Vermeulen, Governmental Relations
Marin Builders Association ◆ Weekly BulletIn ◆ Page 2
www.marinba.org ◆ [email protected]
Select eWaste including computers, cell phones, printers & TVs accepted!
FREE Shred-a-Thon Saturday, September 7 9 am – 1 pm
San Rafael High School | 185 Mission Avenue, San RafaelEnter from the north side of Third St.,
just east of Montecito Plaza Shopping Center
Dispose up to 3 bankers’ boxes of sensitive documents FREE Select eWaste items accepted
Donations of canned food to benefit the Marin Food Bank encouraged
Please visit redwoodcu.org/shredathon for more information
Shredding and eWaste recycling generously donated by:
We look forward to serving you!
Marin Computer Resource Center
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 3
PROJECT OF THE WEEKSealed proposals for
GARDEN ROCK ROAD
DRAINAGE IMPROVEMENTS
Project No. 2013-07
will be received by the Department of Public Works, County
of Marin, Room 404, Marin County Civic Center, San Rafael
until
Thursday, August 29th, 2013 @ 2:30 PM
This project consists of minor drainage improvements such as catch basins, curb and gutter, headwalls, and new culvert pipes at Garden Rock Road, San Anselmo between Crane Dr. and the end of the cul-de-sac. In addition, there will be asphalt resurfacing, clearing and grubbing, and removal of two trees.
The Engineer’s estimate for this project is $90,000.
Plans and specifications may be viewed online by subscribers to the MBA Online Plan Service.
in this issue
________________________
PHIL VERMEULEN REPoRts
fRoM tHE caPItoL .....................1
fREE shred-a-Thon by RcU ...........2
Project of the Week ........................3
5 Things You Need to Know ..............6
The capitol connection ..................7
safety: adjusting to Your New
Work Environment .............................8
Permits ..............................................12
Liens & completions .....................17
Project Bid schedule ........................20
classifieds ..........................................29
__________________________
contact MBa660 Las Gallinas Avenue
San Rafael, CA 94903 ◆
Office: 415-462-1220Fax: 415-462-1225
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 4
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 5
www.marinba.org ◆ [email protected]
2013 MBa Directors & officers
PresidentJeff Mertel - Mertel carpets, inc.
Vice Presidentjim schalich - schalich Bros.
construction
chief financial officer tyler Doherty - cal-West rentals, inc.
secretarYtom Barr - Ghilotti Bros., inc.
Past Presidentaimi Dutra - the Dutra Group
executive DirectorKLif KnoLes
Dave Trahan - Patriot MechanicalHerb Moran - MOC Insurance Services
John Busick - Bob Kunst PaintingOliver Dibble - Dibble & Company
Mark Silvia - Marin Mechanical, Inc.Clayton Fraser - West Bay BuildersRob Scerri - Golden State Lumber
Keith Dotto - Dotto Glass, Inc.Dick Ghilotti - Ghilotti Construction CompanyDave Garbarino - Marin Sanitary Service, IncDiane Henderson - DMH Land Use Planning
Jeff Grady - Grady Consulting, Inc.
STAFFPaula Krause - Office Manager
Barbara Jones - Membership ManagerKellie Buono - Administrative Assistant/Reception
COnSULTAnTSCasey Mazzoni - Legislative Analyst
The weekly bulletin is owned by MBA. Archive available at www.marinba.org
660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Klif Knoles
MBA MEMBER
Marin Builders Association ◆ Weekly BulletIn ◆ Page 6
www.marinba.org ◆ [email protected]
5 things you need to know
By CASey MAZZOnIMARIn BuIlDeRS ASSOCIAtIOn
leGISlAtIVe [email protected]
1 . In A Mee tInG hOSteD By MARIn eCOnOMIC FORuM I leARneD thAt Marin Municipal Water District ratepayers can expect their utility bills to
stay the same next year. the water district will forego any rate increases in the 2014-15 fiscal year, declaring a “Rate Increase holiday.”
2 . the CIt y OF nOVAtO WAntS tO heAR FROM yOu! hOW WOulD you like to see the city develop north Redwood Corridor, from Olive
Avenue to San Marin Drive? the City is hosting an open forum workshop on Saturday, September 28, 9:00 a.m. – 12pm at the Margaret todd Senior Center. I hope to see you there!
3 . SIx MARIn MunICIPAlItIeS WIll See lIVely COunCIl RACeS In the nov. 5 election. the Marin Builders Association will be tracking all of
them and making endorsements.
4 . the CIt y OF nOVAtO hAS ReleASeD A StuDy thAt PROVIDeS An economic impact analysis of a downtown theater district. http://www.
cityofnovato.org/Index.aspx?page=637&recordid=1514&returnuRl=%2findex.aspx
5 . DAnIel ChIn, CFO OF GhIlOt tI BROS. InC. ReCeIVeD the 2013 northbay Best CFO Award. Since 2006, CFO Mr. Chin has developed a
finance team to handle the increased annual volume from $50 million to more than $100 million. http://www.northbaybusinessjournal.com/77624/cfo-recognition-awards-2013-daniel-chin-ghilotti-bros/
“elections should be held on April 16th-
the day after we pay our
income taxes. that is one of the few things that
might discourage politicians from
being big spenders.”
- thomas Sowell
Marin Builders Association ◆ Weekly BulletIn ◆ Page 7
The Capitol Connection Q&A for Contractors By Shauna Krause, Capitol Services, Inc.
Understanding the complex web of paperwork that is required of contractor’s isn’t easy. But, like a ‘house of cards’ when one piece of paper is ‘pulled from the deck’ the whole structure can fall. Who will take over your contracting business when you decide to retire? If it’s family there’s a waiver for that…
Q: Our license is currently suspended based on the fact that our Worker’s Compensation policy on file is expired. We have submitted a new certificate but the CSLB has not put it on record yet. We have several Joint Venture (JV) licenses that are also showing suspended based on no Worker’s Comp policy on file. Do we need to submit a certificate separately for each of the Joint Ventures?
A: The only time you need to submit a separate Worker’s Comp policy for a Joint Venture is if the JV has employees of it’s own. The JV licenses are showing suspended because they are tied to each of the entity’s licenses that make up the Joint Venture. Therefore, when one of those entity’s licenses suspends, the JV license goes down as well. Once the CSLB puts your new policy on record your company license and the Joint Venture licenses should become active again.
Q: I have worked with my father for 16 years. Is it still true that I can just take over his license when he is done working? I
would definitely want to retain the number. How does this all work? Thank you in advance for your help.
A: There are certain circumstances that allow you to “take over” your father’s license when he retires.
If he has a Sole Owner license, you would need to apply for a new license and request that your Dad’s license number be re-issued to you. If your intention is to obtain this license without taking the exams, you can request to waive the exams based on the fact that you have been actively engaged in the business for five out of the last seven years.If your father’s business were a corporation then you would apply to replace your father on the license as the qualifying individual.
Again, you can request to waive the exams if you can show/prove that you have been actively engaged in the business in a supervisory capacity for five out of the last seven years.
Keep in mind that you can request to waive the exams based on the facts above, but it’s not guaranteed that it will be approved. Please call us if you have any further questions or if you’d like our assistance with this process.
Q: You helped our company obtain a nevada contractor’s license last year. At the time it was a brand new company without any assets so we had to have our Officers indemnify the company in order to qualify for the license. I can see where it states in the indemnification instructions that the indemnification is good until revoked in writing. Does that mean that we can just revoke the indemnification without additional support? Or will we be required to submit financials for the company?
A: If you remove the indemnification you will be required to provide new financial documents to support your bid limit. nevada requires that financial information be kept on file at all times. While knowledge is power, knowing where to go for the answers
is half the battle. Get expert assistance immediately when you
call 866-443-0657, email [email protected], or write us at
Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA
95814. Research past columns at www.cutredtape.com.
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 8
Adjusting to Your New Work Environment A walk through other areas of the workplace is a common occurrence, but it can also be dangerous if you don’t stay alert. This is particularly true for employees leaving their old, familiar departments and moving into new roles in other areas. New employees receive instructions regarding training and safety precautions. However, when transitioning roles to another area, it can operate very differently; procedures and equipment may be different and safety precautions may vary as well. Safety in New Surroundings Before entering another area, familiarize yourself with any special rules or procedures necessary for your safety. This might mean wearing special personal protective equipment or meeting certain regulations concerning employee actions. During the transition to your new area, be on the guard at corners and close to machinery, and watch for power and hand trucks on the move. Although equipment operators have their own safety regulations to follow, which include watching for pedestrians, be cautious and ready to move. Look both ways before stepping out into an aisle. In aisles wide enough for truck or other equipment traffic, use extreme caution. Don’t try to beat an oncoming forklift or other machinery; you could easily misjudge its speed and fall in front of it. Don’t walk while you’re looking in another direction, you could bump into another employee or a
machine. If you can’t watch where you’re walking, wait until you can. Watch out for slip, trip and fall hazards. Misplaced tools, pieces of materials or other objects pose hazards. Keep floors and aisles clear of these dangers. In addition, do not take shortcuts, regardless of how much time they save. Shortcuts are not approved routes and taking them can cause very serious injuries. At times, it may be necessary to restrict your admittance to certain areas. Whether the restrictions are temporary or permanent, don’t enter the area unless authorized to do so. Safety Precautions Stay safe when transitioning into a new work environment by remembering these basic safety precautions:
Watch out for moving equipment. Look both ways before stepping
into an aisle. Use handrails. Keep your eyes open for slip, trip
and fall hazards. Don’t take shortcuts. Stay out of restricted areas. Ask for direction regarding
unfamiliar safety guidelines.
A new work environment requires employees to keep basic safety precautions top of mind.
California Builders Insurance Program: Your workplace safety partner
Safety Matters
THIS FLYER IS FOR GENERAL INFORMATIONAL PURPOSES ONLY, AND IS NOT INTENDED AS MEDICAL OR LEGAL ADVICE. CONTENT © 2007-2010 ZYWAVE, INC. ALL RIGHTS RESERVED.
California Builders Insurance Program
For more information, call: (866) 216-5255 or visit our website: http://www.cbeins.com
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 9
www.marinba.org ◆ [email protected] ◆ [email protected]
Asuntos de Seguridad
Adaptación al nuevo entorno de trabajo Una caminata por otras áreas del lugar de trabajo puede ser algo común, pero también puede ser peligroso si no está atento. Esto es particularmente la realidad para los empleados que dejan sus antiguas secciones conocidas y se trasladan a nuevas funciones en otras áreas. Los empleados nuevos reciben instrucciones sobre la capacitación y las medidas de seguridad. Sin embargo, cuando se cambian las funciones a otra área puede ser muy diferente; los procedimientos y el equipo pueden ser diferentes y las medidas de seguridad también pueden variar. Seguridad en nuevos entornos Antes de ingresar a otra área, familiarícese con las normas y procedimientos especiales necesarios para su seguridad. Esto puede significar usar equipo de protección personal especial o cumplir con ciertas reglamentaciones relacionadas a las acciones de los empleados. Durante la transición a un área nueva, esté atento en las curvas y cerca de la maquinaria y esté pendiente de las carretillas de mano y los montacargas eléctricos en movimiento. A pesar de que los operadores del equipo tienen sus propias reglamentaciones de seguridad, las que incluyen tener cuidado con los peatones, sea precavido y esté preparado para moverse. Mire para ambos lados antes de salir a un pasillo. En los pasillos que son lo suficientemente anchos para el tráfico de montacargas y otros equipos, sea extremadamente precavido. No intente adelantársele a una carretilla elevadora u otra maquinaria que se aproxime; podría confundir su velocidad y caer frente a
ella. No camine mientras mira hacia otra dirección, podría chocar con otro empleado o con una máquina. Si no puede mirar por dónde camina espere hasta poder hacerlo. Tenga cuidado con los peligros de resbalones, tropiezos y caídas. Las herramientas, los trozos de materiales y otros objetos mal ubicados son peligrosos. Mantenga los pisos y los pasillos libres de estos peligros. Además, no tome atajos, sin importar cuánto tiempo le ahorren. Los atajos no son caminos aprobados y tomarlos puede causar lesiones muy graves. A veces, puede ser necesario restringir su acceso a ciertas áreas. Ya sea que las restricciones sean temporales o permanentes, no ingrese al área a menos que esté autorizado para hacerlo. Medidas de seguridad Manténgase seguro al cambiar a un nuevo entorno de trabajo recordando estas medidas de seguridad básicas:
Tenga cuidado del equipo en movimiento.
Mire para ambos lados antes de salir a un pasillo.
Utilice los pasamanos. Mantenga los ojos abiertos para
advertir peligros de resbalones, tropiezos y caídas.
No tome atajos. Manténgase fuera de las áreas
restringidas. Pida orientación sobre las pautas de
seguridad que no conoce.
Un nuevo entorno de trabajo requiere que los empleados tengan en cuenta principalmente las medidas básicas de seguridad.
California Builders Insurance Program: Su compañero de seguridad en el lugar de trabajo
ESTE FOLLETO TIENE FINES INFORMATIVOS GENERALES EXCLUSIVAMENTE Y NO DEBE CONSIDERARSE COMO UNA RECOMENDACIÓN MÉDICA O LEGAL. CONTENIDOS © 2007-2010 ZYWAVE, INC. TODOS LOS DERECHOS RESERVADOS.
California Builders Insurance Program
For more information, call: (866) 216-5255 or visit our website: http://www.cbeins.com
Marin Builders Association ◆ Weekly BulletIn ◆ Page 10
www.marinba.org ◆ [email protected] ◆ [email protected]
CONTINUED FROM PAGE 1This too is sponsored by the State Building Trades. While the original bill had significantly more hurdles for contractors to bear, this version is far better; however, an additional amendment to require public agencies to approve change orders to factor in the increases would have been much more preferable. Unfortunately, the pressure from the public agencies kept that amendment from happening. This bill will likely be signed.
AB 1336 (Frazier) - This bill extends the deadline from 180 days to 18 months, for the Labor Commissioner to serve a civil wage and penalty assessment against a public work contractor or subcontractor, or both. This bill also extends the deadline from 180 days to 18 months, as specified, for a joint labor-management committee to bring an action against an employer that fails to pay the prevailing wage to its employees. This bill revises and recasts remedies that may be awarded by a court in these joint labor-management committee actions. This bill authorizes the court to award interest, liquidated damages, and injunctive relief in these actions. Yep, another State Building Trades bill. While I’m still far from happy with it, just realize that the original bill would have allowed the deadline to extend up to 3 years instead of the 18 months that’s now in the bill! Again, I expect the bill to be likely signed.
SB 7 (Steinberg) - Prohibits the reception or use of state funding or financial assistance for construction projects by charter cities that allow contractors to not comply with the state’s prevailing wage law on any public works contract. This too is sponsored by the State Building Trades and will be signed into law.
SB 399 (Wright) – This is our sponsored bill that would require state agencies who call a contractor out on an emergency basis to pay 10% interest above prime if the payments to the contractor are not made within 45 days. The bill will be on the Assembly Floor next week and then will go back for concurrence in the Senate. The Department of General Services just came
out in opposition. I have some clarifying
amendments I will be taking next week. Hopeful that this will be signed into law!
SB 404 (Jackson) – This is a bill that I teamed-up with the California Chamber on to oppose. It was held in the Assembly Appropriations Committee the other day on suspense, meaning that due to its costs, it may be dead (hope upon hope), but won’t officially know until next week. This measure makes it virtually impossible for employers to manage their employees and exposes them to a higher risk of litigation by expanding the Fair Employment and Housing Act (FEHA) to include a protected classification for any person who is, perceived to be, or associated with an individual who provides medical or supervisory care to a listed family member.SB 404 proposes to include “familial status” as a protected classification under the FEHA to prevent discrimination on such basis. The term “familial status” is broadly defined as:1. any individual who provides “medical or supervisory care” to a child, parent, spouse, or domestic partner; 2. any employee who is “perceived” as someone who provides medical or supervisory care to a child, parent, spouse, domestic partner, or in-law; or 3. any person who is “associated” with a person who provides medical or supervisory care to a child, parent, spouse, domestic partner, or in-law.The term “medical” care is undefined and therefore could be liberally interpreted to include such tasks as administering over-the-counter medication once a day or even driving a listed family member to a doctor’s appointment on a quarterly basis. Moreover, “supervisory” care is also ambiguous and would expand this proposed classification to employees who are not actually providing any care to a covered family member, but rather “supervising” the care the family member receives.
Furthermore, SB 404 applies to anyone who is perceived to provide familial care or associated with someone who provides familial care. Such a broad application of a protected classification will essentially encompass almost all employees in the
workforce and, therefore, will hamper employers’ ability to manage their business, as any adverse employment action an employer takes against an employee could potentially be challenged as discriminatory on the basis of “familial status.”
Burdens Small BusinessesThis burden that SB 404 creates will have an impact on small businesses as well as large ones. The FEHA applies to any employer who has five employees or more. Accordingly, SB 404 will subject these small businesses to potential costly litigation based on the allegation that an employee who suffered an adverse employment action provided familial medical or supervisory care, was perceived as providing such care, or was associated with someone providing such care.
Employees Already ProtectedCalifornia already protects employees from discrimination on the basis of sex, pregnancy, medical condition, mental disability, or physical disability. Similarly, California provides employees with leave to care for the serious medical condition of family members, which may be compensated through California’s Paid Family Leave Act. Additionally, California requires “kin care” that mandates an employee be allowed to use at least half of any accrued sick leave to care for family members. These various leaves and protections are in addition to those provided by federal law. Given these existing protections, there is simply no basis to include the broad protected classification under California law as proposed by SB 404, other than to increase litigation opportunities.
Costly LitigationApproximately 19,500 discrimination claims were filed in 2010 with the Department of Fair Employment and Housing under FEHA, which was 1,000 complaints more than in 2009. notably, more than 4,000 of these complaints were dismissed due to lack of evidence of any violation. Adding this new expansive classification to FEHA will only cause such cases to dramatically increase, thereby burdening the state agency as well as California employers with costly litigation.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 11
www.marinba.org ◆ [email protected] ◆ [email protected]
north bayh a p t e rC
Along with increased growth comes increased risk and liability and increased worry. Hear from our panel of experts as they share simple ways to avoid litigation, claims of wrongful termination, and customer disputes.
• Do you keep employees longer than you should because you’re worried about being sued for wrongful termination?
• Would you like to know the top ten things to have in place in contracts that could keep you out of court?
• Do you worry about safety compliance and if OSHA will show up on your job site?
• Ever wish you had a better system for hiring the right people?
This information-packed meeting will give you the low-down on what to do in each of these areas, and help you minimize lisk and liability in your business. NOTE: This is not a presentation about insurance—it’s about smart business practices.
North Bay NARI
When
September 10, 2013 5:30-8:30pm
5:30-6:15 pm Networking 6:15-8:30 pm Dinner and
Presentation
Location Stone Tree Golf Club
9 Stone Tree Lane, Novato
Cost $45 NARI members/ $55 non-members
1st Meeting $20 (one time only)
Registration will be available at the door.
Register and prepay on-line by September 5, and
receive a $5 discount.
Proper attire required.
North Bay NARI PO Box 1313
Novato, CA 94948
Email membership@
northbaynari.org
Website For information on how to become a member: www.northbaynari.org
About our Panelists:
Terri Carter is a Human Resources Consultant with Barrett Business Services, Inc. (BBSI), providing complete human-resources support to business clients in the Bay Area. Terri has a B.A. in Business Economics from UCSB and is certified as a Senior Professional in Human Resources.
Craig Wallace is a partner of McLennon Law Corporation, and provides legal consultation and services to construction industry participants, including general business matters such as insurance and contracts, as well as representing clients in litigation and dispute resolution.
Peter Daly is owner of Constructive Resolution Associates (CRA), a firm providing arbitration, mediation, and expert-witness services. Peter is also a partner in Design Build Alliance and has over 30 years’ experience as a builder. Through CRA, Peter has assisted in the resolution of over 1,000 construction disputes. Peter has been a NARI member since 1998.
Panel moderator Dan McLennon is Managing Partner of McLennon Law Corporation. He has been counsel to the construction industry for over 25 years and has represented all parties for all issues related to construction. Dan has a passion for making insurance companies live up to their promises, is an active author and speaker, and has received numerous awards.
Stop the Worry Treadmill!Panel Discussion
Marin Builders Association ◆ Weekly BulletIn ◆ Page 12
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
cItY & toWN PERMIts IssUEDCity/Town Issue
DateOwner Contractor Site Address Type Valuation
Corte Madera 8/5 John H Teasley Janney Roofing Inc 1141 Meadowsweet Dr Reroof $10,000 Corte Madera 8/5 Corte Madera Village Schrader & Martinez
Construction1530 Redwood Hwy CT Improvements $325,000
Corte Madera 8/6 Athena Christopoulos Rec Solar, Inc. 26 Edgemar Solar $21,000 Corte Madera 8/6 Chris Voy 122 Crescent Rd Conversion $90,000 Corte Madera 8/6 Nordstroms Inc. Plant Construction 1870 Redwood Hwy Site Work $561,156 Corte Madera 8/8 770 Tamalpais Dr Inc Jason Brown
Construction221 Corte Madera Town Ctr
CT Improvements $12,000
Mill Valley 7/1 Leary Dennis & Hawkins Construction 10 Eugene St Remodel Two Bathrooms, Relocate Hallway, Modify Two Windows
$50,000
Mill Valley 7/1 James And Kate Nicholson
Bayside Builders 25 Bigelow Ave Addition & Remodel $600,000
Mill Valley 7/2 Olson, Steve 389 Molino Ave Minor Upgrade Remodel Of Both Bathrooms:
$14,000
Mill Valley 7/2 Madden Shaun Etal Lawnson Roofing 271 Miller Ave B Reroof, No Resheet, With Tar And Gravel
$17,750
Mill Valley 7/2 Colloton Ed & Eve Altman And Co 40 Tamalpais Ave Master Closet Remodel And Lighting Throughout.
$200,000
Mill Valley 7/3 Tong Richard Tr & 20% Etal
Westward Builders, Inc. 10 Park Ave Seismic Retrofit. $60,000
Mill Valley 7/3 23 Janes Street Llc Urban Building Workshop
23 Janes St Construct New 3178 Sf Sfd
$953,400
Mill Valley 7/3 Ogden Douglas H & Stroub Construction Co, Inc.
12 Escalon Dr Addition And Remodel $1,700,000
Mill Valley 7/8 Fong, Alexander Gutierrez Roofing Co 7 Mountain View Ave Re-Roof Including Re-Sheet. Shall Meet All Current Code Requ
$14,206
Mill Valley 7/8 Decarlo, Pierluca Ricalday Roofing Services
422 Cascade Dr Reroof With Metal Seem Roofing, No Resheet. Shall Meet All C
$30,000
Mill Valley 7/8 Wagner Family Trust Bay Area Window Pros 25 Escalon Dr Replacement Of 10 Windows And 4 Sliding Doors, All Existing
$44,000
Mill Valley 7/9 Brigham William E /Tr/&
Charles Window And Door Compan
143 Sycamore Ave Replace 18 Existing Windows,
$22,000
Mill Valley 7/9 Chavez Mark A /Tr/ & American Solar Corporation
126 Cornelia Ave Solar $22,000
Mill Valley 7/9 W. Bradford And Kelly Drury
Riboli Construction 143 Roque Moraes Dr Build New Two Car Garage And Second Unit
$153,849
Mill Valley 7/10 Kevin And Kathy Knowles
Neighborhood Construction Inc.
7 Fairway Dr. Construct Cupola. Alterations To Upper Level; New Windows &
$120,000
Mill Valley 7/11 Pulgram Laurence F /Tr/ &
Sun First! Solar 11 Magdalena Ct Solar $27,000
Marin Builders Association ◆ Weekly BulletIn ◆ Page 13
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Mill Valley 7/12 Krikes Nicholas P Jr /Tr/ &
Newtown Construction 488 Edgewood Ave 3 New Retainaing Walls And Minor Foundation Repair.
$30,000
Mill Valley 7/15 Alhorn Peter /Tr/ & Morris Roofing Company
144 W Blithedale Ave Re-Roof, No Resheet, Comp Roof
$14,230
Mill Valley 7/16 Fischer David H & Douglas Barth 250 Greenwood Way Repair To Cardeck $10,000 Mill Valley 7/16 Herrera Stephen P & Able Roofing Company 20 Oxford Ave Re-Roof, No Re-Sheet, Of
Comp Shingle. Shall Meet All Curren
$10,690
Mill Valley 7/16 Stevens John W /Tr/ & Etal
Rw Construction 35 Cascade Way Bathroom Remodel $20,000
Mill Valley 7/16 Heaney, Kevin Sears Home Improvement
97 Ashford Ave Kitchen Remodel. $26,000
Mill Valley 7/16 Frasson-Sudmann Joan E /Tr/
251 Miller Ave Re-Roof Of Parking Barn And 5 Cottages. Shall Meet All Curre
$39,000
Mill Valley 7/16 Anrig Laverne L Living Trust
North Coast Remodel 165 Helens Ln Bath Remodel $60,000
Mill Valley 7/16 Cabral James D & Building Alchemy 26 Amicita Ave Interior Remodel And Replace Windows And Doors
$95,000
Mill Valley 7/17 Deitch Joshua A & Tamalpais Construction Company
51 Walnut Ave Demo & Temp Power Pole (Only) Of Existing Residence Currentl
$10,000
Mill Valley 7/18 Schow Family Trust Bill Dew Construction 13 Escalon Dr Addition Of 2 Car Garage And 1 Car Carport
$180,000
Mill Valley 7/22 John And Barbara Crary
Armstrong Installation 389 Molino Ave Re-Roof. Window Replacement.
$28,000
Mill Valley 7/25 San Mateo Land Exchange
John Kostelic Construction
25 Roque Moraes Ct Residential Re-Roof. $15,000
Mill Valley 7/25 Sun Shih C /Tr/ & Solarcity Corporation 19 Stanton Way Solar $18,620 Mill Valley 7/25 Colloton Ed & Eve Altman And Co 40 Tamalpais Ave Remove Fireplace
Skylights Etc. $75,000
Mill Valley 7/25 Gaumond, Mark Live Oak Building And Design
16 Eugene St Residential Remodel And Site Work.
$290,000
Mill Valley 7/25 249 W Blithedale Partners Llc
Rn Development 249 W Blithedale Ave Addition & Remodel. $600,000
Mill Valley 7/26 Milwid Mary E 14 Brooke Cir Adding Bathroom $10,000 Mill Valley 7/26 Rezaian Ali /Tr/ & Bracelin Company 420 Lovell Ave Minor Addition $100,000 Mill Valley 7/29 Daane Stephen E & Gene Burch Plumbing
& Heating24 Lower Dr Replace Existing Boiler $10,680
Mill Valley 7/29 Wheeler Robert L /Tr/ Henris Roofing Inc. 293 Eldridge Ave Partial Re-Roof. $13,800 Mill Valley 7/29 Sherman Donald /Tr/& Wedge Roofing Inc. 7 Eton Way Re-Roof Overlay. $24,900 Mill Valley 7/29 Haechler Walter & Thd At Home Services
Inc131 Hazel Ave Remove And Replace 25
Windows $32,068
Mill Valley 7/29 Campbell Family Trust Etal
Hettrich Construction Inc.
4 Underhill Rd Remodel And Addition $96,000
Marin Builders Association ◆ Weekly BulletIn ◆ Page 14
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Mill Valley 7/30 Bertolone Leland Tr & Kurt Jehling Construction
88 Buena Vista Ave Otc Bathroom Remodel. $26,500
Mill Valley 7/30 Sugarman Leon & Rosamond
Modern Design Construction Inc
29 Dorset Ln Living Room Addition Of 403 Sqft.
$87,848
Mill Valley 7/31 Ghodsian Shahram Tr Trush Construction 189 Janes St Construct New Sfr $720,000 Novato 8/5 Planson Thomas & Sustainable Solutions 483 San Andreas Dr Solar $26,000 Novato 8/5 Gribbin Marilyn Lic.Contract.Hired By
Owner683 Olive Ave Construction $45,000
Novato 8/5 Nicolas Pinos Soruco Structures, Inc 216 San Andreas Dr Construction $80,000 Novato 8/5 Jcc Cal Properties Llc Simmons Plumbing Co.
Inc.216 Vintage Way Plumbing $145,000
Novato 8/6 Saunier Martine Ongaro & Sons 285 Bel Marin Keys Blvd U Q
Minor Mechanical $11,151
Novato 8/6 Thom William J & Lic.Contract.Hired By Owner
4 Sage Ct Minor Construction $13,000
Novato 8/6 Freeman Charles J Tr &
Wedge Roofing, Inc. 1308 Cambridge St Reroof $13,000
Novato 8/6 Moore Harry J /Tr/ & Sunburst Solar Energy Inc
17 Harding Dr Solar $15,000
Novato 8/6 Ehmer Nathan & Heather
5 Star Pool Plaster 56 Dorothy Way Pool $35,000
Novato 8/6 Guinan Robert J & Patricia P
Lic.Contract.Hired By Owner
1144 Lea Dr Minor Construction $50,000
Novato 8/7 Emery Douglas L & Henris Roofing Co 22 Nina Dr Reroof $10,500 Novato 8/7 Scarpa Steven J Owner-Builder 1524 Hill Rd Construction $12,000 Novato 8/7 Lamperti Edward &
JudyAaero Htg. & Sheet Metal Inc.
91 Carnoustie Hts Hvac $12,580
Novato 8/7 Pittman J H & Heller-Pittman C
Steen Moller 227 Butterfield Dr Minor Construction $55,000
Novato 8/8 Martin Dennis M & In Out Plumbing 48 Eagle Dr Minor Plumbing $10,500 Novato 8/8 Scatena Christian M A1 Solar Power Inc 7 Nave Ct Solar $11,262 Novato 8/8 Wu April Stephen Curley Roofing 2395 Center Rd Reroof $13,320 Novato 8/8 Van Boer Eric D Tr & Chris Heney
Construction16 Regalia Dr Minor Construction $25,000
Novato 8/8 Ruth Daniel R & Petersen-Dean Inc 112 Windwalker Way Solar $27,825 Novato 8/9 Glendening David Wedge Roofing, Inc. 1275 Parkwood Dr Reroof $17,450 San Rafael 8/6 Bellettini Timothy Tr T.H. Eller Construction 38 Rustic Way Alter-SFD $15,000 San Rafael 8/6 Barzman Mark Abril Roofing 95 Golden Hinde Blvd Alter-SFD $15,500 San Rafael 8/6 Castro Joseph Tr Et Marin County Roofing 24 Lochness Ln Alter-SFD $20,000 San Rafael 8/6 Alioto Franklin & Etal Charles Window And
Door 39 Lochinvar Rd Alter-SFD $24,978
San Rafael 8/6 Olshansky Igor Manada Roofing Inc 200 Peacock Dr Alter-SFD $49,000 San Rafael 8/6 Northgate Mall Ja Bistow 5800 Northgate Dr 134 Alter-Commercial $150,000 San Rafael 8/7 Schwager Brigitte Tr Crown Ridge
Constuction247 Irwin St Alter-SFD $10,665
Marin Builders Association ◆ Weekly BulletIn ◆ Page 15
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
San Rafael 8/7 Licht Kenneth Licht Kenneth 19 Harcourt St Alter-SFD $325,000 San Rafael 8/8 Napell Bruce J & 584 Woodbine Dr Alter-SFD $20,000 San Rafael 8/8 Hinrichs Leanard G & 321 Hyancinth Way Alter-SFD $20,000 San Rafael 8/8 Hardman Christopher 229 Southern Heights
BlvdAlter-SFD $20,000
San Rafael 8/8 Caramucci Joseph W T
Henris Roofing Company
54 Mark Dr Alter-Commercial $24,818
San Rafael 8/8 Basso Roberts Tr 91 Bay Way Alter-SFD $40,000 San Rafael 8/8 Longituted Properties
IncBobzien Electric 31 Roberts Ave Alter-SFD $44,000
San Rafael 8/9 K5 Family Llc K5 Family Llc 55 Lochinvar Rd Alter-SFD $10,000 San Rafael 8/9 Nissam Lanydadoo Himmati Engineering 922 B St Alter-Commercial $25,000 San Rafael 8/9 Koch Judith Tr Aloha Roofing 150 Mitchell Blvd Alter-Commercial $51,000 San Rafael 8/12 San Rafael Rotary
ManorNorthern Pacific Roofing
1821 5Th Ave Alter-Commercial $25,917
San Rafael 8/12 Taaffe Adam & Rinaldi Construction 9 Fernwood Way Alter-SFD $46,470 Tiburon 7/22 Michael Romo David Salyer
Construction 80 Pamela Court Bath Remodel $11,000
Tiburon 7/23 David & Molly Brining Apperson / Hoog & Associates Inc
192 Stewart Drive Remove And Replace Living Room Windows
$32,000
Tiburon 7/23 Chris Sommerville Renewal By Anderson 8 Francisco Vista Court Replace Windows $32,115 Tiburon 7/24 Tiburon Hills Estate
HoaPedro Femenia & Sons Inc
21 Andrew Drive Replacement Of Pool Boiler
$24,800
Tiburon 7/24 Linda Wishart Chris Blum Construction
680 Hilary Drive Add New Two Car Garage $49,600
Tiburon 7/24 Stuart & Gina Peterson
Occidental Power Solar & Cogeneration
110 Gilmartin Drive Solar $148,517
Tiburon 7/25 John Dimmick Owner-Builder 2290 Paradise Drive Repair Stairways And Decks
$49,500
Tiburon 7/28 Essex Property Trust Monterey Construction Company
15 Red Hill Circle #K Remodel Kitchen & Bath $29,990
Tiburon 7/29 Essex Property Trust Monterey Construction Company
65 Red Hill Circle #E Remodel Kitchen & Bath $29,990
Tiburon 7/29 Essex Property Trust Monterey Construction Company
75 Red Hill Circle #H Remodel Kitchen & Bath $29,990
Tiburon 7/29 Essex Property Trust Monterey Construction Company
25 Red Hill Circle #D Remodel Kitchen & Bath $29,990
Tiburon 7/29 Essex Property Trust Monterey Construction Company
25 Red Hill Circle #B Remodel Kitchen & Bath $29,990
Tiburon 7/29 Tom & Karen Cowley Construction West Services Inc
26 Tara Hill Road Replace And Expand Deck
$35,000
Tiburon 7/30 Mary Jones Morris Roofing Company
422 Greenwood Beach Road
Reroof $19,980
Tiburon 7/31 Susie Shindelhaim Owner-Builder 131 Stewart Drive Replace Retaining Wall $10,200
Marin Builders Association ◆ Weekly BulletIn ◆ Page 16
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Tiburon 7/31 Essex Property Trust Wf Eggert Construction Co Inc
65 Red Hill Circle #N Replace Doors Windows $11,000
Tiburon 7/31 Farzin Kaveh Solarcity Corporation 100 Geldert Drive Solar $15,680 Tiburon 7/31 Jeanette Walker Solarcity Corporation 256 Esperanza Street Solar $23,520 Tiburon 8/1 David & Elizabeth
ZobaMcleran, Inc. 941 Owlswood Lane Reroof $12,300
Tiburon 8/1 Betsy & Nathan Wright Rempe Construction 139 Gilmartin Drive Remove And Replace Decks
$100,000
Tiburon 8/1 Thomas & Carol Lollendorff
Camello Inc 8 Acela Drive Remodel Kitchen & Bath $284,000
Tiburon 8/5 Michael Rivo Agf Roofing 406 Hilary Drive Reroof $18,000 Tiburon 8/5 Steven Stolz Owner-Builder 9 Lagoon Vista Remodel Kitchen & Bath $150,000 Tiburon 8/5 Jan And Annette
BrattebergS&S Builders 5 Tara Hill Road Remodel $343,000
Tiburon 8/7 Mark Mccall Full Coverage Company
1731 Mar West Street Reroof $10,000
Tiburon 8/7 Philip Feldman Roto Rooter Plumbers 562 Tenaya Dr Plumbing $12,692 Tiburon 8/7 Brian And Alisa
GolsonRenaissance Remodelers
4992 Ranch Road Pool House $50,000
Tiburon 8/8 Ann & Scott Woods Northern California Roofing
623 Ridge Road Reroof $21,290
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 17
tAx lIenS & COMPletIOnS
www.marinba.org ◆ [email protected]
COMPLETIONSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number08/13/2013 FEARON ROBERT SCOTT (I) (none) COMPLETION 2013-005405908/13/2013 HETTRICH CONSTRUCTION (I) (none) COMPLETION 2013-005405908/13/2013 COUNTY OF MARIN (I) (none) COMPLETION 2013-005416008/13/2013 MARIN COUNTY (I) (none) COMPLETION 2013-005416008/13/2013 MURRAY BUILDING INC (I) (none) COMPLETION 2013-005416008/14/2013 FRANCISCO BOULEVARD INVESTORS
LLC (I)(none) COMPLETION 2013-0054415
08/14/2013 SCOTT BUSBY CONSTRUCTION (I) (none) COMPLETION 2013-005441508/14/2013 CITY OF SAN RAFAEL (I) (none) COMPLETION 2013-005449108/14/2013 SAN RAFAEL CITY (I) (none) COMPLETION 2013-005449108/14/2013 TRAHAN MECHANICAL INC (I) (none) COMPLETION 2013-0054491
LIENSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number08/14/2013 DIRECTOR OF INDUSTRIAL RELATIONS
(E)PETES CONSTRUCTION (O) LIEN 2013-0054468
08/14/2013 DIRECTOR OF INDUSTRIAL RELATIONS (E)
SANDOVAL PETER F (O) LIEN 2013-0054468
08/14/2013 STATE OF CALIFORNIA (E) PETES CONSTRUCTION (O) LIEN 2013-005446808/14/2013 STATE OF CALIFORNIA (E) SANDOVAL PETER F (O) LIEN 2013-005446808/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) WARNER MARION K (O) LIEN 2013-005449308/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) WARNER MARION KIMBERLY (O) LIEN 2013-005449308/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SCHLUESSEL NARYRATHA (O) LIEN 2013-005449408/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SCHLUESSEL ROLAND (O) LIEN 2013-005449408/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SIMKINS 1985 LIVING TRUST (O) LIEN 2013-005449508/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SIMKINS INGRID (O) LIEN 2013-005449508/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SIMKINS INGRID A /TR/ (O) LIEN 2013-005449508/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SIMKINS WILLIAM (O) LIEN 2013-005449508/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) SIMKINS WILLIAM A /TR/ (O) LIEN 2013-005449508/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) STINETT C DARON (O) LIEN 2013-005449608/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) STINETT CHRISTOPHER DARON (O) LIEN 2013-005449608/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) STINETT KRISTIN C (O) LIEN 2013-005449608/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) STINNETT KRISTIN CLAXON (O) LIEN 2013-005449608/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) DE LA CRUZ NORMA (O) LIEN 2013-005449708/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) CUNNINGHAM 1998 REVOCABLE
TRUST (O)LIEN 2013-0054498
08/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) CUNNINGHAM NANCY A /TR/ (O) LIEN 2013-005449808/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) HAVIV SIMON (O) LIEN 2013-005449908/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) RAZI ABOLGHASSEM E (O) LIEN 2013-005450008/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) RAZI IRAN A (O) LIEN 2013-005450008/14/2013 TIBURON HILL ESTATES ASSOCIATION (E) NEWMAN FAMILY WESTERN LTD
PARTNERSHIP (O)LIEN 2013-0054501
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
WARNER MARION K (O) LIEN 2013-0054493
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
WARNER MARION KIMBERLY (O) LIEN 2013-0054493
Marin Builders Association ◆ Weekly BulletIn ◆ Page 18
tAx lIenS & COMPletIOnS
www.marinba.org ◆ [email protected]
LIENS (continued)Recording Date Grantors/Grantees Grantees/Grantors Title Document Number08/14/2013 TIBURON HILL ESTATES ASSOCIATION
INC (E)SCHLUESSEL NARYRATHA (O) LIEN 2013-0054494
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
SCHLUESSEL ROLAND (O) LIEN 2013-0054494
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
SIMKINS 1985 LIVING TRUST (O) LIEN 2013-0054495
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
SIMKINS INGRID (O) LIEN 2013-0054495
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
SIMKINS INGRID A /TR/ (O) LIEN 2013-0054495
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
SIMKINS WILLIAM (O) LIEN 2013-0054495
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
SIMKINS WILLIAM A /TR/ (O) LIEN 2013-0054495
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
STINETT C DARON (O) LIEN 2013-0054496
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
STINETT CHRISTOPHER DARON (O) LIEN 2013-0054496
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
STINETT KRISTIN C (O) LIEN 2013-0054496
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
STINNETT KRISTIN CLAXON (O) LIEN 2013-0054496
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
DE LA CRUZ NORMA (O) LIEN 2013-0054497
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
CUNNINGHAM 1998 REVOCABLE TRUST (O)
LIEN 2013-0054498
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
CUNNINGHAM NANCY A /TR/ (O) LIEN 2013-0054498
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
HAVIV SIMON (O) LIEN 2013-0054499
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
RAZI ABOLGHASSEM E (O) LIEN 2013-0054500
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
RAZI IRAN A (O) LIEN 2013-0054500
08/14/2013 TIBURON HILL ESTATES ASSOCIATION INC (E)
NEWMAN FAMILY WESTERN LTD PARTNERSHIP (O)
LIEN 2013-0054501
08/16/2013 NOVATO CHASE OWNERS ASSOCIATION (E)
MURPHY RACHEL ANN (O) LIEN 2013-0054736
08/16/2013 NOVATO CHASE OWNERS ASSOCIATION (E)
MURPHY STEPHEN (O) LIEN 2013-0054736
RELEASE OF LIENSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number08/12/2013 VACCAREZZA LINDA (E) GRANITE EXPO INSTALLATION COM-
PANY INC (O)RELEASE OF LIEN
2013-0053925
08/12/2013 KAISER FOUNDATION HOSPITALS (E) OREGON DOOR (O) RELEASE OF LIEN
2013-0053949
Marin Builders Association ◆ Weekly BulletIn ◆ Page 19
RELEASE OF LIENS (continued)Recording Date Grantors/Grantees Grantees/Grantors Title Document Number08/13/2013 WEBER ARMEEN ALAN (E) MARIN COUNTY DEPARTMENT OF
CHILD SUPPORT SERVICES (O)RELEASE OF LIEN
2013-0054099
08/13/2013 LIZARRAGA MARITZA (E) PACIFIC COAST DRILLING COMPANY INC (O)
RELEASE OF LIEN
2013-0054109
08/13/2013 LIZARRAGA MARK (E) PACIFIC COAST DRILLING COMPANY INC (O)
RELEASE OF LIEN
2013-0054109
08/13/2013 SAVINO DEBORAH (E) HEADLANDS II HOMEOWNERS AS-SOCIATION (O)
RELEASE OF LIEN
2013-0054216
08/14/2013 FOWLER STEPHEN (E) LUNNY GRADING & PAVING INC (O) RELEASE OF LIEN
2013-0054443
08/14/2013 AMALFI WEST L L C (E) GORDON WALKER BUILDERS (O) RELEASE OF LIEN
2013-0054455
08/16/2013 NUNN STEPHEN (E) SAN MARIN VALLEY HOMEOWNERS ASSOCIATION (O)
RELEASE OF LIEN
2013-0054732
TAX LIENSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number08/12/2013 FRANCHISE TAX BOARD (E) GLASSNER FRANK B (O) TAX LIEN 2013-005381908/12/2013 FRANCHISE TAX BOARD (E) BARRETT TRACY LEIGH (O) TAX LIEN 2013-005382008/12/2013 FRANCHISE TAX BOARD (E) HENRY WENDELL (O) TAX LIEN 2013-005382108/12/2013 FRANCHISE TAX BOARD (E) PARKS JAMES L (O) TAX LIEN 2013-005382208/12/2013 FRANCHISE TAX BOARD (E) SUN JUNG K (O) TAX LIEN 2013-005382308/12/2013 FRANCHISE TAX BOARD (E) MINISH MYRTLE W (O) TAX LIEN 2013-005382408/12/2013 INTERNAL REVENUE SERVICE (E) NEWMAN STEPHEN G (O) TAX LIEN 2013-005382708/12/2013 INTERNAL REVENUE SERVICE (E) DORNHOFER LUKE T (O) TAX LIEN 2013-005382808/12/2013 INTERNAL REVENUE SERVICE (E) AZUCENA MILTON PACAS (O) TAX LIEN 2013-005382908/12/2013 INTERNAL REVENUE SERVICE (E) MC JANITORIAL SERVICE (O) TAX LIEN 2013-005382908/12/2013 INTERNAL REVENUE SERVICE (E) BEN SHOHAM DUBI (O) TAX LIEN 2013-005383008/12/2013 INTERNAL REVENUE SERVICE (E) SHOHAM DUBI BEN (O) TAX LIEN 2013-005383008/12/2013 INTERNAL REVENUE SERVICE (E) ROBELLO ANTHONY (O) TAX LIEN 2013-005383108/12/2013 INTERNAL REVENUE SERVICE (E) BRAYTON ALAN R (O) TAX LIEN 2013-005383208/13/2013 INTERNAL REVENUE SERVICE (E) GLASSNER FRANK B (O) TAX LIEN 2013-005403908/13/2013 INTERNAL REVENUE SERVICE (E) KOOP HEINZ (O) TAX LIEN 2013-005404008/13/2013 INTERNAL REVENUE SERVICE (E) CADY STEPHEN DANIEL (O) TAX LIEN 2013-005404108/13/2013 INTERNAL REVENUE SERVICE (E) INSKO CHARLOTTE (O) TAX LIEN 2013-005404208/16/2013 FRANCHISE TAX BOARD (E) ROHAN BRIAN D SR (O) TAX LIEN 2013-0054984
tAx lIenS & COMPletIOnS
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 20
Bid Date Bid Time Project Name City BIN # Plan Issuer8/16/2013 2:00 PM Los Gatos ONLINE
Las Cumbres Mutual Water Company
Slow Sand Filter Plant Improvements
8/16/2013 4:00 PM Elk Grove ONLINE
Elk Grove, City ofRequest for Design/Build/Operate Proposals for Civic Center Aquatics Complex
8/16/2013 2:00 PM San Francisco ONLINE
Golden State Construction
7-Eleven Store
8/16/2013 4:00 PM Simi Valley ONLINE
Rocon Building InteriorsRalphs Grocery Store # 52
8/16/2013 2:00 PM Richmond ONLINE
Richmond, City ofRFQ - As Needed Emergency General Contractors Maintenance Services
8/16/2013 2:00 PM Oakland ONLINE
Alameda, County ofGlenn Dyer Jail Lobby Renovation
8/16/2013 2:00 PM Placerville ONLINE
Placer County Water Agency
LL Anderson Dam Concrete Repairs
8/16/2013 11:00 AM Modesto ONLINE
Huff Construction Company, Inc.
Sierra Dental TI
8/16/2013 2:00 PM Hayward Online California State University East Bay
Campus Baseball Field Renovation
8/16/2013 2:00 PM Fremont ONLINE
California Dept of Education
Emergency Generator Maintenance For California School for the Deaf
8/19/2013 2:00 PM Roseville ONLINE
Tilton Pacific Construction
99 Cents Only Store
8/19/2013 5:00 PM Fresno ONLINE
Fresno, City ofEngineering Design Review, Plan Check & Engineering Inspection Services for City Infrastructure Affected by High Speed Rail
8/19/2013 2:00 PM Santa Rosa ONLINE
Santa Rosa, City ofSanta Rosa Creek Trail - Streamside to Mission
8/19/2013 2:00 PM Reno ONLINE
Kevcon, Inc.Community Living Center (CLC) Culture & Safety Improvements
8/19/2013 2:00 PM Alameda Co. ONLINE
Alameda, County ofRequest for Quotation for Traffic Signal & Street Light Material
8/19/2013 1:00 PM San Francisco ONLINE
San Francisco, City & Co. of
Brava Theater Repairs
8/19/2013 4:00 PM Berkeley ONLINE
University of California, Berkeley
Hellman Tennis Center Upgrades Architectural Services
8/19/2013 2:00 PM Davis ONLINE
Davis, UCTall Corn Greenhouse Project & Native Plant Screenhouse - REBID
8/19/2013 2:00 PM Petaluma ONLINE
Buffalo Wild Wing Grill & Bar
8/19/2013 5:00 PM San Francisco ONLINE
D-Square ConstructionCG San Francisco Install/Replace HVAC System
8/19/2013 2:00 PM Petaluma ONLINE
D-Square ConstructionCG Petaluma Building 124 Alterations for IDHS
8/19/2013 11:00 AM Carmichael ONLINE
Carmichael Water District
Rustic Woods Complex Pipeling Installation & Service Relocation Project
8/19/2013 11:00 AM Walnut Creek ONLINE
Sequoia Pacific Builders, Inc.
Davidson & Licht Tenant Improvements
8/20/2013 2:00 PM San Rafael 245B/074C
San Rafael, city ofTraffic Signal Preventive Maintenance & Repair Program 2013/2015
8/20/2013 2:00 PM Berkeley ONLINE
Berkeley, City of Sanitary Sewer Rehabilitation - MH Rehab FY 14 PH 1
8/20/2013 1:00 PM Lincoln ONLINE
Lincoln, City ofCrack Seal Project
8/20/2013 2:00 PM Lincoln ONLINE
Lincoln, City ofPavement Repair
8/20/2013 3:00 PM Los Altos ONLINE
Midpeninsula Regional Open Space District
Powell Property Remediation & Demolition
8/20/2013 2:00 PM Roseville ONLINE
Wells Construction, Inc.Infinite Beauty-Westfield Galleria
www.marinba.org ◆ [email protected]
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 21
Bid Date Bid Time Project Name City BIN # Plan Issuer8/20/2013 2:00 PM Mckinleyville ONLINE
RS&H Arcata-Eureka Airport Murray Field Airport Wildlife Exclusion
Fence
8/20/2013 2:00 PM Eureka Online RS&H Wildlife Exclusion Fence
8/20/2013 2:00 PM Livermore ONLINE
Courtyard By Marriott
8/20/2013 3:00 PM Fresno ONLINE
Fresno, City ofVan Ness Ave. Pavement Overlay From Inyo to Railroad Ave. - REBID
8/20/2013 10:00 AM West Sacramento ONLINE
West Sacramento, City of
Southport Parkway Irrigation Renovations
8/20/2013 2:00 PM Berkeley ONLINE
Berkeley, City of Public Works
Sanitary Sewer Rehabilitation-Santa Barbara Rd, Northampton Ave, Southampton Ave, San Luis Rd, Indian Roack Ave, Oxford St, San Diego Rd, Laurel Ln, Turnbridge Ln
8/20/2013 2:00 PM Ukiah ONLINE
Ukiah, City OfSlurry Seal of Local Streets
8/20/2013 2:30 PM San Francisco ONLINE
San Francisco, City & Co. of
Coit Memorial Tower - Rehabilitation Project
8/20/2013 2:00 PM Berkeley ONLINE
Berkeley, UCCalvin Lab Landscape Improvements REBID
8/20/2013 2:30 PM Concord Online Department of Motor Vehicles
Janitorial Services
8/20/2013 2:00 PM Burlingame ONLINE
Burlingame, City ofCreek & Channel Cleaning Services 2013-14
8/20/2013 3:00 PM Palo Alto ONLINE
Palo Alto, City ofRWQCP Administration Building System Upgrade
8/20/2013 3:00 PM Modesto ONLINE
Timothy P. Huff & Associates, Inc
Tech Room Remodel-SCOE
8/20/2013 2:00 PM Mountain View ONLINE
Mountain View, city ofShoreline Boulevard Storm Drain Improvements
8/20/2013 1:30 PM Merced ONLINE
Department of Motor Vehicles
Flooring Removal & Installation at the Merced DMV
8/20/2013 2:00 PM Fairfield R007, 085C
Solano Transporation Authority
Private Access Road in Solano County
8/21/2013 2:00 PM Marin County 243B, 091C
Marin, county ofCivic Center Drinking Fountain Accessibility Modification
8/21/2013 10:00 AM San Carlos 259B San Carlos, City ofEl Camino Real Culvert Cleaning Project (Rebid)
8/21/2013 2:00 PM Sacramento ONLINE
Sacramento, city ofAlley Gates on-Call Project
8/21/2013 3:00 PM Los Banos ONLINE
R & O ConstructionWalmart Store # 2117-Expansion
8/21/2013 2:30 PM Walnut Creek ONLINE
Walnut Creek, city ofPolice Department Dispatch Break Room Remodel
8/21/2013 2:00 PM Sacramento ONLINE
Sacramento, City of28th Street Landfill Tree Removal Mitigation Project
8/21/2013 2:00 PM Sonora ONLINE
KDC ConstructionMcDonald's Store No. 004+4328
8/21/2013 2:00 PM Eureka ONLINE
Danco Builders Northwest
Humboldt County Mental Health Facility Seismic Repair
8/21/2013 2:00 PM Davis ONLINE
Davis, UCRFQ - Memorial Union Renewal
8/21/2013 2:00 PM Sacramento ONLINE
Sacramento, City OfShasta Park Well Project
8/21/2013 11:00 AM Bakersfield ONLINE
Bakersfield, City ofHammer Drill 3 Small Diameter Domestic Water Pump Test Wells - Stations CBK-56, CBK-57 & CBK-58
8/21/2013 2:00 PM Auburn ONLINE
Placer County Water Agency
Bowman WTP Sodium Hypochlorite Conversion Project
8/21/2013 3:00 PM Santa Clara ONLINE
Santa Clara, City ofMission Substation Offsite Paving
8/21/2013 2:00 PM Fremont ONLINE
NexGen BuildersThe Villas at Florio 22 Townhouse Units
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 22
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer8/21/2013 1:30 PM Stockton Online Department of Motor
VehiclesCCTV Systems Maintenance for the Stockton DMV Driver Safety Office
8/21/2013 2:00 PM Madera Online Department of Motor Vehicles
Madera Janitorial Services
8/21/2013 11:00 AM Capitola ONLINE
Capitola, City OfPacific Cove Lower Parking Lot, Retaining Wall & Slide Repair Project
8/21/2013 2:00 PM Sacramento ONLINE
Sacramento, City ofArtivio Guerrero Park
8/21/2013 2:00 PM Menlo Park R125 El Camino Real Trees Project - Phase III
8/22/2013 2:00 PM Ukiah* 071C Ukiah, City Of115 KV Transmission Line Pole Replacement and Realignment
8/22/2013 3:00 PM Palo Alto 254B/065C
East Palo Alto Sanitary District
Garage Door Support Project
8/22/2013 2:00 PM Palo Alto 255B/063C
East Palo Alto Sanitary District
Wheelchair Lift Remodel Project
8/22/2013 2:00 PM Biggs ONLINE
Biggs, city ofThe Construction of the 6th Street Double Box Culvert Bridge No. 12C 0376
8/22/2013 3:00 PM San Jose ONLINE
San Jose, City Of7057-Japantown Sewer Infrastructure Project Phase II-Rebid
8/22/2013 1:00 PM San Mateo ONLINE
Midpeninsula Regional Open Space District
Peter's Creek Bridge Footing & Pier Construction at Long Ridge Open Space Preserve
8/22/2013 2:00 PM Fresno ONLINE
Fresno, County ofOutside Canal Bridge Replacement on Bass Avenue
8/22/2013 3:00 PM San Jose ONLINE
San Jose, City Of5591-Transportation Incident Management Center (TIMC) Facility Improvements (Rebid)r
8/22/2013 2:00 PM Rohnert Park ONLINE
Rohnert Park, city ofRohnert Park Expressway Overcrossing Slurry Seal, Sign, & Stiping
8/22/2013 3:00 PM San Jose ONLINE
San Jose, City OfCoy Park Playground Renovation Project
8/22/2013 2:00 PM Oakley ONLINE
Housing Authority of Contra Costa Co.
Unit 1012 Repairs at Casa De Manana Public Housing Development
8/22/2013 2:00 PM Antioch ONLINE
Housing Authority of Contra Costa Co.
Unit 157 Repair at Bridgemont Public Housing Development
8/22/2013 2:00 PM Oakland ONLINE
Proforma ConstructionTrust Clinic Alameda Health Care Service Agency
8/22/2013 2:00 PM Burlingame ONLINE
Burlingame, City ofSewer Lateral Root Control Treatment Services 2013-04
8/22/2013 3:00 PM Sacramento ONLINE
Sacramento, County of, Internal Services
Chiller-Sacramento County Lab Crime
8/22/2013 1:00 PM East Palo Alto ONLINE
East Palo Alto, City OfCooley Landing Phase II Access Road & Planting Proeject
8/22/2013 2:30 PM Walnut Creek ONLINE
Walnut Creek, city ofPlayground Equipment Replacement
8/22/2013 2:00 PM Saratoga ONLINE
Saratoga, City ofSaratoga Village Pedestrian Enhancement Streetscape Work
8/22/2013 2:00 PM Oroville ONLINE
HVAC, Ceiling & Lighting Renovation Department of Motor Vehicles
8/22/2013 2:00 PM Richmond ONLINE
Richmond, City ofBelding Park Chain Link Fence Installation
8/22/2013 12:00 PM Santa Clara ONLINE
The Hatch GroupCVS # 9743 Minute Clinic (Specs On Plans)
8/22/2013 2:00 PM Sacramento Online Department of Motor Vehicles
Elevator & Escalator Monthly Maintenance
8/22/2013 2:00 PM Porterville ONLINE
Clark & Sullivan Builders, Inc.
Tule River Elders Building
8/22/2013 2:00 PM Citrus Heights ONLINE
SD Deacon General Contractors
New Drive Aisle at Birdcage Marketplace
8/22/2013 2:00 PM Richmond ONLINE
Richmond, City ofLucas Park Chain Link Fence Installation
Marin Builders Association ◆ Weekly BulletIn ◆ Page 23
Bid Date Bid Time Project Name City BIN # Plan Issuer8/22/2013 2:00 PM San Lorenzo ONLINE
Oro Loma Sanitary District
Monika Lane Pump Station 2013 Rehabilitation
8/22/2013 2:00 PM Colusa ONLINE
Colusa, city ofEast Side Pump Station Rehabilitation Project
8/22/2013 3:30 PM Napa ONLINE
Napa, County ofNapa County Juvenile Justice Center Exterior Painting & Sealing
8/22/2013 5:00 PM Moccasin Online California Dept. of Fish and Wildlife
HVAC Repair, Moccasin Creek Hatchery
8/22/2013 2:00 PM Davis ONLINE
Davis, UCRFQ - Seismic Correction Phase 5
8/22/2013 2:00 PM Rohnert Park ONLINE
Rohnert Park, city ofEastside Trunk Sewer Phase II
8/22/2013 2:30 PM Mountain View Online Department of Motor Vehicles
Janitorial Services for the Mountain View Industry Service Center (ISC) DMV
8/22/2013 2:00 PM Cloverdale ONLINE
Coastland Civil Engineering
Safe Routes to School Project
8/22/2013 2:00 PM Lodi ONLINE
Northern California Power Agency
Lodi Energy Center Equipment Weather Covers
8/22/2013 2:00 PM Vallejo ONLINE
Vallejo, City ofMare Island Building 655 Demolition & Abatement Project
8/22/2013 2:00 PM McKinleyville R117, 015C
Humboldt, County ofArcata-Eureka Airport Phase 1 - Site & Civil Improvements for the Aircraft Rescue & Fire Fighting (ARFF) Facility
8/23/2013 2:00 PM San Jose 153B, 073C
Santa Clara Valley Transportation Authority
Rail Rehabilitation - Signal & Track Improvements
8/23/2013 4:00 PM Citrus Heights ONLINE
Arco Tenant Improvements
8/23/2013 10:30 AM Sacramento ONLINE
San Juan Unified School District
El Camino HS Pool Re-Surfacing
8/23/2013 10:00 AM Fair Oaks ONLINE
San Juan Unified School District
Del Campo HS Pool Re-Surfacing
8/23/2013 2:00 PM Fairfield & Vallejo ONLINE
Solano, County OfSolano County Boiler Replacement Projects:1675, 1676, 1677 & 1678
8/23/2013 2:00 PM Alameda ONLINE
Alameda, City ofRemove and Replace Furnaces at the Lincoln Park Harrison Center
8/23/2013 3:00 PM Cupertino ONLINE
Midpeninsula Regional Open Space District
Rancho San Antonio Road Repair Project-Asphalt Mora Rd & St Joseph Service Rd
8/23/2013 3:00 PM Fresno ONLINE
Fresno, City ofRequest for Qualifications & Proposal - Courthouse Park Transit Shelter Design & Engineering Project
8/23/2013 3:00 PM Sacramento ONLINE
San Juan Unified School District
RFQ-Lease-Leaseback Construction Services for Arden Middle School New Multi-Purpose Bldg
8/23/2013 12:00 PM Sacramento ONLINE
Sacramento, City ofLNG Fueling Station Renovation & Expansion
8/23/2013 2:00 PM Lafayette ONLINE
Park Plaza Shops Improvements
8/23/2013 2:00 PM Santee ONLINE
Caliber Contracting Co.El Pollo Loco Tenant Improvements & Facade Remodel
8/23/2013 2:00 PM San Carlos ONLINE
San Mateo, County OfAir Conditioning Units at Lobby, Conference Room & Bookstore
8/26/2013 2:00 PM Corte Madera 257B Corte Madera, town of2013 Pavement Improvement Project-Overlay
8/26/2013 2:00 PM Petaluma ONLINE
D-Square ConstructionCG Design Build New Child Development Playground
8/26/2013 2:00 PM San Jose ONLINE
Kelley ConstructionCalifornia Pizza Kitchen-Valley Fair (Specs on Plans)
8/26/2013 3:30 PM Napa ONLINE
Napa, County ofNapa County Airport Airfield Regulator Replacement
8/26/2013 2:00 PM San Jose ONLINE
Huff Construction Company, Inc.
Aloft Hotel
www.marinba.org ◆ [email protected]
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 24
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer8/26/2013 2:00 PM Burlingame ONLINE
Burlingame, City ofAdrian Pump Station Cathodic Protection
8/26/2013 2:00 PM Santa Rosa ONLINE
R.E. West BuildersChanate Cottages (No GC Openings)
8/26/2013 5:00 PM Galt ONLINE
California Department of Corrections & Rehabilitation
Asphalt, Seal Stripe & Repair
8/26/2013 3:00 PM El Dorado ONLINE
El Dorado Irrigation District
El Dorado Diversion Dam Modification
8/26/2013 2:00 PM Milpitas S001/086C
Milpitas, city of2013 Soundwall Renovation
8/27/2013 2:00 PM Various Locations 201B Bay Area Rapid Trnsit District
Procurement of Destination Sign Units
8/27/2013 3:00 PM Santa Clara B125, 011C
Santa Clara Valley Transportation Authority
Civil & Station Improvements Contract - Santa Clara - Alum Rock Bus Rapid Transit Project
8/27/2013 2:00 PM Elk Grove ONLINE
Elk Grove, City ofCampbell Road Drainage Improvements Project
8/27/2013 2:00 PM Little Rock ONLINE
Bergman KPRSFamily Dollar Store Tenant Improvements
8/27/2013 4:00 PM Modesto ONLINE
Modesto, City of Request for Qualifications- Modesto City/County Airport for Airport Consultant/Engineer for Airport Design & Construction Mgmt Service
8/27/2013 2:55 PM Fresno ONLINE
Fresno, City ofSewer Rehabilitation in Chestnut Avenue
8/27/2013 3:00 PM Palo Alto ONLINE
Palo Alto, City ofRWQCP On-Call Emergency and Critical Service
8/27/2013 2:00 PM Clovis ONLINE
Clovis, City ofTollhouse & Fowler Improvements
8/27/2013 2:00 PM Hayward ONLINE
California State University East Bay
Electrical Contractor Prequalification-Cal State East Bay
8/27/2013 2:00 PM Santa Cruz ONLINE
Santa Cruz, City ofBroadway Brommer Multi-Use Path Project
8/27/2013 3:00 PM Palo Alto ONLINE
Palo Alto, City ofWater Main Replacement 26A 100-490 California Avenue
8/27/2013 2:00 PM Davis ONLINE
Davis, UCRFQ - Veterinary Medicine Student Services and Administration Center
8/27/2013 2:00 PM Cupertino ONLINE
Cupertino, city of McClellan Ranch Preserve Environmental Education Center & Blacksmith Shop Relocation
8/27/2013 3:00 PM Fresno ONLINE
Fresno, City ofStreet Improvements at Willow Ave & Bullard Ave
8/27/2013 2:00 PM Hanford ONLINE
Wells Construction, Inc.Keller Motors-Hanford
8/27/2013 2:00 PM Fremont ONLINE
Fremont, City ofCitywide Intersection Ramps
8/27/2013 2:00 PM Hollister ONLINE
San Benito County Water Dist
Lessalt Water Treatment Plant DBP Reduction Improvements & Fairview Transmission Pipeline Project
8/27/2013 3:00 PM Fresno ONLINE
Fresno, City ofTraffic Signal Modifications Intersection of Palm Ave. & Sierra Ave.
8/27/2013 10:00 AM Isla Vista Online Pacific West Builders, Inc
Pescadero Lofts at Isla Vista
8/27/2013 2:00 PM San Ramon ONLINE
San Ramon Regional Medical Center - Wound Care Clinic
8/27/2013 2:00 PM Hollister ONLINE
GSE Construction Co. Inc.
Lessalt Water Treatment Plant DBP Reduction Improvements & Fairview Transmission Pipeline Project
8/28/2013 2:00 PM Ladera Heights ONLINE
Caliber Contracting Co.99 Cents Only Store 03751
8/28/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
As-Needed Paving Contract No. 9
Marin Builders Association ◆ Weekly BulletIn ◆ Page 25
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer8/28/2013 2:00 PM McClellan ONLINE
Sacramento Regional Transit District
Interior Demolition of Bus Maintenance Facility 2
8/28/2013 2:30 PM San Francisco ONLINE
Sunset Elementary/AP Giannini Middle Safe Routes To School
8/28/2013 2:00 PM San Francisco ONLINE
University Of California, San Francisco Medical Center
Mt. Zion Buildings A, B & R Interior, Seismic & ADA Upgrades
8/28/2013 2:00 PM Mountain View ONLINE
Mountain View, city ofPermanente Creek Pedestrian/Bicycle Trail - Old Middlefield Way to Rock Street
8/28/2013 2:00 PM Discovery Bay ONLINE
HERWIT EngineeringDiscovery Bay Sewage Treatment Plant Solar Dyers C & D Electrical Installation (Master Plan Projects 13,14)
8/28/2013 12:00 PM Arcadia ONLINE
Tri-North BuildersVictoria's Secret Store Remodel
8/28/2013 2:00 PM Pollock Pines ONLINE
Sacramento Municipal Utility District
Transmission Vegetation Management
8/28/2013 2:00 PM Mountain View ONLINE
Mountain View, city ofTraffic Signal Modifications-California St at Ortega Ave & Middlefield Rd at Whisman Rd
8/28/2013 2:00 PM Oakdale Online Oakdale, City of 2013-2014 Water Meter Upgrade Project – Water Meters and Materials Installation – Phase I
8/28/2013 4:00 PM San Jose ONLINE
San Jose/Evergreen Community College District
EVC District Warehouse Carport Project
8/28/2013 3:00 PM Redwood City ONLINE
Redwood City, city of 2013-2014 Watermain Replacement
8/28/2013 2:00 PM San Jose ONLINE
Ed Grush General Contractor
Tisch Tower-Plaza Improvements
8/28/2013 2:00 PM San Mateo ONLINE
Sierra ContractingFootlocker/HOH # 7397
8/28/2013 3:00 PM San Francisco ONLINE
San Francisco, City & County of
SFO-RFP Escalator and Electric Walk Maintenance
8/28/2013 3:00 PM San Francisco Online San Francisco International Airport
SFO-Elevator Maintenance
8/28/2013 10:00 AM West Sacramento ONLINE
West Sacramento, City of
Westmore Oaks Water Meter Project
8/28/2013 4:00 PM Fresno ONLINE
Fresno, City ofInstallation of New Traffic Signals at the Intersection of Clinton Avenue & Valentine Avenue
8/28/2013 3:00 PM Santa Cruz ONLINE
Santa Cruz, UCUniversity Town Center Door Access Controls & Video Surveillance System Upgrades
8/28/2013 3:00 PM San Jose ONLINE
San Jose/Evergreen Community College District
EVC Auto Technology Building Utilities Extension & Upgrade Project
8/28/2013 1:30 PM Lafayette S001 East Bay Municipal Utility District
Bryant No. 2 Pumping Plant Electrical Rehabilitatin
8/28/2013 2:30 PM Livermore T004, 008C
Livermore, city ofLivermore Airport Administration Building
8/28/2013 5:00 PM Oakland T005 Bridge Housing CorpMacArthur Transit Village Plaza Improvement
8/29/2013 2:30 PM Marin County 0263B, 023
Marin, county ofGarden Rock Road Drainage Improvements
8/29/2013 2:00 PM Oakley 0264B
Oakley, City ofRaye Avenue Roadway Improvement Project
8/29/2013 2:00 PM Antioch* 0266B, 061
Asphalt Repairs Delta De Anza Trail
8/29/2013 3:00 PM St. Helena 240B, 064C
Napa, City ofHennessy Treatment Plant Pump Building Roof Replacement
8/29/2013 2:00 PM Hillsborough 252B/019C
Hillsborough, Town ofBlack Mountain Road-Road Stabilization Project
8/29/2013 3:00 PM Merced County ONLINE
Merced, County ofEcho Street Safe Route to School Project
Marin Builders Association ◆ Weekly BulletIn ◆ Page 26
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer8/29/2013 2:00 PM Marysville ONLINE
Linda County Water District
Wastewater Treatment Plant Upgrade & Expansion Project Phase 2 Sluge Drying Beds Installation
8/29/2013 2:00 PM Turlock ONLINE
California State University Stanislaus
Baseball & Softball Field Lighting Design Build Project
8/29/2013 2:00 PM Merced ONLINE
Merced, City OfCMAQ Bike Lanes Various Locations
8/29/2013 2:00 PM Citrus Heights ONLINE
Citrus Heights, City ofAuburn Boulevard Complete Streets Reviltalization Project
8/29/2013 11:00 AM Ross ONLINE
Town of RossSteelpile Bank Stabilization at Town Hall Parking Lot
8/29/2013 3:00 PM Tracy ONLINE
Tracy, City ofSouth MacArthur Drainage Improvement Phase 2 Project
8/29/2013 10:30 AM Tulare ONLINE
Davis, UCSouth Valley Animal Health Laboratory
8/29/2013 2:00 PM Sacramento ONLINE
Sacramento County Municipal Services Agency
Countywide Bicycle Lane Gap Closure & Signal Modification
8/29/2013 2:00 PM Placer Co. ONLINE
Placer County Water Agency
Multi Site Fencing Project
8/29/2013 2:30 PM Walnut Creek ONLINE
Walnut Creek, city ofNorth Locust Garage Deck Sealing
8/29/2013 3:00 PM Turlock ONLINE
Turlock, City ofIntersection Improvements at Golden State Boulevard and Del's Lane
8/29/2013 2:00 PM Santa Clara ONLINE
Midstate ConstructionBank of The West Branch # 008
8/29/2013 11:00 AM Bakersfield Online T.I. Services, Inc.Ming Avenue Walk-In Clinic
8/29/2013 3:00 PM Clearlake ONLINE
Danco Builders Northwest
Clearlake Oaks Senior Center
8/29/2013 2:00 PM Oakland ONLINE
Oakland, City ofCA 130 Grade Crossing Improvements at Broadway and Fruitvale Avenue
8/29/2013 2:00 PM Hughson ONLINE
Huff Construction Company, Inc.
Sovereign Grace Community Church
8/29/2013 3:00 PM San Jose ONLINE
San Jose, City Of7133-HHPZ Danny the Dragon Track Replacement Project
8/29/2013 11:00 AM Bakersfield Online T.I. Services, Inc.Ming Avenue Walk-In Clinic
8/29/2013 2:00 PM Berkeley R133 East Bay Regional Park District
Tilden Narure Area EEC Phase 1 Sewer Improvements
8/30/2013 4:00 PM San Francisco ONLINE
Bosa Development California, Inc
Mission Bay Block 12E Condominiums Prequalification
8/30/2013 3:00 PM San Jose ONLINE
San Jose, City ofAudio Equipment for CSJ Berryessa Community Center
8/30/2013 5:00 PM San Jose ONLINE
Santa Clara, County OfThe County of Santa Clara Energy Storage Project
9/3/2013 2:00 PM Sacramento ONLINE
Department of General Services
Fire Alarm Control Unit Replacement (REBID)
9/3/2013 2:00 PM Turlock ONLINE
Turlock, City ofMonte Vista Avenue Rehabilitation
9/3/2013 2:00 PM Sacramento ONLINE
Sacramento Municipal Utility District
Concrete Vault Repairs As Needed 2013-2016
9/3/2013 3:00 PM Fresno ONLINE
Fresno, City ofReroof Police Department Headquarters
9/4/2013 2:00 PM Pittsburg 0262B, 025
Pittsburg, city of 2013 Pavement Management Project
9/4/2013 10:00 AM Los Gatos 081C Los Gatos, Town ofFY 2013-14 Annual Crub, Gutter, Sidewalk Replacement Project
9/4/2013 2:00 PM San Jose 253B/083C
Santa Clara Valley Transporation Authority
CCTV at Various Locations
9/4/2013 12:00 PM Santa Clara ONLINE
Santa Clara Valley Water District
Guadalupe River Fish Passage Modification, Calabazas Creek Storm Drain Outfall Replacement, San Tomas Aquino Creek Storm Drain Outfall Replacement Project
Marin Builders Association ◆ Weekly BulletIn ◆ Page 27
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer9/4/2013 2:00 PM Oakland ONLINE
J.H. FitzmauricePhoenix Commons Co-Op Housing Project (No GC Openings)
9/4/2013 2:00 PM Sacramento ONLINE
Sacramento Regional Transit District
Camera Installation for Bus Parking lots (South, North, and P & Q Lots)
9/4/2013 2:00 PM Auburn ONLINE
Stantec Consulting Services
SMD1 Sewer Conveyance Pump Station
9/4/2013 2:00 PM Martinez ONLINE
Mountain View Sanitary Dist
Grease Receiving Station
9/5/2013 2:00 PM Vallejo 0265B
Greater Vallejo Recreation District
Cunningham Pool Complex Interior & Exterior Paint
9/5/2013 2:00 PM San Francisco ONLINE
James E. Roberts-Obayashi Corp.
Hunters Point - Blocks 53 & 54
9/5/2013 11:00 AM Sonoma ONLINE
Sonoma, City ofZone 1-2 Intertie
9/5/2013 2:30 PM San Joaquin County ONLINE
Levee Maintenance Project Levee Crown AB Road Surfacing Between Station 773+80 and Station 799+80
9/5/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
Request for Qualifications for As-Needed Design Services For Health Facilities
9/5/2013 2:00 PM Hercules ONLINE
West Contra Costa Unified School District
Hercules Middle High School Additional Exterior Lighting
9/5/2013 2:00 PM Sebastopol ONLINE
Sonoma, County ofRagle Ranch Regional Park FEMA Trail & RIPRAP Repair
9/5/2013 3:00 PM Arcata ONLINE
Humboldt State University
Marine Wildlife Care Center Addition
9/5/2013 2:00 PM Sacramento ONLINE
California State University Sacramento
Reprographics Re-Roof
9/5/2013 10:00 AM Oakley S002/017C
Contra Costa Water District
Canal Levee Elimination & Flood Protection Project, Segment 2-Pipeline
9/6/2013 2:00 PM San Jose 256B, 067C
Santa Clara Valley Transportation Authority
Replace the Suspended Ceiling at River Oaks Building A Auditorium - REBID
9/6/2013 2:00 PM San Lorenzo ONLINE
San Lorenzo Unified School Dist
Bay Elementary School New Classroom Buildings Prequalification & Proposal
9/6/2013 1:00 PM Visalia Online Visalia, City OfVisalia Water Conservation Plant Upgrades: Recycled Water Pipeline Project
9/6/2013 4:00 PM San Francisco ONLINE
Lennar UrbanArchitectural Consulting Services for Phase 1 of Hunters Point Shipyard - Block 52JV
9/6/2013 5:00 PM Rancho Cordova Online The California Department of Technology
Interior Painting & Wall Covering Services
9/6/2013 12:00 PM Saratoga Online Saratoga, City ofQuito Road Bridges
9/6/2013 10:00 AM Sacramento ONLINE
Sacramento, City OfMCC "E" Entrance/Exit Vault
9/9/2013 2:00 PM Livingston ONLINE
Livingston, City OfWell No. 8 Wellhead Treatment
9/10/2013 9:00 AM Monterey ONLINE
State of CaliforniaHVAC System Upgrade (Monterey District Boiler Project)
9/10/2013 2:30 PM Solano County ONLINE
Levee Maintenance Project Ryer Island Pipe Replacement Project Along Cache Slough at Levee Station 40
9/10/2013 2:00 PM Napa ONLINE
Department of General Services
Boiler Burner Retrofit
9/10/2013 2:00 PM Merced County Online California Dept. of Fish and Wildlife
Well and Pump Maintenance & Repair
9/10/2013 2:00 PM Santa Cruz ONLINE
Santa Cruz, City ofJenne Street Sewer Project
9/10/2013 2:00 PM Danville ONLINE
Danville, Town ofCrow Canyon Road Sound Walls Project
9/10/2013 2:00 PM Hayward ONLINE
Alameda, County ofTurner Court Roof Replacement
Marin Builders Association ◆ Weekly BulletIn ◆ Page 28
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer9/10/2013 2:00 PM Sacramento ONLINE
Owl Harbor Levee Improvements Project Levee Fill & Toe Berm Phase 1-Station 314+40 to Station 316+00
9/10/2013 2:00 PM San Francisco ONLINE
James E. Roberts-Obayashi Corp.
Hunters Point Shipyard Welcome Center
9/10/2013 3:00 PM San Joaquin County ONLINE
Kjeldsen, Sinnock & Neudeck, Inc.
2013 Levee Toe Berm Project Between Station 470+50 and Station 523+50
9/10/2013 2:00 PM Fresno ONLINE
Fresno, City ofTransit Window Glass Guards
9/10/2013 1:00 PM Davis ONLINE
Davis, UCGeidt Pathway & Bioletti Turning Circle Improvements
9/11/2013 2:00 PM Santa Clara County 016C Santa Clara Valley Transportation Authority
RFQ & RFP - LRT Efficiency Project Tasman Drive Pocket Track Contract
9/11/2013 1:30 PM Ione 0260B, 022
East Bay Municipal Utility District
Camanche North Shore Boat Dock Replacement
9/11/2013 1:30 PM El Sobrante 0261B, 021
East Bay Municipal Utility District
Argyle Reservoirs Access Road Improvements
9/11/2013 2:00 PM Berkeley 242B East Bay Regional Park District
Tilden Park-Wildcat Canyon Road Wildland Fuels Reduction Contract
9/11/2013 2:00 PM Sacramento ONLINE
Sacramento, City OfBasin 85 Influent Sewer Rehabilitation
9/11/2013 2:00 PM Lincoln ONLINE
Lincoln, City ofWastewater Treatment & Reclamation Facility
9/12/2013 4:00 PM Madera County ONLINE
Madera, County ofA Purchase Design-Build/Lease Back Project for Site Improvements & Tenant Improvement of an Existing Building for the Madera County Sheriff's Department
9/12/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
County Jail No. 3 & 4 Fire Alarm Replacement
9/12/2013 4:00 PM Merced ONLINE
Merced, County ofLandscape Maintenance Services for the John Latorraca Adult Correction Facility
9/12/2013 2:00 PM Antioch ONLINE
Antioch Unified School District
Security Enhancement Project (Multiple Sites)
9/12/2013 2:00 PM Sacramento ONLINE
California State University Sacramento
Riverfront Center Annex Remodel-Starbucks
9/13/2013 2:00 PM San Francisco ONLINE
San Francisco, City & County of
RFQ-Better Market Street Project Environmental Review Service
9/17/2013 3:00 PM Fresno ONLINE
Fresno, City ofDesign-Build Headworks Building Concrete Repair & Stop Palte Installation at Fresno/Clovis WRF
9/17/2013 2:00 PM Pleasanton ONLINE
Dublin San Ramon Services District
WWWTP Fencing and Security - Phase I
9/18/2013 2:00 PM El Cerrito ONLINE
El Cerrito High School Stadium
9/18/2013 2:00 PM Ceres ONLINE
Stanislaus, County of Psychiatric Health Facility
9/18/2013 3:00 PM Los Altos Hills ONLINE
Foothill-De Anza Community College District
District Office Building Renovation
9/19/2013 3:00 PM Monterey Co. ONLINE
Monterey, County ofMonterey County JOC-Roads & Bridges
9/19/2013 2:00 PM Monterey Co. ONLINE
Monterey, County ofMonterey County JOC-Facilities Project
9/19/2013 2:00 PM San Francisco* ONLINE
San Francisco, City & County of
As-Needed Integration Services (Lenel VAR Required) 2013-2015
9/19/2013 1:30 PM Stockton Online San Joaquin, County ofAlpine Avenue and Sinclair Avenue Resurfacing Plymouth Sta. Federal to Mission Road and to Fourth Street)
9/19/2013 2:00 PM Pittsburg ONLINE
Delta Diablo Sanitation District
Secondary Solids Thickener & Fog Receiving Facility
9/24/2013 2:00 PM Lafayette/Orinda/Oakland/San Francisco
251B/066C
Bay Area Rapid Trnsit District
Wayfinding Improvements Phase II
Marin Builders Association ◆ Weekly BulletIn ◆ Page 29
PROjeCt BID SCheDule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer9/25/2013 2:00 PM Modesto ONLINE
Stanislaus, County of Juvenile Justice Center Roofing & Heating & Air Conditioning
(HVAC) project
10/24/2013 2:00 PM Milpitas ONLINE
Santa Clara Valley Transporation Authority
Parking Structures at Milpitas and Berryessa Stations
ClASSIFIeD ADSclassified ads are provided free to MBa members & staff.
Please advise if position is filled or commodity is [email protected]
FOR SALE:BLUEPRINT DIGITIZER
Blueprint Digitizer $1500.00 or best offer
GTCO Super L VI blueprint digitizer with software and accessories. Great Condition. Professionals in construction estimating, CAD, Textiles and other fields will appreciate the flexibility and performance of the Super LVI series.
Please call Pamela at 415-381-3162 or email [email protected]
MCGUIRE AND SONS CONSTRUCTIONIS SEEKING JOURNEYMAN
CARPENTER FOR RESIDENTIONAL CONSTRUCTION
Requirements:• Minimum 5 years experience in residential construction• Truck with Racks• Basic Tools• Salary DOE
Please forward inquiry or resume to: [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 30
ClASSIFIeD ADSclassified ads are provided free to MBa members & staff.
Please advise if position is filled or commodity is [email protected]
CAL-WEST RENTALSIS SEEKING A
MEChANIC / TEChNICIAN
Cal-West Rentals is in search of a technician to work within our service department at our yard in Petaluma. They will be responsible for repairing and maintaining all types of equipment including small engines, heavy construction equipment, and delivery trucks.
The work is mostly in the shop, but also includes field service calls and deliveries of equipment. It is a full-time position, M-F, with full benefits. This person will be reporting to our service manager. Must possess knowledge and experience in the mechanical and construction field.
Please apply to [email protected] or call 707.763.5665.
FONTANA CONSTRUCTION
IS SEEKING ESTIMATOR FOR RESIDENTIAL CONSTRUCTION
Seeking Estimator/Project Manager for a Marin based Residential General Contractor.Requirements:• Minimum 10 years experience in Residential
Construction. Field experience desired.• Offering Benefits• Salary DOE
Please reply to the email below with your resume if you are interested.
Lee Bonilla - Fontana Construction Inc. 1945 E. Francisco Blvd. Suite n., San Rafael ,CA 94901
415-457-1290 P | 415-457-1294 F | [email protected]
www.marinba.org ◆ [email protected]
YOURAD
HEREPlease contact Paula Krause for more
information at (415) 462-1220 or [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 31
www.marinba.org ◆ [email protected] ◆ [email protected]
ClASSIFIeD ADSclassified ads are provided free to MBa members & staff.
Please advise if position is filled or commodity is [email protected]
MANN EXCAVATIONIS SEEKING AN ESTIMATOR
Our company is a professional organization that has been providing all types of excavation services in the San Fran-
cisco Bay Area for over 15 years. We specialize in shoring, drilling, grading and site preparation needs. Our projects are wide and varied from excavating large hillsides and creating
lakes to digging swimming pools.
We are seeking an Estimator for our growing company. Estimator must be proficient in estimating public work for excavation, demolition, shoring and pipe work.
• Interpret architectural and structural drawings, specifica-tions, and bid documents
• Perform take offs and write RFPs, and RFIs• Review Job site conditions to determine scope, costs and
project timeline• Compile detailed scope of work inclusions, exclusions, &
clarifications for estimates• Attention to detail, strong organizational and time man-
agement skills
Job Requirements
• Previous experience with computer estimating using Dodge Pro and similar sites a plus
• Project Manager experience is a plus but Estimating is the priority
• Experience in Earthwork is also a plus• Work independently as well as part of a team and accept
feedback constructively• Ability to communicate efficiently with the owner, follow
directions and have own transportation• Local references are a prerequisite of the position
Please send e-mail and cover letter to [email protected]
If you are an outstanding, high-energy Estimator/Project Manager looking for the �rm where you can reach your full potential, then Oak Grove Construction wants to talk with you. Based in Santa Rosa for over 30 years, we are a full-service Engineering Site-work Contractor highly regarded for our service, quality, ethics, and simple hard work. You can �nd out more about us and the projects we construct by viewing our website at: www.oakgroveconstruction.com.
If you are right for us, you will likely have a minimum of 5 years experience bidding and managing both Public and Private works projects, with a CM degree preferred. Candidates must possess strong verbal and written communication skills, be a self-starter, and work well in a team environment. Prior experience with Master-Builder and Earthworks Estimating software programs is a strong plus. Salary will be commensurate with prior related experience. The position is fully bene�tted, including company-funded health, dental and vision insurance; with committed company contributions to your 401(k) retirement plan. We are proudly an Equal Opportunity Employer.
Please send resume and salary history to: [email protected]
Estimator/Project Manager
Marin Builders Association ◆ Weekly BulletIn ◆ Page 32Marin Builders Association ◆ Weekly Bulletin ◆ Page 34
Publication rules for submission of articles to the MBA Weekly Bulletin
Members cornerLimited to 600 words and edited for length, grammar, spelling, clarity, style, libel and civility. We do not publish form
letters, petitions or consumer complaints. Please include writers name, address and phone number. All submissions become the property of Marin Builders Association and cannot be returned.
note: We would like a photo (jpeg) head shot and can offer ¼ page ad space to *fill out page for ½ the price.
*Ad space only available to fill out page if necessary.
www.marinba.org ◆ [email protected]
Page 34
Marin Builders Associationcirca 1962