Michael Pacholok, Chief Purchasing Officer Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Sabrina Dipietro Acting Manager Construction Services January 17, 2019 Reply to: Michael Porcarelli Via Website Posting: 7 Pages Tel: (416) 338-5585 Addendum No. 3 Tender No. 300-2018 Re: North Facing Dock Wall Reconstruction in the Western Channel, 5 Eireann Quay, Toronto. Closing Date: 12:00 P.M. Noon (Local Time), January 31, 2019 Please refer to the above Tender Call document in your possession and be advised of the following: 1. General Clarifications To Questions From Bidders Q1. In regards to detail of area drain found on L02 drawing which is sheet 23 of drawings. You show the drain under the granite cobble stone. How is water to get to drain? The tight spacing and polymeric sand in cobble stones do not allow water to penetrate down through the slab. Is there a concern for free flowing water on top of slab to get to drain? This will cause sand washout or settlement. Should not the drain be closer to the soil/sod transition area? or HPB be used to allow free flowing water A1. The drains are provided to deal with any water that may percolate or seep through the paver stone joints and polymeric sand. Q2. We have counted 63 area drains on drawings the tender form has a count of 60. Please confirm quantity required A2. Per the drawings, there are 43 drains in Part 1, and 20 drains in Part 2 – for a total of 63 drains. The tender quantity for Item 28 (Part 1) in the Unit Price is revised to 43 units, per the revised Unit Price Table in Section 3 – Tender Submission Package, Pricing Form – Itemized Prices (enclosed with this addendum). Continued on next page… 1 of 7

Michael Pacholok, Chief Purchasing Officer Purchasing and … · 2020. 7. 16. · Michael Pacholok, Chief Purchasing Officer Acting Manager Purchasing and Materials Management Division

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Michael Pacholok, Chief Purchasing Officer

Purchasing and Materials Management Division City Hall, 18th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2

Sabrina Dipietro Acting Manager Construction Services

January 17, 2019 Reply to: Michael Porcarelli Via Website Posting: 7 Pages Tel: (416) 338-5585

Addendum No. 3

Tender No. 300-2018

Re: North Facing Dock Wall Reconstruction in the Western Channel, 5 Eireann Quay, Toronto.

Closing Date: 12:00 P.M. Noon (Local Time), January 31, 2019

Please refer to the above Tender Call document in your possession and be advised of the following: 1. General Clarifications To Questions From Bidders

Q1. In regards to detail of area drain found on L02 drawing which is sheet 23 of drawings.

You show the drain under the granite cobble stone. How is water to get to drain? The tight spacing and polymeric sand in cobble stones do not allow water to penetrate down through the slab. Is there a concern for free flowing water on top of slab to get to drain? This will cause sand washout or settlement. Should not the drain be closer to the soil/sod transition area? or HPB be used to allow free flowing water

A1. The drains are provided to deal with any water that may percolate or seep through the

paver stone joints and polymeric sand. Q2. We have counted 63 area drains on drawings the tender form has a count of 60.

Please confirm quantity required A2. Per the drawings, there are 43 drains in Part 1, and 20 drains in Part 2 – for a total of 63

drains.

The tender quantity for Item 28 (Part 1) in the Unit Price is revised to 43 units, per the revised Unit Price Table in Section 3 – Tender Submission Package, Pricing Form – Itemized Prices (enclosed with this addendum).

Continued on next page… 1 of 7

Q3. Is wifi/cellular available in both the tunnel section and the stairwell? If wifi/cellular is not available can we run a wire for an antennae to the ground surface via the stairwell?

A3. There is no wifi/cellular available in the tunnel section and the stairwell. The

contractor would be responsible for having their own set up in the site trailer. Q4. Is 120VAC power available near the four proposed vibration monitoring locations to

power the sensors, data logger and communication equipment? A4. Contractor should assume that it will have to self-power the monitoring equipment.

Q5. Can a small job box (0.5 m x 0.5 m x 1.0 m) be situated on the floor at each of the proposed locations? If fire code or pedestrian traffic requirements prevent the use of the job boxes, can we mount equipment enclosures on the wall or ceiling? Will the locations be free from potential tampering/false readings due pedestrians?

A5. Toronto and Ports Toronto will work with the contractor to accommodate the

monitoring station locations and positioning. Contractor should ensure that the boxes are tamper proof; foot traffic will not affect readings of appropriately selected equipment (as selected by a tender compliant party). The box dimensions are acceptable.

Q6. Is one setup to monitor noise level adequate? A6. There will and must be 4 locations. The locations will be decided by the City of Toronto. Q7. For turbidity monitoring, what quantifies as regular monitoring? What is the

occurrence required per week? A7. Per Section 01 57 19, Clause 3.1.1 of the specifications, frequency of turbidity

monitoring may vary over the in-water construction period Monitoring will only be performed during in-water operations. Bidders should assume a minimum of 2 monitoring events per week, but this number could increase or decrease.

Q8. What is the load capacity of crib/dock wall once top cap and slab have been

removed? Will equipment be allowed to work off this area? A8. Following removal of the existing concrete cap and deck, work will proceed using barge-

mounted equipment. The contractor is responsible for making his own assessment and determination of load capacities to avoid overloading and damage, and ensure the safety of structures and personnel.

Continued on next page… 2 of 7

Q9. In regard to Maxxam analytical data provided. Where were the samples taken from? Is there a map of sample locations?

A9. The laboratory analytical data provided is the general soil quality for the property (i.e. 5

Eireann Quay) and should be used as a baseline to determine off-site disposal options of excess soil during construction. Please see site plan attached for borehole locations.

Q10. Are there any contaminated soils below the slab structure to be removed or bore

whole samples? A10. No boreholes where advanced directly below the slab structure. However, boreholes

were advanced in proximity to the structure (see attached Site Plan). The laboratory analytical data previously provided is the general soil quality for the property and it is expected that soil beneath the structure will be of similar quality.

2. Revisions and Clarifications

1. Section 3 – Tender Submission Package,

Pricing Form – Itemized Prices, Page 49 of 119 (3-14)

Unit Price Table – PART1:  

1. Item #28 - Drains

Estimated Quantity: Delete: “40 ea” Substitute: “43 ea”

Refer to enclosed Revised Pricing Form – Itemized Prices, replacing pages 48, 49 and 50 of 119 from the tender document. (Enclosed 3 pages)

All other information regarding the call document is unchanged. All other terms and conditions remain the same. Should you have any questions regarding this addendum contact Michael Porcarelli, Corporate Buyer, at email [email protected]. Please attach this addendum to your Request for Tender document and be governed accordingly. Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 9 - Addenda, of the Tender Call document. All other aspects of the Tender remain the same. Yours truly, Sabrina Dipietro, Acting Manager, Construction Services, Purchasing & Materials Management

3 of 7

Section 3 – Tender Submission Package Revised Pricing Form – Itemized Prices

Tender Call No. 300-2018 Contract No. N/A (Addendum No. 3 January 17, 2019)

Revised Pricing Form – Itemized Prices North Facing Dock Wall Reconstruction in the Western Channel, 5 Eireann Quay, Toronto.

NAME OF CONTRACTOR: _________________________________________________________ The Bidder must complete and submit the following Itemized Prices Form within five (5) working days upon being contacted by the City. Failure to submit the documents within this time limit will result in disqualification of the Bid. We, the Bidder, provide below the requested breakdown of items of Work included in our bid price (as entered in the Price Form). It is understood that these itemized prices are provided for information purposes only and will not be used to modify the scope of the Work and adjust our bid price.

NORTH FACING DOCKWALL REHABILITATION – WESTERN CHANNEL

UNIT PRICE TABLE (H.S.T. excluded)

UNIT ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

A. B. (A x B) PART 1

1

Sta. 0—11.146 to 0+120 / Sta. 0+180 to 0+215 Mobilization & Demobilization

LS

1

$

$

2 Site Preparation LS 1 $ $

3 Monitoring Program - Dockwall LS 1 $ $

4 Monitoring Program – Pedestrian Tunnel LS 1 $ $

5 Ireland Park – Site Protection – Hoarding & Sculptures

LS

$

$

6 Ireland Park – Limestone Bench – Removal &

Storage

LS

1

$ 83,022.00

$ 83,022.00

7 Ireland Park – Limestone Bench - Reinstall LS 1 $ 96,348.00 $ 96,348.00

8 Ireland Park – Limestone Pavers – Repair LS 1 $ 70,533.00 $ 70,533.00

9 Rock Probes – 4 Locations LS 1 $ $

10 Demolitions and Removals - Concrete M3 510 $ $

11 Demolition – Storage Bldg. & Pump House LS 1 $ $

4 of 7

Section 3 – Tender Submission Package Revised Pricing Form – Itemized Prices

Tender Call No. 300-2018 Contract No. N/A (Addendum No. 3 January 17, 2019)

12 Excavation M3 260 $ $

13 Backfill – 50 mm Clear Stone Tonne 2,460 $ $

14 Steel Sheet Piling - Supply M2 1,385 $ $

15 Steel Sheet Piling - Install M2 1,360 $ $

16 Waler M 165 $ $

17 Tie Rods – 37 mm diameter M 180 $ $

18 Tie Rods – 43 mm diameter M 32 $ $

19 Toe Pins – 75 mm diameter Ea 103 $ $

20 Toe Pins – 125 mm diameter Ea 5 $ $

21 Concrete - Deck M3 840 $ $

22 Concrete - Copewall M3 205 $ $

23 Drilled Casings - Deck Ea 100 $ $

24 Ladders Ea 6 $ $

25 Bollards Ea 8 $ $

26 Marine Rescue Stations Ea 6 $ $

27 Paver Stones – Supply & Install M2 750 $ $

28 Drains Ea 43 $ $

29 Timber Fenders – Return Wall LS 1 $ $

30 Fish Spawning Shoals LS 1 $ $

31 Granite Barrier Benches M 105 $ $

32 Rubber Tire Fenders – Ferry Slip Corners LS 1 $ $

Part 1 –

Total of Amounts for Items 1-32 above

$

(HST excluded)

5 of 7

Section 3 – Tender Submission Package Revised Pricing Form – Itemized Prices

Tender Call No. 300-2018 Contract No. N/A (Addendum No. 3 January 17, 2019)

PART 2

Sta. 33 to 50

33 Demolitions and Removals - Concrete M3 230 $ $

34 Excavation M3 115 $ $

35 Backfill – 50 mm Clear Stone Tonne 890 $ $

36 Steel Sheet Piling - Supply M2 505 $ $

37 Steel Sheet Piling - Install M2 495 $ $

38 Waler M 60 $ $

39 Tie Rods – 37 mm diameter M 70 $ $

40 Toe Pins – 75 mm diameter Ea 39 $ $

41 Concrete - Deck M3 305 $ $

42 Concrete - Copewall M3 75 $ $

43 Drilled Casings - Deck Ea 38 $ $

44 Ladders Ea 3 $ $

45 Bollards Ea 4 $ $

46 Marine Rescue Stations Ea 3 $ $

47 Paver Stones – Supply & Install M2 365 $ $

48 Drains Ea 20 $ $

49 Granite Barrier Benches M 55 $ $

50 Rubber Tire Fenders – Front Wall LS 1 $ $

Part 2 – Total of Amounts for Items 33-50 above

$

(HST excluded)

TOTAL – PART 1 AND PART 2 Total of Amounts for Items 1-50 above

$

(HST excluded)

Transfer this “TOTAL – PART 1 AND PART 2” to Item (a) for WORK SPECIFIED IN THE PRICING FORM – BID PRICE

6 of 7

!?

!?

!?!?

!? !?

!A

!?

!?

!?!?!?!?

!?!?!?!?

!?!A

!?

!?

!A

!A

!?

!?!?

!A

!A

!A

!A

!?

!?

!A!A

!?

!?!?

!?

!?

MW06

MW13

BH032

BH030

SBH10-ESBH10-NSBH10-W

SBH10-S

MW05

BH022

BH021

SBH6-NSBH6-W

SBH6-SSBH6-E

SBH13-WSBH13-N

SBH13-E

SBH13-S

BH023MW07

BH025BH024

MW01

MW14

BH026

BH029BH028

MW10

MW08

BH038

BH037

MW01BMW03

BH035

BH036BH039

BH034

BH040

B'

A'

C

B

A

Figu re 6-1G e o log ica l C ro ss S e c tion Loca tionsS ite C ha ra c te riza tio n a nd C oncep tua l S ite M ode lC ity o f To ron to5 E ire an n Q ua y, T oron to

!? Borehole!A Monitoring Well

Approximate PropertyBoundaryCross-section LocationApproximate Location of Void

\\BROOKSIDEFILES\GIS_SHARE\ENBG\00_PROJ\T\TORONTOCITYOF\ENVROSTER\MAPFILES\5EIREANN\PHASETWO\DRAFT1\CROSSSECTIONLOCATION.MXD VM048279 10/25/2018 4:46:08 PM

DRAFT

0 5 10

Metres³Note1. Aerial Imagery: ESRI 2018

7 of 7