36
Molonglo Aquatic Sports and Recreation Centre Feasibility Study 81 Molonglo Aquatic Sports and Recreation Centre Feasibility Study 81 81 81 81 81 81 81 81 81 81 1 81 8 81 81 81 1 8 81 8 8 8 8 8 B Appendix B Site Utility Services & Engineering

Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Molonglo Aquatic Sports and Recreation Centre Feasibility Study

81

Molonglo Aquatic Sports and Recreation Centre Feasibility Study

818181818181818181811818818181188188888

BAppendix B

Site Utility Services & Engineering

Page 2: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

© Northrop 2012

Molonglo Aquatic, Sports & Recreation Centre Feasibility Study

Utility Services & Engineering Issues

Page 3: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Contents

Page 4: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Figures

Appendices

Page 5: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

1. Introduction

Figure 1 Location and Concept

Page 6: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

2. Site Characteristics 2.1 Land Use

2.2 Geology & Soils

Figure 2 Site Conditions

Page 7: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Figure 3 Site Topography

2.3 Terrain

2.4 Stormwater

Page 8: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

2.5 Bushfire

Figure 4 Natural Drainage Paths

Page 9: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Figure 5 Fire management zones

SITE

Page 10: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

3. Utility Services

Figure 6 Indicative utility services locations

3.1 Sewerage

Page 11: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Figure 7 Sewerage connection

3.2 Water supply

SITE

Holdens Creek

A

B

C

Page 12: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Figure 8 Water supply zones

Page 13: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

3.3 Energy

3.3.1 Electricity

3.3.2 Street Lighting

3.3.3 Gas

3.4 Communications

Page 14: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

4. Roads & Drainage

Figure 9 Access strategy

4.1 John Gorton Drive Primary Access

Page 15: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Earthworks

Service Roads

Four-way Intersection

Cycleway

4.2 Uriarra Road

4.3 Drainage

Page 16: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Figure 10 Stormwater Drainage Outlet Points

Page 17: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

5. Conclusions

Site Characteristics

Utility Services

Roads and Drainage

Page 18: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 19: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Reference Drawings

Page 20: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 21: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 22: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 23: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 24: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 25: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 26: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 27: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Extracts from SMEC 2008 Geotechnical Investigation

Page 28: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 29: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 30: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 31: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 32: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 33: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C
Page 34: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

SITE

Page 35: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Molonglo Aquatic Sports and Recreation Centre Feasibility Study

83

Molonglo Aquatic Sports and Recreation Centre Feasibility Study

838383838338383838383838383838383383883888

CAppendix C

Site Costings

Page 36: Molonglo Aquatic Sports and Recreation Facility Feasibility Study Appendix B & C

Estimate S

um

mary

Code

Description

Quantity

Unit

Rate

Total

Project:

Molonglo S

ports + Leisure C

entreB

uild

ing

:Concept Plan - W

ith Project Costs

Details:

12107DA05

Feasibility Cost Plan

Preferred Site S

trategyM

olonglo Aquatic S

ports & R

ecreationFacility - A

pril 2012

Preliminaries

6,660,000

Substructure

2,409,000

Colum

ns57,000

Upper Floors

2,019,000

Staircases

365,000

Roof

11,658,000

External Walls

12,937,000

Window

s2,156,000

External Doors

184,000

Internal Walls

410,000

Internal Screens &

Borrow

ed Lights236,000

Internal Doors

147,000

Wall Finishes

578,000

Floor Finishes1,938,000

Ceiling Finishes

1,260,000

Fitments

1,426,000

Special Equipm

ent4,006,000

Hydraulic S

ervices1,715,000

Mechanical S

ervices1,973,000

Fire Services

988,000

Electrical Services

2,748,000

Transportation System

s723,000

Special S

ervices685,000

Centralised Energy S

ystems

910,000

Site Preparation

687,000

External Works

1,060,000

External Services

783,000

Contingency - 10%

6,072,000

Exclusions0

Ord

er of Prob

able C

osts - Presen

t6

6,7

90

,00

0

Projections based on historical B

uilding Price Index:

Ord

er of Prob

able C

osts - 5 yrs p

rojection1

.09

72

,63

4,7

81

Ord

er of Prob

able C

osts - 10

yrs projection

1.4

09

3,5

29

,14

3

CostX