View
217
Download
1
Embed Size (px)
DESCRIPTION
Â
Citation preview
Molonglo Aquatic Sports and Recreation Centre Feasibility Study
81
Molonglo Aquatic Sports and Recreation Centre Feasibility Study
818181818181818181811818818181188188888
BAppendix B
Site Utility Services & Engineering
© Northrop 2012
Molonglo Aquatic, Sports & Recreation Centre Feasibility Study
Utility Services & Engineering Issues
Contents
Figures
Appendices
1. Introduction
Figure 1 Location and Concept
2. Site Characteristics 2.1 Land Use
2.2 Geology & Soils
Figure 2 Site Conditions
Figure 3 Site Topography
2.3 Terrain
2.4 Stormwater
2.5 Bushfire
Figure 4 Natural Drainage Paths
Figure 5 Fire management zones
SITE
3. Utility Services
Figure 6 Indicative utility services locations
3.1 Sewerage
Figure 7 Sewerage connection
3.2 Water supply
SITE
Holdens Creek
A
B
C
Figure 8 Water supply zones
3.3 Energy
3.3.1 Electricity
3.3.2 Street Lighting
3.3.3 Gas
3.4 Communications
4. Roads & Drainage
Figure 9 Access strategy
4.1 John Gorton Drive Primary Access
Earthworks
Service Roads
Four-way Intersection
Cycleway
4.2 Uriarra Road
4.3 Drainage
Figure 10 Stormwater Drainage Outlet Points
5. Conclusions
Site Characteristics
Utility Services
Roads and Drainage
Reference Drawings
Extracts from SMEC 2008 Geotechnical Investigation
SITE
Molonglo Aquatic Sports and Recreation Centre Feasibility Study
83
Molonglo Aquatic Sports and Recreation Centre Feasibility Study
838383838338383838383838383838383383883888
CAppendix C
Site Costings
Estimate S
um
mary
Code
Description
Quantity
Unit
Rate
Total
Project:
Molonglo S
ports + Leisure C
entreB
uild
ing
:Concept Plan - W
ith Project Costs
Details:
12107DA05
Feasibility Cost Plan
Preferred Site S
trategyM
olonglo Aquatic S
ports & R
ecreationFacility - A
pril 2012
Preliminaries
6,660,000
Substructure
2,409,000
Colum
ns57,000
Upper Floors
2,019,000
Staircases
365,000
Roof
11,658,000
External Walls
12,937,000
Window
s2,156,000
External Doors
184,000
Internal Walls
410,000
Internal Screens &
Borrow
ed Lights236,000
Internal Doors
147,000
Wall Finishes
578,000
Floor Finishes1,938,000
Ceiling Finishes
1,260,000
Fitments
1,426,000
Special Equipm
ent4,006,000
Hydraulic S
ervices1,715,000
Mechanical S
ervices1,973,000
Fire Services
988,000
Electrical Services
2,748,000
Transportation System
s723,000
Special S
ervices685,000
Centralised Energy S
ystems
910,000
Site Preparation
687,000
External Works
1,060,000
External Services
783,000
Contingency - 10%
6,072,000
Exclusions0
Ord
er of Prob
able C
osts - Presen
t6
6,7
90
,00
0
Projections based on historical B
uilding Price Index:
Ord
er of Prob
able C
osts - 5 yrs p
rojection1
.09
72
,63
4,7
81
Ord
er of Prob
able C
osts - 10
yrs projection
1.4
09
3,5
29
,14
3
CostX
30/07/2012 3:03:06 PMN
orthcroft (Australia) Pty Ltd
Page 1 of 1