November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street, NW Washington, DC 20005-4128 Dear Cliff: Certified Mail Tracking Number: 7011 2000 0002 7189 8794 As information, enclosed is a copy of the first Post Implementation Review for the Lancaster, Pennsylvania Processing & Distribution Center (P&DC) Area Mail Processing (AMP). If you have any questions, please contact Rickey Dean at extension 7412. Sincerely, Patrick M. Devine Manager Contract Administration (APWU) Enclosure (CA2012-838)

November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

November 2, 2102

Mr. Cliff Guffey President American Postal Workers

Union, AFL-CIO 1300 L Street, NW Washington, DC 20005-4128

Dear Cliff:

Certified Mail Tracking Number: 7011 2000 0002 7189 8794

As information, enclosed is a copy of the first Post Implementation Review for the Lancaster, Pennsylvania Processing & Distribution Center (P&DC) Area Mail Processing (AMP).

If you have any questions, please contact Rickey Dean at extension 7 412.

Sincerely,

Patrick M. Devine Manager Contract Administration (APWU)

Enclosure

(CA2012-838)

Page 2: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Type of Distribution Consolidated: Originating

Facility Name & Type: Lancaster P&DF

Street Address: 1400 Harrisburg Pike

City: Lancaster

State: PA 50 Facility ZIP Code: 17604

District: Central Pennsylvania Area: Eastern

Finance Number: 414409

Current 30 ZIP Code(s): 174-176

Miles to Gaining Facility: 40.2

EXFC office: Yes

Plant Manager: Brian Stewart (A)

Senior Plant Manager: Christine Goughler

District Manager: Dale Walker

Facility Name & Type: Harrisburg P&DC

Street Address: 1425 Crooked Hill Road

City: Harrisburg

State: PA 50 Facility ZIP Code: 17107

District: Central Pennsylvania

Area: Eastern

Finance Number: 413485

Current 30 ZIP Code(s): 170-173, 178

EXFC office: Yes

Plant Manager: Christine Goughler

Senior Plant Manager: Christine Goughler

District Manager: Dale Walker

3~ Background Information Approval Date: June 24, 2011

Implementation Date: Jan-01-2012

PIR Type: 1st PIR

Date Range of Data: Jan-01-2012: Jun-30-2012

Processing Days per Year: 310

Bargaining Unit Hours per Year: 1,742

EAS Hours per Year: 1,819

Date of HQ memo, DAR Factors/Cost of Borrowing! New Facility Start-up Costs Update

Date & Time this workbook was last saved:

4. Other.Informaflon Area Vice President:

Vice President, Network Operations: Area AMP Coordinator:

NAI Contact:

Jordan M. Small

David E. Williams

Bob Roseberry

Barbara Brewington

May 7, 2010

~--------------------------1 09-26-2012 12:43

PIR Data Entry Page

Page 3: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Approval Signatures

Finance Numoor: SCF ZIP Cooe(&l.

of Distribution Consolidated;

Financf!! Numoor: SCF ZIP Code(st:

nl"'"''""lu>tinn Date:

Plant

St:mitn Plant Manager:

District

Area President:

Page 4: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Executive Summary Last Saved: September 26, 2012 Date Range of Data

Losing Facility Name and Type: Street Address:

City:

State:

Current SCF ZIP Code(s):

Type of Distribution Consolidated:

Gaining Facility Name and Type: Street Address:

City:

State:

Savings/Costs

Staffing

Service

Function 1 Workhour Savings

Non-Processing Craft Workhour Savings (less Maint/Trans)

PCES/EAS Workhour Savings

Transportation Savings

Maintenance Savings

Space Savings

Total Annual Savings

Total One-Time Costs

Total First Year Savings

Craft Position Loss

PCES/EAS Position Loss

First-Class Mail Service Performance (EXFC 0/N)

First-Class Mail Service Performance (EXFC 2 Day)

First-Class Mail Service Performance (EXFC 3 Day)

Customer Experience Measurement Overall Satisfaction Residential at PFC level

Customer Experience Measurement Overall Satisfaction Small Business at PFC level

3

Lancaster P&DF 1400 Harrisburg Pike Lancaster PA 174-176

Originating

Harrisburg P&DC 1425 Crooked Hill Road

Losing Current Qtr Gaining Current Qtr

97.30% 98.18%

95.31% 96.57%

93.03% 94.60%

93.71%

86.63%

PIR Type: 1st PIR Jan-01-2012 - Jun-30-2012

from Service Performance & CSM

from Semce Performance & CSM

from Service Performance & CSM

from Service Performance & CSM

from Semce Performance & C SM

PIR Executive Summary

Page 5: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Calculatioo Befereoces Combined Losing and Gaining Facility Data: PreAMP Proposed 1st PIR

Function 1 Workhour Costs $61,801,090 $59,714,566 $58,837,061 Non-Processing Craft Workhour Costs

$1,582,783 $1,585,784 $1,544,267 (less Maintenance & Transportation)

PCES/EAS Workhour Costs $7,950,011 $7,927,967 $7,818,656 Transportation Costs $8,428,407 $8,324,084 $8,513,973

Maintenance Costs $21 ,835,058 $21,533,308 $20,798,205 Space Savings $0 $0 $0

Total Annual Cost $101,597,348 $99,085,709 $97,512,161

Total One-Time Costs $0 $1,524,135 $1 '190,836

Total First Year Costs $101,597,348 $100,609,844 $98,702,997

Staffing

Craft Position Total On-Rolls 1 '129 1 '101 1 '114 PCES/EAS Position Total On-Rolls 81 85 70

1st PIR vs Proposed 1st PIR vs Pre-AMP {A~~roved) AMP Approved AMP

Function 1 Workhour Savings $2,964,029 $877,505 $2,086,524 Non-Processing Craft Workhour Savings $38,515 $41,517 ($3,002) (less Maintrrrans)

PCES/EAS Workhour Savings $131,356 $109,312 $22,044 Transportation Savings ($85,566) ($189,889) $104,323

Maintenance Savings $1,036,853 $735,103 $301,750 Space Savings $0 $0 $0

Total Annual Savings $4,085,187 $1,573,548 $2,511,639

Total One-Time Costs ($1 '190,836) $333,299 ($1,524,135)

Total First Year Savings $2,894,351 $1,906,847 $987,504

Staffing Craft Position Loss 15 (13) 28

PCES/EAS Position Loss 11 15 (4)

PIR Executive Summary

4

Page 6: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Summary Narrative Last Saved: September 26, 2012

Losing Facility Name and Type: Lancaster P&DF Current SCF ZIP Code(s): 17 4-176

Type of Distribution Consolidated: Originating

Gaining Facility Name and Type: Harrisburg P&DC Current SCF ZIP Code(s): 170-173, 178

5

Background:

The Eastern Area. with the assistance of the Central Pennsylvania District. has completed the first Post Implementation Review (PIR) of the Area Mail Processing (AMP) that consolidated originating mail from the Lancaster P&DC into the LeGree S. Daniels (Harrisburg) P&DC. The data for the pre-AMP period was January 01, 2010 though December 31, 2010 and included all operations for the Lancaster P&DC and the LeGree S. Daniels P&DC. The transfer of originating mail began on December 24. 2011. The data for the 6-month PIR is Jan 1, 2012 thru June 30, 2012.

Financial Summary:

Total Annual Savings

Total First Year Savings

151 PIR Vs Pre-AMP

$4,085,187

$2,894,351

Customer Service Considerations:

1"1 PIR Vs Approved

$1,573,548

$1,906,847

The EXFC overnight, 2-day and 3-day mail service performance is shown below.

Loncaster PS.DF

Fiscal Overnight 2 Day 3 o .. y Oua.rtar Pe,.centaoe Parcenta.ae Percentaao

022011 97 34 93.98 BB. !9

Be'fore AMP 03 2011 97 70 94 ae 91.70

042011 98 23 93.11 91 02

01 2012 96.85 92 39 90.12

02 2012 97 84 95 39 91.94

After AMP 032012 97 30 95 31 93.03

04 2012

_ __9_1.~-- L...-..--. -

After AMP

01 2013

PIR Summary Narrative

Page 7: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

6

Transportation Changes:

HCR PIR vs Pre AMP shows a cost of ($85,566). The transportation loss for the PIR review is in PVS operations. No new routes were added in either site. The over-run for PVS costs are due the placement of the FSS Phase 2 testing and the addition of the destinating priority operations at the Lancaster Plant. The difference in the proposed and actual PVS was due to the fact VITAL had inaccurate mileages on the 4533s when the AMP study was done.

Total Transportation

(15) (16)

1st PIR vs 1st PIR vs PreAMP Proposed

HCR $22,094 ($75,045) PVS $63,473 $264,935

Total 1st PIR vs Pre AMP Transportation (PVS & HCR): $85,566

Staffing Impacts:

The approved AMP proposal identified a reduction of 28 craft employees and an increase of 4 EAS employees. Complement data at the end of the first PIR period shows that complement has only decreased by 15 craft employees. The additional positions in the LeGree S. Daniels P&DC are due to the PSE hiring prior to the AMP implementation. The EAS staffing has been reduced by 26 total positions in both gaining and losing facilities.

1 Craft = all categories 2 Craft= F1 + F4 at Losing; F1 only at Gaining

Maintenance Impacts:

The Maintenance savings PIR vs Pre-AMP is $1,036,853 and PIR vs Approved savings is $735,103.

Space Impacts and One-Time Facilitv Costs:

The approved AMP projected $1,524,135 for projected one-time costs. The proposed costs were for facility modification and MPE relocation. The total costs incurred were $1,190,836. Although proposed, there were no employee relocation costs for this AMP.

PIR Summary Narrative

Page 8: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Service Performance and Customer Satisfaction Measurement Last Saved: September 26, 2012

PIR Type: 1st PIR Implementation Date: 01/01/12

Losing Facility: Lancaster P&DF District: Central Pennsylvania

After AMP

Gaining Facility: Harrisburg P&DC District: Central Pennsylvania

After AMP

(15) Notes: _____________________ _

~"<:;entre~ '..t:~nn~}'llf_a~i.CI ... I CEM Q3 2012 !Customer Satisfaction Measurement (CSM) became Customer Experience Measurement i :2010. Data reflects most recently completed quarter available in CEM.

~- auestion # /R;;~~~~}~-Pr::~:~:~:~:· 1-------------+---·---r-·~---~-·-

~---O!_ ___ L 93.71% 1 86.63% Overall Satisfaction (Overall Experience)

1- Q4a I 95.77% I 90.62% Satisfaction wrth Receiving (Experience wtth receiving)

f· Q8a ~i.~l- 88 32~- Satisfaction wtth Sending (Experience wtth sending)

! Q12a ·j' 91.38% j 85.88% Satisfaction wrth most frequently visrted PO (Experience wtth most frequently visrted PO)

! Q16a . 68.09% I 61.27% Satisfaction wrth most recent contact wtth USPS (Experience wtth most recent contact wrtt i-----o1s-~--88.s2%-·-y---S3.60% Likely to recommend the USPS

7 PIR Service Performance and Customer Satisfaction Measurement

Page 9: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

I Combine~ilw;;-u--~ ---~

Type of Distribution Consolidated: Ongma1mg

~ENUAUZED_~ J L _ANNUALIZED

Wor1<.hour Costs • Combined Facilities Last Save& Septl!!mb~r 26, 2012

Functio'01 ,..--- -·---Function 4

t1 l$45 53 I G$39 05 41 L$35 31 G-WA

12 L~18/G~25 ., " L$45 ~7 r GS4S 07 43 L$353/G-NIA

14 L~52S/G$<417 «

" #VALUE~ .. l-N/AIG$3508

" " 17 L1431t/G.$397 47

" l$41 22/GS-4067 48~-N/A I

PIR Type": ""~"s!:.:::c:~CiRp,..,R,-:o::;:~;c:,mn=•-::~-:..,:::,c:,al:;;o:;:"'=toc:cFc::,":;o'p'R

Date Range of Data: Jan-01-2012 to Jun-30~2012

c:=:!'~_.J c:::__ ANNOALlZED ~:.::J

PlR Workhour Costs- Combined Facilities

Page 10: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

PIR Work hour Costs- Combmed Fac11!t!es

Page 11: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

P!R Workhour Costs- Combined FaCJhtJes

Page 12: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

(1) I. ~~·~··:m...~.·--~i A~3~HPVotu~ (() 'If ifF ~·.l~TPHf6!rN~TPHJ~ume {7) I AnnuaiWofl<hours

10 -:---rrn---T A~oducUv~ ]'1'3} Annu.:i~ r - ''{1i

P,...... I 1otPtRt P"'AMP l .,...... I 1stPIR U PaiiMP j p,.,.,.,_, htPIR P4'0AMP ,.,.,....., tstPIR PreAMP P- I 1otPIR

g 1----i~!H----- - $0

0 • $0 0 $0 $0 0 $0 $0 0 $0 $0 0 • $0 0 $0 $0 0 • $0 0 $0 $0 0 $0 $0 0 • $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 • $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 $0 0 $0 $0 0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 . $0

0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 "$0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0. $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 $0 0 $0 0 $0 $0 0 $0 $0 0 $0 $0

~~~~i h.~1.tl41.~~: l u_s1.tl41.731 I "400.171.572 h 4,001,%$4,8~~~+-~--.. -00-1-.tM-... -.~-,--.-.• -..,-.• -.-3.-13-.111'""--,-,Il-~-3-,51-4-,~-,---,-~-•. -54~~:+----,-.• -1-6.-17-1 1 ____ j-- J

~~~.V~rl~~H or NATPH VofurM Valiartcu Annuaf WorthOOrs

(10) Change I (19) I (20) Change J (21) (22) ;Propo .. (! Analy~is 1atP!RvsPr•AMP 1•tP!Rv&PTopo..O Ana~is 1atP!~vsPreAMP 1•tPIJCtv•Pr~Md _j) Anatv$is I 1stP!RvsPr•AMP ) 1&tPIRv•F'ropoM<f )) Anaty$is J 1JtPIRv•Pr•AMP ) 1•tF>tRv•Pr~ (51,67<l.150) UnKs I 242,398.250 I 242,398,250 UnKs (97.343) (S-370!1 I UnKs 353 188 I I UnKs l ($2,964,029) ($877 ,505)

-----'--------'----6_% __ _, !'e.-cent I 6.1% j 6.1% Pe.-cent I -<;.4% I -0.&"/, II Pe<cent I 13.3% I 6.7% II Pe.-cent l -4.8% I -1.5%

(27) NOTES:

"'"'~

11

P! R Workhour Costs - Combmed F ac1hties

Page 13: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Lo$ing Facility: Lancaster P&OF

Type of Distribution Consolidated: Originatmg

Workhour Costs -Losing Facility Last SaYed Septerrber 26,2012

11 ~.:).,1

12 $48.18 13 ~.47

14 $45.25 16 $37.21 1t

17 $.43.18

PIR Type•: ""~"'s;';:,~C::,',o-;RP,.IR0<X>l=u:::mn::::,:-:,::c.,=,u:;a;;;lg:::adnto;:;r<'F=••t PIR

Date Range of Data: Jan-01-2012 to Jun-30-2012

P!R Workhour Costs - Lostng

Page 14: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

PIR Workhour Costs- Losing

Page 15: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

(1) ~=~cc , ; Annuo~~PVo~i !"I

~::; ~ ~ Pri$AMP PtopoMd htPIR

Ad,

Totals

Change Analysis

Unfts

Percent

379,064,130

r v .. u, ........ ~ AAnwd FHP Votume

(17) I (18) 111:PlRvsPro.AW 1a:tP1Rvs~

(11l,M7,.4&8)j 18,W4.487

·229% SO%

I 1,467,01!1,97'

---Change Analysis

Units

Percant

~ AMP

Annual Worl<hours

Propooed

10) II {11) I ·ttn· ~ : ' l {13' Annuat Productivity

1stPIR 'I P(&AMP

I ~ca~l 1stPIR

14) I 1:!~ <I 11-51 Annual Worlrhour Cocta

PmAMP - 15t:PIR

$0 $0 No Calc NOCaiC

$0 $0 $0 $0

0

1.115,09~. 1,1a.& .......... m.l r 479,3391 m.11s1 l83,852tr 3,0571 3,2631 3,091 . $20,~51,9&9 $15,101

--- J -- l -...._ I i or NATPH-V~u~ Variances Ann~ Workhours Variances Annual ProducttVitV Variance• 1 Workhour •a.ta

4!-"lt'lo ~~· A~A ~.u ..... 7.251 $17,020,357

(19) I (20) Change I (21) J (22) Change I (23) T (24) Change (25) I (26) 1st PtR vs Pr~ AMP 1st PfR vs PropoMO Analysis 1st P1R vs Pre ANP 1st PtR 'If. Propoud Analysis 1st ptR >n Pre AI# 1st PJR w Propo:tMd Analy$is 1R PfR vs Pre AMP 1st PIR yt; Pr~

(2110,543,333)1 21,383,.04 UnitJ I (95,99711 26,737 Units I 34 f (172) Units ($3.231.612) $1,913,106

~19.1% I 1.8% Percent I -10J}% I 7.5% Percent ! 1.1% [ -5.3% Percent +H>.O% I UJ%

(27)NOTES'-----------------------------------------------------------------------------------------------------------------------------------------------------

14 PlR Workhour Costs- Los1ng

Page 16: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Gaining Facility: Hamsburg P&DC

Type of Distribution Cons-olidated: Ongtnatmg

Worl<hour Costs -Gaining Facility Last Saved September 26,2012

PIR Type•: i~'='::.:::-:,',:-;RP""IR=w:;:-u:=mo::cs:-:~::-a:::o:;;ou::::a:;::lg::::ed:;-ro;;::,,-,F'="':7' PIR

Date Range of Data: J.an-01..-2012 to Jun..J0-2012

PIR Workhour Costs - Gaining

Page 17: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

P!R Wori<.hour Costs - Ga1ning

Page 18: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

.........

PIR Workhour Costs - Gaining

Page 19: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

(1) m 4 • m 8 10 11 121 13 14 ~rtsl 1 Annu.a.l FHP Yotume Annu'" TPH Of NA TPH Votum& Annual WoOI.hours Annual ProductMty Annual Wortthour Costs

-~ Operlltlon Pf<>AMP ? Proposed 1st PIR PreAMP Proposed 1st PlR ~reAMP Propooed 1stPIR Pf<>AMP Propooed 1stPIR Pro AMP Pr- 1stPIR . ...,.,.,. ·. 0 No Cal<; $0 $0

0 N<>Cak; $0 $0 Ad! 0 $0

Totals '• 959,910,133 1 ,Oact,l72,088 1,021,107,442 2,$34,234,911 2,S36,161,S.t 3,0S7,176,494 1,033,675 1,067.~7 1,032,319 2,462 2,657 2,961 W.$4t.•tt $44,607,315 $41,816,704

-............. l ---- 1 --- J -- I -- T Variance-s Annual FHP Volume Varl~ Annual TPH or NATPH Volume Variance:$ Annual Workhoun Variances Annual P~~uctlvltv Variances Annual Workhour Costs

Change {17) {1S) Change (19) (20) Cllange (21) (22) Change (23) (24) Change (25) (26) Analysi$ 1m PtR" Pre ANP 1R: Plfl: n PropoMd Analysjs 1st ptR: V$ PT. A.MP 1st PlR,... Proposed Analysis 1st P1R: n Pnt AM> 1stf>tR:vsPropowd Analysis 1st P1R vs PTe AMP 1stP1R.\11;Propowd Analysfs 1st Pm \IS Pre ANP 1s:t P1R ~ Propost'd.

Units &1.197,309 (69,7M ...... ) Units 522,941,563 221,014,846 Units (1.356) (35,108) Units 510 304 Units $267,583 {$2.790,611)

Percent 64% -64% Percent I 20.6% I 7.6% Percent -0,1% I -3,3% Percent I 20.8.% I 11,5% Percent I 0.6% I -f3.3%

(V)NOTES: __________________________________________________________________________________________________________________________________________________ ___

18 P!R Workhour Costs- Gatntng

Page 20: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

[ Other Workhour Move Analysis I Losing Facility Lancaster P&DF Harrisburg P&DC 01/01112 to 06/30/12

PIR Other Workhour Costs

Page 21: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Totals 165,358 148,580 155,012 ' $7,441,503 $6,655,723 $7,050,512 Totals 358,543 365,215 355,623 $16,027,073 $16,342,162 $16,016,647

20

P!R OthPr Wnrl.-hr."r f'r.d"

Page 22: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

PIR Other Wmi<hour Costs

Page 23: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Totals 53,668 41,293 43.373 $2,704,634 $2,109,006 $2,193,994 Totals 108,306 120,681 110,779 $5,245,378 $5,818,962 $5,624.661

22

PIR Other Worl<hour Costs

Page 24: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

[ Distribution to Other PIR Worksheet Tabs I

23

P!R OthAr Wnrlo:-hn, orr,..._,..,

Page 25: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

-1 78

145"''

·2 59

-165

-936 -1 79

Losing Facility Summary

24

PIR Other Worl<hour Costs

Page 26: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Staffing - Craft Last Saved: September 26, 2012

PIR Type: 1st PIR Data Extraction Date: 07/17/12

Losing Facility: Lancaster P&DF Finance#: 414409

(1) (2) (3} (4) (5} I {6 •· (7) I (8) (9)

Casuai/PSE Qn-R()IIS Part TimE On-Rolls Full Time On-Rolls Total Qn-Rolls Craft Positions

PreAMP 1st PIR PreAMP 1st PIR PreAMP 1st PIR PreAMP Proposed 1st PIR

!Function 1 -Clerk 0 0 0 0 .1!51 129 158 134 129 I FLJilction 4 _Cielj< 0 0 [) 0 0 0 0 iFl:l!1_ctio_n 1 - Mail Handler 3 3 7 10! _93 119 100 1_Q~ I Function 4 - Mail Handler 0 0 J 0 0 0 0 0 'Function 3A- Vehicle Service 0 0 2 0 12 14 .·.· 14 14 14 ,Function 3B- Maummc:ulet:

~I ~ 0 0 69 65 69 63 66

Functions 67-69- Lmtd/Rehab/WC 0 0 1 1 1 Other Functions Q 0 4 4 I. 4 _4_ !Total 3 4( 9 7 353 306 ·.· ~!5 316 _317 --- ]

'go OQOW oq Total On-Rolls.

Change (10) (11)

Analysis 1st PIR vs 1st vs PreAMP

c ...... (48) 1 Percent -1~% 0.3%

Gaining Facility: Harrisbur9 P&DC Finance#: 413485

(12) (13) (14) (15) (16) (17) (18) (19) (20)

Casuai/PSE On-Rolls Part Time On-Rolls Full Time On-Rolls Total On-Rolls Craft Positions

PreAMP 1st PIR PreAMP 1st PIR PreAMP 1st PIR PreAMP Proposed 1st PIR

I Function 1 - Clerk 35 67 0 0 286 293 321 331 360 !Function 1 -_Mail_ Handler 26 24 19 19 205 209 250 258 252 I Function 3A- Vehicle Service 0 0 0 32 32 35 35 32 !Function 3B- Ma1 '"'"""""'

~ :, ( 0 15( 138 150 153 145

!Functions 67-69- LmttJI"\ehab/WC ( 0 0 1 1 0 Other Functions ( _0 8 7 7 8 Total .61 98 22 19 681 680 !64 785 797

--- ~ l Harrisburg includes employees from concurrent Reading AMP Variances Total 0 "toll:.

~·---~-·-·--~~-·-~-"'-'*'-·-~ .. (21) (22) I (23) I (24) I Change

1st PIR vs 1st PIR vs

! 1st PIR vs Pre AMP ! 1st PIR vs Pro~sed ! Analysis PreAMP Proposed I

Total Craft Position Loss:! 15 ! (13) ! Positions 33 12

L~-~-~-~-~-~-L-,_,_,_,_,_J Percent 4.3% 1.5% (Above numbers are carried forward to the Executive Summary)

rev41~110

25 PIR Staffing- Craft

Page 27: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Staffing - PCES/EAS

Losing Facility: Lancaster P&DF Data Extraction Date· 7/1412012

PCES/EAS Positions Authorized

(1) (2) (3}

LinE Position Title Level PreAMP

1 MGR PROCESSING/DISTRIBUTION EAS-25 1 2 MGR MAINTENANCE EAS-22 1 3 MGR IN-PLANT SUPPORT EAS-21 1 4 MGR DISTRIBUTION OPERATIONS EAS-20 2 5 MGR TRANSPORTATION/NETWORKS EAS-18 1 6 OPERATIONS SUPPORT SPECIALIST EAS-17 I 3 7 SUPV DISTRIBUTION OPERATIONS EAS-17 I 11 8 SUPV MAINTENANCE OPERATIONS EAS-17 4 9 SUPV TRANSPORTATION OPERATIONS EAS-17 1 10 NETWORKS SPECIALIST EAS-16 1 11 SECRETARY (FLD) EAS-12 1 12 ADMINISTRATIVE ASSISTANT (FLD) EAS-12 13 14

15 16 17 18 19

20 21 22 23 24 25 26 27

28 29 30 31 32 33 34 I 35 36 37 38 39 40 41 42

43 44 45 46 47

48 49

50 51 52 53

54 55

56 57 = 58 59

60 Totals 27

26

Last Saved: September 26, 2012

PIR Type: 1st PIR

Finance# _4_1_44_0;_9 ____ _

Staffing On-Rolls

(4) ($) (6) (7)

1st P!R PreAMP Propo•ed 1stPIR

1 1 1 0 1 1 1 0 1 1 1 0 1 2 2 1 1 1 1 0 3 3 2 3

11 12 10 9 4 w 4 4 1 1 1 0 0 0 0 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

§ 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 II 0 0

I~ 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 28 24 19

~ Variances Total On-Rolls

(15) (16)

Change 1st PIR vs 1stPIR vs Anatysis PreAMP Propo.ed

Positions (9) (5) Percent -32.1% -20.8%

PIR Staffing - P ES/EAS

Page 28: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

27

Gaining Facility: Hanisburg P&OC Data Extraction Date:

Finance# ..;.4.:..13:..;48;,;:c.:..5 ____ _

PCES/EAS Positions Authorized

~ On-Rolls

Staffing

(19) (20) (21} (22) (2.) (25)

lin Position Title Level PreAMP 1st PIR Proposed 1st PIR

1 SR PLANT MANAGER (2) PCES-01 1 1 1 0

2 MGR IN-PLANT SUPPORT EAS-25 1 1 1 1

3 MGR DISTRIBUTION OPERATIONS EAS-24 1 1

~~ 1 1

4 MGR MAINTENANCE (LEAD) EAS-24 t=+=t=+= 1 1

5 MGR DISTRIBUTION OPERATIONS EAS-22 2 1

6 MGR MAINTENANCE OPERATIONS EAS-21 3 2

7 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-21 3 3 3 3 3

8 MGR MAINT ENGINEERING SUPPORT EAS-20 1 1 1 1 1

9 MGR TRANSPORTATION/NETVVORKS EAS-20 1 1 1 1 1 10 OPERATIONS SUPPORT SPECIALIST EAS-20 1 1 1 1 1

11 MAINTENANCE ENGINEERING SPECIALIST EAS-19 1 1 1 1

12 MGR DISTRIBUTION OPERATIONS EAS-19 2 0 m 2 0

13 MGR FIELD MAINT OPRNS (LEAD) EAS-19 1 1 1 1

14 MGR MAINTENANCE OPERATIONS SUPPT EAS-19 1 1 1 1

15 OPERATIONS SUPPORT SPECIALIST EAS-18 2 2 2 2

16 OPERATIONS SUPPORT SPECIALIST EAS-17 2 2 2 2

17 SUPV DISTRIBUTION OPERATIONS EAS-17 23 24

~ 23 19

18 SUPV MAINTENANCE OPERATIONS EAS-17 10 10 10 7

19 SUPV TRANSPORTATION OPERATIONS EAS-17 2 2 2 2

20 NETWORKS SPECIALIST EAS-16 1 1 1 1

21 SECRETARY (FLO) EAS-12 1 0 1 1 0

22 MGR DISTRIBUTION OPERATIONS EAS-20 2 2

23 ADMINISTRATIVE ASSISTANT (FLO) EAS-12 1 1

24 0 0

25 0 0

26 0 0

27 0 0

28 0 0

29 0 0

30 0 0

31 0 0

32 0 0

33 0 0

34 0 0

35 0 0

36 0 0

37 0 0

38 0 0

39 0 0

40 0 0

41 0 0

42 0 0

43 0 0

44 0 0 45 0 0 46 0 0 47 0 0 48 0 0 49 0 0 50 0 0 51 0 0 52 0 0 53 0 0 54 0 0 55 0 0 56 0 0 57 0

~ 0

58 0 0 59 I 0 0 60 0 0

Totals tj' I o1 0;:1 I b' ~

~ Variances Total On-Rolls

(33) (3<)

Change 1st PIR vs 1st PIR vs

Anatys~ Pre AMP Proposed

Positions (2) (10) Percent -3.8% -16.4%

r·----------------~----------·---~-·-----·-·---~ j Total PCES/EAS' (37> ' (3S) '

j Position Lossj 11 j 15 j ~-----------------~--------------1-------------~ (Above numbers are carried forward to the Executive Summary)

PIR Staffing - PCES/EAS

Page 29: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Transportation - PVS Last Saved: September 26, 2012

Losing Facility: Lancaster P&DF Finance Number: ...:4~1~44.:..0::..:9::._ _____ _

(1) (2) (3) (4) (5) Variance 1st Variance 1st

PreAMP Proposed 1st PIR PIR vs Pre PIRvs AMP Pronosed

PVS Owned Equipment Seven Ton Trucks 4 4 4 0 0

Eleven Ton Trucks 1 1 0 (1) (1)

Single Axle Tractors 3 3 3 0 0

Tandem Axle Tractors 1 1 1 0 0

Spotters 1 1 1 0 0

PVS Transportation ·. '

Number of Schedules 20 18 23 3 5

Total Annual Mileage 52,521 42,697 129,127 $76,606 $86,430

Total Mileage Costs $0 $0 $0 $0 $0

PVS Leases Total Vehicles Leased 0 0 0

Total Lease Costs $0 $0 $0 $0 $0

PVS Workhour Costs LDC 31 (617, 679, 764) $141,237 $120,051 $149,143 $7,906 $29,092

LDC 34 (765, 766) $1,201,843 $1,021,566 $1,288,781 $86,938 $267,214

Total Workhour Costs $1 .. 343,0~ $1,141 ,6'!!_ $1,437,924 $94,844 $296,306

(11) Total 1st PIR vs Pre AMP Transportation-PVS Savings: $63,473 (This number added to the Executive Summary

1st PIR PIR Type: ___ .:....:...;._:...;.__ __

Date Range of Data: Jan-01-2012 ----------Gaining Facility: Harrisburg P&DC

Finance Number: 413485 ---------(6) (7)

PreAMP Proposed

PVS Owned Equipment ..

Seven Ton Trucks 8 8 Eleven Ton Trucks 0 0 Single Axle Tractors 8 8 Tandem Axle Tractors 0 ·. 0 Spotters I '•2 2

PVS Transportation I Number of Schedules 43. 43 Total Annual Mileage 258,036 258,038

Total Mileage Costs 0 $0

PVS Leases Total Vehicles Leased 0 0

Total Lease Costs $0 $0

PVS Workhour Costs LDC 31 (617, 679, 764) $477,858 $477,858

LDC 34 (765, 766) $2,581,457 $2,581,457

Total Workhour Costs $3,039,315 $3,039,315

-to - Jun-30-2012

(8) (9) Variance 1st

PIR PIR vs Pre AMP

8 0 0

8 0 0

2 0

41 (2)

223,822 (34,216)

$0 $0

0

$0 $0

$532,161 $54,303

$2,475,782 ($85,6751

$3,007,943 ($31,372)

(10) Variance 1st

PIRvs Prooosed

0

0

0

(2)

(34,216)

$0

$0

$54,303

($85,675)

($31,372)

(12) Total 1st PIR vs Proposed Transportation-PVS Savings: $264,935 (This number added to the Executive Summary)

(13)Notes: ___________________________________________________________ _

rev 1/8/2008 b

28 PIR Transportation - PVS

Page 30: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

(1)

Losing Facility: Lancaster P&DF

Type of Distribution Consolidated: Originating

Data of HCR Data File: 08/01/12

Route# PreAMP Annual Mileage

(3)

Proposed Annual Mileage

(4)

1st PIR Annual Mileage

29

Transportation - HCR Last Saved: September 26, 2012

(5)

PreAMP Annual

Cost

(6)

Proposed Annual

Cost

(7)

1st PIR Annual Cost

PIR Type: 1st PIR-

CT for Outbound Dock:

(8)

PreAMP Annual

Cost/Mile

(9)

Proposed Annual

Cost/Mile

(10)

1st PIR Annual

Cost/Mile

PIR Transportation HCR - Losing

Page 31: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

0 0 0 $0 #DIV/0!

0 0 0 $0 #DIV/0!

0 0 0 $0 #DIV/0!

0 0 0 $0 '

#DIV/0!

0 0 0 $0 #DIV/0!

0 0 0 $0 #DIV/0!

0 0 0 $0 #DIV/0!

0 0 0 $0 #DIV/0! IT

0 0 0 $0 #DIV/0! ' 0 0 0 $0 #DIV/0!

0 0 0 ! $0 #DIV/0!

0 0 0 $0 ¥ #DIV/0!

0 0 0 $0 #DIV/0!

Totals 1,373,948 1,338,646 1,316,755 $3,299,716 $3,362,719 $3,187,734 ------ --- ::::::::1 -Variances Total Annual Costs

(11) (12)

Change Analysis 1st PIR vs Pre AMP 1st PIR vs Proposed

Dollars ($111 982) ($174 985) Percent L - O.Q_% - __ , 0.0%

30 PIR Transportation HCR - Losing

Page 32: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Gaining Facility: Harrisburg P&DC

Type of Distribution Consolidated: Originating

Date of HCR Data File:

(1)

Route#

(3) (4)

1st PIR Annual

Transportation - HCR Last Saved: September 26, 2012

CET for Inbound Dock:

CET for Cancellations:

(6) (7)

Proposed I 1st PIR Annual Annual Cost Cost

PIR Type: Originating

CETforOGP: -------CT for Outbound Dock:

PreAMP

(9)

Proposed Annual

Cost/Mile

(10)

1st PIR Annual Cost/Mile

II ~ I

#DIV/0!

PIR Transportation HCR- Gaining

Page 33: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

Totals ~fi~ AA3 376,449 386,081

32

$0 #DIV/01

$0 #DIV/0!

$0 #DIV/0!

$0 #DIV/0!

$0 #DIV/0!

$0 #DIV/0!

$0 i

#DIV/0!

$0 #DIV/0!

$746,296 $780,431 $880,371 ;

------ - ::::::::J Variances Total Annual Costs Summary HCR Losing & Gaining

(11) (12)

Change Analysis 1st PIR vs Pre AMP 1st PIR vs Proposed

Dollars $134 075 $99 940 Losing Percent 18.0% 12.8% Gaining

(13) Total 1st PIR vs Pre AMP Transportation-HeR Savings: (from losing and gaining facilities)

(13)

1st PIR vs Pre AMP

($111,982) $134 075

$22,094

(14) Total 1st PIR vs Proposed Transportation-HeR Savings: (from losing and gaining facilities)

(14)

1st PIR vs Proposed

($174 985) $99,940

($75,045}

Total Transportation

(15)

1st PIR vs Pre AMP

HCR $22 094 PVS _____j§3,473

(15) Total 1st PIR vs Pre AMP Transportation (PVS & HeR): $85,566 (This number carried forward to the Executive Summary)

(16) Total 1st PIR vs Proposed Transportation (PVS & HeR): (This number carried forward to the Executive Summary)

(16)

1st PIR vs Proposed

($75 045) $264,935

$189,889

PIR Transportation HCR- Gaining

Page 34: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

MPE Inventory Last Saved: September 26, 2012

Data Extraction Date: 07/18/12 PIR Type: 1st PIR Date Range of Data: Jan-01-2012 -to-- Jun-30-2012

Losing Facility: ...::L;.:;ac;..;nca=s:...:.te:..:.r...:.P.....:&:.;:D:...:F ________ _ Gaining Facility: Harrisburg P&DC

(1) (2) (3) {4) (5) (6) (7) (8) (9)

PreAMP Proposed 1st PIR Equipment

Proposed 1st PIR Variance in

PreAMP Proposed 1st PIR Relocation Relocation Costs

Equipment Costs Costs

AFCS 4 0 4 AFCS 5 7 7 $70,635 $70,635 $o I AFSM-ALL 2 2 2 AFSM-ALL 3 3 3 $0 $0 $o I

APPS 0 0 0 APPS 1 1 1 $0 $0 $0 ClOSS 4 4 4 ClOSS 0 0 0 $0 $0 $0 CSBCS 0 0 0 CSBCS 0 0 0 $0 $0 $0

DBCS 2 4 4 DBCS 21 19 21 $5,750 $5,750 $0 DBCS-OSS 3 3 3 DBCS-OSS 0 0 0 $0 $0 $0

DIOSS 2 0 0 DIOSS 6 8 8 $5,750 $5,750 $0 FSS 0 0 0 FSS 0 0 0 $0 $0 $0

SBPS 1 1 1 SBPS 0 0 0 $0 $0 $0 UFSM 0 0 0 UFSM 0 0 0 $0 $0 $0

Facer Canceller 0 0 2 Facer Canceller 2 2 2 $0 $0 $0

ROBOT GANTRY 0 0 0 I ROBOT GANTRY 6 6 6 $0 $0 $0 HSTS/HSUS 0 0 0 I HSTS I HSUS 0 0 0 $0 $0 $0

LCTS/LCUS 0 0 0 I LCTS I LCUS 1 1 1 $0 $0 $0 LIPS 0 0 0 LIPS 0 0 0 $0 $0 $0

MLOCR-ISS 0 0 0 MLOCR-ISS 0 0 0 $0 $0 $0

MPBCS-OSS 0 0 0 MPBCS-OSS 0 0 0 $0 $0 $0

TABBER 0 0 0 TABBER 0 0 0 $0 $0 $0 POWERED POWERED

INDUSTRIAL 0 0 0 INDUSTRIAL 0 0 0 $0 $0 $0 VEHICLE VEHICLE

LCREM 1 LCREM 1

FSS 1

18 14 .·· 22 Totals .:45 47 50 $82,135 $82,135 $0

(10) Notes: "::.. ..-:::: "::::..

Carried to Space Evaluation and

-- Other Costs Move 2 AFCS's (@ $23,730 each) with BDS and VFS@ $23,175 from LNC to HBG = $70,635 [VFS- Siemens ($14,17§) and 1 Dual BDS ($9,QQOJ =_ $23, 175]; moved 1 DBCS and 1 DIOSS.

Addjsonal equipment at Harrisburg comes from approved Reading AMP. PIR MPE Inventory

Page 35: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

LDC 36

LDC 37

LDC 38

LDC 39

Maintenance Last Saved September 26, 2012

PIR Type•:_1_st_P_IR ______ _

Date Range of Data: Jan-01-2012 Jun-30-2012

Losing Facility: Lancaster P&DF Gaining Facility: Harrisburg P&DC ---------------------------------------- ----~~---------------------------------

Wotf!:tiour A.ctivij'l

Building Equipment S

Building Services $ (Cu$/Odtal C/eanmg)

(2)

Proposed Costs

$ 2,775,944 $

452,220 $ 452,220 $

1,512,548 $ 1,512,548 $

378,935 $ 359,989 $

(3)

1st PIR Costs

2,683,432 $

497,492 $

1,626,333 $ -----416,414 $

---

(4) (5) Variance 1st Variance 1st

PIR to Pre PIRto AMP Proposed

(621,264) $ (92,512)

45,272 $ 45,272

113,785 113,785

37,479 56,425

Workhcn.1r A.ctivity

(6)

PreAMP Costs

(7)

Proposed Costs

(8)

1stPIR Costs

(9) Variance 1st PIR to Pre

AMP

198.943 $ I. ~oc 36 Mail PEroc_essinntg $ 6,232,330 $ 6,490,330 $ 6,431,273 $ ~-====~--------~~QcU~tp~rne~= _______ _

LDC 37

LDC 38

LDC 39

Building Equipment $

Building Services $ (Custodial Ctoanmg)

Maintenance Operations $

Suooort

1,926,879 $

-----3,097,331 $

734,973 $

1,926,879 $ 1,811,185 $ (115,694) $

3,097,331 $ 2,960,277 $ {137,054) $

752,440 $ 774,346 $ 39,374

(10) Variance 1st PIR to Pre Proposed

(59,057)

(115,694)

(137,054)

21,906

(48,136) 971 .$, =

127,296 $ 127,296 $ 152,344 .$, I. Maintenance$ 49,1o7 $ 49,107 $ LDC 93 Training -----

(48,136) 25,048 25,048

•>,~, *"" YJ,, '"'",; '""h"k'""'''" ,,, ,,,Ad

$

Pans and Supplies

$

Grand 'total $

. $ 5,149,808 $ 5,224,641 l (472,865) 74,833

1,364,372 $

0 $

7,061,878 $

1,255,222 $ 1,003,372 $ (361,000) (251,850)

0 $ 0 $ 0 o.

6,405,030 6,228,013 $ (833,865) (177,017)

(11) 1st PIR vs Pre AMP- Maintenance Savings:

(12) 1st PIR vs Proposed- Maintenance Savings:

12,118,809 $ 12,394,276 $ 12,129,425 $ 10,617 $

Pans and Supplies

Maintenance Stockroom $ 2,654,371 · $ 2,734,002 $ and Suoohes

2,440,766 $ (213,605) $

BDS Testing Consttmables OnJ· · $ o $ o $ 0 $ 0 $

Grand 'total $ 14,773,180. $ 15,128,278 14,570,191 $ (202,988) $

($1,036,853)

($735,103) (These numbers carried forward to the Executive Summary)

(These numbers carried forward to the Executive Summary)

(264,850)

(293,236)

0

(558,686)

(13)Nows: ____________________________________________________________________________________________________________ ___

*Data in PIR columns Is annualized fOl F1rst PIR

. ""'jJer.lOO$·

34

PIR Maintenance

Page 36: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

(1)

Distribution Changes Last Saved: September 26, 2012

Losing Facility : Lancaster P&DF PIR Type: 1st PIR

Type of Distribution Consolidated: Originating Date Range of Data: Jan-01-2012 --to-- Jun-30-2012

Place a "X" next to the DMM labeling list(s) revised as result of the approved AMP.

DMM L001 DMM L011

DMM L002 X DMM L201

DMM L003 DMM L601

DMM L004 DMM L602

DMM L005 DMM L603

DMM L006 DMM L604

DMM L007 DMM L605

DMM L008 DMM L606

DMM L009 DMM L607

DMM L010 DMM L801

Identify the date of the Postal Bulletin that contained DMM labeling list revisions.

(Z) Oct-06-2011, Postal Bulletin 22321

Was the Service Standard Directory updated for the approved AMP?

(3) Yes

(4) Drop Shipments for Destination Entry Discounts

FAST Appointment Summary Report NASS

Facility Name Total No-Show Late Arrival O~en

Month Losing/ Gaining Facility Code Schd Count % Count % Count % Count

May '12 losing Facility 175 Lancaster P&DC 282 31 10.99% 124 43.97% 0 0.00% 251

June'12 losing Facility 175 Lancaster P&DC 271 49 18.08% 108 39.85% 0 0.00% 222

May '12 Gaining Facility 170 Harrisburg P&DC 693 170 24.53% 202 29.15% 0 0.00% 521

June '12 Gaining Facility 170 Harrisburg P&DC 640 147 22.97% 194 30.31% 0 0.00% 493 .

Closed %

89.01%

81.92%

75.18%

77.03%

(5lNotes: --------------------------------------------------------~======================================== rev 1/8/2008

35

Unschd I Count

5

2

10

3

PIR Distribution Changes

Page 37: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Customer Service Issues Last Saved September 26, 2012

Losing Facility: Lancaster P&DF 5-Digit ZIP Code: -:1-'::-7""60:..4:._ _____ _

Data Extraction Date: 07/18/12

3-Digit ZIP Code: 174 3-Digit ZIP Code: 175 3-Digit ZIP Code: 176 3-Digit ZIP Code:

PreAMP PIR PreAMP PIR PreAMP PIR PreAMP PIR

1. Collection Points Mon.-Fri. Sat Mon.-Fri. Sat. Mon.-Fri. Sat. Mon.· Fri. Sat. Mon.-Fri. Sat. Mon. -Fri. Sat. Mon.-Fri. Sat Mon.· Fri. Sat. Number picked up before 1 p.m. 36 43 22 40 74 177 69 174 4& 53 29 34 0 0

Number picked up between 1·5 p.m. 68 14 62 14 165 25 165 23 00 !l4 66 63 0 0

Number picked up after 5 p.m. 10 () 10 0 1 0 0 0 16 4 13 4 0 0 Total Number of Collection Points 112 57 94 54 240 202 234 197 150 141 108 101 0 o. 0 0

2. How many collection boxes are currently designated for "local delivery"? c~

3. How many "local delivery" boxes were removed as a result of AMP? I~

4. Delivery Performance Report PreAMP 1st PIR

Central PA District QuarteriFY Percent QuarteriFY Percent

%Carriers returning before 5 p.m. Q1 2011 !3:4.3% Q1 2012 74.2%

Q2 2011 88.6% Q2 2012 85.5%

Q3 2011 83.8% Q3 2012

Q4 2011 75.0°~ Q4 2012

5. Retail Unit Inside Losing Facility (Window Service Times) 6. Business (Bulk) Mall Acceptance Hours

Proposed 1st PIR PreAMP Proposed 1st PIR

Start End Start End Start End Start End Start End

7:30AM 7:00PM 7.30AM 700PM Monday 9:00AM 5:00PM 9:00AM 5:00PM 900AM 5:00PM

7:30AM 7:00PM 7:30AM 700PM Tuesday 9:00AM 5:00PM 9:00AM 5:00PM 9:00AM SOOPM

J 7:00PM II 730AM 7:00PM 730AM 700PM Wednesday 9:00AM 5:00PM 9:00AM 5:00PM 9:00AM 5:00PM

I .. 7:00PM ll 730AM 7:00PM 730AM 7:00PM Thursday 9:00AM 5:00PM 9:00AM 5:00PM 900AM 5:00PM

7:30AM 7:00PM 730AM 700PM Friday 9:00AM 5:00PM 9:00AM 5:00PM 9:00AM 5:00PM

Saturday( 9:00AM I 2:00PM II 9:00AM 2:00PM 900AM 200PM Saturday Closed CloSed Closed Closed CloSed cloSed

7. Can customers obtain a local postmark In accordance with applicable policies In the Postal Operations Manual? Yes

8. Notes:

Gaining Facility: Harrisburg P&DC

9. What postmark is printed on collection mail? I HARRISBURG PA 171 I . ""'119/Z008

36 PIR Customer Service Issues

Page 38: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,

Space Evaluation and Other Costs Last Saved September 26, 2012

Losing Facility: Lancaster P&DF Date: ___ O:...:Sc.../1'-4"'-/1.;.:2;;_ __

1 Affected Facility

2. One-Time Costs

Enter any one-time costs: $1,302 000 $1 '108,701 ($193,299) (These numbers shown below under One-Time Costs section.)

3. Savings Information

Space Savings ($): __ ,.,;$0"'---- $0 $0 (These numbers carried forward to the Executive Summary)

4. Did you utilize the acquired space as planned? Explain.

Space will be used to acccmmodate 2 additional DBCS machines for PARS consolidation

5. Notes: One time costs include $91,022 for new dock doors and $1,017,679 for 010 modifications as approved in AMP.

Employee Relocation Costs

Mail Processing Equipment Relocation Costs (from MPE Inventory)

(1)

Facility Costs (from above)

Total One-Time Costs

Losing Facility: Lancaster P&DF

Pre-AMP: FY 2011

(2) (4)

$82,135 $82,135 $0

$1,302,000 $1,108,701 ($193,299)

$1,524,135 $1,190,836 ($333,299) PIR costs canied forward to ExaClJfiv9 Summary)

Range of Report

(5) 16)

Gaining Facility: Harrisburg P&DC

PIR: FY 2012 YTD

(7) (3) 191

Product

(31

PreAMP Co.st per 1,000

lmajje•

1stPIR Associated REC

1st PIR Cost per 1,000 Images Product 1st PIR

37

110)

1st PIR Cost per 1,000 Images

PIR Space Evaluation and Other Costs

Page 39: November 2, 2102 Mr. Cliff Guffey President 7011 2000 0002 … · 2012-09-26 · November 2, 2102 Mr. Cliff Guffey President American Postal Workers Union, AFL-CIO 1300 L Street,