1
OSUN IN BRIEF
Dec 2017
http://www.osuneng.co.kr
2
Business Overview - OSUN Engineering Co. Ltd.
3AGENDA
• History & Organization
• Business Area&
• Field of Activities
• Partners&
• Key Projects
4
OSUN’s Growth History• Feb 2016 Contracted TOR CDU Expansion Project in Ghana (EPC, including FEED)
• Feb 2016 Performed PMC work for Seosan No.2 Battery Factory of SK Energy
• Feb 2014 Performed Engineering Support for Akkas Gas Field Project of KOGAS
• Sep 2011 Established branch office in Abu Dhabi, UAE
• Nov 2010 Awarded for grand prize in green energy project of Korea
• Sep 2008 Acquired EN ISO 9001 certificate
• Sep 2006 Awarded for Industrial Medallion from Korean government
• Feb 2006 Established corporate R&D center
• Feb 2001 Opened Ulsan office in SK Energy Ulsan Complex
• May 2000 Established OSUN Engineering Co., Ltd.
• May 2005 Registered as a qualified contractor in engineering for KOGAS-Tech
5
Organization
R& D Center
Human ResourcesGeneral Affairs
Financing & Accounting
CEO
Engineering ManagementProcess
MechanicalPiping
Site ManagersDiscipline Site Supervision
Quality ControlHSE
Commissioning SupervisionElectricalInstrument & Control
Civil / Architecture
Project Management/Control Group
Project LeadersProcurement
ContractsSchedule Control
Engineering Group ConstructionManagement Group
Advisor
Management Support
COO
Cost Control
6OSUN’s Business Area
Project ManagementConsultancy
Engineering &
Procurement Service
ConstructionManagement
Lender’s Technical
Assistance
7
Field of Activities
Oil Refinery
Petrochemical Plant
Thermal Power Generation Plant
Combined Heat and Power Generation Plant
Industrial Plant
Offsite Facilities and Utilities
Oil & Gas Plant
8
Scope of Services
Project Front End Development & Consulting
Client Project & Program Management
Basic Engineering Studies – Process Option & Evaluation
Engineering Package Development
Procurement Services
Construction Management
Commissioning Supervision
Feasibility Study
9
Executive ProfileY. S. Min, Chief Executive Officer
- Bachelor in Civil Engineering- Served in the marine and infrastructure industry for over 40 years- Worked for Lotte Construction and SK Corp. for 25 years before
founding OSUN in year 2000.- Engaged in major development and construction of marine and jetty
construction for loading and unloading crude oil, petroleum productsand overseas civil construction project in Saudi Arabia
- Awarded Presidential Medal from Government for Corporate Green Energy Project Contribution
R. D. Lee, Chief Operating Officer- Bachelor in Mechanical Engineering- Served in engineering and construction industry for over 40 years- Worked for SK Engineering & Construction, and Samsung C & T in
the field of oil & gas, power and renewable energy projects - Served as project leader by implementing various chemical, industry
and renewable energy projects in Kuwait, Saudi Arabia, UAE, Ghana, Thailand and Canada
- Joined OSUN in 2015 to enhance corporate project management consultancy business for overseas projects
10
Executive ProfileS. K. Jeon, Executive Vice President, Head of Power Plant CM
- Bachelor in Civil Engineering- Served in civil construction industry for various industrial projects
for over 30 years- Engaged in construction management for power generation
projects, offshore projects, bridge and other major civil projects- Joined OSUN in 2003 as vice president responsible for project
management consultancy business for power generation andindustrial projects
-
J. S. Lim, Vice President, Project Operation - Master in Mechanical Engineering-
- Began his engineering carrier in 1984 when working for SK Engineering & Construction
- Worked as piping engineer in various domestic and international oil & gas related projects
- With successful track records in engineering management, began project manager & director career for overseas projects
- Joined OSUN in 2015 as vice president to lead project operation for project management consultancy services
11
Clients and Business Partners
12Key Project Executed (1)
Project Name : TOR CDU Expansion Project
Client : Tema Oil Refinery (Tema, Ghana) Period : Nov 2016 ~ Dec 2018 Facilities : Crude Column Trays / Heat Exchangers
Centrifugal Pumps / Condensers / Desalters / Air Coolers
Project Summary : Increasing the capacity of the CDU from 45,000 to 65,000 BPSD.
Service : - Feasibility Study- FEED (Front End Engineering Design)- Detail Design and Engineering- Procurement- Construction (Consortium)
13
Client : KOGAS Akkas B.V. (Akkas Gas Field, Iraq) Period : Apr 2014 ~ Oct 2014 Total Engineering Man-hour : 12,000
Service : - Review of all engineering deliverables - Evaluate quality and constructability of the detail design - Peer reviews and report to identify the main technical, environmental, safety and commercial risks.
- Template for engineering supports for Company’s activities, performance andinstruction toward Engineering contractor
- Provision of engineering support for 9 disciplines such as process, mechanical, piping & pipeline, electrical, instrument & control, firefighting,HVAC and water treatment
Project Name : Akkas Gas Development Project
Key Project Executed (2)
14
Project Name : VRU & BLS(Vapor Recovery Unit & Bottom Loading System)
Client : SK Energy(Gwangju, Jeonju, Masan Oil Terminal) Period : Apr 2014 ~ Feb 2015 Facilities : VOC Recovery Package (320 KL/H × 3)
Bottom Loading Facilities
Total Engineering Man-hour : 15,000
Service : - Preparation of Plot Plan, PFD and P&ID- Basic & Detail Design (Process, Civil, Electrical, Instrument & Piping)
- Procurement Service- Technical Bid Evaluation- Commissioning Supervision
Key Project Executed (3)
15
Project Name : No.5 Crude Distillation Unit Revamp
Client : SK Energy (SK Ulsan Complex) Period : Sep 2012 ~ Feb 2013
Facilities : Crude Distillation Column (260 320 MBPD)Side Stripper Column, Splitter Column, Stabilizer ColumnHeat Exchanger Network,.. Etc.
Total Engineering Man-hour : 10,000
Service : Process Design (Front-End Engineering)- Process Simulation (HYSYS)- Heat Exchanger Rating (HTRI, HTFS) - Exchanger Fouling Factor Summary- Hydraulic Calculation
Key Project Executed (4)
16Key Project Executed (5)
Project Name : Spent Caustic Treatment Unit
Client : SK Innovation (Jurong Aromatic Complex, Singapore) Period : Jan 2012 ~ Jun 2013 Facilities : Air Compressor Package / Oxidation Reactor Section
DNU Package / Chemical Pump Package High Pressure Pump Package / Heat Exchanger PackageSeparator / Scrubber
Total Engineering Man-hour : 23,000 Service :
- Process Design Review(Licensor Design Development)- Detail Design (Piping, Civil, Electrical, Instrumentation)
- 3D Design (PDS) - Procurement Service
17
Project Name : Lube Oil Plant Capacity Expansion
Client : SK Lubricants(SK Ulsan Complex) Period : Dec 2010 ~ May 2012 Facilities : Lube Base Oil Storage Tank (93,000 BBL)
Additive Storage Tank (5,300 BBL)Metering Station / Filler PackageBatch Blender (4,700 BBL)Truck Loading/Unloading Station
Total Engineering Man-hour : 35,000 Service :
- Process Design (BDP)- Detail Design (Piping, Civil, Electrical, Instrumentation, Control Building, Fire Fighting)
- Local Government Approval - Procurement Service
Key Project Executed (6)
18
Project Name Client Work Scope Location Working Period(yy.mm.dd)
Cheonan Tank Re-Arrange Project Daehan Oil Pipeline Corporation DE Cheonan 17.08.16~17.10.24
59.0km point(from Ulsan) YKP Relocation Daehan Oil Pipeline Corporation DE Ulsan 17.07.28~17.10.31
Hanhwa NH3 Pipeline Installation Seil Engineering DE Incheon 17.06.27~17.10.31
22.7km point(from Ulsan) Pipeline Relocation SK Energy DE Ulsan 17.04.26~17.08.30
22.6km point(from Ulsan) Pipeline Relocation SK Energy DE Ulsan 17.03.15~17.06.30
QTL HFO Pipeline Quantum Terminals Limited BD, DE Tema, Ghana 17.02.11~17.04.20
20.7km point(from Ulsan) Pipeline Relocation SK Energy DE Ulsan 17.01.13~17.10.31
TOR WWT Revamping Feasibility Study Tema Oil Refinery FS Tema, Ghana 16.12.01~17.08.30
NO.5 New SBM SK E&C DE Ulsan 16.11.28~17.12.30
TOR CDU Expansion Project Tema Oil Refinery EPC Tema, Ghana 16.11.24~18.12.20
※ Legend : ① FS = Feasibility Study ② BD = Basic Design ③ DE = Detailed Design④ PS = Procurement Service ⑤ CM = Construction Management ⑥ ES = Engineering Service⑦ PMC = Project Management & Consultancy ⑧ EPC = Engineering & Procurement & Construction
Chemical Plant and Utility
Recent 5 Years Experiences
19
Project Name Client Work Scope Location Working Period(yy.mm.dd)
Seosan 2nd Battery Producing Factory Construction SK Innovation PMC Seosan 16.11.14~18.02.28
NCC Flare System Improvement-1 SK Chemical BD, DE Ulsan 16.10.28~17.07.31
NCC Flare System Improvement-2 (NCC PGC Heat Exchanger) SK Chemical BD, DE Ulsan 16.10.28~17.05.31
No.5 CDU Horizontal Heat Exchanger Installation SK Energy BD, DE Ulsan 16.10.21~17.07.31
Pyeontaek High Sulfer Butane Injection Facility SK Gas BD, DE Pyeongtaek 16.09.30~16.12.30
58km point(from Ulsan) Pipeline Relocation SK Energy BD, DE Ulsan 16.07.13~17.12.31
New Grease Horizontal Tank SK Lubricants DE Ulsan 16.06.22~16.12.30
Kyeongin Oil Pipeline Relocation SK Energy BD, DE Incheon 16.04.01~16.05.31
Pyeongtaek C4 Shipping Technical Review SK Gas BD Pyeongtaek 16.04.01~16.04.22
Deokyang P-PROJECT(PDH) New Pipeline SK E&C Detail Design Deokyang 16.02.29~16.12.31
※ Legend : ① FS = Feasibility Study ② BD = Basic Design ③ DE = Detailed Design④ PS = Procurement Service ⑤ CM = Construction Management ⑥ ES = Engineering Service⑦ PMC = Project Management & Consultancy
Chemical Plant and Utility
Recent 5 Years Experiences
20
Project Name Client Work Scope Location Working Period(yy.mm.dd)
Pyeongtaek P&ID Revision SK Gas BD Pyeongtaek 15.11.16~15.12.15
SK Grease Plant Revamp SK Lubricants FS Ulsan 15.10.14~16.01.15
Choopoongryung Sump Tank Installation Daehan Oil Pipeline Corporation BD Choopoongryung/Gokseong 15.08.24~15.09.28
43km point(from Ulsan) Pipeline Protection SK Energy BD Ulsan 15.03.30~16.12.15
Unit Price Contract of Detail Design SK Incheon Petro-Chemical DD Incheon 13.08.27~15.11.26
Relocation of SK Energy Oil Terminal SK Energy BD, DE, PS Masan 15.04.29~15.12.31
Study of C4 Loading System improvement SK Gas ES Pyeongtaek 15.04.14~15.05.15
Relocation of SK Energy KIP SK Energy DE Incheon 15.04.17~15.07.31
SK Gas Pyeongtaek Plant P&ID R25 Revision SK Gas DE Pyeongtaek 14.11.14~14.12.22
Relocation of SK Energy 81.0km pipeline SK Energy DE Kyeongsan 14.10.06~15.05.31
Chemical Plant and Utility
Recent 5 Years Experiences
※ Legend : ① FS = Feasibility Study ② BD = Basic Design ③ DE = Detailed Design④ PS = Procurement Service ⑤ CM = Construction Management ⑥ ES = Engineering Service⑦ PMC = Project Management & Consultancy
21
Project Name Client Work Scope Location Working Period(yy.mm.dd)
SK Innovation V-Project BOM Inspection SK IncheonPetrochemical ES Incheon 14.08.18~14.12.31
Akkas Gas field Project KOGAS Akkas ES Akkas, Iraq 14.04.07~14.10.31
Vapor Recovery Revamping Project SK Energy BD, DE, PS Gwangju, Jeonju,Masan 14.04.07~14.10.31
Feasibility Study for Grease Plant Relocation Project SK Innovation FS Ulsan 14.02.24~14.03.31
P-Project(PDH) FEED(OSB) SK Energy BD Ulsan 14.02.14~15.11.30
Relocation of Kyeongin Long Distance Pipeline SK Energy DE Incheon 13.12.05~14.04.30
Kuwait KNPC FCC Revamp Daelim DE Kuwait 13.11.15~14.08.31
Relocation of Kyeongin Long Distance Pipeline SK Energy DE Incheon 13.11.04~13.11.30
Jurong Aromatic Complex Project SK Singapore DE Singapore 13.09.03~13.10.31
Proposal BM for Russia ZapSib-2 Daelim DE Russia 13.09.01~13.10.31
Chemical Plant and Utility
Recent 5 Years Experiences
※ Legend : ① FS = Feasibility Study ② BD = Basic Design ③ DE = Detailed Design④ PS = Procurement Service ⑤ CM = Construction Management ⑥ ES = Engineering Service⑦ PMC = Project Management & Consultancy
22
Project Name Client Work Scope Location Working Period(yy.mm.dd)
Design service for Incheon CLX SKIPC DE Incheon 13.08.27~15.08.26
P-Project(PDH) FEED(OSB) SK Energy DE Ulsan 13.08.01~13.12.24
VLCC Facility SK Energy DE Incheon 13.07.30~14.02.28
V-Project OBL 1 (Exisiting Facility Revamp) SK Energy DE Incheon 13.07.30~13.12.31
Relocation of Kyeongin Long Distance Pipeline SK Energy DE Incheon 13.06.01~13.07.31
Proposal BM for Saudi Arabia Ras PKG1&2 Daelim DE Saudi Arabia 13.05.29~13.08.31
V-Projet Electrical construction SK Energy DE Incheon 13.04.25~14.04.24
Relocation of YKP SK Energy DE Daegu 13.03.07~13.06.20
New PX Project Ulsan Aromatics DE Ulsan 13.03.01~14.04.24
Lubricants Blending Unit Revamping Phase2 SK Lubiracants DE Ulsan 13.01.28~13.03.31
Chemical Plant and Utility
Recent 5 Years Experiences
※ Legend : ① FS = Feasibility Study ② BD = Basic Design ③ DE = Detailed Design④ PS = Procurement Service ⑤ CM = Construction Management ⑥ ES = Engineering Service⑦ PMC = Project Management & Consultancy
23
End of Document