PECO Energy Company Default Service Program Request for Proposals Exhibit B

PECO Energy Company Default Service Program Request for ... · Overview I.1.1. Capitalized terms in this document, which are not defined explicitly herein, are defined in the PECO

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • PECOEnergyCompany

    DefaultServiceProgram

    RequestforProposals

    Exhibit B

  • 2

    TABLEOFCONTENTS

    ARTICLEI. INTRODUCTION ........................................................................................ 3I.1. Overview......................................................................................................................................................3I.2. ProductsandBids .......................................................................................................................................6I.3. Process .......................................................................................................................................................13I.4. Supplier’sObligations ...............................................................................................................................15

    ARTICLEII. InformationandSchedule..........................................................................17II.1. RFPWebsite ..............................................................................................................................................17II.2. RFPSchedule .............................................................................................................................................18

    ARTICLEIII. GeneralRequirementsforProposals ...........................................................20ARTICLEIV. Part1ProposalRequirements....................................................................25IV.1. ContactInformationandRepresentations ..............................................................................................25IV.2. FinancialRequirementsandAgencyAgreements ..................................................................................27IV.3. CreditInstrumentsandUniformSMA .....................................................................................................33IV.4. Representations ........................................................................................................................................36IV.5. ForeignRFPBiddersandForeignEntities ..............................................................................................39

    ARTICLEV. Part2ProposalRequirements....................................................................45V.1. ContactInformationandRepresentations ..............................................................................................45V.2. Pre-BidLetterofCredit ............................................................................................................................48V.3. RFPBiddersRelyingontheFinancialStandingofanRFPGuarantor ..................................................49V.4. RFPBiddersRelyingontheFinancialStandingofanRFPPrincipal.....................................................51V.5. ForeignRFPBiddersandForeignEntities ..............................................................................................53

    ARTICLEVI. BidSubmission ........................................................................................58ARTICLEVII. Process ...................................................................................................60VII.1. Part1andPart2Proposals:SubmissionandProcessing ......................................................................60VII.2. Bids:Submission,Processing,andEvaluation ........................................................................................70VII.3. Post-BidProcess........................................................................................................................................73VII.4. PersonnelandConfidentiality..................................................................................................................77

    ARTICLEVIII. ReservedRights .......................................................................................79

    Exhibit B

  • 3

    ARTICLEI. INTRODUCTION

    I.1. Overview

    I.1.1. Capitalizedtermsinthisdocument,whicharenotdefinedexplicitlyherein,aredefinedinthePECO

    Energy Company - Pennsylvania Default Service Supplier Master Agreement (“Uniform SMA” or

    “SMA”).TheUniformSMA isattachedasAppendix1tothisdocument.

    I.1.2. Aspartofitsfourth DefaultServicePlan(“DSPIV”),PECOEnergyCompany(“Company” or“PECO”)

    isproposingacompetitivebiddingprocesstoobtainfullrequirementssupplyfortheCompanyto

    meet a portion of its obligations as Default Service Provider pursuant to Chapter 28 of the

    PennsylvaniaPublicUtilityCode,66Pa. C. S.§§2801-2812. Thiscompetitivebiddingprocess is

    consistentwithChapter28,withP.L.1592No.129(“Act129”),withthePennsylvaniaPublicUtility

    Commission’s(“Commission” or“PaPUC”)DefaultServiceregulationsinitsFinalRulemakingOrder

    inDocketNo.L-2009-2095604,andtheCommission’sFinalPolicyStatementonDefaultServicein

    DocketNo.M-2009-2140580.

    I.1.3. PECO currently provides electric generation service to all customerswithin its service territory

    who do not select an electric generation supplier (“EGS”). Such customers are “Default Service

    customers” or “DS Customers”. The competitive bidding processwould procure supply for the

    periodbeginningJune1,2017whenPECO’sthirdDefaultServicePlan(“DSPIII”)expires.

    I.1.4. The competitive bidding process will be conducted through a series of Requests for Proposals

    (“RFPs”) issued twiceyearly. TheRFPconsistsofa totalof thirteen (13)documents. Thismain

    documentiscalledthe“RFPRules” anditdescribeshowtheRFPwillbeconducted.Thefollowing

    documentsareappendedto,andshallbeconsideredanintegralpartof,theRFPRules:

    Appendix 1:UniformSMAAppendix2:AlternateGuarantyProcessAppendix3:IllustrativeStandardPart1FormAppendix4: IllustrativeShortPart1FormAppendix5:ChiefFinancialOfficerAttestationAppendix6:Officers’ Certificate(forRFPBiddersunderanAgencyAgreement)Appendix7:IllustrativeStandardPart2FormAppendix8:IllustrativeShortPart2FormAppendix9:StandardPre-BidLetterofCreditAppendix10:SampleBidFormAppendix11: TentativeScheduleforFutureSolicitations

    Exhibit B

  • 4

    Appendix12: ConfidentialityStatement

    I.1.5. DSP IV plans for the procurement of full requirements supply for three (3) “Classes” of Default

    Service customers: the Residential (“RES”) Class, the Small Commercial (“SC”) Class, and the

    Consolidated Large Commercial and Industrial (“CCI”) Class. Each such Class (or “DS Customer

    Group”)isagroupofspecificrateschedulesasprovidedinthefollowingtable:

    TableI-1.CustomerClasses.

    Class CustomersIncludedRate

    ScheduleDescription

    Residential Allresidentialcustomers R ResidenceService

    RH ResidentialHeatingService

    Small Non-residentialcustomers GS GeneralService

    Commercial withPeakLoadContribution HT High-TensionPower

    uptoandincluding 100kW PD Primary– DistributionPower

    and lightingcustomers AL AlleyLighting inCityofPhiladelphia

    TLCL TrafficLightingConstantLoadService

    POL PrivateOutdoorLighting

    SL-E StreetLightingCustomer-OwnedFacilities

    SL-S StreetLighting-SuburbanCounties

    ConsolidatedLargeCommercialandIndustrial

    Non-residentialcustomerswithPeakLoadContributiongreaterthan 100kW

    GS GeneralService

    HT High-TensionPower

    PD Primary–Distribution Power

    EP ElectricPropulsion

    I.1.6. FortheRES andSCClasses,theCompanywillsolicitbidsfortheprocurementoffullrequirements

    serviceonafixed-pricebasis.FortheCCIClass,theCompanywillsolicitbidsfortheprocurement

    of full requirements servicewith energy priced to the PJM day-ahead spotmarket. The Default

    Service supply (“Default Supply” or “DS Supply”) for a Class is the full requirements electricity

    supply based on the load of the retail customers in that Class measured and recorded by the

    CompanyandsettledbyPJM. TheloadoftheDefaultServicecustomersinaClass isthe“Default

    Load” or “DS Load” of that Class. A supplier selected through the competitive bidding process

    under DSP IV to provide Default Supply for a particular Class and approved by the Commission

    becomesa“DefaultSupplier” or“DSSupplier”forthatClass.

    Exhibit B

  • 5

    I.1.7. ADefaultServicecustomermaychoosetobeginreceivingservicefromanEGSonthecustomer’s

    meter reading date in accordance with the Company’s standard switching requirements as

    described in the Company’s Electric Generation Supplier Coordination Tariff including, without

    limitation, prior advance notice to the Company. A customer served by an EGS may return to

    DefaultServiceonthecustomer’smeterreadingdate inaccordancewiththeCompany’sstandard

    switching requirementsasdescribed in theCompany’sElectricGenerationSupplierCoordination

    Tariffincluding,withoutlimitation,prioradvancenoticetotheCompany.

    I.1.8. There are eight (8) “solicitations” or “DS Solicitations” under DSP IV that will select electricity

    suppliers toprovideDefault Supply for theperiod June1, 2017 throughMay31, 2021 and for a

    portionoftheCompany’srequirementsforthe RESClassandSCClassforthe periodbeyondJune1,

    2021. Each solicitationwill be identified by themonth and year in which the Bid Date occurs.

    SolicitationswillbeheldinMarchandSeptemberofeachyear,startingwithasolicitationinMarch

    2017 and endingwith a solicitation in September 2020. A typical schedule for a solicitation is

    provided in Paragraph II.2.1. The Independent Evaluator and the Company may advise the

    Commission to postpone or modify the schedule of a solicitation when market conditions are

    impactedbyextraordinaryevents,suchastheadventofwar,terrorism,oranactofGod.

    I.1.9. Foreachsolicitation,theseRFPRuleswillbeupdatedtoincludethedatesforthatsolicitationand

    torefertotheparticularproductstobeprocuredinthatsolicitation.TheRFPRulesmaybefurther

    updatedtoreflectadditionaldecisionsbytheCommission,relevantchangesinlaw,ornon-material

    modifications to the processing of Proposals expected to improve potential participation by

    suppliers. Additionally, theRFPRulesmaychangeasa resultof issues raised in the stakeholder

    collaborativePECOwillholdinJanuary2018and,ifnecessary,inthefollow-upcollaborativetobe

    heldinFebruary 2018.Further,theIndependentEvaluatorandtheCompanymayamendtheRFP

    Rulesifnecessarytocorrecttypographicalerrors,cureinconsistenciesintheprovisionsofthisRFP,

    orclarifytheintentoftheprovisionsofthisRFP.

    I.1.10. The rates of Default Service customers for a Class are determined on the basis of the prices

    determinedthroughthisRFPforthatClass,exceptforapproximately1% oftheDefaultLoadofthe

    RESClass, forwhichPECO assumes responsibility. PECOacquires thenecessary supply through

    Exhibit B

  • 6

    PJM-administeredmarketsandobtainingsufficientAlternative EnergyCredits(“AECs”)atmarket

    prices to satisfyanynear-termobligationsunder theAEPSAct.Asprovided in theCommission’s

    directivedatedOctober12,2010(DocketNo.M-2009-2082042),PECOprovidesaDefaultService

    ratecalculationmodelthattranslatesthepricesdeterminedthroughthisRFPintoDefaultService

    rates.ThiscalculationmodelispostedtothePECOwebsite:

    https://www.peco.com/CustomerService/RatesandPricing/EnergyChoice/Pages/PricetoCompare.aspx

    I.2. ProductsandBids

    I.2.1. Default Load for each Class is divided into tranches. A tranche for a Class represents a fixed

    percentageoftheDefaultLoadforthatClass. ADefaultSupplierservingatrancheina particular

    ClassprovidesfullrequirementsserviceforthepercentageofthatClass’ DefaultLoadrepresented

    bythatone(1)trancheforaspecifiedperiod.

    I.2.2. ThetotalnumberoftranchesofDefaultLoadisbasedonthatClass’ annualPeakLoadContribution

    (“PLC”)onthePECOsysteminaccordancewithPJM.TheMW-Measureiscalculatedastheannual

    PLC for the Default Load of the Class divided by the total number of tranches. This figure is

    calculatedforreferencepurposesonly.

    I.2.3. EachClasshas“LoadCaps”,whichare limitsonthenumberof tranchesofDefaultSupplythatan

    RFPBiddercanbidandserveforthatClass.TheLoadCapsensurethattherewillbeadiversified

    poolofDefaultSuppliersforeachClass.TheLoadCapsforaClassaresetsothattheDefaultService

    customersofthatClasshavenomorethana50%exposuretoanyoneDefaultSupplieratanygiven

    time.IftwoormoreDefaultSuppliersareaffiliated,theLoadCapswillapplyjointlytosuchgroup

    ofDefaultSuppliers.

    I.2.4. Thetotalnumberoftranches,thepercentagesizeofeachtranche,theMW-Measureofeachtranche,

    and theLoadCapsareshowninthefollowingtable.

    TableI-2.NumberofTranchesandSizeofaTrancheforDefaultLoad.

    ClassTotal

    TranchesLoadCap

    %SizeofaTranche

    TotalPeak(MW)

    DefaultPeak(MW)

    MW-MeasureofaTranche

    RES 62 31 1.60% 3,596.40 2,377.02 37.93

    SC 24 12 4.17% 1,387.99 539.42 22.48

    CCI 8 4 12.50% 2,318.29 83.76 10.47

    Exhibit B

  • 7

    I.2.5. ThetotalnumberoftranchesandthetranchesizefortheSCandCCI Classesaresubjecttochange.

    TheIndependentEvaluatorandPECOmayrevisethetotalnumberoftranchesforaClassifdoingso

    isexpectedtoincreasesupplierinterest. TheIndependentEvaluatorinformsCommissionStaffof

    such a revision and announces the revision to suppliers in advanceof supplierspresenting their

    qualifications.

    I.2.6. TheactualDefaultLoadfortheRES,SC,orCCIClass willdependuponmanyfactorsincluding,but

    notlimitedto,customermigrationtoEGSsandweatherconditions. Themaximumpeakloadofa

    ClassmaybehigherorlowerthanthePLCutilizedtodeterminetheMW-Measureoftranchesfor

    that Class.EachparticipantisresponsibleforevaluatingtheuncertaintiesassociatedwithDefault

    ServiceLoadforaparticularClassandsupplyperiod.

    I.2.7. A product for purposes of this RFP is defined by three characteristics: a) the Class to which it

    contributesDefaultSupply;b)thelengthofthesupplyperiod;andc)thedateatwhichthesupply

    periodbegins.Forexample,theRES-12-Jun17productrepresentsDefaultSupplyfortheRESClass

    for the supply period from June 1, 2017 through May 31, 2018. A product name may be

    abbreviatedwhenthecontextisclear;forexample,RES-12referstoallproductsfortheResidential

    Classthat aretwelve(12)monthsinduration,regardlessofthestartdateofthesupplyperiod.

    I.2.8. AProposalisaresponsetothisRFPforasolicitationpursuanttotheseRFPRules.Anentitythat

    submitsanypartofaresponsetothisRFPforasolicitationis an“RFPBidder”.ABidforatranche

    for anyproduct is a price indollarsperMWh rounded to the nearest cent. AnRFPBiddermay

    submitdifferentBidsfordifferenttranchesofagivenproduct.

    I.2.9. ThetablebelowprovidestheproductsthatwillbeprocuredforeachsolicitationunderDSPIV.

    Exhibit B

  • 8

    TableI-3.ScheduleofProcurementforProducts.

    Product

    Solicitation

    March2017

    September2017

    March2018

    September2018

    March2019

    September2019

    March2020

    September2020

    RES-12-Jun17 12 0 0 0 0 0 0 0

    RES-24-Jun17 11 0 0 0 0 0 0 0

    RES-12-Dec17 0 12 0 0 0 0 0 0

    RES-24-Dec17 0 9 0 0 0 0 0 0

    RES-12-Jun18 0 0 12 0 0 0 0 0

    RES-24-Jun18 0 0 9 0 0 0 0 0

    RES-12-Dec18 0 0 0 12 0 0 0 0

    RES-24-Dec18 0 0 0 9 0 0 0 0

    RES-12-Jun19 0 0 0 0 12 0 0 0

    RES-24-Jun19 0 0 0 0 11 0 0 0

    RES-12-Dec19 0 0 0 0 0 12 0 0

    RES-24-Dec19 0 0 0 0 0 9 0 0

    RES-12-Jun20 0 0 0 0 0 0 12 0

    RES-24-Jun20 0 0 0 0 0 0 9 0

    RES-12-Dec20 0 0 0 0 0 0 0 12

    RES-24-Dec20 0 0 0 0 0 0 0 9

    SC-12-Jun17 9 0 0 0 0 0 0 0

    SC-24-Jun17 3 0 0 0 0 0 0 0

    SC-12-Dec17 0 9 0 0 0 0 0 0

    SC-24-Dec17 0 3 0 0 0 0 0 0

    SC-12-Jun18 0 0 6 0 0 0 0 0

    SC-24-Jun18 0 0 3 0 0 0 0 0

    SC-12-Dec18 0 0 0 6 0 0 0 0

    SC-24-Dec18 0 0 0 3 0 0 0 0

    SC-12-Jun19 0 0 0 0 6 0 0 0

    Exhibit B

  • 9

    Product

    Solicitation

    March2017

    September2017

    March2018

    September2018

    March2019

    September2019

    March2020

    September2020

    SC-24-Jun19 0 0 0 0 3 0 0 0

    SC-12-Dec19 0 0 0 0 0 6 0 0

    SC-24-Dec19 0 0 0 0 0 3 0 0

    SC-12-Jun20 0 0 0 0 0 0 6 0

    SC-24-Jun20 0 0 0 0 0 0 3 0

    SC-12-Dec20 0 0 0 0 0 0 0 6

    SC-24-Dec20 0 0 0 0 0 0 0 3

    CCI-12-Jun17 8 0 0 0 0 0 0 0

    CCI-12-Jun18 0 0 8 0 0 0 0 0

    CCI-12-Jun19 0 0 0 0 8 0 0 0

    CCI-12-Jun20 0 0 0 0 0 0 8 0

    I.2.10. TheLoadCapsapplytoall productsthatcontributetoDefaultSupplyforaClassatagivenpointin

    time.ThetablebelowprovidestheproductsprocuredunderDSPIII andproductstobeprocured

    under DSP IV that contribute to Default Supply for that Class during that time period and that

    shouldbeconsideredindeterminingwhetherLoadCapsapplytoaparticularDefaultSupplier. The

    productsprocuredunderDSPIII areitalicized.Forexample,atanygivenpointintimeintheperiod

    from June 1, 2018 to November 30, 2018, the Default Supply for the RES Class includes the

    following products: RES-24-Dec16 and RES-24-Jun17 and RES-12-Dec17 and RES-24-Dec17 and

    RES-12-Jun18andRES-24-Jun18.

    Exhibit B

  • 10

    TableI-4.LoadCaps.

    Class TimePeriodProductsthatcontributetoDefaultSupply

    duringtimeperiod

    FromDSPIII FromDSPIV

    RES

    Jun-Nov17

    RES-24-Dec15RES-24-Jun16RES-12-Dec16RES-24-Dec16

    RES-12-Jun17RES-24-Jun17

    Dec17-May18RES-24-Jun16RES-24-Dec16

    RES-12-Jun17RES-24-Jun17RES-12-Dec17RES-24-Dec17

    Jun-Nov18 RES-24-Dec16

    RES-24-Jun17RES-12-Dec17RES-24-Dec17RES-12-Jun18RES-24-Jun18

    Dec18-May19

    RES-24-Jun17RES-24-Dec17RES-12-Jun18RES-24-Jun18RES-12-Dec18RES-24-Dec18

    Jun-Nov19

    RES-24-Dec17RES-24-Jun18RES-12-Dec18RES-24-Dec18RES-12-Jun19RES-24-Jun19

    Dec19-May20

    RES-24-Jun18RES-24-Dec18RES-12-Jun19RES-24-Jun19RES-12-Dec19RES-24-Dec19

    Jun-Nov20

    RES-24-Dec18RES-24-Jun19RES-12-Dec19RES-24-Dec19RES-12-Jun20RES-24-Jun20

    Dec20-May21

    RES-24-Jun19RES-24-Dec19RES-12-Jun20RES-24-Jun20RES-12-Dec20RES-24-Dec20

    SC

    Jun-Nov17 SC-12-Dec16SC-12-Jun17SC-24-Jun17

    Dec17-May18

    SC-12-Jun17SC-24-Jun17SC-12-Dec17SC-24-Dec17

    Exhibit B

  • 11

    Class TimePeriodProductsthatcontributetoDefaultSupply

    duringtimeperiod

    FromDSPIII FromDSPIV

    Jun-Nov18

    SC-24-Jun17SC-12-Dec17SC-24-Dec17SC-12-Jun18SC-24-Jun18

    Dec18-May19

    SC-24-Jun17SC-24-Dec17SC-12-Jun18SC-24-Jun18SC-12-Dec18SC-24-Dec18

    Jun-Nov19

    SC-24-Jun18SC-12-Dec18SC-24-Dec18SC-12-Jun19SC-24-Jun19

    Dec19-May20

    SC-24-Dec18SC-12-Jun19SC-24-Jun19SC-12-Dec19SC-24-Dec19

    Jun-Nov20

    SC-24-Jun19SC-12-Dec19SC-24-Dec19SC-12-Jun20SC-24-Jun20

    Dec20-May21

    SC-24-Dec19SC-12-Jun20SC-24-Jun20SC-12-Dec20SC-24-Dec20

    CCI Any CCI-12

    I.2.11. TheRFPRulesforeachsolicitationwillcontainatablewiththeavailabletranchesandLoadCaps

    forthatsolicitationspecificallyaswellasanexplanationoftheLoadCapsforthatsolicitation.This

    ParagraphincludesasanexampletheexplanationfortheLoadCapsintheMarch2017Solicitation

    withtheassociatedtables below:

    TheLoadCapfortheRESClasswillapplyasfollows. AnRFPBidderislimitedto31tranchesof

    the RES-24-Dec15, RES-24-Jun16, RES-12-Dec16, RES-24-Dec16, RES-12-Jun17, and RES-24-

    Jun17 products combined, including tranches of RES-24-Dec15, RES-24-Jun16, RES-12-Dec16,

    Exhibit B

  • 12

    andRES-24-Dec16wonunderDSPIII andtranchesbid forRES-12-Jun17andRES-24-Jun17 in

    thissolicitation.

    TheLoadCapfortheSCClasswillapplyasfollows.AnRFPBidderislimitedto12tranchesfor

    the SC-12-Dec16, SC-12-Jun17, and SC-24-Jun17 products combined, including tranches of SC-

    12-Dec16 woninDSPIIIandtranchesbidforSC-12-Jun17andSC-24-Jun17 inthissolicitation.

    TheLoadCapfortheCCI Classwillapplyasfollows.Inthissolicitation,anRFPBidderislimited

    to4tranchesfortheCCI-12-Jun17product.

    TableI-5.AvailableTranchesand LoadCaps (March2017Solicitation; RESClass).

    ProductsAvailable

    Tranches

    LoadCapsApplytoanRFPBidder

    WhenanRFPBidderHas:LoadCapsforRESClass

    RES-12-Jun17 12

    Wonmorethan19RES-24-Dec15,

    RES-24-Jun16,RES-12-Dec16,and

    RES-24-Dec16tranchesunderDSPIII31lessRES-24-Dec15,RES-

    24-Jun16,RES-12-Dec16,

    andRES-24-Dec16tranches

    wonunderDSPIIIRES-24-Jun17 11

    Wonmorethan20 RES-24-Dec15,

    RES-24-Jun16,RES-12-Dec16,and

    RES-24-Dec16tranchesunderDSPIII

    TableI-6.AvailableTranchesandLoadCaps(March2017Solicitation; SC andCCI Classes).

    ProductsAvailable

    Tranches

    LoadCapsApplytoanRFP

    BidderWhenanRFPBidderHas:LoadCaps

    SC-12-Jun17 9Wonmorethan3SC-12-Dec16

    underDSPIII12lessSC-12-Dec16 tranches

    wonunderDSPIII

    SC-24-Jun17 3Wonmorethan9SC-12-Dec16

    underDSPIII

    CCI-12-Jun17 8 LoadCapsapplyalways 4

    I.2.12. AsupplierparticipatinginthisRFPbidstoprovideDefaultSupplyforoneormoreoftheRES,SC,

    andCCI Classes,and foroneormoresupplyperiods. Theobligationsof theDefaultSupplierare

    described in the “Uniform SMA”. The term Uniform SMA is an abbreviation for PECO Energy

    CompanyPennsylvaniaDefaultServiceSupplierMasterAgreement,whichmayalsobeabbreviated

    Exhibit B

  • 13

    by“SMA”,“DSSupplierMasterAgreement”or“SupplierMasterAgreement”.Themainprovisionsof

    theUniformSMA aresummarizedinSectionI.4.

    I.2.13. ThecontingencyplanintheeventthatPECOisunabletoobtainDefaultSupplyforall tranchesofa

    productinasolicitationisasfollows.Iftheproductismorethansix(6)monthsinduration,PECO

    willassumeresponsibilityfortheunfilledtranchesasaPJMLSE forthefirstsix(6)monthsofthe

    supply period, acquiring the necessary supply through PJM-administeredmarkets and obtaining

    sufficient AECs at market prices to satisfy any near-term obligations under the AEPS Act. The

    unfilled tranches, with a supply period that starts six (6)months later than tranches that were

    unfilled,willbeplacedforre-bid inthenextsolicitation. Forproductsthataresix(6)monthsor

    shorter, PECOwill assume responsibility for theunfilled tranches as an LSEandwill acquire the

    necessarysupplythroughPJM-administeredmarketsfortheentiresupplyperiod. PECOreserves

    therighttofileanalternateplanwiththeCommission.

    I.2.14. AnyprospectivesupplierthatmeetsthequalificationstandardsestablishedintheseRFPRules and

    thatiswillingtoprovidepricesatwhichtoservetranchesofDefaultServiceLoadcanrespondto

    thisRFP,includingany PECOaffiliates.

    I.3. Process

    I.3.1. Priortoatypicalsolicitation,asupplierunabletousetheGuarantyprovidedasAppendix Gtothe

    UniformSMA (the“StandardGuaranty”)canrequestconsiderationbyPECOofanalternateformof

    guarantythatthesupplierusesinitsnormalcourseofbusiness.Suchrequestmustbereceivedno

    laterthanfifteen(15)businessdayspriortotheopeningofthePart1Window. Withinthree(3)

    business days of receipt of such a request, the Independent Evaluator will issue a timetable for

    receiptofthematerials fromthesupplierandforconsiderationofthesematerialsbyPECO. This

    timetablewill be such that a final decisiononwhether to accept the supplier’s alternate formof

    guarantywillbecommunicatedtothesupplierpriortothePart1Window.

    I.3.2. To qualify for a typical solicitation, suppliers provide materials to respond to the qualification

    standardsdescribedinArticleIV.RFPBiddersthatdidnotqualifyinaprevioussolicitationunder

    DSPIVusetheStandardPart1FormavailableonlinethroughtheProposalsubmissionwebsiteto

    Exhibit B

  • 14

    respond to these qualification standards. Previously qualified RFP Bidders under DSP IV may

    participateinanabbreviatedqualificationprocessbyusingtheShortPart1Formavailableonline

    through the Proposal submission website to respond to these qualification standards. An

    IllustrativeStandardPart1FormandanIllustrative ShortPart1FormareavailableasAppendix3

    andAppendix 4 respectively to theseRFPRules and are also available electronically on theRFP

    website: www.PECOProcurement.com. The generic term “Part 1 Form” refers either to the

    StandardPart1FormortheShortPart1Form.Part1Proposalsaresubmittedduringthe“Part1

    Window”.

    I.3.3. Tobecomeeligibletobidforasolicitation,RFPBiddersthathavemetthequalificationstandardsof

    Article IVmust respond to thePart 2Proposal requirementsdescribed inArticleV of theseRFP

    Rules. RFPBiddersusethePart2FormavailableonlinethroughtheProposalsubmissionwebsite

    torespondtotheserequirements. RFPBiddersthatbecameeligibletosubmitBids inaprevious

    solicitationheldunderDSPIVmayparticipateinanabbreviatedprocessbyusingtheShortPart2

    FormavailableonlinethroughtheProposalsubmissionwebsitetorespondtotheserequirements.

    Thegenericterm“Part2Form”referseithertotheStandardPart2FormortheShortPart2Form.

    Part2Proposalsaresubmittedduringthe“Part2Window”.

    I.3.4. RFP Bidders use the Bid Form provided by the Independent Evaluator to submit their Bids. A

    sampleBidFormisprovidedforillustrativepurposesasAppendix10 oftheseRFPRules.EachRFP

    Bidder’s Bids must be received between 10 AM and 12 PM (noon) on the “Bid Date” or “Bid

    ProposalDueDate”.

    I.3.5. OnthefirstbusinessdayaftertheBidDate,theIndependentEvaluatorpresentstotheCommission

    theresultsofthesolicitationinaconfidentialreport.TheCommission hasone(1)businessdayto

    considerthereportoftheIndependentEvaluatorandtoapproveorrejecteachofthewinningBids.

    IfthePaPUCdoesnotactwithinone(1)businessday,thewinningBidsaredeemedtobeapproved.

    I.3.6. PECO and each RFP Bidder with Bids that are approved by the Commission proceed to the

    executionoftheUniformSMA andtheTransactionConfirmationswithinone(1)businessday ofthe

    Commissiondecision. PECOandeachsuchRFPBidderexecutea singleUniformSMA during the

    courseofDSP IV. Eachsolicitation,PECOandeachsuch RFPBidderexecuteone(1)Transaction

    Exhibit B

  • 15

    Confirmation for each product for which such RFP Bidder has Bids that are approved by the

    Commission.AppendixEtotheUniformSMA specifiestheAEPSpercentageobligationsineffecton

    theBidDatefortheperiodcoveredbyeachTransactionConfirmation.

    I.3.7. Within fifteen (15) days of the close of the solicitation, the Independent Evaluator releases the

    weightedaveragepriceforeach productprocured aswellasthepercentageofloadrepresentedby

    eachtranche.

    I.4. Supplier’s Obligations

    I.4.1. AsupplierselectedthroughthisRFPtoprovideDefaultSupplyforaparticularClassandapproved

    by the Commission becomes a “Default Supplier” for that Class. A Default Supplier may be

    providingDefaultSupplyforoneormoreoftheRES,SC,andCCI Classes.

    I.4.2. ThisSectiondescribesingeneraltermsseveralprovisionsoftheUniformSMA.Thisisasummary

    onlyandissubjecttoandqualifiedin itsentiretybytheUniformSMA providedasAppendix1to

    theRFPRules. EachRFPBidderaccepts theobligationsandassociated rights toprovideDefault

    SupplyasdefinedintheUniformSMA aspartofitsProposal.

    I.4.3. DefaultSuppliersforaClasswillservetheCompany’sDefaultLoadforthatClass. DefaultService

    for oneof theseClasses is theCompany’s full requirements service including,without limitation,

    energy, capacity, transmission (excluding Network Integration Transmission Service), ancillary

    services,AECsforcompliancewiththeAEPSAct,transmissionanddistributionlosses,congestion

    management costs, and such other services or products that are required to serve the specified

    percentageofDefaultLoadforthatClass(exceptfor distributionservice). DefaultLoadfortheRES

    Class is reduced by a fractional percentage of committed energy and capacity obtained under

    contractwithAlleghenyElectricCooperative,Inc.forsupplyfromtheNewYorkPowerAuthority.

    I.4.4. Default Suppliers are also responsible for providing AECs during the term of the Uniform SMA

    necessaryforPECOtomeetitsobligationsundertheAEPSAct,aswellasotherOrders,regulations

    andrulesthatmaybepromulgatedbythePaPUCwithrespecttotheAEPS.DefaultSupplierswill

    be required to participate in the PJMGenerationAttribute Tracking System (“PJM-EISGATS”) to

    transfer AECs to PECO. The Company will provide an estimate of the Default Supplier’s AEPS

    Exhibit B

  • 16

    obligationfollowingthesecondquarteroftheAEPSReportingPeriodandtheDefaultSupplierwill

    berequiredtotransferAECstoPECOintheamountoftheestimatewithinforty-five(45)calendar

    days of the date of that estimate. The Company will provide a final statement to the Default

    Supplier within thirty (30) calendar days of the end of AEPS Reporting Period and the Default

    Supplierwill be required to transferAECs in the amount of the final statementwithin forty-five

    (45)calendardaysafterthedateofthefinalstatement.

    I.4.5. ADefault Supplier that fails to provide sufficient AECs for a tranchewill be required to pay any

    AEPS penalties, costs, charges, etc. assessed against the Default Supplier and/or the Company

    associatedwiththeDefaultSupplier’snon-performancewithAEPSrequirements.

    I.4.6. PECO has obtained AECs from separate AEPS procurement(s) approved by the Commission and

    PECO will reduce the amount of AECs that Default Suppliers must provide. Prior to each

    solicitation, PECOwill informRFPBiddersof the amounts ofAECs allocated for thispurpose for

    eachtrancheofeachproductforwhichDefaultSupplyisprocuredinthatsolicitation.

    I.4.7. A DefaultSupplierforaproductwillbepaidasupplier-specificpriceforeachMWhofelectricload

    servedasspecifiedintheTransactionConfirmationforthatproduct.Thesupplier-specificpricefor

    aDefaultSupplierforaproductwillbetheaverageofapprovedBidsforthatDefaultSupplier and

    for that product. ThePJMday-aheadprice for energy and theReliability PricingModel (“RPM”)

    priceforcapacity arealsopaidtoaDefaultSupplierprovidingfullrequirementsserviceonaspot-

    pricebasis.

    I.4.8. TheDefault Supplierwill specify in the Transaction Confirmation the price of each type of AECs

    includedinitssupplier-specificprice.

    I.4.9. PECO will transfer or assign Auction Revenue Rights (“ARRs”) to each Default Supplier in

    proportionto thepercentageofDefaultLoadthat it serves. ADefaultSupplierwillparticipate in

    the PJM process for the nominations of ARRs to the extent that the supply period under the

    Transaction Confirmation is inclusive of the PJM Planning Period for which the ARRs are

    nominated;otherwise,PECOwillparticipateinthePJMARRnominationprocess.

    Exhibit B

  • 17

    ARTICLEII. InformationandSchedule

    II.1. RFPWebsite

    II.1.1. PECOand its Independent Evaluatorhave established anRFPwebsite that is themain sourceof

    information.RFPBiddersandotherstakeholderscanvisitthisRFPwebsite toobtaininformation

    anddocumentsrelatedtothisRFP.TheRFPwebsite addressiswww.PECOProcurement.com.

    II.1.2. TheRFPwebsite containsthesectionsdescribedbelow.Newsectionsmaybeaddedasnecessary

    toassistRFPBidders.

    Home: This section provides announcements of interest toRFPBidders and to other interested

    parties,anoutlineoftheRFPprocess,asearchfunction,andasummaryofimportantdates.

    Background: Thesesectionsprovidebackgroundinformationontheregulatoryprocess,theresults

    of previous solicitations and archives of documents. FAQs and announcements from previous

    solicitationsareprovidedforreferencepurposesonly.

    Supplier Information: This section provides documents regarding theRFP aswell as frequently

    asked questions (“FAQs”), and RFP-related announcements. All stakeholders, including RFP

    Bidders,areabletoaskquestionsviaawebform.TheIndependentEvaluatorprovidesananswer

    tothequestionviaemailtothequestioner,andacopyofthequestionandanswerispostedsothat

    all stakeholders and RFP Bidders have access to the same information. Aspects of the question

    and/oranswerthatmightidentifythepartyaskingthequestionare removedbeforeposting tothe

    extentpractical.

    DataRoom:Thissectionprovideshistoricaldatatoassistprospectivesuppliers.LinkstothePJM

    website andrelateddocumentscanalsobefoundinthissection.

    Calendar: This section provides the timeline for the main events in the current and upcoming

    solicitations.

    Contact Us: This section gives any stakeholder an opportunity to register its email address to

    receive updates and announcements regarding this RFP. The section also provides the contact

    information for the Independent Evaluator, an electronic web form to submit questions to the

    Exhibit B

  • 18

    IndependentEvaluator,andawebformforprospectivesupplierstoregisterforbidderinformation

    sessions.

    II.2. RFPSchedule

    II.2.1. Eachsolicitationwillfollowtheorderofeventsinthegeneralschedule providedbelow.

    TableII-1. General Schedule.

    Event Timing

    Deadlinetorequestconsiderationofanalternateformofguaranty

    Day-15

    BidderInformationWebcast Day-7

    Decisiononalternateguarantyforms (ifany) Day-2

    Part1WindowOpens Day0

    Part1Date(Part1WindowCloses) Day4

    Part1NotificationDate Day6

    ApprovedmodificationstoStandardGuarantyposted Day7

    Part2ProposalWindowOpens Day7

    BidSubmissiontraining Day8

    Part2Date(Part2WindowCloses) Day11

    Part2NotificationDate Day13

    BidDate(BidsareDue) Day14

    IEprovidesitsreporttothePaPUC Day15

    PaPUCDecision(closeofbusiness) NolaterthanDay16

    IfBidsareapprovedbythePaPUC:

    PECOandeachwinningRFPBidderproceed toexecutionoftheUniformSMA andeachTransactionConfirmation

    WithinthreebusinessdaysoftheBidDate

    II.2.2. A total of eight (8) solicitations are planned under DSP IV. The Bid Dates for each of the

    solicitationsareprovidedbelow.

    TableII-2.BidDates.

    Solicitation BidDates

    March2017 Tuesday,March14,2017

    September2017 Tuesday,September26,2017

    March2018 Tuesday,March13,2018

    September2018 Tuesday,September25,2018

    March2019 Tuesday,March12,2019

    September2019 Tuesday,September24,2019

    March2020 Tuesday,March10,2020

    September2020 Tuesday,September29,2020

    Exhibit B

  • 19

    II.2.3. The date for each event in each solicitation is provided in the Tentative Schedule for Future

    Solicitationsattached asAppendix11 totheseRFPRules.Thedatesfollowtheorderofeventsand

    the number of days between events in the general schedule above except as needed to

    accommodateholidays.The scheduleforasolicitationmaybeamendedifcircumstanceswarrant.

    Anysuchamendments willbepostedtotheRFPwebsite.

    II.2.4. Specific times for submissionofmaterials for thePart 1Proposals, thePart2Proposals, and the

    Bidsareprovidedelsewherein thisRFP.AllsuchtimesareEasternPrevailingTime(“EPT”) unless

    specificallynoted.

    Exhibit B

  • 20

    ARTICLEIII. GeneralRequirementsforProposals

    III.1.1. AnentitythatsubmitsanypartofaresponsetothisRFPforasolicitationisan“RFPBidder”. An

    RFPBiddercansubmitatmostonePart1ProposalandonePart2Proposal foreachsolicitation.

    An RFP Bidder that qualifies for a solicitation by submitting a Part 1 Proposal that fulfills all

    requirements described in Article IV and that submits a Part 2 Proposal that fulfills all the

    requirements described in Article V is eligible to submit Bids in that solicitation. Aside from

    submissionoffinancialguaranteestosupportitsBids,allmaterialsforthePart1Proposalsandall

    Part2Proposalsare submitted to the IndependentEvaluatoronline through theonlineProposal

    submissionwebsiteinaccordancewiththeinstructionsprovidedinArticleVII.

    III.1.2. ThesubmissionofaPart1ProposaloraPart2ProposaltotheIndependentEvaluatorconstitutes

    the RFP Bidder’s acknowledgement and acceptance of all the terms and conditions of this RFP,

    regardlessoftheoutcomeofthesolicitationortheoutcomeofsuchProposal.

    III.1.3. EachsolicitationwillhaveaPart1WindowduringwhichPart1Proposalsmaybesubmitted.The

    lastday of thePart1Window is the “Part1Date”. The requirementsof thePart 1Proposalare

    described in Article IV. “Previously qualified RFP Bidder” means an RFP Bidder that met the

    qualificationstandardsinaprevioussolicitationunderDSPIVbysubmittingaPart1Proposalthat

    fulfilledalltherequirementsofArticleIV.ApreviouslyqualifiedRFPBiddermayparticipateinan

    abbreviatedPart1Proposalprocess. Asupplierselectedthroughthecompetitivebiddingprocess

    under DSP IV to provide Default Supply for a particular Class and approved by the Commission

    becomesaDefaultSupplierforthatClass.

    III.1.4. Theexclusivemethod foranRFPBiddertocompletethePart 1Proposalistosubmit theonlinePart

    1 Form aswell as provide Inserts to the Part 1 Form available as separateWord Forms on the

    Proposal submission website or from the Independent Evaluator. Documents (supporting

    documents,draftLetterofCreditordraftStandardGuaranty,andInserts)maybeuploadedtothe

    Proposal submission website or sent to the Independent Evaluator by email at

    [email protected].

    Exhibit B

  • 21

    III.1.5. Each RFP Bidder must comply with all Part 1 Proposal requirements described in Article IV.

    SectionIV.1 describesthecontactinformationandrepresentationsrequired.SectionIV.2 describes

    financial requirements including requirements thatapply toRFPBidders relyingon the financial

    standing of an RFP Guarantor and additional requirements applicable only to RFP Bidders

    submittingaProposalunderanAgencyAgreement. Section IV.3describes theprocessbywhich

    RFPBiddersmayproposemodificationstothecredit instruments(theStandardPre-Bid Letterof

    Credit, the Standard Post-Bid Letter of Credit, and the Standard Guaranty) and describes the

    informationthatanRFPBidder is askedtoprovide fortheIndependentEvaluator topreparethe

    Uniform SMA documents should the Independent Evaluator identify one or more of the RFP

    Bidder’s Bids to the Commission as winning Bids. Section IV.4 describes the representations

    required. Section IV.5 listsadditionalrequirementsapplicableonly toRFPBidders thathavenot

    been incorporated or otherwise formed under the laws of a state of the United States or of the

    DistrictofColumbia(“ForeignRFPBidders”),ortoRFPBiddersthatrelyonthefinancialstanding

    ofanentity thathasnotbeen incorporatedorotherwise formedunder the lawsofa stateof the

    United States or of theDistrict of Columbia (“Foreign Entity”). Eachof the SectionsofArticle IV

    explains theabbreviatedPart1Proposalprocess inwhichpreviouslyqualifiedRFPBiddersmay

    participate.

    III.1.6. The Independent Evaluator informs each RFP Bidder of whether it has met all qualification

    standardsofArticle IV throughaPart1Notification that the IndependentEvaluatorsends to the

    RFPBidderby thePart1NotificationDate. The IndependentEvaluator transmitswithin two(2)

    business days of the Part 1 Notification Date to each RFP Bidder that has a successful Part 1

    Proposalanumberofdocumentsandinstructions,calledthe“Part1Materials”.

    III.1.7. All information provided and certifications made in the Part 1 Proposal must remain valid and

    remain in full force and effect until six (6) business days after the Bid Date. Regardless of the

    reason,ifanyinformationprovidedinthePart1Proposalchangesoranypreviouscertificationfails

    toremainvalid,itisthesoleresponsibilityoftheRFPBiddertonotifytheIndependentEvaluatoras

    soon as practicable. Failing to do somay result in disqualification of the RFP Bidder and of its

    Exhibit B

  • 22

    Proposal. The Independent Evaluator reserves the right to change the assessment of an RFP

    Bidder’squalificationsbasedonanyrevisedinformationprovidedbytheRFPBidder.

    III.1.8. EachsolicitationwillhaveaPart2WindowduringwhichPart2Proposalsmaybesubmitted.The

    lastdayofthePart2Windowis the“Part2Date”.RFPBiddersalsohavetheoptiontosubmitthe

    Part 2 Form during the Part 1 Window for early processing. The requirements of the Part 2

    Proposalaredescribed in ArticleV. “Previously eligibleRFPBidder” meansanRFPBidder that

    becameeligibletosubmitBidsinaprevioussolicitationheldunderDSPIVbysubmittingaPart1

    Proposalthat fulfilledall therequirementsofArticleIV anda Part2Proposalthat fulfilledall the

    requirementsofArticleV.ApreviouslyeligibleRFPBiddermayparticipateinanabbreviatedPart

    2Proposalprocess.

    III.1.9. TheexclusivemethodforanRFPBidderto completethePart2Proposalistosubmit theonlinePart

    2Formaswell asprovide anexecuted Pre-BidLetter ofCredit. Anydocuments requiredby the

    Part2Proposalmaybeuploadedto theProposalsubmissionwebsite orsent to the Independent

    [email protected].

    III.1.10. EachRFPBiddermustcomplywithallPart2ProposalrequirementsdescribedinArticleV.Section

    V.1 describesthecontactinformationandrepresentationsrequiredbythePart2Proposal.Section

    V.2 describes thePre-BidLetterofCreditrequiredtosupport theRFPBidder’sBids. SectionV.3

    listsadditionalrequirementsforRFPBiddersrelyingonthefinancialstandingofanRFPGuarantor.

    Section V.4 lists additional requirements applicable only to RFP Bidders submitting a Proposal

    underanAgencyAgreement. SectionV.5 listsadditionalrequirementsapplicableonlytoForeign

    RFPBiddersortoRFPBiddersthatrelyonthefinancialstandingofaForeignEntity. Eachofthe

    SectionsofArticleV explainstheabbreviatedPart2Proposalprocessinwhichpreviouslyeligible

    RFPBiddersmayparticipate.

    III.1.11. The Independent Evaluator informs each RFP Bidder of whether it has met all qualification

    standardsofArticleIV andallrequirementsofArticleV sothatitiseligibletosubmitBidsthrough

    aPart2Notification.TheIndependentEvaluatorsendsthePart2NotificationtotheRFPBidderby

    thePart2NotificationDate.

    Exhibit B

  • 23

    III.1.12. All information provided and certifications made in the Part 2 Proposal must remain valid and

    remain in full force and effect until six (6) business days after the Bid Date. Regardless of the

    reason,ifanyinformationprovidedinthePart2Proposalchangesoranypreviouscertificationfails

    toremainvalid,itisthesoleresponsibilityoftheRFPBiddertonotifytheIndependentEvaluatoras

    soon as practicable. Failing to do somay result in disqualification of the RFP Bidder and of its

    Proposal. The Independent Evaluator reserves the right to change the assessment of an RFP

    Bidder’seligibilitytosubmitBidsbasedonanyrevisedinformationprovidedbytheRFPBidder.

    III.1.13. Foragivensolicitation,allrepresentationsandcertificationsrequiredbythisRFPmustbemadeby

    a single individualwho serves as Officer of the RFP Bidder. An Officer of the RFP Bidder is an

    individual authorized to undertake contracts (including the Uniform SMA) and bind that RFP

    Bidder. As a requirement of the Part 1 Proposal, the RFPBiddermust name an individualwho

    servesasOfficer of theRFPBidderandmustprovide full contact information for this individual.

    TheOfficeroftheRFPBiddermaysignallrepresentationsandcertificationsofthePart1Formand

    Part2FormatonetimeandRFPBiddershavetheoptiontosubmitcertificationsrequiredbythe

    Part2FormduringthePart 1Windowforearlyprocessing.

    III.1.14. The Officer of the RFP Bidder named in the Part 1 Proposalwill sign, or will nominate another

    authorizedindividualtoexecute theUniformSMA aswellasanyTransactionConfirmationsifany

    oftheRFPBidder’sBidsareapprovedbytheCommission.

    III.1.15. EachRFPBiddermust complywith the instructions for the submissionofBidsprovidedwith its

    Part1Notification. ArticleVI describes ingeneral terms the requirements for the submissionof

    Bids.

    III.1.16. Proposals that do not adhere to the terms and conditions of this RFP, or that do not fulfill all

    requirements of Article IV, Article V, and Article VI of this RFP, or that are not submitted in

    accordancewith theprocessofArticleVII or inaccordancewith theinstructionsprovidedby the

    IndependentEvaluatorinanaddendumtotheseRFPRules, willnotbeconsidered.

    III.1.17. The Independent Evaluator will send to each RFP Bidder that submitted a successful Part 1

    Proposal in a previous solicitation under DSP IV an email confirming its status as a previously

    qualifiedRFPBidder.SuchRFPBiddermayparticipate inanabbreviatedPart1Proposalprocess.

    Exhibit B

  • 24

    The Independent Evaluator will send to each RFP Bidder that submitted a successful Part 1

    Proposal and a successful Part 2 Proposal in a previous solicitation under DSP IV an email

    confirming its statusasapreviouslyeligibleRFPBidder. SuchRFPBiddermayparticipate inan

    abbreviatedPart1ProposalprocessandanabbreviatedPart2Proposalprocess.

    III.1.18. TheRFPBidder,atitsowncostandexpense,shalldefendPECO,andtheIndependentEvaluatorand

    theirsubsidiaries,affiliates,successorsandassigns,andeachandeveryoneoftheirrespectivepast,

    present,orfutureofficers,directors, trustees,employees,shareholders,executors,administrators,

    successorsandassigns,otherthanentitiesthatarealsoRFPBidders,againstanyandallmannerof

    past, present, or future claims, demands, disputes, controversies, complaints, suits, actions,

    proceedings,orallegationsofanykindwhichinanymannerrelateto,ariseoutof,orresult from

    anyfalsestatementintheProposalorbreachofanycovenantbytheRFPBiddersetforth herein.

    TheRFPBiddershallindemnifyandholdharmlessPECO,theIndependentEvaluator,theirparent

    companies, subsidiaries, affiliates, successors and assigns, and each and every one of their

    respectivepast,present,orfutureofficers,directors,trustees,employees,shareholdersandagents,

    aswellastheheirs,executors,administrators,successorsandassigns,otherthanentitiesthatare

    RFPBidders, against any and all liens, judgments, liabilities, losses, injuries, damages, fees, fines,

    penalties, costs or expenseswhich in anymanner relate to, ariseout of, or result fromany false

    statementormisrepresentationintheProposalorbreachofanywarrantybytheRFPBidderasset

    forthherein.

    Exhibit B

  • 25

    ARTICLEIV. Part1ProposalRequirements

    Previously qualifiedRFPBidders underDSP IVmay participate in an abbreviated qualification process by

    using theShortPart1Formavailableonline through theProposalsubmissionwebsite to respondto these

    qualificationstandards.

    IV.1. ContactInformation andRepresentations

    IV.1.1. Contact Information for the RFP Bidder. Each RFP Bidder must provide the RFP Bidder’s legal

    nameandaddress.

    AnRFPBidderthathasnotpreviouslyqualified mustsubmitthiscontactinformationinits

    Part1Proposal.

    ApreviouslyqualifiedRFPBiddereithermustconfirmthatthepreviouslyprovidedcontact

    information remainsvalidormustupdate this information. If theRFPBidderupdates the

    RFPBidder’s legalname, theRFPBiddermustprovide evidenceof thechangeofname. If

    there was a change in the corporate structure of the RFP Bidder, through a merger for

    example, theRFPBiddermaynotparticipate in the abbreviatedPart 1Proposal orPart 2

    Proposalprocess.

    IV.1.2. Officer of the RFP Bidder. The Officer of the RFP Bidder must be an officer, a director, or an

    individualotherwiseauthorizedtoundertakecontracts(includingtheUniformSMA)andbindthe

    RFPBidder. TheOfficer of theRFPBidderwhose contact information is provided in the Part 1

    ProposalmustmakeallrepresentationsrequiredbytheonlinePart1Form.ShouldtheRFPBidder

    submitaPart2Proposal,theindividualnamedasOfficeroftheRFPBidderinthePart1Proposal

    mustmaketherepresentationsrequiredbytheonlinePart2Form.TheOfficeroftheRFPBidder

    maysignallrepresentationsandcertificationsofthe online Part1FormandonlinePart2Format

    onetime andRFPBiddershavetheoptiontosubmitthecertificationsrequiredbythePart2Form

    duringthePart1Windowforearlyprocessing.

    IfanRFPBidderhasnotpreviouslyqualified underDSPIV,oriftheindividualwhoservedas

    Officer of the RFP Bidder for a previously qualified RFP Bidder is not available in this

    Exhibit B

  • 26

    solicitation, thentheRFPBiddermustprovide thename, title,and full contact information

    (address,phonenumber,emailaddress)oftheindividualwhowillserveasOfficeroftheRFP

    Bidder.

    Ifan RFPBidderhaspreviouslyqualifiedandtheindividualwhoservedasOfficeroftheRFP

    Bidderinaprevioussolicitationisavailableforthissolicitation,theRFPBiddereithermust

    confirmthatthepreviouslysubmittedcontactinformationfortheOfficeroftheRFPBidder

    remainsvalidormustupdatethisinformation.

    IV.1.3. RepresentativeoftheRFPBidder.TheIndependentEvaluatorusestheRepresentativeasthemain

    pointofcontactfortheRFPBidder.TheIndependentEvaluatorcontactstheRepresentativeifthe

    IndependentEvaluatorrequiresadditional informationregardingtheRFPBidder’sProposal. The

    Independent Evaluator sends correspondence related to the solicitation to the Representative,

    includingconfidentialinformationrequiredtosubmitBidsontheBidDate.

    Ifan RFPBidderhasnotpreviouslyqualified,theOfficeroftheRFPBiddermustdesignatean

    individual to serve asRepresentative of theRFPBidder by completing theRepresentative

    InsertpreparedforthispurposeandavailableontheProposalsubmissionwebsite.TheRFP

    Bidder provides the Representative Insert by upload to the online Part 1 Form. The RFP

    Biddermustprovide thename, title, and full contact information (address,phonenumber,

    email address)of the individualnamedby theOfficer of theRFPBidderwhowill serveas

    RepresentativeoftheRFPBidder.

    ApreviouslyqualifiedRFPBiddereithermustconfirmthatthepreviouslysubmittedcontact

    information for the Representative of the RFP Bidder remains valid or must update this

    information. The Officer of the RFP Bidder may, at his or her option, name another

    individual to serve asRepresentative of theRFPBidder by completing theRepresentative

    Insert. TheRFPBidderprovides theRepresentative Insert byupload to theonlinePart 1

    Form.

    IV.1.4. Nominees. The Independent Evaluator provides notifications to the RFP Bidder by email and

    providesdocumentsneededforparticipationbysecurefiletransfer.WhetherornotanRFPBidder

    Exhibit B

  • 27

    haspreviouslyqualified, the RFPBiddermaydesignateup to three (3) authorized individuals to

    receivecommunications fromthe IndependentEvaluator inaddition to theRepresentativeof the

    RFPBidder. Eachsuchauthorizedindividual isaNominee. EithertheRepresentativeoftheRFP

    Bidder or the Officer of the RFP Bidder may complete the Nominee Insert prepared for this

    purpose. The Nominee Insert requires that the following be provided for each authorized

    individualwhowill serveasNominee: the individual’snameandtitle,phonenumber,andemail

    address. TheRFPBidderprovides theNominee Insertbyupload to theonlinePart1Form. The

    Representative of the RFP Bidder or the Officer of the RFP Bidder may designate such other

    authorized individuals at any time during the solicitation using the Nominee Insert. The RFP

    BidderisnotrequiredtodosointhePart1Proposalprovided,however,thatthetotalnumberof

    Nomineesnotexceedthree(3)individualsatanyonetime.

    IV.1.5. Allinformationrequiredby thisSectionIV.1 mustbeprovidedexclusivelybycompletingSection1

    oftheonlinePart1Form andtheInsertspreparedforthispurpose,asfurtherexplainedinArticle

    VII.InsertsmustbesubmittedbyuploadtotheonlinePart1Form.Incaseoftechnicaldifficulties,

    documents or Inserts may be sent by email to the Independent Evaluator at

    [email protected].

    IV.2. FinancialRequirements andAgencyAgreements

    IV.2.1. AgencyAgreement.TheRFPBiddermuststatewhetheritissubmittingaProposalunderanagency

    authorization(“AgencyAgreement”). IfanRFPBidder issubmittingaProposalunderanAgency

    Agreement,theRFPBiddermustidentifyaPrincipalastheentityonwhosefinancialstandingthe

    RFPBidderrelies,as furtherexplainedinthenextparagraph.

    IV.2.2. Election of Entity on Whose Financial Standing the RFP Bidder is relying. For purposes of

    submitting to the requirements of this section, each RFP Bidder elects: (a) to rely on its own

    financialstanding;or:(b)torelyonthefinancialstandingofan“RFPGuarantor”;or:(c)torelyon

    the financial standing of a Principal. An RFP Bidder submitting a Proposal under an Agency

    Agreementmustselectoption(c)andoption(c)mayonlybeselectedbyanRFPBiddersubmitting

    aProposalunderanAgencyAgreement.

    Exhibit B

  • 28

    AnRFPBidderthathasnotpreviouslyqualifiedmustclearlyselectoneoftheseoptions.

    A previously qualified RFP Bidder must confirm that the identity of the entity on whose

    financial standing the RFP Bidder last relied remains valid in order to participate in the

    abbreviatedPart1Proposalprocess.IfsuchRFPBidderchangestheidentityoftheentityon

    whosefinancialstandingtheRFPBidderrelies,theRFPBiddermustusetheStandardPart1

    Formandsubmitall informationrequiredforthePart1Proposalas if theRFPBidderhad

    notpreviouslyqualified.

    A previously qualified RFP Biddermust either confirm that the previously provided legal

    nameoftheentityonwhosefinancialstandingtheRFPBidderreliesremainvalidortheRFP

    Biddermustupdatethisinformation.IftheRFPBidderupdatestheentity’slegalname,the

    RFP Bidder must provide evidence of the change of name. If there was a change in the

    corporatestructureoftheentity,throughamergerforexample,theRFPBiddermustusethe

    StandardPart1FormtopresentitsPart1Proposal.

    IV.2.3. Information Required from RFP Bidders Relying on Their Own Financial Standing. The

    requirementsofthisparagraphonlyapply toanRFPBidderthatselectsoption(a)inresponseto

    ParagraphIV.2.2.

    Whether or not the RFP Bidder has previously qualified, an RFP Bidder must submit

    available financial information for theRFPBidderbyupload to theonlinePart1Form. If

    available, the RFP Bidder must submit its most recent quarterly financial information,

    including a balance sheet, income statement, cash flow statement, and any accompanying

    notes and schedules. If available, the most recent Securities and Exchange Commission

    (“SEC”) Form 10-Q or 10-K (whichever is more recent) must be submitted to fulfill this

    requirement.IftheSECForm10-Q/10-Kisunavailable,theRFPBiddermustsubmititsmost

    recentquarterly,monthlyorbi-annualfinancialinformationaccompaniedbyanattestation

    by the RFP Bidder’s Chief Financial Officer (or similar position) that the information

    contained in the financial statements fairly presents in all material respects the financial

    condition and results of the operations of the RFP Bidder. The requirements for this

    Exhibit B

  • 29

    attestationareprovidedmorespecificallyin Appendix5oftheseRFPRules.Ifsuchfinancial

    informationisunavailablefortheRFPBidder,theRFPBiddermustclearlystatethisfact.

    AnRFPBidderthathasnotpreviouslyqualifiedmustsubmitallavailablecreditratingsfor

    the RFP Bidder from the following rating agencies: Standard & Poor’s Ratings Services

    (“S&P”),Moody’sInvestorsService,Inc.(“Moody’s”),andFitchRatings(“Fitch”).Ifnoratings

    areavailablefortheentity,theRFPBiddermustclearlystatethisfact.Apreviouslyqualified

    RFPBiddermusteitherconfirmthatthepreviouslyprovidedcreditratingsremainvalidor

    theRFPBiddermustupdatethisinformation.

    IV.2.4. Information Required from RFP Bidders Relying on the Financial Standing of an RFP Guarantor.

    TherequirementsofthisparagraphonlyapplytoanRFPBidderthatselectsoption(b)inresponse

    toParagraphIV.2.2.

    Financialinformationmustbeavailable fortheRFPGuarantor.

    Ifnotpreviouslyqualified,theRFPBiddermustprovidethe RFPGuarantor’slegalnameand

    address.ApreviouslyqualifiedRFPBiddermusteitherconfirmthatthepreviouslyprovided

    legalnameandaddressof theRFPGuarantorremainvalidor theRFPBiddermustupdate

    thisinformation.IftheRFPBidderupdatestheRFPGuarantor’slegalname,theRFPBidder

    must provide evidence of the change of name. If there was a change in the corporate

    structureoftheRFPGuarantor,throughamergerforexample,theRFPBiddermustusethe

    StandardPart1FormtopresentitsPart1Proposal.

    An RFP Bidder must submit by upload to the online Part 1 Form, if available, the RFP

    Guarantor’smost recent quarterly financial information, including abalance sheet, income

    statement,cashflowstatement,andanyaccompanyingnotesandschedules.Ifavailable,the

    mostrecentSECForm10-Qor10-K(whicheverismorerecent)mustbesubmittedtofulfill

    thisrequirement.IftheSECForm10-Q/10-Kisunavailable,theRFPBiddermustsubmitthe

    RFP Guarantor’s most recent quarterly, monthly, or bi-annual financial information

    accompaniedbyanattestationbytheentity’sChiefFinancialOfficer(orsimilar position)that

    theinformationcontainedinthefinancialstatementsfairlypresentsinallmaterialrespects

    Exhibit B

  • 30

    thefinancialconditionandresultsoftheoperationsoftheentity.Therequirementsforthis

    attestationareprovidedmorespecificallyinAppendix5oftheseRFPRules.

    AnRFPBidderthathasnotpreviouslyqualifiedmustsubmitallavailablecreditratingsfor

    theRFPGuarantorfromthefollowingratingagencies:S&P,Moody’s,andFitch.Suchratings

    mustbeavailable for theRFPGuarantor. ApreviouslyqualifiedRFPBiddermust confirm

    thatthecreditratingslastsubmittedfortheRFPGuarantorremainvalidortheRFPBidder

    must update this information with respect to any or all of the credit ratings. The

    Independent Evaluator uses the information submitted by such RFP Bidder in the most

    recent solicitationunder thisRFP forwhich theRFPBidder submitted a successful Part 1

    Proposal.IftheRFPBidderupdatestheinformation,theRFPBiddermuststatethenameof

    theratingagencythathasupdateditscreditrating,theupdatedcreditrating,andthetypeof

    rating. The IndependentEvaluatormay also inquire specifically about oneormore credit

    ratings on file for the entity onwhose financial standing theRFPBidder and ask theRFP

    Biddertoconfirmthatnoupdateshavebeenissued.

    IV.2.5. InformationRequiredfromRFPBiddersRelyingontheFinancialStandingofanRFP Principal.The

    requirementsofthisparagraphonlyapplytoanRFPBiddersubmittingaProposalunderanAgency

    Agreementthatselectsoption(c)inresponsetoParagraphIV.2.2.

    If not previously qualified, the RFP Bidder must provide each Principal’s legal name and

    address.ApreviouslyqualifiedRFPBiddermusteitherconfirmthatthepreviouslyprovided

    legalnameandaddressofeachPrincipalremainvalidor theRFPBiddermustupdate this

    information.

    Ifnotpreviouslyqualified,theRFPBiddermustprovideacopyoftheagencyagreementby

    uploadtotheonlinePart1Form.Ifpreviouslyqualified,theRFPBiddermusteitherconfirm

    that the previously provided document remains valid or theRFPBiddermust update this

    information.

    IftheRFPBidderisacting asanagentformultiplePrincipals,theRFPBiddermustidentify

    thePrincipalwiththelowestcreditratingastheentityonwhosefinancialstandingtheRFP

    Exhibit B

  • 31

    Bidderrelies.IfseveralPrincipalshavethesamelowestcreditrating,theRFPBiddermust

    identify the Principal that also has the lowest tangible net worth as the entity on whose

    financialstandingtheRFPBidderrelies.ThisPrincipalisreferredtoasthe“RFPPrincipal”.

    IfthereisasinglePrincipal,thesinglePrincipalisthe“RFPPrincipal”.Financialinformation

    mustbeavailable fortheRFPPrincipal.

    An RFP Bidder must submit by upload to the online Part 1 Form, if available, the RFP

    Principal’s most recent quarterly financial information, including a balance sheet, income

    statement,cashflowstatement,andanyaccompanyingnotesandschedules.Ifavailable,the

    mostrecentSECForm10-Qor10-K(whicheverismorerecent)mustbesubmittedtofulfill

    thisrequirement.IftheSECForm10-Q/10-Kisunavailable,theRFPBiddermust submitthe

    RFP Principal’s most recent quarterly, monthly, or bi-annual financial information

    accompaniedbyanattestationbytheentity’sChiefFinancialOfficer(orsimilarposition)that

    theinformationcontainedinthefinancialstatementsfairlypresentsinallmaterialrespects

    thefinancialconditionandresultsoftheoperationsoftheRFPPrincipal.Therequirements

    forthisattestationareprovidedmorespecificallyinAppendix5oftheseRFPRules.

    AnRFPBidderthathasnotpreviouslyqualifiedmustsubmitallavailablecreditratingsfor

    theRFPPrincipalfromthefollowingratingagencies:S&P,Moody’s,andFitch.Suchratings

    must be available from at least two rating agencies for the RFP Principal. A previously

    qualifiedRFPBiddermust confirmthatthecreditratingslastsubmittedfortheRFPPrincipal

    remainvalidortheRFPBiddermustupdatethisinformationwithrespecttoanyorallofthe

    credit ratings. The Independent Evaluator uses the information submitted by such RFP

    Bidder inthemostrecentsolicitationunderthisRFPforwhichtheRFPBiddersubmitteda

    successfulPart1Proposal.IftheRFPBidderupdatestheinformation,theRFPBiddermust

    state the name of the rating agency that has updated its credit rating, the updated credit

    rating,andthetypeofrating.TheIndependentEvaluatormayalsoinquirespecificallyabout

    oneormorecredit ratingson file for theRFPPrincipalandask theRFPBidder to confirm

    thatnoupdateshavebeenissued.

    Exhibit B

  • 32

    WhetherornotanRFPBidderhaspreviouslyqualified,theOfficerofthe RFPBiddermust:

    (i)certifythattheOfficeroftheRFPBidderhastheauthoritytobindthePrincipal(s);and(ii)

    acknowledge that an Officers’ Certificate, signed by an officer of each Principal and

    substantiallyintheformofAppendix6totheseRFP Rules,mustbeprovidedwiththePart2

    Proposal.TheOfficeroftheRFPBiddermakesthiscertificationandthisacknowledgmentby

    completingtheP1AgencyCertificationsInsert.

    Whether or not the RFP Bidder has previously qualified, the RFP Bidder may, but is not

    required to, submit adraft Officers’ Certificate for evaluation. If anRFPBidder submits a

    draft Officers’ Certificate for evaluation, the Independent Evaluator will provide this

    evaluation to the RFP Bidder, including notice of any changes required to the Officers’

    Certificate,alongwiththePart1Notification.ThisOfficers’Certificatewillstatethat:(i)the

    Agency Agreement submitted in response to this RFP is a true and complete copy of the

    AgencyAgreementascurrentlyineffect;(ii)theAgencyAgreementisinfullforceandeffect

    and shall remain in full force and effect for a period extending to six (6) business days

    following the Bid Date; (iii) there are no proceedings pending for the amendment or

    terminationoftheAgencyAgreement,contemplatedbytheRFPBidder,orcontemplatedby

    thePrincipal(s)totheRFPBidder’sknowledge; (iv)eachindividualwhohasexecuted the

    Officers’CertificateandtheAgencyAgreementis(or wasatthetimeoftheexecutionofsuch

    documents)authorizedtoexecuteanddeliversuchdocumentsonbehalfofthePrincipal(s);

    and(v)theOfficeroftheRFPBidderisauthorizedtoexecutetheUniformSMAaswellasany

    TransactionConfirmation(s)pursuanttotheUniformSMAonbehalfofthePrincipal(s).

    IV.2.6. Allinformation requiredbythisSectionIV.2 mustbeprovidedexclusivelybycompletingSection2

    oftheonlinePart1FormandtheInsertspreparedforthispurpose,asfurtherexplainedinArticle

    VII. InsertsmustbesubmittedbyuploadtotheonlinePart1Form.Incaseoftechnicaldifficulties,

    documents or Inserts may be sent by email to the Independent Evaluator at

    [email protected].

    Exhibit B

  • 33

    IV.3. CreditInstrumentsandUniformSMA

    IV.3.1. Standard Pre-Bid Letter of Credit. RFP Bidders have an opportunity, in the Part 1 Proposal, to

    proposemodificationstothePre-BidLetterofCredit.

    Whetherornot theRFPBidderhaspreviouslyqualified, anRFPBiddermust, in itsPart2

    Proposal,submitaPre-BidLetterofCreditinanamountofatleast: $250,000pertranchebid

    onproductsoftheRESandSCClasses;and $125,000pertranchebidonaCCIproduct. This

    Pre-BidLetterofCreditmustbeintheformoftheStandardPre-BidLetterofCreditprovided

    as Appendix 9 to these RFP Rules ormust incorporate onlymodifications that have been

    approvedbyPECOandtheIndependentEvaluator.

    AspartofthePart1Proposal,anRFPBiddermayrequestmodificationstotheStandardPre-

    BidLetterofCreditthatarenon-materialinnature,orthatareadvantageoustobothPECO

    andtheRFPBidder.AnRFPBidderrequestsmodificationstotheStandardPre-BidLetterof

    CreditbysubmittingaDraftPre-BidLetterofCreditsubstantiallyintheformoftheStandard

    Pre-BidLetterofCreditindicatingclearlyanyandallmodificationstotheStandardPre-Bid

    Letter of Credit. TheDraft Pre-Bid Letter of Creditmust be submitted inMicrosoftWord

    withtrackedchanges byupload totheonlinePart1Form. ADraftPre-BidLetterofCredit

    that is not substantially in the form of the Standard Pre-Bid Letter of Credit will not be

    consideredorevaluated.

    AllapprovedmodificationstotheStandardPre-BidLetterof Credit willbepostedtotheRFP

    website.EachRFPBiddermayuseanyoftheapprovedmodifications,regardlessofwhether

    theRFPBidderitselforanotherRFPBidderproposedthemodification.

    AnRFPBidderthatchoosesnottoproposemodificationstotheStandardPre-BidLetterof

    Creditmustclearlystatethatfact.

    IV.3.2. Standard Post-Bid Letter of Credit. RFPBidders have an opportunity, in the Part 1 Proposal, to

    proposemodificationstothePost-BidLetterofCredit.

    Exhibit B

  • 34

    TheUniformSMA includes,asAppendix F, LetterofCreditDocumentationthatmaybeused

    topostsecurityunderthetermsoftheUniformSMA.ThisParagraphreferstothisletterof

    creditasthe“StandardPost-BidLetterofCredit”.

    Whether or not theRFPBidder has previously qualified, anRFPBiddermay, in its Part 1

    Proposal, request modifications to the Standard Post-Bid Letter of Credit that are non-

    material in nature, or that are advantageous to both PECO and the RFP Bidder. An RFP

    BidderrequestsmodificationstotheStandardPost-BidLetterofCreditbysubmittingaDraft

    Post-BidLetterofCreditsubstantially intheformoftheStandardPost-BidLetterofCredit

    indicating clearly any and allmodifications to the StandardPost-BidLetter of Credit. The

    DraftPost-BidLetterofCreditmustbesubmittedinMicrosoftWordbyupload totheonline

    Part 1 Form. ADraft Post-Bid Letter of Credit that is not substantially in the formof the

    StandardPost-BidLetterofCreditwillnotbeconsideredorevaluated.

    All approvedmodifications to the Standard Post-Bid Letter of Creditwill be posted to the

    RFPwebsite. Each RFP Biddermay use any of the approvedmodifications, regardless of

    whethertheRFPBidderitselforanotherRFP Bidderproposedthemodification.

    AnRFPBidderthatchoosesnottoproposemodificationstotheStandardPre-BidLetterof

    Creditmustclearlyindicatesthatfact.

    IV.3.3. Standard Guaranty. RFP Bidders have an opportunity, in the Part 1 Proposal, to propose

    modificationstotheStandardGuaranty.

    The Uniform SMA includes, as Appendix G, Guaranty Documentation thatmay be used to

    provideafinancialguarantyunderthetermsoftheUniformSMA.ThisParagraphrefersto

    thisfinancialguaranty asthe“StandardGuaranty”.

    Whether or not theRFPBidder has previously qualified, anRFPBiddermay, in its Part 1

    Proposal,requestmodificationstotheStandardGuaranty thatarenon-materialinnature,or

    that are advantageous to both PECO and the RFP Bidder. An RFP Bidder requests

    modificationstotheStandardGuaranty bysubmittingaDraftGuaranty substantially inthe

    formof theStandardGuaranty indicatingclearlyanyandallmodifications to theStandard

    Exhibit B

  • 35

    Guaranty.TheDraftGuaranty mustbesubmittedinMicrosoftWordbyupload totheonline

    Part1Form.ADraftGuarantythatisnotsubstantiallyintheformoftheStandardGuaranty

    willnotbeconsideredorevaluated.

    AllapprovedmodificationstotheStandardGuaranty willbepostedtotheRFPwebsite.Each

    RFP Bidder may use any of the approved modifications, regardless of whether the RFP

    BidderitselforanotherRFPBidderproposedthemodification.

    AnRFPBidderthatchoosesnottoproposemodificationstotheStandardPre-BidLetterof

    Creditmustclearlyindicatesthatfact.

    IV.3.4. InformationtoPreparetheUniformSMA.Thisparagraphapplies onlytoRFPBiddersthatarenot

    Default Suppliers. Such RFP Bidder is asked, in its Part 1 Proposal, to provide all information

    neededbytheIndependentEvaluatortoprepareforexecutiontheUniformSMA anditsExhibits by

    completing the Uniform SMA Insert prepared for this purpose and available on the Proposal

    submissionwebsite. TheRFPBidderprovidestheUniformSMAInsertbyupload totheonlinePart

    1 Form. If the Independent Evaluator identifies one or more of such RFP Bidder’s Bids to the

    Commission aswinningBids, the IndependentEvaluatorwilluse this information toprepare the

    UniformSMA anditsExhibitsforexecution.

    Such RFPBidderis asked:(i)to specify anyelectionstobemadeintheUniformSMA; and(ii)

    toprovidethecontactinformationrequiredtopreparetheFormofNotice,whichisincluded

    asExhibit2totheUniformSMA;and(iii)toprovideanyadditionalinformationrequiredto

    preparetheUniformSMAanditsExhibits.

    IfsuchRFPBidderfailstosubmittheseelectionsandinformationwiththePart1Proposal,

    theOfficerof theRFPBiddermustacknowledge that, if the IndependentEvaluatornotifies

    theRFPBidderthattheIndependentEvaluatorisidentifying oneormoreoftheRFPBidder’s

    BidstotheCommission aswinningBids,theRFPBidderwillberequiredto provide:(i) any

    elections to bemade in theUniform SMA; and (ii) the contact information to prepare the

    FormofNotice; and (iii) any additional information required toprepare theUniformSMA

    and itsExhibits; by12PM (noon)EPTon the day after suchnotification is received. The

    Exhibit B

  • 36

    OfficeroftheRFPBidderprovidestherequiredacknowledgementbycompletingtheDelay

    (SMA) Insertprepared for thispurposeandavailableon theProposal submissionwebsite.

    TheRFPBidderprovidestheDelay(SMA)Insertbyupload totheonlinePart1Form.

    IV.3.5. AllinformationrequiredbythisSectionIV.3 mustbeprovidedexclusivelybycompletingSection3

    oftheonlinePart1Form andtheInsertspreparedforthispurpose,asfurtherexplainedinArticle

    VII. InsertsmustbesubmittedbyuploadtotheonlinePart1Form.Incaseoftechnicaldifficulties,

    documents or Inserts may be sent by email to the Independent Evaluator at

    [email protected].

    IV.4. Representations

    IV.4.1. Representationsby theOfficerof theRFPBidder. WhetherornotanRFPBidderhaspreviously

    qualified,theOfficeroftheRFPmustcertifythat:

    he/sheisanofficer,a director,oranindividualotherwiseauthorizedtoundertakecontracts

    (includingtheUniformSMA)andbindtheRFPBidder;

    all information provided in the Part 1 Proposal is true and accurate to the best of the

    knowledgeandbeliefoftheOfficerofthe RFPBidder;

    if, for any reason or due to any circumstance, any information provided in the Part 1

    Proposalchangesoranypreviouscertificationfailstoremainvalidbeforethesixthbusiness

    day after theBidDate, the Officer of theRFPBidder or theRepresentativewill notify the

    IndependentEvaluatorofsuchchangesassoonaspracticablebutinnoeventlaterthanone

    (1)daybeforetheBidDate;

    thePart1Proposalwillremainvalidandremaininfullforceandeffectuntilsix(6)business

    daysaftertheBidDate;and

    the RFP Bidder is not part of a bidding agreement, a joint venture for purposes of

    participating in any solicitation for this RFP, a bidding consortium, or any other type of

    agreement related to bidding in any solicitation of this RFP. An RFP Bidder found to be

    actinginconcertwithanotherRFPBiddermaybedisqualifiedbytheIndependentEvaluator.

    Exhibit B

  • 37

    TheOfficerof theRFPBidderpresentssuchcertificationsbycompleting theP1Certifications(A)

    Insert prepared for thispurpose. TheRFPBidderprovides the required Insert by upload to the

    Part1Form.

    IV.4.2. AdditionalRepresentationsforRFPBiddersthathavenotpreviouslyqualified.Ifan RFPBidderhas

    notpreviouslyqualified,theOfficeroftheRFPBiddermustcertifythat:

    he/she understands the terms of theUniform SMA, that theRFPBidder accepts all of the

    termsof theUniformSMAwithoutmodifications,and that theRFPBidderwillexecute the

    UniformSMAandtheTransactionConfirmation(s)forallBidsapprovedbytheCommission;

    the submission of the Part 1 Proposal constitutes the RFPBidder’s acknowledgement and

    acceptance of all the terms and conditions of the RFP, regardless of the outcome of the

    solicitationortheoutcomeofsuchProposal;

    theRFPBidderhasnoactionsatlaw,suitsinequity,proceedingsorclaimspendingor,tothe

    RFP Bidder’s knowledge, threatened against it before any federal, state, foreign or local

    court,tribunalorgovernmentalagencyorauthoritythatmightmateriallydelay,preventor

    hindertheRFPBidder’sperformanceofitsobligationsundertheUniformSMA;

    theRFPBidderisnotbankruptorinsolventandtherearenoproceedingspendingorbeing

    contemplatedbyitor,toitsknowledge,threatenedagainstitwhichwouldresultinitbeing

    orbecomingbankruptorinsolvent;and

    if the Independent Evaluator notifies the RFP Bidder that the Independent Evaluator is

    identifying one or more of the RFP Bidder’s Bids to the Commission as winning Bids, all

    information required for the preparation of the Uniform SMA and its Exhibits must be

    submittedandcompleteby12PM(noon)EPTonthedayaftersuchnotificationisreceived;

    TheOfficerof theRFPBidderpresentssuchcertificationsbycompleting theP1Certifications(B)

    Insert prepared for thispurpose. TheRFPBidderprovides the required Insert by upload to the

    Part1Form.

    Exhibit B

  • 38

    IV.4.3. Additional Representations for RFP Bidders have previously qualified but that are not Default

    Suppliers.IfanRFPBidderhaspreviouslyqualifiedbutisnotaDefaultSupplier,theOfficerofthe

    RFPBiddermustcertifythat:

    TheRFPBidderhasnoactionsat law,suits inequity,proceedingsorclaimspendingor, to

    theRFPBidder’sknowledge,threatenedagainstitbeforeanyfederal,state,foreignorlocal

    court,tribunalorgovernmentalagencyorauthoritythatmightmateriallydelay,preventor

    hindertheRFPBidder’sperformanceofitsobligationsundertheUniformSMA;

    TheRFPBidderisnotbankruptorinsolventandtherearenoproceedingspendingorbeing

    contemplatedbyitor,toitsknowledge,threatenedagainstitwhichwouldresultinitbeing

    orbecomingbankruptorinsolvent;and

    if the Independent Evaluator notifies the RFP Bidder that the Independent Evaluator is

    identifying one or more of the RFP Bidder’s Bids to the Commission as winning Bids, all

    information required for the preparation of the Uniform SMA and its Exhibits must be

    submittedandcompleteby 12PM(noon)EPTonthedayaftersuchnotificationisreceived.

    TheOfficerof theRFPBidderpresentssuchcertificationsbycompleting theP1Certifications(C)

    Insert prepared for thispurpose. TheRFPBidderprovides the required Insert by upload to the

    Part1Form.

    IV.4.4. PJMLoadServingEntity.TherequirementsofthisparagraphapplyonlytoRFPBiddersthatarenot

    previously qualified RFP Bidders. A Default Supplier must be an LSE by the start of the supply

    period.

    An RFP Bidder that has not previously qualified must, in its Part 1 Proposal, either: (i)

    demonstrate that theRFP Bidder is an LSE in PJMby providing the signature page of the

    ReliabilityAssuranceAgreement(“RAA”);or(ii)certifythattheRFPBidderhasinvestigated

    therequirementstobecomeanLSEinPJMandthatthereexistnoimpedimentsfortheRFP

    Bidder to become an LSE by the start of the supply period and to remain an LSE for the

    durationofthesupplyperiod.

    Exhibit B

  • 39

    AnRFPBidderthatprovidesthesignaturepageoftheRAAdoessobyuploadtotheonline

    Part1Form.

    An RFP Bidder that submits the certification above does so by completing the LSE

    Representation Insertprepared for thispurposeandavailableon theProposal submission

    website. TheRFPBidder provides the LSERepresentation Insert by upload to the online

    Part1Form.

    IV.4.5. AllinformationrequiredbythisSectionIV.4 mustbeprovidedexclusivelybycompletingSection4

    oftheonlinePart1 FormandtheInsertspreparedforthispurpose,asfurtherexplainedinArticle

    VII. InsertsmustbesubmittedbyuploadtotheonlinePart1Form.Incaseoftechnicaldifficulties,

    documents or Inserts may be sent by email to the Independent Evaluator at

    [email protected].

    IV.5. ForeignRFPBiddersandForeignEntities

    IV.5.1. The requirementsof thisSectionapplyonly to: (1)ForeignRFPBidders thatseek tobegranted

    unsecuredcreditunderthetermsoftheUniformSMA;or(2)RFPBiddersthatrelyonthefinancial

    standingofaForeignEntity(eitheranRFPGuarantororaPrincipal). OtherRFPBiddersarenot

    subjecttotherequirementsofthisSection.

    IV.5.2. AdditionalrequirementsforForeignRFPBidders. TherequirementsofthisParagraphapplyonlyto

    ForeignRFPBiddersthatseektobegrantedunsecuredcreditunderthetermsoftheUniformSMA;

    otherRFPBiddersarenotsubjecttotherequirementsofthisParagraph.

    WhetherornotsuchRFPBidderhaspreviouslyqualified,suchRFPBiddermayprovide,in

    addition to supplying all required information and documents under Section IV.2, any

    additionalevidenceofcreditworthinesssoastoprovidePECOwithcomparableassurances

    of creditworthiness as is applicable for an RFP Bidder that has been incorporated or

    otherwiseformedunderthelawsofastateoftheUnitedStatesoroftheDistrictofColumbia.

    WhetherornotsuchRFPBidderhaspreviouslyqualified,theOfficerofaForeignRFPBidder

    must acknowledge that the following additional documents are required with the Part 2

    ProposalfortheForeignRFPBiddertobegrantedunsecuredcreditunderthetermsofthe

    Exhibit B

  • 40

    Uniform SMA: (i) a legal opinion of outside counsel qualified to practice in the foreign

    jurisdiction inwhich theForeignRFPBidder is incorporatedorotherwise formed that the

    UniformSMA is, orupon the completionof execution formalitieswill become, the binding

    obligationoftheForeignRFPBidderinthejurisdictioninwhichithasbeenincorporatedor

    otherwiseformed;(ii)thesworncertificateofthecorporatesecretary(orsimilarofficer)of

    suchForeignRFPBidderthatthepersonexecutingtheUniformSMA onbehalfoftheForeign

    RFPBidderhas theauthority toexecute theUniformSMA andthat thegoverningboardof

    suchForeignRFPBidderhasapprovedtheexecutionoftheUniformSMA;and(iii)thesworn

    certificateofthecorporatesecretary(orsimilarofficer)ofsuchForeignRFPBidderthatthe

    ForeignRFPBidderhasbeenauthorizedbyitsgoverningboardtoenterintoagreementsof

    thesametypeastheUniformSMA.

    WhetherornotsuchRFPBidderhaspreviouslyqualified,suchRFPBiddermay,but isnot

    requiredto,submitadraftofthefollowingdocuments forevaluation:(i)a legalopinionof

    outside counsel qualified to practice in the foreign jurisdiction in which the Foreign RFP

    BidderisincorporatedorotherwiseformedthattheUniformSMA is,oruponthecompletion

    ofexecutionformalitieswillbecome,thebindingobligationoftheForeignRFPBidderinthe

    jurisdictioninwhichithasbeenincorporatedorotherwiseformed;(ii)thesworncertificate

    of the corporate secretary (or similar officer) of such ForeignRFPBidder that the person

    executingtheUniformSMA onbehalfoftheForeignRFPBidderhastheauthoritytoexecute

    theUniformSMA andthatthegoverningboardofsuchForeignRFPBidderhasapprovedthe

    executionoftheUniformSMA;and(iii) thesworncertificateofthecorporatesecretary(or

    similarofficer)ofsuchForeignRFPBidderthattheForeignRFPBidderhasbeenauthorized

    byitsgoverningboardtoenterintoagreementsofthesametypeastheUniformSMA.The

    IndependentEvaluatorwillmakeavailable toRFPBiddersasampleof the legalopinionof

    outsidecounselthatissufficientforaForeignEntityasPrincipal. IfsuchRFPBiddersubmits

    a draft of these documents for evaluation, the Independent Evaluator will provide this

    evaluation tosuchRFPBidder, includingnoticeofanychangesrequiredto thedocuments,

    alongwiththePart1Notification.

    Exhibit B

  • 41

    The RFP Bidder presents this information by completing the P1 Foreign Bidder Insert

    preparedforthispurposeandprovidesassociateddocuments.ThisInsertisavailableonthe

    Proposalsubmissionwebsite.

    IV.5.3. AdditionalrequirementsforRFPBiddersrelyingonthefinancialstandingofaForeignGuarantor.

    TherequirementsofthisParagraphapplyonlytoRFPBiddersthatrelyonthefinancialstandingof

    aForeignEntityasRFPGuarantor;otherRFPBiddersarenotsubject to therequirementsof this

    Paragraph.

    Whether or not such RFP Bidder has previously qualified, an RFP Bidder relying on the

    financialstandingofaForeignEntityasRFPGuarantormayprovide,inadditiontosupplying

    all required information and documents under Section IV.2, any additional evidence of

    creditworthinessfortheRFPGuarantorsoastoprovidePECOwithcomparableassurances

    of creditworthiness as is applicable for an entity that has been incorporated or otherwise

    formedunderthelawsofastateoftheUnitedStatesoroftheDistrictofColumbia.

    Whether or not such RFP Bidder has previously qualified, the Officer of such RFP Bidder

    must acknowledge that the following additional documents are required with the Part 2

    ProposalfortheForeignEntityasRFPGuarantortobegranted unsecuredcreditandforthe

    RFPBidder to rely on the financial standing of theRFPGuarantor under the terms of the

    Uniform SMA: (i) a legal opinion of outside counsel qualified to practice in the foreign

    jurisdiction in which the RFP Guarantor is incorporated or otherwise formed that the

    guarantypursuant to theUniformSMA is,orupon thecompletionof execution formalities

    willbecome,thebindingobligationoftheRFPGuarantor inthe jurisdictioninwhichithas

    been incorporated or otherwise formed; and (ii) the sworn certificate of the corporate

    secretary(orsimilarofficer)ofsuchRFPGuarantorthatthepersonexecutingtheguaranty

    pursuanttotheUniformSMA onbehalfoftheRFPGuarantorhastheauthoritytoexecutethe

    guarantypursuanttotheUniformSMA andthatthegoverningboardofsuchRFPGuarantor

    hasapprovedtheexecutionoftheguarantypursuanttotheUniformSMA;and(iii)thesworn

    certificateofthecorporatesecretary(orsimilarofficer)ofsuchRFPGuarantorthattheRFP

    Exhibit B

  • 42

    Guarantorhasbeenauthorizedbyitsgoverningboardtoenterintoagreementsofthesame

    typeastheguarantypursuanttotheUniformSMA.

    Whether or not suchRFPBidder has previously qualified, theRFPBiddermay, but is not

    requiredto, submitwith itsPart1Proposaladraftof the followingdocuments: (i)a legal

    opinionofoutsidecounselqualifiedtopractice intheforeignjurisdictioninwhichtheRFP

    Guarantor is incorporatedorotherwise formed that theguarantypursuant to theUniform

    SMA is,oruponthecompletionofexecutionformalitieswillbecome,thebindingobligation

    of the RFP Guarantor in the jurisdiction in which it has been incorporated or otherwise

    formed;and(ii)thesworncertificateofthecorporatesecretary(orsimilarofficer)ofsuch

    RFP Guarantor that the person executing the guaranty pursuant to the Uniform SMA on

    behalf of the RFP Guarantor has the authority to execute the guaranty pursuant to the

    Uniform SMA and that the governing board of such RFP Guarantor has approved the

    executionoftheguarantypursuanttotheUniformSMA;and(iii)thesworncertificateofthe

    corporate secretary (or similar officer) of suchRFPGuarantor that theRFPGuarantorhas

    been authorized by its governing board to enter into agreements of the same type as the

    guarantypursuant to theUniformSMA. The IndependentEvaluatorwillmakeavailable to

    RFPBiddersasampleofthelegalopinionofoutsidecounselthatissufficient foraForeign

    Entity asPrincipal. If anRFPBidder submits adraft of the documents for evaluation, the

    IndependentEvaluatorwillprovidethisevaluationtotheRFPBidder,includingnoticeofany

    changesrequiredtothedocuments,alongwiththePart1Notification.

    The RFP Bidder presents this information by completing the P1 Foreign Guarantor Insert

    preparedforthispurposeandprovidesassociateddocuments.ThisInsertisavailableonthe

    Proposalsubmissionwebsite.

    IV.5.4. AdditionalRequirementsforRFPBidderssubmittingaProposalunderanAgencyAgreementwitha

    ForeignEntityasPrincipal. TherequirementsofthisParagraphapplyonlytoRFPBiddersthatrely

    onthefinancialstandingofaForeignEntityasRFPPrincipal;otherRFPBiddersarenotsubjectto

    therequirementsofthisParagraph.

    Exhibit B

  • 43

    Whether or not such RFP Bidder has previously qualified, an RFP Bidder submitting a

    ProposalunderanAgencyAgreementwithaForeignEntityasPrincipalmay,inadditionto

    supplyingallrequiredinformationanddocumentsunderSectionIV.2,provideanyadditional

    evidence of creditworthiness for the Principal so as to provide PECO with comparable

    assurancesofcreditworthinessas isapplicable foranentity thathasbeen incorporatedor

    otherwiseformedunderthelawsofastateoftheUnitedStatesoroftheDistrictofColumbia.

    Whether or not such RFP Bidder has previously qualified, the Officer of such RFP Bidder

    must acknowledge that the following additional documents are required with the Part 2

    Proposal for the RFP Bidder and the Foreign Entity as Principal to be granted unsecured

    creditunderthetermsoftheUniformSMA:(i)alegalopinionofoutsidecounselqualifiedto

    practice in the foreign jurisdiction in which the Principal is incorporated or otherwise

    formed that the Uniform SMA is, or upon the completion of execution formalities will

    become, the binding obligation of the Principal in the jurisdiction in which it has been

    incorporatedorotherwiseformed;and(ii)thesworncertificateofthecorporatesecretary

    (orsimilarofficer)ofsuchPrincipalthatthePrincipalhasbeenauthorizedbyitsgoverning

    boardtoenterintoagreementsofthesametypeastheUniformSMA.

    WhetherornotsuchRFPBidderhaspreviouslyqualified,suchRFPBiddermay,but isnot

    requiredto,submitwithitsPart1Proposaladraftofthefollowingadditionaldocuments:(i)

    alegalopinionofoutsidecounselqualifiedtopracticeintheforeignjurisdictioninwhichthe

    Principal is incorporated or otherwise formed that the Uniform SMA is, or upon the

    completionofexecutionformalitieswillbecome,thebindingobligationofthePrincipalinthe

    jurisdiction in which it has been incorporated or otherwise formed; and (ii) the sworn

    certificateofthecorporatesecretary(orsimilarofficer)ofsuchPrincipalthatthePrincipal

    hasbeenauthorizedbyitsgoverningboardtoenterintoagreementsofthesametypeasthe

    UniformSMA.TheIndependentEvaluatorwillmakeavailabletoRFPBiddersasampleofthe

    legalopinionofoutsidecounselthatissufficientforaForeignEntityasPrincipal.IfanRFP

    Bidder submits a draft of the documents for evaluation, the Independent Evaluator will

    Exhibit B

  • 44

    provide this evaluation to theRFPBidder, includingnotice ofanychanges required to the

    documents,alongwiththePart1Notification.

    The RFP Bidder presents this information by completing the P1 Foreign Principal Insert

    preparedforthispurposeandprovidesassociateddocuments.ThisInsertisavailableonthe