Capital Improvement ProgramFor the City of Yuma as adopted by the City Council
RESOLUTION NO. R2015-023
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF YUMA, ARIZONA, ADOPTING THE CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2016 THROUGH 2020
WHEREAS, pursuant to Article XIII, Section 10 of the Yuma City Charter, the City Administrator submitted to the City Council, a proposed five-year Capital Improvement Program listing all capital improvements whieh are proposed to be undertaken during the next five fiscal years, with appropriate supporting information as to the neeessity for sueh improvements; and,
WHEREAS, pursuant to Artiele XIII, Seetion II of the Yuma City Charter, City Council published a general summary of the Capital Improvement Program; and,
WHEREAS, after proper notiee required by the Yuma City Charter, a Public Hearing on the Capital Improvement Program was held on May 20, 2015; and,
WHEREAS, the first year of the Capital Improvement Program utilizes committed funds, the second through the fifth years of the Capital Improvement Program are fiseally constrained to reasonably antieipated revenues, and a listing of the sixth through the tenth years of the program are the projeeted Capital Improvement Program based upon anticipated demand and funding availability.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Yuma, Arizona, as follows:
SECTION 1: The Capital Improvement Program for Fiseal Years 2016 through 2020 dated May 1, 2015, on file with the City Clerk, as inereased, reduced or changed, is adopted.
SECTION 2: The Capital Improvement Program Budget for Fiscal Year 2016 will be adopted as a part of the City of Yuma budget for Fiseal Year 2016.
SECTION 3: The Capital Improvement Program is subjeet to annual revision and authorization and is not binding on future legislative bodies.
Adopted this 3rd day of June
APPROVED ASrTO FORM:
City Stev( n W. Moore
Attorney
_, 2015.
APPROVED:
Douglas J. Nicholls Mayor
Capital Improvement Program
2016-2020 Capital Improvement Program Effective July 1, 2015
Douglas J. Nicholls Mayor
Edward C. ThomasDeputy Mayor
Cody Beeson Councilmember
William Craft Councilmember
Gary Knight Councilmember
Leslie L. McClendon Councilmember
Gary Wright Councilmember
Gregory K. Wilkinson City Administrator
Ricky RinehartDeputy City Administrator
Introduction i
Department Summary 1
List of Projects and Funding by Department 2
List of Projects by Funding Source 7
Project Index by Fiscal Years and Departments 11
13
17
20
24
26
6180
Fiscal Year 2016 - 2021
General Government ProjectsParks and Recreation Projects
Public Safety Projects
Stormwater Control Projects
Transportation Projects
Wastewater Utility Projects
Water Utility Projects
Yuma Crossing National Heritage Area (YCNHA) 94
Fiscal Years 2021 through 2025 98Potential Infrastructure Projects (PIP) 100Alphabetic Project Index 104Maps
TABLE OF CONTENTS
Capital Improvement Program
City of Yuma, Arizona
i
City of Yuma Capital Improvement Program
The City of Yuma’s Capital Improvement Program (CIP) is the City’s financial plan for the improvement
and/or construction of municipal infrastructure. The purpose of the City’s CIP is to identify and address
infrastructure needs while adopting the goals and policies set forth by City Council and the City of Yuma
General Plan. Our mission is to deliver quality public services and to advance the social and economic
well-being of our present and future citizens. The role infrastructure plays in delivering quality services
cannot be overstated.
Infrastructure includes the basic physical structure, systems and facilities needed to provide services to
residents such as sidewalks, streets, parks, fire stations, police facilities, and water and sewer systems.
Infrastructure impacts the community and its economy heavily. Capital projects represent a significant
investment in the construction of new infrastructure and the improvement or expansion of current
infrastructure. Capital projects must be infrequent, systematic and a minimum of $25,000. The impact of
capital projects must be incorporated into the respective department’s operating budget.
New projects are developed throughout the course of the fiscal year. New projects are proposed to
Administration by City Council, Planning and Zoning Commission, citizens and staff. Once a project is
proposed, it is evaluated for compatibility with City goals and policies, related projects and priority. City
goals and policies can be identified in a number of programs and plans adopted by City Council such as
the City of Yuma General Plan, Major Roadways Plan, Infrastructure Improvements Plan, and the Parks
and Recreation Facility Plan, to name a few. These plans can be found on the City of Yuma website
under City Bookshelf link: http://www.yumaaz.gov/bookshelf.
Once project compatibility is established, funding must be identified. Funding availability is a key factor
in determining project initiation and completion. There are multiple funding sources available for capital
projects. Funding sources are limited in both amount and how funds can be utilized. Once funding is
established, projects are reviewed by Administration and Executive staff for approval. After approved
the project is included in the Department's capital project schedule.
Funding Sources
Bond Funds: These are debt securities issued by the City to finance capital projects. Bond proceeds
being utilized currently are from the 2007 B and D Issue and the Municipal Property Corporation (MPC)
2007 Utility Series Bond.
City Road Tax: The source of this funding is a local one-half percent transaction privilege tax approved
by voters in 1994 for maintenance and construction of roads. City Road Tax revenues are primarily
utilized to support operations related to street activities, debt payments related to the 2007 Series of Bond
Issue, and a small portion is dedicated to capital projects.
Development Fees: Municipalities in Arizona assess and collect development fees to offset infrastructure
costs associated with providing necessary public services to new development. Development fees include
the following necessary public services: parks and recreation, fire, police, general government, and streets.
Fees are collected at the time building permits are issued.
Grant Funding: Grant Funding is continually pursued by City staff. Projects classified as “Grant”
funded are projects that have been awarded grants. All grant funds are restricted to the purpose for which
the grant is received.
ii
Other - Proposed: This is funding from various internal and/or external sources to include potential
grant funding.
ProRata Funds: Road infrastructure and parks facilities were the two categories that Prorata fees were
collected for. This funding was replaced with the citywide development fees adopted in 2006. The
remaining funds are scheduled to be spent in fiscal year 2016.
Public Safety Tax: The source of this funding is a special two-tenths of one percent of the privilege
license tax approved by voters in 1994 and renewed in 2010 for public safety and criminal justice
facilities and equipment. Public safety tax funds are utilized to pay debt incurred for the construction of
the Police Station and various public safety projects.
Sewer Utility: Sewer Utility funds are not supported by tax. Revenues are generated through a series of
rate and capacity charges. Capacity charges are paid when construction permits are issued. Sewer Utility
Fund revenues are primarily utilized to support operations related to sewer activities, debt payment related
to the MPC2007 Utility Series bond, and a small portion is dedicated to capital projects.
Two Percent: The transaction privilege tax began in 1971 and has been renewed twice, most recently in
2009. This transaction privilege tax applies to a small tax base which includes bars, hotels, and
restaurants. Funding is restricted to recreational complexes, golf courses, parks, and the Yuma Crossing
National Heritage Area.
Water Utility: Water Utility funds are not supported by tax. Revenues are generated through water sales
and capacity charges. Capacity charges are paid when construction permits are issued. The Water Utility
Fund revenues are primarily utilized to support operations related to water activities, debt payment related
to the MPC2007 Utility Series bond, and a small portion for capital projects.
Challenges
One of the City’s major challenges is providing ongoing maintenance to infrastructure. Maintenance such
as resurfacing streets, repair and replacing leaky roofs, is vital to the preservation of assets. A major area
of concern is streets and basin maintenance. The City continues to fall behind replacing asphalt as the
State continues to divert Highway User Revenue Funds (HURF). At this time streets continue to
deteriorate and the cost of repairs will exponentially increase as a result of peripheral damage. The City
has reached the point where alternative revenues will be explored, such as increasing requests of State and
Federal Funds.
The City of Yuma strives to provide the best level of service to its residence. Every day when citizens
turn on a faucet, take out their trash, or drive down the street, it is testament to the hard work and
dedication of our organization. Infrastructure is the foundation upon which the City delivers services.
Addressing deteriorating, aging, and additional infrastructure needs is of utmost importance and is at the
forefront of the Capital Improvement Program.
Capital Improvement Progam
City of Yuma, Arizona
DEPARTMENT SUMMARY
Total2016 2017 2018 2019 2020Department
General Government 4,040,0004,040,000
Parks and Recreation 15,530,0003,330,000 12,200,000
Public Safety 3,200,000200,000 1,000,000 2,000,000
Stormwater Control 1,165,000500,000 665,000
Transportation 36,328,50011,596,000 12,815,000 4,550,500 3,262,000 4,105,000
Wastewater Utility 12,034,0005,359,000 1,400,000 1,325,000 1,000,000 2,950,000
Water Utility 18,620,0005,740,000 2,635,000 2,795,000 3,650,000 3,800,000
YCNHA 10,042,0002,085,000 1,157,000 6,800,000
32,850,00032,850,00032,850,00032,850,000 30,872,00030,872,00030,872,00030,872,000 15,470,50015,470,50015,470,50015,470,500 8,912,0008,912,0008,912,0008,912,000 12,855,00012,855,00012,855,00012,855,000 100,959,500100,959,500100,959,500100,959,500TOTAL
Page 12016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam
City of Yuma, Arizona
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Total2016 2017 2018 2019 2020Department
General Government
90,00090,000Citywide Development Fee Update
Development Fee 90,000 90,000
3,500,0003,500,000Citywide Energy Savings Project
Other - Proposed 3,500,000 3,500,000
50,00050,000Financial Administration Software
Bond - General 50,000 50,000
400,000400,000Joint Land Use Study
Other - Proposed 400,000 400,000
4,040,0004,040,000General Government Total
Parks and Recreation
130,000130,000Civic Center Sunset Terrace Expansion
Development Fee - Arts & Culture 130,000 130,000
14,200,0002,000,000 12,200,000Pacific Avenue Athletic Complex
Bond - 2015 Issue 2,000,000 11,000,000 13,000,000
Development Fee - Parks 1,200,000 1,200,000
1,200,0001,200,000Stewart Vincent Wolfe Creative Playground
Other - Proposed 1,200,000 1,200,000
15,530,0003,330,000 12,200,000Parks and Recreation Total
Public Safety
150,000150,000Police Station Cooling Towers and Chillers
Bond - General 150,000 150,000
50,00050,000Police Station Parking Garage Repairs
Bond - General 50,000 50,000
1,000,0001,000,000Fire Station 4 Remodel
Public Safety Tax Fund 1,000,000 1,000,000
2,000,0002,000,000Police Storage Facility
Public Safety Tax Fund 2,000,000 2,000,000
3,200,000200,000 1,000,000 2,000,000Public Safety Total
Stormwater Control
1,000,000500,000 500,000Smucker Regional Storm Drain Basin
City Road Tax 500,000 500,000 1,000,000
165,000165,000Arena Drive Storm Drain
Other - Proposed 165,000 165,000
1,165,000500,000 665,000Stormwater Control Total
Transportation
7,600,0003,800,000 3,800,00016th Street & 4th Avenue Intersection Improvements
Bond - Transportation 2,400,000 2,400,000
Bond - Water 970,000 970,000
Page 22016-2020 Capital Improvement Program Effective July 1, 2015
Total2016 2017 2018 2019 2020Department
City Road Tax 1,500,000 1,500,000
Development Fee - Transportation 330,000 2,300,000 2,630,000
Wastewater Utility Fund 100,000 100,000
97,00097,0001st Avenue - 24th to 26th Street Paving
City Road Tax 97,000 97,000
788,000788,00022nd Street - Avenue A to 4th Avenue Paving
Bond - Water 340,000 340,000
City Road Tax 448,000 448,000
2,540,0002,540,00024th Street - Avenue B to C Improvements
City Road Tax 800,000 800,000
ProRata Fund 1,740,000 1,740,000
178,000178,0004th Avenue and Big Curve Turn Lane
City Road Tax 145,300 145,300
Development Fee - Transportation 32,700 32,700
82,00082,0004th Avenue Extension Pedestrian Pathway
City Road Tax 82,000 82,000
50,00050,00056th Street Pavement Overlay
City Road Tax 50,000 50,000
237,000237,000Airport Loop Road Improvements
City Road Tax 237,000 237,000
315,000315,000Arizona Ave - Palo Verde to Country Club Dr Paving
City Road Tax 315,000 315,000
265,00065,000 200,000Avenue 3E and 16th Street Improvements
Bond - Transportation 65,000 200,000 265,000
75,00075,000Avenue 9E Railroad Crossing Quiet Zone
City Road Tax 75,000 75,000
325,000325,000Catalina Drive - 32nd Street to 4th Avenue Paving
City Road Tax 325,000 325,000
700,000140,000 140,000 140,000 140,000 140,000Citywide Safety Improvements
City Road Tax 140,000 140,000 140,000 140,000 140,000 700,000
9,950,0001,800,000 8,150,000Fleet Services Maintenance Shop
Bond - 2015 Issue 1,350,000 8,150,000 9,500,000
Development Fee - Public Works 70,000 70,000
Development Fee - Solid Waste 380,000 380,000
309,000309,000Palo Verde St - Catalina Dr to Arizona Ave Paving
City Road Tax 309,000 309,000
795,000795,000West Main Canal Multi-Use Path
City Road Tax 114,500 114,500
Grant 680,500 680,500
213,500213,50014th Street - 4th to 1st Avenue Paving
City Road Tax 213,500 213,500
205,000110,500 94,500Avenue 10E Improvements
City Road Tax 94,500 94,500
Development Fee - Transportation 40,500 40,500
Water Utility Fund 70,000 70,000
201,000201,000Gila Street - 1st to 3rd Street Paving
City Road Tax 201,000 201,000
120,000120,00016th Street Turn Lane - Maple to 1st Avenue
City Road Tax 120,000 120,000
1,420,0001,420,0001st Avenue - 12th to 16th Street Paving
City Road Tax 320,000 320,000
Wastewater Utility Fund 500,000 500,000
Water Utility Fund 600,000 600,000
Page 32016-2020 Capital Improvement Program Effective July 1, 2015
Total2016 2017 2018 2019 2020Department
490,000490,0001st Avenue - Orange Avenue to 9th Street Paving
City Road Tax 490,000 490,000
1,580,0001,580,00028th Street - Avenue B to Avenue C Improvements
City Road Tax 202,000 202,000
Development Fee - Transportation 1,378,000 1,378,000
706,000706,0003rd Avenue - Orange Avenue to 14th Street Paving
City Road Tax 706,000 706,000
60,00060,00016th Street and Arizona Avenue Improvements
City Road Tax 60,000 60,000
351,000351,00016th Street and Pacific Avenue Turn Lane
City Road Tax 351,000 351,000
371,700371,70018th Street and Avenue C Traffic Signal
City Road Tax 195,040 195,040
Development Fee - Transportation 51,660 51,660
Other - Proposed 125,000 125,000
728,000728,00024th Street and 1st Avenue Turn Lane
City Road Tax 532,961 532,961
Development Fee - Transportation 195,039 195,039
400,300400,30032nd Street and Avenue 5E Turn Lanes
City Road Tax 331,459 331,459
Development Fee - Transportation 68,841 68,841
351,000351,0004th Avenue and 8th Street Turn Lane
City Road Tax 259,208 259,208
Development Fee - Transportation 91,792 91,792
860,000860,000Avenue B and 16th Street Turn Lane
City Road Tax 618,320 618,320
Development Fee - Transportation 241,680 241,680
1,520,0001,520,0001st to Colorado Street-Avenue A to 23rd Ave Paving
City Road Tax 1,520,000 1,520,000
315,000315,00024th Street and Pacific Avenue Turn Lane
City Road Tax 315,000 315,000
1,200,0001,200,00028th Street - 45th Avenue to Avenue C
City Road Tax 528,000 528,000
Development Fee - Transportation 672,000 672,000
930,000930,00032nd Street and Pacific Avenue Improvements
City Road Tax 838,208 838,208
Development Fee - Transportation 91,792 91,792
36,328,50011,596,000 12,815,000 4,550,500 3,262,000 4,105,000Transportation Total
Wastewater Utility
320,000320,00010th Avenue and Avenue A Alley Sanitary Sewer
Wastewater Utility Fund 320,000 320,000
730,000730,00024th Street Lift Station Replacement
Wastewater Utility Fund 730,000 730,000
24,00024,0004th Street & Avenue A Sewer Line Replacement
Wastewater Utility Fund 24,000 24,000
250,000250,0005th Street Sanitary Sewer Replacement
Wastewater Utility Fund 250,000 250,000
460,000460,000Desert Dunes Improvement Project
Wastewater Utility Fund 460,000 460,000
175,000175,000Downtown Sewer Line Replacement
City Road Tax 115,000 115,000
Wastewater Utility Fund 60,000 60,000
Page 42016-2020 Capital Improvement Program Effective July 1, 2015
Total2016 2017 2018 2019 2020Department
1,800,0001,800,000Figueroa WPCF Bar Screen Replacement
Bond - Wastewater 1,040,000 1,040,000
Wastewater Utility Fund 760,000 760,000
500,000500,000Figueroa WPCF Biosolids Dewatering Process
Wastewater Utility Fund 500,000 500,000
50,00050,000Figueroa WPCF Capacity Study
Wastewater Utility Fund 50,000 50,000
500,000500,000Figueroa WPCF On-Site Manhole Replacement
Wastewater Utility Fund 500,000 500,000
50,00050,000Interceptor Sewer Flow Monitoring Upgrade
Wastewater Utility Fund 50,000 50,000
500,000100,000 100,000 100,000 100,000 100,000Manhole Rehabilitation/Reconstruction
Wastewater Utility Fund 100,000 100,000 100,000 100,000 100,000 500,000
500,000100,000 100,000 100,000 100,000 100,000Sewer Line Replacements/Improvements
Wastewater Utility Fund 100,000 100,000 100,000 100,000 100,000 500,000
1,500,000300,000 300,000 300,000 300,000 300,000Wastewater Collection System Lift Station Upgrade
Wastewater Utility Fund 300,000 300,000 300,000 300,000 300,000 1,500,000
1,025,000700,000 325,00032nd Street Manhole Rehabilitation
Wastewater Utility Fund 700,000 325,000 1,025,000
200,000200,000Figueroa WPCF AZPDES Renewal
Wastewater Utility Fund 200,000 200,000
1,000,000500,000 500,000Wastewater Vac Truck Dump Station Upgrades
Wastewater Utility Fund 500,000 500,000 1,000,000
1,200,0001,200,000Desert Dunes WRF Reclaimed Water System
Other - Proposed 1,020,000 1,020,000
Wastewater Utility Fund 180,000 180,000
1,250,0001,250,000Ferrous Chloride Injection System Upgrade
Wastewater Utility Fund 1,250,000 1,250,000
12,034,0005,359,000 1,400,000 1,325,000 1,000,000 2,950,000Wastewater Utility Total
Water Utility
685,000685,00016th Street Tanks and Pump Station Improvements
Bond - Water 685,000 685,000
300,000300,000Madison Avenue - 2nd to 3rd Street Waterline
Bond - Wastewater 60,000 60,000
Bond - Water 30,000 30,000
City Road Tax 210,000 210,000
3,350,0001,850,000 1,500,000Main Street WTP Filter System Upgrade
Water Utility Fund 1,850,000 1,500,000 3,350,000
215,00030,000 35,000 45,000 50,000 55,000New Water Services
Water Utility Fund 30,000 35,000 45,000 50,000 55,000 215,000
760,000760,000Pecan Grove Neighborhood Waterline Replacement
Bond - Water 760,000 760,000
7,865,0001,865,000 1,500,000 1,500,000 1,500,000 1,500,000Water Main Replacement Annual Project
Bond - Water 1,500,000 1,500,000 3,000,000
City Road Tax 365,000 365,000
Water Utility Fund 1,500,000 1,500,000 1,500,000 4,500,000
1,250,000250,000 250,000 250,000 250,000 250,000Waterline Replacement/Improvements
Bond - Water 250,000 250,000
Water Utility Fund 250,000 250,000 250,000 250,000 1,000,000
1,070,00070,000 1,000,000Agua Viva Well No. 1 Replacement
Other - Proposed 1,000,000 1,000,000
Water Utility Fund 70,000 70,000
Page 52016-2020 Capital Improvement Program Effective July 1, 2015
Total2016 2017 2018 2019 2020Department
780,000780,000Main Street WTP Chlorine System Modification
Water Utility Fund 780,000 780,000
700,000350,000 350,000Chlorine Booster Pump Stations
Water Utility Fund 350,000 350,000 700,000
250,000250,000Avenue 4E and 36th Street Water Main Intersection
Water Utility Fund 250,000 250,000
400,000400,000Avenue C - 16th to 18th Street Waterline
Water Utility Fund 400,000 400,000
250,000250,000Strategic Groundwater Wells and Filtration System
Water Utility Fund 250,000 250,000
745,000745,000TTHM Air Stripping Tank System
Water Utility Fund 745,000 745,000
18,620,0005,740,000 2,635,000 2,795,000 3,650,000 3,800,000Water Utility Total
YCNHA
125,000125,000Downtown Revitalization
Bond - General 50,000 50,000
Grant 75,000 75,000
669,000669,000Fourth Avenue Gateway
Bond - General 37,000 37,000
Grant 632,000 632,000
85,00085,000West Wetlands Lower Bench Completion
Bond - General 85,000 85,000
9,163,0001,206,000 1,157,000 6,800,000Yuma Multimodal Center
Grant 964,800 925,488 1,890,288
Other - Proposed 6,800,000 6,800,000
Two Percent Tax 241,200 231,512 472,712
10,042,0002,085,000 1,157,000 6,800,000YCNHA Total
GRAND TOTAL 100,959,50032,850,000 30,872,000 15,470,500 8,912,000 12,855,000
Page 62016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam
City of Yuma, Arizona
PROJECTS BY FUNDING SOURCE
TotalSource 2016 2017 2018 2019 2020
Bond - 2015 Issue
9,500,0001,350,000 8,150,000Fleet Services Maintenance Shop
13,000,0002,000,000 11,000,000Pacific Avenue Athletic Complex
22,500,0003,350,000 19,150,000Bond - 2015 Issue Total
Bond - General
50,00050,000Downtown Revitalization
50,00050,000Financial Administration Software
37,00037,000Fourth Avenue Gateway
150,000150,000Police Station Cooling Towers and Chillers
50,00050,000Police Station Parking Garage Repairs
85,00085,000West Wetlands Lower Bench Completion
422,000422,000Bond - General Total
Bond - Transportation
2,400,0002,400,00016th Street & 4th Avenue Intersection Improvements
265,00065,000 200,000Avenue 3E and 16th Street Improvements
2,665,0002,465,000 200,000Bond - Transportation Total
Bond - Wastewater
1,040,0001,040,000Figueroa WPCF Bar Screen Replacement
60,00060,000Madison Avenue - 2nd to 3rd Street Waterline
1,100,0001,100,000Bond - Wastewater Total
Bond - Water
970,000970,00016th Street & 4th Avenue Intersection Improvements
685,000685,00016th Street Tanks and Pump Station Improvements
340,000340,00022nd Street - Avenue A to 4th Avenue Paving
30,00030,000Madison Avenue - 2nd to 3rd Street Waterline
760,000760,000Pecan Grove Neighborhood Waterline Replacement
3,000,0001,500,000 1,500,000Water Main Replacement Annual Project
250,000250,000Waterline Replacement/Improvements
6,035,0004,535,000 1,500,000Bond - Water Total
City Road Tax
97,00097,0001st Avenue - 24th to 26th Street Paving
448,000448,00022nd Street - Avenue A to 4th Avenue Paving
800,000800,00024th Street - Avenue B to C Improvements
145,300145,3004th Avenue and Big Curve Turn Lane
82,00082,0004th Avenue Extension Pedestrian Pathway
Page 72016-2020 Capital Improvement Program Effective July 1, 2015
TotalSource 2016 2017 2018 2019 2020
50,00050,00056th Street Pavement Overlay
237,000237,000Airport Loop Road Improvements
315,000315,000Arizona Ave - Palo Verde to Country Club Dr Paving
75,00075,000Avenue 9E Railroad Crossing Quiet Zone
325,000325,000Catalina Drive - 32nd Street to 4th Avenue Paving
700,000140,000 140,000 140,000 140,000 140,000Citywide Safety Improvements
115,000115,000Downtown Sewer Line Replacement
210,000210,000Madison Avenue - 2nd to 3rd Street Waterline
309,000309,000Palo Verde St - Catalina Dr to Arizona Ave Paving
1,000,000500,000 500,000Smucker Regional Storm Drain Basin
365,000365,000Water Main Replacement Annual Project
114,500114,500West Main Canal Multi-Use Path
213,500213,50014th Street - 4th to 1st Avenue Paving
1,500,0001,500,00016th Street & 4th Avenue Intersection Improvements
201,000201,000Gila Street - 1st to 3rd Street Paving
120,000120,00016th Street Turn Lane - Maple to 1st Avenue
320,000320,0001st Avenue - 12th to 16th Street Paving
490,000490,0001st Avenue - Orange Avenue to 9th Street Paving
202,000202,00028th Street - Avenue B to Avenue C Improvements
706,000706,0003rd Avenue - Orange Avenue to 14th Street Paving
94,50094,500Avenue 10E Improvements
60,00060,00016th Street and Arizona Avenue Improvements
351,000351,00016th Street and Pacific Avenue Turn Lane
195,040195,04018th Street and Avenue C Traffic Signal
532,961532,96124th Street and 1st Avenue Turn Lane
331,459331,45932nd Street and Avenue 5E Turn Lanes
259,208259,2084th Avenue and 8th Street Turn Lane
618,320618,320Avenue B and 16th Street Turn Lane
1,520,0001,520,0001st to Colorado Street-Avenue A to 23rd Ave Paving
315,000315,00024th Street and Pacific Avenue Turn Lane
528,000528,00028th Street - 45th Avenue to Avenue C
838,208838,20832nd Street and Pacific Avenue Improvements
14,783,9964,327,800 2,554,500 2,072,500 2,487,988 3,341,208City Road Tax Total
Development Fee
90,00090,000Citywide Development Fee Update
90,00090,000Development Fee Total
Development Fee - Arts & Culture
130,000130,000Civic Center Sunset Terrace Expansion
130,000130,000Development Fee - Arts & Culture Total
Development Fee - Parks
1,200,0001,200,000Pacific Avenue Athletic Complex
1,200,0001,200,000Development Fee - Parks Total
Development Fee - Public Works
70,00070,000Fleet Services Maintenance Shop
Page 82016-2020 Capital Improvement Program Effective July 1, 2015
TotalSource 2016 2017 2018 2019 2020
70,00070,000Development Fee - Public Works Total
Development Fee - Solid Waste
380,000380,000Fleet Services Maintenance Shop
380,000380,000Development Fee - Solid Waste Total
Development Fee - Transportation
2,630,000330,000 2,300,00016th Street & 4th Avenue Intersection Improvements
32,70032,7004th Avenue and Big Curve Turn Lane
40,50040,500Avenue 10E Improvements
1,378,0001,378,00028th Street - Avenue B to Avenue C Improvements
51,66051,66018th Street and Avenue C Traffic Signal
195,039195,03924th Street and 1st Avenue Turn Lane
68,84168,84132nd Street and Avenue 5E Turn Lanes
91,79291,7924th Avenue and 8th Street Turn Lane
241,680241,680Avenue B and 16th Street Turn Lane
672,000672,00028th Street - 45th Avenue to Avenue C
91,79291,79232nd Street and Pacific Avenue Improvements
5,494,004362,700 2,340,500 1,378,000 649,012 763,792Development Fee - Transportation Total
Grant
75,00075,000Downtown Revitalization
632,000632,000Fourth Avenue Gateway
680,500680,500West Main Canal Multi-Use Path
1,890,288964,800 925,488Yuma Multimodal Center
3,277,7882,352,300 925,488Grant Total
Other - Proposed
3,500,0003,500,000Citywide Energy Savings Project
400,000400,000Joint Land Use Study
1,200,0001,200,000Stewart Vincent Wolfe Creative Playground
165,000165,000Arena Drive Storm Drain
1,000,0001,000,000Agua Viva Well No. 1 Replacement
6,800,0006,800,000Yuma Multimodal Center
125,000125,00018th Street and Avenue C Traffic Signal
1,020,0001,020,000Desert Dunes WRF Reclaimed Water System
14,210,0005,100,000 165,000 7,800,000 125,000 1,020,000Other - Proposed Total
ProRata Fund
1,740,0001,740,00024th Street - Avenue B to C Improvements
1,740,0001,740,000ProRata Fund Total
Public Safety Tax Fund
1,000,0001,000,000Fire Station 4 Remodel
2,000,0002,000,000Police Storage Facility
Page 92016-2020 Capital Improvement Program Effective July 1, 2015
TotalSource 2016 2017 2018 2019 2020
3,000,0001,000,000 2,000,000Public Safety Tax Fund Total
Two Percent Tax
472,712241,200 231,512Yuma Multimodal Center
472,712241,200 231,512Two Percent Tax Total
Wastewater Utility Fund
320,000320,00010th Avenue and Avenue A Alley Sanitary Sewer
100,000100,00016th Street & 4th Avenue Intersection Improvements
730,000730,00024th Street Lift Station Replacement
24,00024,0004th Street & Avenue A Sewer Line Replacement
250,000250,0005th Street Sanitary Sewer Replacement
460,000460,000Desert Dunes Improvement Project
60,00060,000Downtown Sewer Line Replacement
760,000760,000Figueroa WPCF Bar Screen Replacement
500,000500,000Figueroa WPCF Biosolids Dewatering Process
50,00050,000Figueroa WPCF Capacity Study
500,000500,000Figueroa WPCF On-Site Manhole Replacement
50,00050,000Interceptor Sewer Flow Monitoring Upgrade
500,000100,000 100,000 100,000 100,000 100,000Manhole Rehabilitation/Reconstruction
500,000100,000 100,000 100,000 100,000 100,000Sewer Line Replacements/Improvements
1,500,000300,000 300,000 300,000 300,000 300,000Wastewater Collection System Lift Station Upgrade
1,025,000700,000 325,00032nd Street Manhole Rehabilitation
200,000200,000Figueroa WPCF AZPDES Renewal
500,000500,0001st Avenue - 12th to 16th Street Paving
1,000,000500,000 500,000Wastewater Vac Truck Dump Station Upgrades
180,000180,000Desert Dunes WRF Reclaimed Water System
1,250,0001,250,000Ferrous Chloride Injection System Upgrade
10,459,0004,304,000 1,400,000 1,825,000 1,000,000 1,930,000Wastewater Utility Fund Total
Water Utility Fund
3,350,0001,850,000 1,500,000Main Street WTP Filter System Upgrade
215,00030,000 35,000 45,000 50,000 55,000New Water Services
70,00070,000Agua Viva Well No. 1 Replacement
70,00070,000Avenue 10E Improvements
780,000780,000Main Street WTP Chlorine System Modification
1,000,000250,000 250,000 250,000 250,000Waterline Replacement/Improvements
600,000600,0001st Avenue - 12th to 16th Street Paving
4,500,0001,500,000 1,500,000 1,500,000Water Main Replacement Annual Project
700,000350,000 350,000Chlorine Booster Pump Stations
250,000250,000Avenue 4E and 36th Street Water Main Intersection
400,000400,000Avenue C - 16th to 18th Street Waterline
250,000250,000Strategic Groundwater Wells and Filtration System
745,000745,000TTHM Air Stripping Tank System
12,930,0001,880,000 1,205,000 2,395,000 3,650,000 3,800,000Water Utility Fund Total
100,959,50032,850,000 30,872,000 15,470,500 8,912,000 12,855,000GRAND TOTAL
Page 102016-2020 Capital Improvement Program Effective July 1, 2015
Projects Year Department Page
2016 General Government 13
2016 General Government 14
2016 General Government 16
2016 General Government 15
2016 Parks and Recreation 17
2016 Parks and Recreation 18
2016 Parks and Recreation 19
2016 Public Safety 20
2016 Public Safety 21
2019 Public Safety 22
2019 Public Safety 23
2016 Stormwater Control 24
2017 Stormwater Control 25
2016 Transportation 26
2016 Transportation 27
2016 Transportation 28
2016 Transportation 29
2016 Transportation 30
2016 Transportation 31
2016 Transportation 32
2016 Transportation 33
2016 Transportation 34
2016 Transportation 35
2016 Transportation 36
2016 Transportation 37
2016 Transportation 38
2016 Transportation 39
2016 Transportation 40
2016 Transportation 41
2017 Transportation 42
2017 Transportation 43
2017 Transportation 44
2018 Transportation 45
2018 Transportation 46
2018 Transportation 47
2018 Transportation 48
2018 Transportation 49
2019 Transportation 50
2019 Transportation 51
2019 Transportation 52
2019 Transportation 53
2019 Transportation 54
2019 Transportation 55
2019 Transportation 56
Citywide Development Fee Update
Citywide Energy Savings Project
Financial Administration Software
Joint Land Use Study
Civic Center Sunset Terrace Expansion
Pacific Avenue Athletic Complex
Stewart Vincent Wolfe Creative Playground
Police Station Cooling Towers and Chillers
Police Station Parking Garage Repairs
Fire Station 4 Remodel
Police Storage Facility
Smucker Regional Storm Drain Basin
Arena Drive Storm Drain
16th Street and 4th Avenue Intersection Improvements
1st Avenue - 24th to 26th Street Paving
22nd Street - Avenue A to 4th Avenue Paving
24th Street - Avenue B to C Improvements
4th Avenue and Big Curve Turn Lane
4th Avenue Extension Pedestrian Pathway
56th Street Pavement Overlay
Airport Loop Road Improvements
Arizona Ave - Palo Verde to Country Club Dr Paving Avenue 3E and 16th Street Improvements
Avenue 9E Railroad Crossing Quiet Zone
Catalina Drive - 32nd Street to 4th Avenue Paving
Citywide Safety Improvements
Fleet Services Maintenance Shop
Palo Verde Street - Catalina Drive to Arizona Avenue Paving West Main Canal Multi-use Path
14th Street - 4th to 1st Avenue Paving
Avenue 10E Improvements
Gila Street - 1st to 3rd Street Paving
16th Street Turn Lane - Maple to 1st Avenue
1st Avenue - 12th Street to 16th Street Paving
1st Avenue - Orange Avenue to 9th Street Paving
28th Street - Avenue B to Avenue C Improvements
3rd Avenue - Orange Avenue to 14th Street Paving
16th Street and Arizona Avenue Improvements
16th Street and Pacific Avenue Turn Lane
18th Street and Avenue C Traffic Signal
24th Street and 1st Avenue Turn Lane
32nd Street and Avenue 5E Turn Lanes
4th Avenue and 8th Street Turn Lane
Avenue B and 16th Street Turn Lane
1st to Colorado Street-Avenue A to 23rd Ave Paving 2020 Transportation 57
Capital Improvement ProgramCity of Yuma, Arizona
PROJECT INDEX
Page 112016-2020 Capital Improvement Program Effective July 1, 2015
Projects Year Department Page
2020 Transportation 58
2020 Transportation 59
2020 Transportation 60
2016 Wastewater Utility 61
2016 Wastewater Utility 62
2016 Wastewater Utility 63
2016 Wastewater Utility 64
2016 Wastewater Utility 65
2016 Wastewater Utility 66
2016 Wastewater Utility 67
2016 Wastewater Utility 68
2016 Wastewater Utility 69
2016 Wastewater Utility 70
2016 Wastewater Utility 71
2016 Wastewater Utility 72
2016 Wastewater Utility 73
2016 Wastewater Utility 74
2017 Wastewater Utility 75
2017 Wastewater Utility 76
2018 Wastewater Utility 77
2020 Wastewater Utility 78
2020 Wastewater Utility 79
2016 Water Utility 80
2016 Water Utility 81
2016 Water Utility 82
2016 Water Utility 83
2016 Water Utility 84
2016 Water Utility 85
2016 Water Utility 86
2017 Water Utility 87
2017 Water Utility 88
2019 Water Utility 89
2020 Water Utility 90
2020 Water Utility 91
2020 Water Utility 92
2020 Water Utility 93
2016 Yuma Crossing National Heritage Area 94
2016 Yuma Crossing National Heritage Area 95
2016 Yuma Crossing National Heritage Area 96
24th Street and Pacific Avenue Turn Lane
28th Street - 45th Avenue to Avenue C
32nd Street and Pacific Avenue Improvements
10th Avenue and Avenue A Alley Sanitary Sewer
24th Street Lift Station Replacement
4th Street & Avenue A Sewer Line Replacement
5th Street Sanitary Sewer Replacement
Desert Dunes Improvement Project
Downtown Sewer Line Replacement
Figueroa WPCF Bar Screen Replacement
Figueroa WPCF Biosolids Dewatering Process
Figueroa WPCF Capacity Study
Figueroa WPCF On-Site Manhole Replacement
Interceptor Sewer Flow Monitoring Upgrade
Manhole Rehabilitation/Reconstruction
Sewer Line Replacement/Improvement
Wastewater Collection System Lift Station Upgrade
32nd Street Manhole Rehabilitation
Figueroa WPCF AZPDES Renewal
Wastewater Vac Truck Dump Station Upgrades
Desert Dunes WRF Reclaimed Water System
Ferrous Chloride Injection System Upgrade
16th Street Tanks and Pump Station Improvements
Madison Avenue - 2nd to 3rd Street Waterline
Main Street WTP Filter System Upgrade
New Water Services
Pecan Grove Neighborhood Waterline Replacement
Water Main Replacement Annual Project
Waterline Replacement/Improvements
Agua Viva Well No. 1 Replacement
Main Street WTP Chlorine System Modification
Chlorine Booster Pump Stations
Avenue 4E and 36th Street Water Main Intersection
Avenue C - 16th to 18th Street Waterline Strategic Groundwater Wells and Filtration System
TTHM Air Stripping Tank System
Downtown Revitalization
Fourth Avenue Gateway
West Wetlands Lower Bench Completion
Yuma Multimodal Center 2016 Yuma Crossing National Heritage Area 97
Page 122016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam General Government
Citywide Development Fee Update
Description
Update the City’s Land Use Assumptions document to reflect projections of change in land uses, intensities in population for a specified services area over a period of at least ten years and pursuant to the General Plan. Update the Infrastructure Improvements Plan and Development Fees for the North Service Area for several categories of necessary public services pursuant to Arizona Revised Statues 9-463.05.
Justification
Municipalities in Arizona assess development fees to offset infrastructure costs associated with providing necessary public services. Municipalities shall update the Land Use Assumptions and Infrastructure Improvements Plan at least every five years. The Land Use
Assumptions and Infrastructure Improvements Plan were last updated in January 2012.
Category Citywide Assessment
Type Assessment
Total Cost $90,000
Progress Planning
Department General GovernmentRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
90,00090,000Planning
90,000 90,000Total
Total2016 2017 2018 2019 2020Funding Sources
90,00090,000Development Fee
90,000 90,000Total
Page 132016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam General Government
Citywide Energy Savings Project
Description
Replace and/or upgrade Building Automation Systems with Energy Management Systems (EMS), mechanical components of Heating Ventilation and Air Conditioning, and lighting systems at several locations citywide.
Justification
City staff is constantly working to find ways to cut operating costs and increase efficiency. In January 2015 the City entered into a 15 year Energy Efficiency Program which will yield savings of $6,255,000 over the life of the project. This program includes energy retrofit installation
and measurement and verification services throughout 20 City-owned facilities. Facilities include City Hall, Police Department, Municipal Court, (4) Fire Stations, Public Works Administration Building, The Art Center, Civic Center, several parks and traffic intersections, etc. It is proposed this project be funded by eight different funding sources.
Category Facilities
Type Improvement
Total Cost $3,500,000
Progress Implementing
Department AdministrationRelated Projects
Location Various City Facilities
Active
Total2016 2017 2018 2019 2020Expenditures
3,500,0003,500,000Installation
3,500,000 3,500,000Total
Total2016 2017 2018 2019 2020Funding Sources
3,500,0003,500,000Other - Proposed
3,500,000 3,500,000Total
Page 142016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam General Government
Financial Administration Software
Description
Costs include the application software, implementation, project management services and data file conversions.
Justification
Financial Administration Software was purchased in fiscal year 2010 and has been implemented. The City will add a Special Assessment Module to this software in order to manage the financial aspects of Improvement Districts.
Category Other
Type Equipment
Total Cost $50,000
Progress Planning
Department FinanceRelated Projects Software Syst
Location City Hall
Active
Total2016 2017 2018 2019 2020Expenditures
50,00050,000Software/Hardware
50,000 50,000Total
Total2016 2017 2018 2019 2020Funding Sources
50,00050,000Bond - General
50,000 50,000Total
Page 152016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam General Government
Joint Land Use Study
Description
Apply for and complete a JLUS.
Justification
The Department of Defense Office of Economic Adjustment (OEA) administers community planning assistance through a Joint Land Use Study (JLUS) program. The purpose of JLUS is to promote compatible civilian development patterns near military installations by applying the local
planning process to update comprehensive general plans and support land use regulations. The JLUS program is a basic planning process designed to identify encroachment issues confronting both civilian communities and the military installation and recommend strategies to address the issues. The City will apply for Federal and State funding to complete the JLUS, funding has not been awarded.
Category Improvement
Type Assessment
Total Cost $400,000
Progress Planning
Department AdministrationRelated Projects
Location Marine Corps Air Station Surrounding Areas
Active
Total2016 2017 2018 2019 2020Expenditures
400,000400,000Planning/Design
400,000 400,000Total
Total2016 2017 2018 2019 2020Funding Sources
400,000400,000Other - Proposed
400,000 400,000Total
Page 162016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Parks and Recreation
Civic Center Sunset Terrace Expansion
Description
Expand Sunset Terrace to include gazebo, lighting and shade structure.
Justification
The Terrace behind the Civic Center is a wide open area with no shade, which limits its use at certain times of the year. Expanding the area with the gazebo and shade structure will enhance the existing site; providing opportunities for increased customer service.
Category Structural
Type Construction
Total Cost $130,000
Progress Planning
Department Parks and RecreationRelated Projects
Location 1440 W Desert Hills Dr
Active
Total2016 2017 2018 2019 2020Expenditures
130,000130,000Construction
130,000 130,000Total
Total2016 2017 2018 2019 2020Funding Sources
130,000130,000Development Fee - Arts & Culture
130,000 130,000Total
Page 172016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Parks and Recreation
Pacific Avenue Athletic Complex
Description
The Park will include lit ball fields, batting cages, concessions, restrooms, parking. As funding becomes available the construction of passive green spaces such as playgrounds, picnic areas, open space, ramadas, and connection to existing pathways. The facility service area is approximately 49 acres.
Phase I - Land Acquisition (2014)
Phase II - Planning and design (2015-2016)Phase III - Construction Phase I (2016)Phase IV - Construction Phase II - TBD
Justification
The facility will enhance Yuma's historic downtown area, retail and hospitality by bringing new visitors and additional spending to the community. The City’s competitive leagues are growing and as a result local demand and tournament play will utilize the complex year round.
This project also represents an opportunity for Private-Public partnerships.
Category Park
Type Construction
Total Cost $14,200,000
Progress Under Design
Department Parks and RecreationRelated Projects
Location Pacific Avenue and 8th Street
Active
Total2016 2017 2018 2019 2020Expenditures
1,500,0001,500,000Planning/Design
11,200,000500,000 10,700,000Construction
1,500,0001,500,000Inspection
2,000,000 12,200,000 14,200,000Total
Total2016 2017 2018 2019 2020Funding Sources
13,000,0002,000,000 11,000,000Bond - 2015 Issue
1,200,0001,200,000Development Fee - Parks
2,000,000 12,200,000 14,200,000Total
TotalOperational Effect 2016 2017 2018 2019 2020
250,000250,000Capital Outlay
410,750116,250 139,500 155,000Other (Insurance, Utilities)
1,046,083267,371 341,339 437,373Staff Cost
305,00075,000 100,000 130,000Supplies/Materials
708,621 580,839 722,373 2,011,833Total
Page 182016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Parks and Recreation
Stewart Vincent Wolfe Creative Playground
Description
Rebuild the Stewart Vincent Wolfe Creative Playground.
Justification
The Stewart Vincent Wolfe Creative Playground was built by more than 50 volunteers, over $400,000 in community contributions, and hundreds of dollars in in-kind goods and service. Over 5,000 school children participated in the design, it included custom designed art features,
musical elements and bursts of color. On December 28, 2014 the Playground was burnt down. The City’s Insurance Company will cover the cost to rebuild the Playground. Donations received from community contributions will be spent towards making the Playground bigger, better and safer.
Category Park
Type Construction
Total Cost $1,200,000
Progress Planning
Department Parks and RecreationRelated Projects
Location W Water St, Yuma, AZ 85364
Active
Total2016 2017 2018 2019 2020Expenditures
1,200,0001,200,000Construction
1,200,000 1,200,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,200,0001,200,000Other - Proposed
1,200,000 1,200,000Total
Page 192016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Public Safety
Police Station Cooling Towers and Chillers
Description
Repair and/or replace sheet metal, fix leaking duct, install duct, and adding damper supply and return. Repair variable air volume boxes and digital data connectors at 18 locations throughout the system.
Justification
The HVAC System has been replaced however in order for the system to run efficiently additional system components must be replaced and/or repaired.
Category Building Enhancement
Type Equipment
Total Cost $150,000
Progress Implementing
Department Yuma Police DepartmentRelated Projects
Location Police Department
Active
Total2016 2017 2018 2019 2020Expenditures
150,000150,000Installation
150,000 150,000Total
Total2016 2017 2018 2019 2020Funding Sources
150,000150,000Bond - General
150,000 150,000Total
Page 202016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Public Safety
Police Station Parking Garage Repairs
Description
Repair the structural and drainage issues the parking garage is currently experiencing.
Justification
Water is draining from the top deck along the inside of the support walls. Repairs are needed in order to redirect water and prevent water damage to the structure.
Category Structural
Type Improvement
Total Cost $50,000
Progress Planning
Department Public SafetyRelated Projects
Location 1500 South 1st Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
10,00010,000Planning/Design
40,00040,000Construction
50,000 50,000Total
Total2016 2017 2018 2019 2020Funding Sources
50,00050,000Bond - General
50,000 50,000Total
Page 212016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Public Safety
Fire Station 4 Remodel
Description
This project involves a total remodel of the dormitory at Fire Station 4. Six private rooms will replace the partially open bay sleeping area. A five foot wide corridor will be created down the center of the wing running North/South. New mill work will be built for each area to provide locker and study space.
Justification
The upgrades to Fire Station #4 will address the needs of the Engine Company and Rescue. The asphalt apron will be replaced and bunkroom will be updated to comply with anticipated changes to Occupational Safety and Health Administration (O.S.H.A.) and National Fire Protection
Association (N.F.P.A.) standards for a fire station sleeping area.
Category Buildings
Type Improvement
Total Cost $1,000,000
Progress Planning
Department Yuma Fire DepartmentRelated Projects
Location Fire Station 4 - 2850 W. 16th Street
Active
Total2016 2017 2018 2019 2020Expenditures
100,000100,000Planning/Design
860,000860,000Construction
40,00040,000Inspection
1,000,000 1,000,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,000,0001,000,000Public Safety Tax Fund
1,000,000 1,000,000Total
Page 222016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Public Safety
Police Storage Facility
Description
Design and construct a facility to store police impound/evidence vehicles for an extended period of time.
Justification
The secure impound and evidence storage is at or near maximum capacity with demand not expected to diminish. It is important to begin planning for an alternative means of secure storage.
Category Buildings
Type Building
Total Cost $2,000,000
Progress Planning
Department Yuma Police DepartmentRelated Projects
Location Avenue 4E and 36th Street
Active
Total2016 2017 2018 2019 2020Expenditures
100,000100,000Planning/Design
1,800,0001,800,000Construction
100,000100,000Inspection
2,000,000 2,000,000Total
Total2016 2017 2018 2019 2020Funding Sources
2,000,0002,000,000Public Safety Tax Fund
2,000,000 2,000,000Total
Page 232016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Stormwater Control
Smucker Regional Storm Drain Basin
Description
A 96 inch diameter pipe will be installed at the intersections of 28th Street and Westridge Drive at Avenue A. A storm water collection basin will be built east of the East Main Canal and on the northwest corner of Smucker Park.
Justification
The basin was first purposed to the Yuma County Flood Control District (Y.C.F.C.D.) in 1996 by the West Yuma Mesa Storm Drainage Discharge System Study. The Arizona Department of Water Resources has classified this basin as a dam as a result of its size. Construction
activities and costs will be managed by Y.C.F.C.D. The project cost has risen from approximately $2,250,000 to $6,490,000. The increases are due to inflation and additional design requirements. The Basin construction will be primarily funded by the Y.C.F.C.D. with the City’s share being $1,000,000.
Category Storm Sewer/Drainage
Type Improvement
Total Cost $1,000,000
Progress Design Complete
Department City EngineeringRelated Projects
Location Area Surrounding Smucker Park
Active
Total2016 2017 2018 2019 2020Expenditures
1,000,000500,000 500,000Construction
500,000 500,000 1,000,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,000,000500,000 500,000City Road Tax
500,000 500,000 1,000,000Total
Page 242016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Stormwater Control
Arena Drive Storm Drain
Description
Extend existing storm sewer from Arena Drive and 9th Street south along Arena Drive to 10th Street then east to the intersection of 10th Street and 13th Avenue. Include inlet structures.
Justification
Storm water from 13th Avenue is to be channeled in 10th Street, 9th Place and Arena Drive then conveyed by surface flow to the existing inlets at 9th Street and Arena Drive. However, moderately small storms create overland flows that quickly jump the curbs and create erosion problems across private property. Other external funding is actively being pursued.
Category Storm Sewer/Drainage
Type Improvement
Total Cost $165,000
Progress Planning
Department City EngineeringRelated Projects
Location Arena Drive, 9th St to 10th St, East to 10th St and 13th Ave
Active
Total2016 2017 2018 2019 2020Expenditures
165,000165,000Construction
165,000 165,000Total
Total2016 2017 2018 2019 2020Funding Sources
165,000165,000Other - Proposed
165,000 165,000Total
Page 252016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
16th Street & 4th Avenue Intersection Improvements
Description
The intersection improvement parameters are from 15th Street to 17th Street on 4th Avenue and 2nd Avenue to 6th Avenue on 16th Street. Improvements will consist of dual left-turn lanes and dedicated right-turn lanes at all four legs of the intersection and bike lanes as identified within the transportation element of the General Plan. The project also includes waterline replacement and upgrades. Existing waterlines includes 12", 4" and 16" which will be replaced with one new single 16" Polyvinyl Chloride water main. From 16th street to 17th Street a 10" waterline will be replaced with a new 12" waterline.
Justification
This intersection is one of the City’s most congested intersections. Improving this intersection will increase capacity thus improving traffic flow and the safety of road traffic and pedestrians. The project design has been updated and as a result budget estimates are closer to actual cost.
Category Street Reconstruction
Type Improvement
Total Cost $7,600,000
Progress Design Complete
Department City EngineeringRelated Projects
Location 16th Street & 4th Avenue Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
7,300,0003,650,000 3,650,000Construction
300,000150,000 150,000Inspection
3,800,000 3,800,000 7,600,000Total
Total2016 2017 2018 2019 2020Funding Sources
2,400,0002,400,000Bond - Transportation
970,000970,000Bond - Water
1,500,0001,500,000City Road Tax
2,630,000330,000 2,300,000Development Fee - Transportation
100,000100,000Wastewater Utility Fund
3,800,000 3,800,000 7,600,000Total
Page 262016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
1st Avenue - 24th to 26th Street Paving
Description
Asphalt pavement reconstruction on 1st Avenue from 24th to 26th Street.
Justification
Existing pavement has deteriorated with severe abrasive block cracking making replacement necessary.
Category Street Paving
Type Improvement
Total Cost $97,000
Progress Planning
Department Public WorksRelated Projects
Location 1st Avenue - 24th to 26th Street
Active
Total2016 2017 2018 2019 2020Expenditures
89,00089,000Construction
8,0008,000Inspection
97,000 97,000Total
Total2016 2017 2018 2019 2020Funding Sources
97,00097,000City Road Tax
97,000 97,000Total
Page 272016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
22nd Street - Avenue A to 4th Avenue Paving
Description
Remove and replace existing pavement on 22nd Street from Avenue A to 4th Avenue. Replace approximately 3,000 lineal feet of 6 inch and 4 inch asbestos cement pipe along 22nd Street from 4th Avenue to Avenue A.
Justification
Existing pavement has deteriorated severely with abrasive block cracking making pavement replacement necessary. The 6 inch waterline located in this segment of road was installed in the 1950's and replacing the waterline will prevent future failures.
Category Street Paving
Type Improvement
Total Cost $788,000
Progress Planning
Department Streets DivisionRelated Projects
Location 22nd Street - Avenue A to 4th Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
30,00030,000Planning/Design
730,000730,000Construction
28,00028,000Inspection
788,000 788,000Total
Total2016 2017 2018 2019 2020Funding Sources
340,000340,000Bond - Water
448,000448,000City Road Tax
788,000 788,000Total
Page 282016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
24th Street - Avenue B to C Improvements
Description
Reconstruct the existing minor arterial, to include turn and hold lanes and construct a 10 foot wide lit multiuse path and roadway discharge storage.
Justification
Existing development makes widening of arterial necessary. The existing street was built to County Farm-to-Market Roadway Standards and is not adequate for traffic generated by the surrounding urban development.
Category Street Reconstruction
Type Improvement
Total Cost $2,540,000
Progress Design Complete
Department City EngineeringRelated Projects 0096-TR
Location 24th Street - Avenue B to C
Active
Total2016 2017 2018 2019 2020Expenditures
2,540,0002,540,000Construction
2,540,000 2,540,000Total
Total2016 2017 2018 2019 2020Funding Sources
800,000800,000City Road Tax
1,740,0001,740,000ProRata Fund
2,540,000 2,540,000Total
Page 292016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
4th Avenue and Big Curve Turn Lane
Description
Design and construct a dedicated southbound right-turn lane from 4th Avenue/Big Curve onto southbound 4th Avenue Extension along with traffic signal mast arm and controller replacements.
Justification
A southbound right–turn lane on 4th Avenue/Big Curve will improve the flow of southbound through traffic to 4th Avenue Extension.
Category Street Improvement
Type Improvement
Total Cost $178,000
Progress Planning
Department City EngineeringRelated Projects
Location 4th Avenue and Big Curve Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
17,60017,600Planning/Design
148,500148,500Construction
11,90011,900Inspection
178,000 178,000Total
Total2016 2017 2018 2019 2020Funding Sources
145,300145,300City Road Tax
32,70032,700Development Fee - Transportation
178,000 178,000Total
Page 302016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
4th Avenue Extension Pedestrian Pathway
Description
Construct an eight foot wide pedestrian pathway utilizing two inch asphalt concrete.
Justification
This segment of road does not include sidewalks. Sidewalks and pathways provide increase security, mobility and encourage a healthier community. This pathway will allow pedestrians to travel alongside the road more safely.
Category Pathway
Type Construction
Total Cost $82,000
Progress Planning
Department Public WorksRelated Projects
Location 4th Avenue - 32nd Street to Rainbow Lane
Active
Total2016 2017 2018 2019 2020Expenditures
74,00074,000Construction
8,0008,000Inspection
82,000 82,000Total
Total2016 2017 2018 2019 2020Funding Sources
82,00082,000City Road Tax
82,000 82,000Total
TotalOperational Effect 2016 2017 2018 2019 2020
13,0002,000 2,000 2,000 2,000 5,000Maintenance
2,000 2,000 2,000 2,000 5,000 13,000Total
Page 312016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
56th Street Pavement Overlay
Description
56th Street/County 14th Street will be repaved using 2-3 inches of asphalt.
Justification
Existing pavement shows signs of wear, distress and block cracking. A pavement overlay will extend the life of this street. Yuma County has secured a Surface Transportation Program (STP) grant for this project. Costs in excess of grant will be covered by Yuma County and the City of
Yuma as stipulated in Intergovernmental Agreement 2013-05632.
Category Street Reconstruction
Type Improvement
Total Cost $50,000
Progress Design Complete
Department Public WorksRelated Projects
Location Avenue A to Avenue 3E
Active
Total2016 2017 2018 2019 2020Expenditures
50,00050,000Construction
50,000 50,000Total
Total2016 2017 2018 2019 2020Funding Sources
50,00050,000City Road Tax
50,000 50,000Total
Page 322016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Airport Loop Road Improvements
Description
Design and rebuild the storm drain located approximately 2,200 feet west of Avenue A on Airport Loop.
Justification
Storm water run-off coming from the Marine Corps Air Station property has washed out sections of shoulder on the Airport Loop section of South 4th Avenue. Storm water discharge causes soil erosion with sediment ending on this segment of road. Storms in August 2010, December
2011, and July 2012 have caused considerable damage to the extent that the storm drain has been redesigned and will be reconstructed.
Category Street Improvement
Type Improvement
Total Cost $237,000
Progress Under Design
Department Public WorksRelated Projects
Location Airport Loop Road
Active
Total2016 2017 2018 2019 2020Expenditures
7,0007,000Planning/Design
230,000230,000Construction
237,000 237,000Total
Total2016 2017 2018 2019 2020Funding Sources
237,000237,000City Road Tax
237,000 237,000Total
Page 332016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Arizona Ave - Palo Verde to Country Club Dr Paving
Description
Remove and replace existing pavement on Arizona Avenue - Palo Verde to Country Club Drive.
Justification
Existing pavement has deteriorated with severe cracking and abrasive block cracking making replacement necessary.
Category Street Paving
Type Improvement
Total Cost $315,000
Progress Planning
Department Streets DivisionRelated Projects
Location Arizona Avenue - Palo Verde to Country Club Drive
Active
Total2016 2017 2018 2019 2020Expenditures
305,000305,000Construction
10,00010,000Inspection
315,000 315,000Total
Total2016 2017 2018 2019 2020Funding Sources
315,000315,000City Road Tax
315,000 315,000Total
Page 342016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Avenue 3E and 16th Street Improvements
Description
This project will involve the reconstruction and widening of Avenue 3E between Interstate-8 and 16th Street to a five-lane arterial roadway, signal upgrades at the Avenue 3E and 16th Street intersection and a pavement overlay of 16th Street, between Avenue 3E and Araby Road. Also included in the project will be the addition of turn lanes, where appropriate, and incidental pavement reconfigurations necessary to transition the new roadway sections to the existing streets. Yuma County has committed the local federal fund match for design and the City the construction match.
Justification
The improvements that are a result of Avenue 3E purposed as an alternative route to provide connectivity from the northern end of Area Service Highway SR 195 and US Highway 95, at the intersection of 16th Street and Araby Road, as addressed in the Second Addendum to Joint Project
Agreement (JPA) 98-175, the Area Service Highway Agreement and approved by adoption of Yuma City Council Resolution No. R2012-54.
Category Street Improvement
Type Improvement
Total Cost $265,000
Progress Under Design
Department Public WorksRelated Projects
Location Avenue 3E, 16th St to I-8 and 16th St to Araby Road
Active
Total2016 2017 2018 2019 2020Expenditures
265,00065,000 200,000Construction
65,000 200,000 265,000Total
Total2016 2017 2018 2019 2020Funding Sources
265,00065,000 200,000Bond - Transportation
65,000 200,000 265,000Total
Page 352016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Avenue 9E Railroad Crossing Quiet Zone
Description
Install SSM at Avenue 9E and Union Pacific Railroad Crossing. Under FRA Final Rule, SSM that would qualify for a Quiet Zone are "Mountable Medians with Reflective Traffic Channelization Devices".
Justification
A quiet zone will be established in the vicinity of Avenue 9E and the Union Pacific Railroad crossing. A quiet zone is a section of rail line at least one-half mile in length that contains one or more consecutive public highway grade crossings, where locomotive horns are not routinely
sounded when trains are approaching the crossing. Quiet zone regulations do not eliminate the use of locomotive bells at crossing as trains horns will be utilized in emergency situations or to comply with railroad or Federal Railroad Administration (FRA) rules. In order to establish a quiet zone the City must install Supplementary Safety Measure (SSM).
Category Street Improvement
Type Improvement
Total Cost $75,000
Progress Planning
Department EngineeringRelated Projects
Location Avenue 9Eat Union Pacific Railroad Crossing
Active
Total2016 2017 2018 2019 2020Expenditures
19,50019,500Inspection
42,50042,500Equipment
13,00013,000Installation
75,000 75,000Total
Total2016 2017 2018 2019 2020Funding Sources
75,00075,000City Road Tax
75,000 75,000Total
Page 362016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Catalina Drive - 32nd Street to 4th Avenue Paving
Description
Replace existing pavement and the roll curb and gutter at all driveways.
Justification
The street was resurfaced in early 1980. Crack seal and slurry seal were applied in November 1994 however, reflection cracking has reached the point where pavement replacement is necessary.
Category Street Paving
Type Improvement
Total Cost $325,000
Progress Under Design
Department City EngineeringRelated Projects
Location Catalina Drive - 32nd Street to 4th Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
325,000325,000Construction
325,000 325,000Total
Total2016 2017 2018 2019 2020Funding Sources
325,000325,000City Road Tax
325,000 325,000Total
Page 372016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Citywide Safety Improvements
Description
Systemic improvement projects designed to consider longer segments the transportation network improving roadways at a broad view. In addition, staff may require preparation and submission of grant applications in order to address safety concerns. Such improvements will complement existing roadway infrastructure in new or existing subdivisions.
Justification
There are roadway segments in the community that will benefit from improvements that address safety concerns. The safety concerns may be an immediate spot improvement or systemic in nature. Improvements may include streetlights fill in, handicap ramps, traffic signal upgrades,
signage, street crosswalks, striping, and sidewalks/pathways.
Category Street Improvement
Type Improvement
Total Cost $700,000
Progress Planning
Department Streets DivisionRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
700,000140,000 140,000 140,000 140,000 140,000Construction
140,000 140,000 140,000 140,000 140,000 700,000Total
Total2016 2017 2018 2019 2020Funding Sources
700,000140,000 140,000 140,000 140,000 140,000City Road Tax
140,000 140,000 140,000 140,000 140,000 700,000Total
Page 382016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Fleet Services Maintenance Shop
Description
Construction of a new Fleet Maintenance complex for the relocation of maintenance and operating functions with storage for streets, solid waste, fire, parks, police and utilities vehicles, equipment and materials.
Phase I: Update phases to current building code (2008)Phase II: Utility relocation and site preparation (2015-2016)
Phase III: Facility construction (2016-2017)
Justification
The City of Yuma requires an adequate facility to ensure the maintenance of its fleet and to guarantee operational readiness. Public Safety share of this facility will be substantial due to the size of their fleet.
Category Buildings
Type Building
Total Cost $9,950,000
Progress Design Complete
Department Field OperationsRelated Projects
Location 190 W. 14th Street
Active
Total2016 2017 2018 2019 2020Expenditures
210,000210,000Planning/Design
9,240,0001,590,000 7,650,000Construction
500,000500,000Inspection
1,800,000 8,150,000 9,950,000Total
Total2016 2017 2018 2019 2020Funding Sources
9,500,0001,350,000 8,150,000Bond - 2015 Issue
70,00070,000Development Fee - Public Works
380,000380,000Development Fee - Solid Waste
1,800,000 8,150,000 9,950,000Total
Page 392016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Palo Verde St - Catalina Dr to Arizona Ave Paving
Description
Remove and replace existing pavement.
Justification
Pavement replacement is necessary as existing pavement has deteriorated severely. Abrasive block cracking can be found throughout this segment of road.
Category Street Paving
Type Improvement
Total Cost $309,000
Progress Under Design
Department Streets DivisionRelated Projects
Location Palo Verde St. - Catalina Drive to Arizona Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
309,000309,000Construction
309,000 309,000Total
Total2016 2017 2018 2019 2020Funding Sources
309,000309,000City Road Tax
309,000 309,000Total
Page 402016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
West Main Canal Multi-Use Path
Description
This project will design and construct a lighted pathway along the West Main Canal. The path will be at least 10 feet wide. Enhancement Grant funding was sought and awarded for this project.
Justification
The West Main Canal Multi-Use Path is identified as a path in need of improvement within the Transportation Element of the City of Yuma General Plan.
Category Street Construction
Type Improvement
Total Cost $795,000
Progress Under Design
Department City EngineeringRelated Projects
Location West Main Canal between Main Canal (Avenue A) and Thacker Canal (Avenue B)
Active
Total2016 2017 2018 2019 2020Expenditures
149,400149,400Planning/Design
544,000544,000Construction
101,600101,600Inspection
795,000 795,000Total
Total2016 2017 2018 2019 2020Funding Sources
114,500114,500City Road Tax
680,500680,500Grant
795,000 795,000Total
Page 412016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
14th Street - 4th to 1st Avenue Paving
Description
Remove and replace existing pavement on 14th Street from 1st Avenue to 4th Avenue.
Justification
Existing pavement has deteriorated with severe cracking and abrasive block cracking making replacement necessary.
Category Street Paving
Type Improvement
Total Cost $213,500
Progress Planning
Department City EngineeringRelated Projects
Location 14th Street - 4th to 1st Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
205,000205,000Construction
8,5008,500Inspection
213,500 213,500Total
Total2016 2017 2018 2019 2020Funding Sources
213,500213,500City Road Tax
213,500 213,500Total
Page 422016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Avenue 10E Improvements
Description
Agreement requires property owners to design and construct certain roadway improvements on Avenue 10E with the City reimbursing the owners a portion of costs.
Justification
Participate in the design and construction costs associated with the improvements on Avenue 10E as identified in Resolution No R2000-37 Preannexation Development Agreement.
Category Street Improvement
Type Improvement
Total Cost $205,000
Progress Planning
Department Public WorksRelated Projects
Location Avenue 10E - 40th Street to South Frontage Road
Active
Total2016 2017 2018 2019 2020Expenditures
18,00018,000Planning/Design
177,00092,500 84,500Construction
10,00010,000Inspection
110,500 94,500 205,000Total
Total2016 2017 2018 2019 2020Funding Sources
94,50094,500City Road Tax
40,50040,500Development Fee - Transportation
70,00070,000Water Utility Fund
110,500 94,500 205,000Total
Page 432016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Gila Street - 1st to 3rd Street Paving
Description
Remove and replace existing pavement on Gila Street from 1st Street to 3rd Street.
Justification
Existing pavement has deteriorated with severe cracking and abrasive block cracking making replacement necessary.
Category Street Paving
Type Improvement
Total Cost $201,000
Progress Planning
Department Streets DivisionRelated Projects
Location Gila Street - 1st Street to 3rd Street
Active
Total2016 2017 2018 2019 2020Expenditures
182,600182,600Construction
18,40018,400Inspection
201,000 201,000Total
Total2016 2017 2018 2019 2020Funding Sources
201,000201,000City Road Tax
201,000 201,000Total
Page 442016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
16th Street Turn Lane - Maple to 1st Avenue
Description
Design and construct an extension of the westbound right-turn lane, from approximately Maple Avenue to 1st Avenue including roadway widening, pavement markings and signing.
Justification
A continuation of the existing right-turn lane would improve the flow of traffic.
Category Street Improvement
Type Improvement
Total Cost $120,000
Progress Planning
Department City EngineeringRelated Projects
Location 16th Street - 1st Avenue to Maple Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
12,00012,000Planning/Design
100,000100,000Construction
8,0008,000Inspection
120,000 120,000Total
Total2016 2017 2018 2019 2020Funding Sources
120,000120,000City Road Tax
120,000 120,000Total
Page 452016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
1st Avenue - 12th to 16th Street Paving
Description
Replace pavement and conduct other minor improvements on 1st Avenue from 12th to 16th Street. Replace 2,700 lineal feet of asbestos cement waterline pipe and 8 inch vitrified clay sewer pipe line with 12 inch polyvinyl chloride pipe. The sewer improvements take place on 1st Avenue from 10th to 16th Street, then east to sewer manhole #2218, between Madison and Maple Avenue.
Justification
The pavement has deteriorated severely making pavement replacement necessary. Improving the water and sewer lines is also necessary in order to improve the level of service.
Category Street Paving
Type Improvement
Total Cost $1,420,000
Progress Design Complete
Department City EngineeringRelated Projects
Location 1st Avenue - 12th Street to 16th Street
Active
Total2016 2017 2018 2019 2020Expenditures
45,00045,000Land Acquisition/Right-of-Way
1,324,3501,324,350Construction
50,65050,650Inspection
1,420,000 1,420,000Total
Total2016 2017 2018 2019 2020Funding Sources
320,000320,000City Road Tax
500,000500,000Wastewater Utility Fund
600,000600,000Water Utility Fund
1,420,000 1,420,000Total
Page 462016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
1st Avenue - Orange Avenue to 9th Street Paving
Description
Replace pavement and conduct minor upgrades on 1st Avenue from Orange Avenue to 9th Street.
Justification
Pavement replacement is necessary as existing pavement has deteriorated severely. Abrasive block cracking can be found throughout this segment of road.
Category Street Reconstruction
Type Improvement
Total Cost $490,000
Progress Planning
Department City EngineeringRelated Projects
Location 1st Avenue - Orange Avenue to 9th Street
Active
Total2016 2017 2018 2019 2020Expenditures
40,00040,000Planning/Design
432,000432,000Construction
18,00018,000Inspection
490,000 490,000Total
Total2016 2017 2018 2019 2020Funding Sources
490,000490,000City Road Tax
490,000 490,000Total
Page 472016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
28th Street - Avenue B to Avenue C Improvements
Description
Design and construct a minor arterial road with pedestrian crossing at the Thacker Lateral. Three-quarters of street was constructed by developer and City of Yuma in FY2006. The western half of the east bound street remains to be constructed.
Justification
This minor arterial road will carry traffic between Avenue B and Avenue C as an alternate route to 32nd Street.
Category Street Construction
Type Improvement
Total Cost $1,580,000
Progress Planning
Department City EngineeringRelated Projects 0029-TR
Location 28th Street - Avenue B to Avenue C
Active
Total2016 2017 2018 2019 2020Expenditures
80,00080,000Planning/Design
300,000300,000Land Acquisition/Right-of-Way
1,100,0001,100,000Construction
100,000100,000Inspection
1,580,000 1,580,000Total
Total2016 2017 2018 2019 2020Funding Sources
202,000202,000City Road Tax
1,378,0001,378,000Development Fee - Transportation
1,580,000 1,580,000Total
Page 482016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
3rd Avenue - Orange Avenue to 14th Street Paving
Description
Remove and replace existing pavement on 3rd Avenue from Orange Avenue to 14th Street and Orange Avenue from 3rd Avenue to 4th Avenue.
Justification
Existing pavement has deteriorated with severe cracking and abrasive block cracking making replacement necessary.
Category Street Paving
Type Improvement
Total Cost $706,000
Progress Planning
Department Streets DivisionRelated Projects
Location 3rd Avenue - Orange Avenue to 14th Street
Active
Total2016 2017 2018 2019 2020Expenditures
662,000662,000Construction
44,00044,000Inspection
706,000 706,000Total
Total2016 2017 2018 2019 2020Funding Sources
706,000706,000City Road Tax
706,000 706,000Total
Page 492016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
16th Street and Arizona Avenue Improvements
Description
Design and construct additional pedestrian refuge areas and pedestrian signals, push buttons and controls.
Justification
Install pedestrian refuge areas in order to improve pedestrian traffic.
Category Street Improvement
Type Improvement
Total Cost $60,000
Progress Planning
Department City EngineeringRelated Projects
Location 16th Street and Arizona Avenue Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
6,0006,000Planning/Design
50,00050,000Construction
4,0004,000Inspection
60,000 60,000Total
Total2016 2017 2018 2019 2020Funding Sources
60,00060,000City Road Tax
60,000 60,000Total
Page 502016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
16th Street and Pacific Avenue Turn Lane
Description
Design, construction and inspection of a westbound 16th Street right-turn lane, approaching Pacific Avenue, along with traffic signal mast and controller replacement.
Justification
Increased right-turn movements from westbound 16th Street to northbound Pacific Avenue at the intersection necessitate the installation of this right-turn lane to move turning traffic from westbound 16th Street through traffic.
Category Street Improvement
Type Improvement
Total Cost $351,000
Progress Planning
Department City EngineeringRelated Projects
Location 16th Street and Pacific Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
25,00025,000Planning/Design
200,300200,300Land Acquisition/Right-of-Way
115,700115,700Construction
10,00010,000Inspection
351,000 351,000Total
Total2016 2017 2018 2019 2020Funding Sources
351,000351,000City Road Tax
351,000 351,000Total
Page 512016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
18th Street and Avenue C Traffic Signal
Description
Design and construct a complete traffic signal system at the intersection of 18th Street and Avenue C. Other funding for this project will be pursued.
Justification
Traffic restrictions at 20th Street shifts additional traffic onto 18th Street causing congestion at peak hours. Other funding is actively being pursued.
Category Street Improvement
Type Improvement
Total Cost $371,700
Progress Planning
Department City EngineeringRelated Projects
Location 18th Street and Avenue C Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
37,20037,200Planning/Design
310,500310,500Construction
24,00024,000Inspection
371,700 371,700Total
Total2016 2017 2018 2019 2020Funding Sources
195,040195,040City Road Tax
51,66051,660Development Fee - Transportation
125,000125,000Other - Proposed
371,700 371,700Total
Page 522016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
24th Street and 1st Avenue Turn Lane
Description
Design and construct a westbound right-turn lane on 24th Street approaching 1st Avenue and replace traffic signal mast arm and controller.
Justification
Westbound traffic at the intersection of 24th Street and 1st Avenue is experiencing congestion from traffic turning northbound onto 1st Avenue. A westbound right-turn lane on 24th Street would mitigate the congestion at this intersection and improve traffic flow on 24th Street.
Category Street Improvement
Type Improvement
Total Cost $728,000
Progress Planning
Department City EngineeringRelated Projects
Location 24th Street and 1st Avenue Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
17,80017,800Planning/Design
550,000550,000Land Acquisition/Right-of-Way
148,300148,300Construction
11,90011,900Inspection
728,000 728,000Total
Total2016 2017 2018 2019 2020Funding Sources
532,961532,961City Road Tax
195,039195,039Development Fee - Transportation
728,000 728,000Total
Page 532016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
32nd Street and Avenue 5E Turn Lanes
Description
Design and construct eastbound and westbound right-turn lanes on 32nd Street and replace traffic signal mast arms and controllers.
Justification
Development at this intersection has increased traffic volumes causing congestion. The addition of right-turn lanes will improve traffic flows on 32nd Street.
Category Street Improvement
Type Improvement
Total Cost $400,300
Progress Planning
Department City EngineeringRelated Projects
Location 32nd Street and Avenue 5E Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
40,00040,000Planning/Design
333,600333,600Construction
26,70026,700Inspection
400,300 400,300Total
Total2016 2017 2018 2019 2020Funding Sources
331,459331,459City Road Tax
68,84168,841Development Fee - Transportation
400,300 400,300Total
Page 542016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
4th Avenue and 8th Street Turn Lane
Description
Design and construct a right-turn lane on southbound 4th Avenue approaching 8th Street and replace traffic signal mast arm and controller.
Justification
Southbound traffic at the intersection of 4th Avenue and 8th Street is experiencing congestion from traffic turning westbound onto 8th Street. A southbound right-turn lane on 4th Avenue would mitigate congestion at this intersection and improve traffic flow on 4th Avenue.
Category Street Improvement
Type Improvement
Total Cost $351,000
Progress Planning
Department City EngineeringRelated Projects
Location 4th Avenue and 8th Street Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
11,00011,000Planning/Design
200,300200,300Land Acquisition/Right-of-Way
133,000133,000Construction
6,7006,700Inspection
351,000 351,000Total
Total2016 2017 2018 2019 2020Funding Sources
259,208259,208City Road Tax
91,79291,792Development Fee - Transportation
351,000 351,000Total
Page 552016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
Avenue B and 16th Street Turn Lane
Description
Design and construct a northbound right-turn lane on Avenue B approaching 16th Street and replace traffic signal mast arm and controller.
Justification
Northbound traffic at the intersection of Avenue B and 16th Street is experiencing congestion from traffic turning eastbound onto 16th Street. A northbound right-turn lane on Avenue B would mitigate congestion at this intersection and improve traffic flow on Avenue B.
Category Street Improvement
Type Improvement
Total Cost $860,000
Progress Planning
Department City EngineeringRelated Projects
Location 18th Avenue and 24th Street Intersection
Active
Total2016 2017 2018 2019 2020Expenditures
23,00023,000Planning/Design
680,000680,000Land Acquisition/Right-of-Way
147,000147,000Construction
10,00010,000Inspection
860,000 860,000Total
Total2016 2017 2018 2019 2020Funding Sources
618,320618,320City Road Tax
241,680241,680Development Fee - Transportation
860,000 860,000Total
Page 562016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
1st to Colorado Street-Avenue A to 23rd Ave Paving
Description
Pavement reconstruction to entire subdivision of approximately 76,000 square yards.
Justification
Existing pavement has deteriorated with severe cracking and abrasive block cracking making replacement necessary.
Category Street Paving
Type Improvement
Total Cost $1,520,000
Progress Planning
Department Public WorksRelated Projects
Location 1st to Colorado Street-Ave A to 23rd Ave
Active
Total2016 2017 2018 2019 2020Expenditures
1,368,0001,368,000Construction
152,000152,000Inspection
1,520,000 1,520,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,520,0001,520,000City Road Tax
1,520,000 1,520,000Total
Page 572016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
24th Street and Pacific Avenue Turn Lane
Description
Design, construction and inspection of an eastbound 24th Street right-turn lane, approaching Pacific Avenue, along with traffic signal mast and controller replacements.
Justification
The addition of a right-turn lane will improve traffic flow by moving right-turn traffic from the through traffic lane.
Category Street Improvement
Type Improvement
Total Cost $315,000
Progress Planning
Department City EngineeringRelated Projects
Location 24th Street and Pacific Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
19,00019,000Planning/Design
125,000125,000Land Acquisition/Right-of-Way
158,300158,300Construction
12,70012,700Inspection
315,000 315,000Total
Total2016 2017 2018 2019 2020Funding Sources
315,000315,000City Road Tax
315,000 315,000Total
Page 582016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
28th Street - 45th Avenue to Avenue C
Description
Construct the north half width of 28th Street between Ave C and 45th Avenue.
Justification
The new street will provide a third point of access for residents of Barkley Ranch subdivisions. In accordance with Section 7.3(c) of the preannexation development Agreement R2012-30, recorded at FEE # 2012-2013-08606, Yuma County Records.
Category Street Construction
Type Improvement
Total Cost $1,200,000
Progress Planning
Department EngineeringRelated Projects
Location 28th Street - 45th Avenue to Avenue C
Active
Total2016 2017 2018 2019 2020Expenditures
1,200,0001,200,000Construction
1,200,000 1,200,000Total
Total2016 2017 2018 2019 2020Funding Sources
528,000528,000City Road Tax
672,000672,000Development Fee - Transportation
1,200,000 1,200,000Total
Page 592016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Transportation
32nd Street and Pacific Avenue Improvements
Description
Add second dedicated eastbound left-turn lane, convert existing left-through lane to a through lane, upgrade traffic signal, extend median on north leg and revise access to properties on west side of north leg. The project will also include installation of conduit and fiber optic cable to coordinate the signal with other signals providing for smooth traffic flow.
Justification
This recommendation is based on the Avenue 3E Corridor Study completed in 2004. The study included 32nd Street from Pacific Avenue to Avenue 5E. Widening is needed in order to eliminate congestion, adequately provide for traffic growth, and decrease accidents. The median
extension and access revisions are needed to reduce traffic accidents and permit the intersection to function at full capacity.
Category Street Reconstruction
Type Improvement
Total Cost $930,000
Progress Planning
Department City EngineeringRelated Projects
Location 32nd Street & Pacific Avenue
Active
Total2016 2017 2018 2019 2020Expenditures
30,00030,000Planning/Design
880,000880,000Construction
20,00020,000Inspection
930,000 930,000Total
Total2016 2017 2018 2019 2020Funding Sources
838,208838,208City Road Tax
91,79291,792Development Fee - Transportation
930,000 930,000Total
Page 602016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
10th Avenue and Avenue A Alley Sanitary Sewer
Description
Replace 1,900 feet of 8 inch vitrified clay pipe with 8 inch pipe and reconnect service laterals.
Justification
The tar-sealed vitrified clay pipe has been damaged. The damage allows roots to breach the pipe and causes system disruptions. Replacing this sewer line will improve service levels by minimizing service disruptions.
Category Wastewater
Type Improvement
Total Cost $320,000
Progress Under Design
Department UtilitiesRelated Projects 0050-UT
Location 10th Avenue / Avenue A, alley 5th Street to 8th Street
Active
Total2016 2017 2018 2019 2020Expenditures
305,000305,000Construction
15,00015,000Inspection
320,000 320,000Total
Total2016 2017 2018 2019 2020Funding Sources
320,000320,000Wastewater Utility Fund
320,000 320,000Total
Page 612016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
24th Street Lift Station Replacement
Description
Purchase approximately 6,000 square feet of property behind the existing lift station and construct a new wastewater lift station to include Supervisory Control and Data Acquisition (SCADA) controls and new energy efficient variable drive pumps.
Justification
The wastewater collection system currently has twenty-six wastewater lift stations. The 24th Street wastewater lift station is 40 years old and has exceeded its useful life. This lift station is a strategic collection point within the wastewater collection system. Replacing this lift station is
critical to maintaining the integrity of the overall system.
Category Wastewater
Type Construction
Total Cost $730,000
Progress Planning
Department UtilitiesRelated Projects
Location 24th Street West of Avenue B
Active
Total2016 2017 2018 2019 2020Expenditures
75,00075,000Planning/Design
15,00015,000Land Acquisition/Right-of-Way
630,000630,000Construction
10,00010,000Inspection
730,000 730,000Total
Total2016 2017 2018 2019 2020Funding Sources
730,000730,000Wastewater Utility Fund
730,000 730,000Total
Page 622016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
4th Street & Avenue A Sewer Line Replacement
Description
Replace approximately 200 feet of 8 inch vitrified clay sanitary sewer line and two manholes from the 4th Street and Avenue A intersection east to the 9th/10th Avenue alley.
Justification
The existing sewer line is shallow and the possibility of sanitary sewer overflows is high. The existing sewer levels allow for adjustments in grade to increase line capacity, this will prevent overflows into public right of way.
Category Wastewater
Type Improvement
Total Cost $24,000
Progress Under Design
Department UtilitiesRelated Projects
Location 4th Street - Avenue A to 9th Avenue Alley
Active
Total2016 2017 2018 2019 2020Expenditures
1,0001,000Planning/Design
22,00022,000Construction
1,0001,000Inspection
24,000 24,000Total
Total2016 2017 2018 2019 2020Funding Sources
24,00024,000Wastewater Utility Fund
24,000 24,000Total
Page 632016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
5th Street Sanitary Sewer Replacement
Description
Replace 1,600 linear feet of 8 inch and 10 inch sanitary sewer mainline, manholes and reconnect existing service lines. This project has been designed.
Justification
The existing sewer line is vitrified clay tree roots and other debris has damaged the clay pipe causing system disruptions. Replacing this mainline will improve service levels and minimize system disruptions.
Category Wastewater
Type Improvement
Total Cost $250,000
Progress Design Complete
Department UtilitiesRelated Projects 0051-UT
Location 5th Street at 6th/7th Ave alley to Ave. A
Active
Total2016 2017 2018 2019 2020Expenditures
240,000240,000Construction
10,00010,000Inspection
250,000 250,000Total
Total2016 2017 2018 2019 2020Funding Sources
250,000250,000Wastewater Utility Fund
250,000 250,000Total
Page 642016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Desert Dunes Improvement Project
Description
Install 3rd ground water monitoring well, replace final clarifier skimmers and install hoist/crane lifting system inside headwork building.
Justification
The Desert Dunes Facility is 10 years old and minor improvements are needed in order to maintain effective plant operations. The facility must meet strict Arizona Department of Environmental Quality (ADEQ) permit limits, in order to ensure compliance with those limits are maintained
a 3rd ground water monitoring well must be installed adjacent to the facility’s onsite percolation beds. The existing skimmers on the two final clarifiers have corroded, are no longer functional and must be replaced. Staff has no mechanism to remove/replace large in-line grinders within the headwork building due to the lack of overhead lifting system.
Category Wastewater
Type Construction
Total Cost $460,000
Progress Planning
Department UtilitiesRelated Projects
Location Desert Dunes Water Reclamation Facility
Active
Total2016 2017 2018 2019 2020Expenditures
460,000460,000Construction
460,000 460,000Total
Total2016 2017 2018 2019 2020Funding Sources
460,000460,000Wastewater Utility Fund
460,000 460,000Total
Page 652016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Downtown Sewer Line Replacement
Description
Replace 380 linear feet of 8 inch Vitrified Clay Pipe (VPC) on 3rd Street from Madison Avenue to Main Street and 510 linear feet of 8 inch VCP on Madison Avenue from Giss Parkway to 5th Street. Remove and replace all pavement on 3rd Street from Madison Avenue to Main Street and Madison Avenue from Giss Parkway to 5th Street.
Justification
Sewer lines in the downtown area are some of the oldest sewer lines in the City. Many of these pipes are broken due to root intrusion or age and must be replaced.
Category Wastewater
Type Improvement
Total Cost $175,000
Progress Under Design
Department UtilitiesRelated Projects
Location 3rd Street from Madison Avenue to Main Street and Madison Avenue from Giss Parkway to 5th Street
Active
Total2016 2017 2018 2019 2020Expenditures
165,000165,000Construction
10,00010,000Inspection
175,000 175,000Total
Total2016 2017 2018 2019 2020Funding Sources
115,000115,000City Road Tax
60,00060,000Wastewater Utility Fund
175,000 175,000Total
Page 662016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Figueroa WPCF Bar Screen Replacement
Description
This project will replace two existing influent bar screens and electrical control system to prevent large untreatable objects and debris from entering the primary clarifiers and subsequently the digesters.
Justification
The bar screens at the Figueroa Facility are the first phase of the water treatment process. The screens prevent large untreatable objects and debris from entering the primary clarifiers and subsequently the digesters. Without operable bar screens debris can enter the primary clarifiers
and cause extensive damage to the rake, arms and transfer pumps. The existing screens were originally installed in the mid 1990’s and the manufacturer no longer supports the make and model of the current screens.
Category Wastewater
Type Maintenance
Total Cost $1,800,000
Progress Planning
Department UtilitiesRelated Projects
Location Figueroa Water Pollution Control Facility (WPCF)
Active
Total2016 2017 2018 2019 2020Expenditures
50,00050,000Inspection
1,750,0001,750,000Installation
1,800,000 1,800,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,040,0001,040,000Bond - Wastewater
760,000760,000Wastewater Utility Fund
1,800,000 1,800,000Total
Page 672016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Figueroa WPCF Biosolids Dewatering Process
Description
Design and construct a biosolids dewatering process capable of producing Environmental Protection Agency certified Class A biosolids.
Justification
Figueroa WPCF produces Class B biosolids, Class B biosolids must be disposed of by certified personnel and annual disposition costs exceed $700,000. Solar dry technology would enable the production of Class A biosolids, significantly decreasing operating expenditures and
producing an environmentally friendly product.
Category Wastewater
Type Improvement
Total Cost $500,000
Progress Under Design
Department UtilitiesRelated Projects
Location Figueroa Water Pollution Control Facility (WPCF)
Active
Total2016 2017 2018 2019 2020Expenditures
20,00020,000Planning/Design
430,000430,000Construction
50,00050,000Inspection
500,000 500,000Total
Total2016 2017 2018 2019 2020Funding Sources
500,000500,000Wastewater Utility Fund
500,000 500,000Total
Page 682016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Figueroa WPCF Capacity Study
Description
The Capacity Study is a three phase study. Phase 1 is a comprehensive examination the facility’s current treatment system. The examination will provide operating recommendations and costs associated with long term facility operation. Phase 2 will examine treatment alternatives that will meet any potential permit requirements. Phase 3 is a cost benefit analysis of each treatment alternative. Recommendation will be provided that meet current and future capacity needs and/or discharge parameters. The recommendation will be used to plan for future capital
expenditures at the Figueroa WPCF.
Justification
The Figueroa WPCF was constructed in the early 1970’s and expanded in the 1980’s. The facility currently meets or exceeds all permitted discharge water quality requirements. However, there is a push by the Environmental Protection Agency through the Clean Water Act for States
to place more stringent parameters on nutrient removal. The facility does not have the ability to meet these more stringent limits. The Utilities Department needs a comprehensive engineering study to effectively plan for and implement new treatment technology in order to meet these expected water quality requirements.
Category Wastewater
Type Assessment
Total Cost $50,000
Progress Evaluating Facility
Department UtilitiesRelated Projects
Location Figueroa Water Pollution Control Facility (WPCF)
Active
Total2016 2017 2018 2019 2020Expenditures
50,00050,000Planning/Design
50,000 50,000Total
Total2016 2017 2018 2019 2020Funding Sources
50,00050,000Wastewater Utility Fund
50,000 50,000Total
Page 692016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Figueroa WPCF On-Site Manhole Replacement
Description
Evaluate, rehabilitate and/or replace in plant manholes as needed within Figueroa Avenue Water Pollution Control Facility.
Justification
The existing manholes at the Figueroa Water Pollution Control Facility were constructed in the 1970's and are in need of repair or replacement.
Category Wastewater
Type Improvement
Total Cost $500,000
Progress Design Complete
Department UtilitiesRelated Projects
Location Figueroa Water Pollution Control Facility (WPCF)
Active
Total2016 2017 2018 2019 2020Expenditures
460,000460,000Construction
40,00040,000Inspection
500,000 500,000Total
Total2016 2017 2018 2019 2020Funding Sources
500,000500,000Wastewater Utility Fund
500,000 500,000Total
Page 702016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Interceptor Sewer Flow Monitoring Upgrade
Description
Install flow monitoring stations at strategic locations within the large diameter sanitary sewer interceptors throughout the collection system.
Justification
Real-time flow data is needed in order to ensure the accuracy of the computerized flow model. The installation of "in manhole" flow monitoring equipment will allow wastewater operators to monitor and alter pumping schedules to maximize the use of existing facilities and avoid possible
sanitary sewer overflows.
Category Wastewater
Type Construction
Total Cost $50,000
Progress Planning
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
45,00045,000Construction
5,0005,000Inspection
50,000 50,000Total
Total2016 2017 2018 2019 2020Funding Sources
50,00050,000Wastewater Utility Fund
50,000 50,000Total
Page 712016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Manhole Rehabilitation/Reconstruction
Description
Replace failed concrete and brick manholes in order to prevent damage to nearby infrastructure.
Justification
Hydrogen sulfide is corrosive to concrete and cementitious materials and damages manholes. Many of the City’s older brick or concrete manholes are highly susceptible to damage from the hydrogen sulfide and should be replaced before complete failure.
Category Wastewater
Type Improvement
Total Cost $500,000
Progress Contingency Project
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
50,00010,000 10,000 10,000 10,000 10,000Planning/Design
400,00080,000 80,000 80,000 80,000 80,000Construction
50,00010,000 10,000 10,000 10,000 10,000Inspection
100,000 100,000 100,000 100,000 100,000 500,000Total
Total2016 2017 2018 2019 2020Funding Sources
500,000100,000 100,000 100,000 100,000 100,000Wastewater Utility Fund
100,000 100,000 100,000 100,000 100,000 500,000Total
Page 722016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Sewer Line Replacements/Improvements
Description
Replace damaged or compromised sanitary sewer lines where necessary or as defects are discovered through routine collection system inspections.
Justification
Replace or repair damaged sanitary sewer lines as needed in order to maintain uninterrupted service.
Category Wastewater
Type Improvement
Total Cost $500,000
Progress Contingency Project
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
50,00010,000 10,000 10,000 10,000 10,000Planning/Design
450,00090,000 90,000 90,000 90,000 90,000Construction
100,000 100,000 100,000 100,000 100,000 500,000Total
Total2016 2017 2018 2019 2020Funding Sources
500,000100,000 100,000 100,000 100,000 100,000Wastewater Utility Fund
100,000 100,000 100,000 100,000 100,000 500,000Total
Page 732016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Wastewater Collection System Lift Station Upgrade
Description
This is an annual project to upgrade and/or refurbish sanitary wastewater lift stations as needed. The project will replace obsolete electrical equipment and Supervisory Control and Data Acquisition (SCADA) controls and worn or undersized pumps with new energy efficient variable drive pumps. Worn or deteriorated piping and other miscellaneous appurtenances will be replaced as needed at each lift station.
Justification
The wastewater collection system currently has twenty-six sanitary waste water lift stations. This project will upgrade existing lift stations with high efficiency pumps, electrical gear, control/monitoring equipment and appurtenances to maintain the necessary level of service and to prevent
sanitary sewer overflows.
Category Wastewater
Type Improvement
Total Cost $1,500,000
Progress Planning
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
100,00020,000 20,000 20,000 20,000 20,000Planning/Design
1,325,000265,000 265,000 265,000 265,000 265,000Construction
75,00015,000 15,000 15,000 15,000 15,000Inspection
300,000 300,000 300,000 300,000 300,000 1,500,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,500,000300,000 300,000 300,000 300,000 300,000Wastewater Utility Fund
300,000 300,000 300,000 300,000 300,000 1,500,000Total
Page 742016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
32nd Street Manhole Rehabilitation
Description
Replace concrete and brick manholes with new polyurea concrete manholes which are impervious to the damaging effects of Hydrogen sulfide.
Justification
Hydrogen sulfide is corrosive to concrete and cementitious materials and has damaged manholes. The manholes in this area are constructed of either brick or unprotected concrete. The Hydrogen sulfide gas has caused severe deterioration of the unprotected structures. Complete
replacement is necessary to prevent potential service disruptions if a manhole(s) fail.
Category Wastewater
Type Maintenance
Total Cost $1,025,000
Progress Planning
Department UtilitiesRelated Projects
Location 32nd Street - 4th Avenue to Avenue 3E
Active
Total2016 2017 2018 2019 2020Expenditures
120,00080,000 40,000Planning/Design
810,000560,000 250,000Construction
95,00060,000 35,000Inspection
700,000 325,000 1,025,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,025,000700,000 325,000Wastewater Utility Fund
700,000 325,000 1,025,000Total
Page 752016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Figueroa WPCF AZPDES Renewal
Description
The project includes testing, modeling and document submittal to the AZPDES Permit Program for permit renewal.
Justification
On December 2002 Arizona became one of 45 states with authorization from Environmental Protection Agency (EPA) to operate the National Pollutant Discharge Elimination System (NPDES) Permit Program (Section 402 of the Clean Water Act) at the state level.
Under the Arizona Pollutant Discharge Elimination System (AZPDES) Permit Program, all facilities that discharge pollutants from any point source into waters of the United States (navigable waters) are required to obtain or seek coverage under an AZPDES permit. Without a permit the Figueroa Water Pollution Control Facility will not be permitted to discharge its treated effluent to the Colorado River.
Category Wastewater
Type Assessment
Total Cost $200,000
Progress Planning
Department UtilitiesRelated Projects
Location Figueroa Water Pollution Control Facility (WPCF)
Active
Total2016 2017 2018 2019 2020Expenditures
200,000200,000Planning/Design
200,000 200,000Total
Total2016 2017 2018 2019 2020Funding Sources
200,000200,000Wastewater Utility Fund
200,000 200,000Total
Page 762016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Wastewater Vac Truck Dump Station Upgrades
Description
Upgrade or replace existing wastewater vacuum truck disposal stations at Figueroa Water Pollution Control Facility and Desert Dunes Water Reclamation Facility.
Justification
Improve existing or purchase two new vacuum truck disposal stations in order to improve operations and reduce residential odor complaints adjacent to dump stations.
Category Wastewater
Type Equipment
Total Cost $1,000,000
Progress Planning
Department UtilitiesRelated Projects
Location Figueroa Water Pollution Control Facility and Desert Dunes Water Reclamation Facility
Active
Total2016 2017 2018 2019 2020Expenditures
100,00050,000 50,000Planning/Design
880,000440,000 440,000Construction
20,00010,000 10,000Inspection
500,000 500,000 1,000,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,000,000500,000 500,000Wastewater Utility Fund
500,000 500,000 1,000,000Total
Page 772016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Desert Dunes WRF Reclaimed Water System
Description
Upgrade Desert Dunes Water Reclamation Facility reclaimed water system with a new storage tank, chlorination system and pump station to provide effluent delivery to off-site reuse applications.
Justification
Upgrades to the existing reclaimed water reuse system will deliver a more functional system. This project is the initial step in providing a reclaimed water delivery system for the use of the Desert Dunes effluent and for potential industrial water users. Other funding sources will be
pursued.
Category Wastewater
Type Improvement
Total Cost $1,200,000
Progress Planning
Department UtilitiesRelated Projects
Location Desert Dunes Water Reclamation Facility
Active
Total2016 2017 2018 2019 2020Expenditures
200,000200,000Planning/Design
960,000960,000Construction
40,00040,000Inspection
1,200,000 1,200,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,020,0001,020,000Other - Proposed
180,000180,000Wastewater Utility Fund
1,200,000 1,200,000Total
Page 782016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Wastewater Utility
Ferrous Chloride Injection System Upgrade
Description
Upgrade ferrous chloride system by moving tanks and pumping system outside of building.
Justification
Ferrous chloride tanks and pumping systems are currently located inside the building at the Avenue 3E and 36th Street lift station. This causes a very corrosive atmosphere within the facility and degradation of exposed metal equipment located inside the facility. Relocating the tanks and
pumping systems outside will reduce operating and maintenance costs by eliminating the premature replacement of equipment inside the building.
Category Wastewater
Type Improvement
Total Cost $1,250,000
Progress Design Complete
Department UtilitiesRelated Projects
Location Avenue 3E and 36th Street
Active
Total2016 2017 2018 2019 2020Expenditures
1,175,0001,175,000Construction
75,00075,000Inspection
1,250,000 1,250,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,250,0001,250,000Wastewater Utility Fund
1,250,000 1,250,000Total
Page 792016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
16th Street Tanks and Pump Station Improvements
Description
Recoat the interior of tanks 1 and 3 and recoat exterior of tanks 1, 2 and 3. Exterior recoating is to include new artwork. Replace small booster pumps with large high capacity pumps, with optional roof top solar panel installation in order to reduce station's long term energy costs.
Phase I - Recoat the interior surface of tank 1 and 3 (2016)Phase II - Recoat the exterior surface of tanks 1, 2, and 3 (2021)
Phase III - Upgrade pump station and install solar panels (2023)
Justification
Improving tanks and pump stations will improve efficiency and yield higher service levels. Tanks number 1 and 3 reveal extreme floor wear with 2-5 years remaining useful life. Tank number 2 has already been recoated. The exterior coating of all three tanks provides a necessary level
of protection against ultraviolet light and the existing coating is reaching the end of its useful life. Larger more efficient pumps at the facility will increase pumping flexibility while providing energy cost savings.
Category Water
Type Improvement
Total Cost $685,000
Progress Planning
Department UtilitiesRelated Projects
Location 16th Street Water Tanks
Active
Total2016 2017 2018 2019 2020Expenditures
685,000685,000Construction
685,000 685,000Total
Total2016 2017 2018 2019 2020Funding Sources
685,000685,000Bond - Water
685,000 685,000Total
Page 802016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Madison Avenue - 2nd to 3rd Street Waterline
Description
Replace existing 8 inch waterline with new 12 inch polyvinyl chloride pipe. Remove and replace existing pavement and rehabilitate sidewalk, curb and gutter.
Justification
The existing 8 inch line was installed in 1940. The section between 2nd and 3rd Street is the only section still in service along Madison Avenue from 1st Street to Giss Parkway. In order to provide more reliable service to the Downtown area and City Hall the 1940’s line should be
replaced.
Category Water
Type Improvement
Total Cost $300,000
Progress Under Construction
Department UtilitiesRelated Projects
Location Madison Avenue - 2nd Street to 3rd Street
Active
Total2016 2017 2018 2019 2020Expenditures
290,000290,000Construction
10,00010,000Inspection
300,000 300,000Total
Total2016 2017 2018 2019 2020Funding Sources
60,00060,000Bond - Wastewater
30,00030,000Bond - Water
210,000210,000City Road Tax
300,000 300,000Total
Page 812016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Main Street WTP Filter System Upgrade
Description
Design and install emergency de-watering system in filter gallery. Upgrade existing backwash recovery system filter, system controls, control buildings and backwash recovery pump.
Phase I - Refurbish/Repair under drain gallery, valves, piping and replace media in filters 1-4 (2016)Phase II - Refurbish/Repair under drain and replace media in filters 5-8 (2019)
Phase III - Refurbish/Repair under drain and replace media in filters 9-12 (TBD)
Justification
The existing filter and backwash system is over 40 years old. Potential failure is possible due to the age of the structures and equipment. System failure may result in lengthy service interruption for a majority of water customers.
Category Water
Type Improvement
Total Cost $3,350,000
Progress Planning
Department UtilitiesRelated Projects
Location Main Street Water Treatment Plant (WTP)
Active
Total2016 2017 2018 2019 2020Expenditures
3,350,0001,850,000 1,500,000Construction
1,850,000 1,500,000 3,350,000Total
Total2016 2017 2018 2019 2020Funding Sources
3,350,0001,850,000 1,500,000Water Utility Fund
1,850,000 1,500,000 3,350,000Total
Page 822016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
New Water Services
Description
New service installations include water meter boxes, polyvinyl chloride pipe and fittings.
Justification
New water services represent an investment in our infrastructure this project captures these improvements throughout the course of the fiscal year.
Category Water
Type Improvement
Total Cost $215,000
Progress Contingency Project
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
215,00030,000 35,000 45,000 50,000 55,000Construction
30,000 35,000 45,000 50,000 55,000 215,000Total
Total2016 2017 2018 2019 2020Funding Sources
215,00030,000 35,000 45,000 50,000 55,000Water Utility Fund
30,000 35,000 45,000 50,000 55,000 215,000Total
Page 832016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Pecan Grove Neighborhood Waterline Replacement
Description
Replace existing 4 inch asbestos cement waterlines currently serving each residential parcel with new larger 6 inch and 8 inch Polyvinyl Chloride waterlines in the street right of way fronting each residential parcel. Service lines entering each home will be relocated from the back to the front of the property requiring temporary construction easements and repair or replacement of existing landscape, driveways, etc.
Justification
The existing waterlines were installed in 1949. Due to the age of these lines and with limited or no access, existing lines should be abandoned and new larger lines installed within the existing street right of way fronting each property.
Category Water
Type Improvement
Total Cost $760,000
Progress Planning
Department UtilitiesRelated Projects
Location Peacan Grove Neighborhood
Active
Total2016 2017 2018 2019 2020Expenditures
750,000750,000Construction
10,00010,000Inspection
760,000 760,000Total
Total2016 2017 2018 2019 2020Funding Sources
760,000760,000Bond - Water
760,000 760,000Total
Page 842016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Water Main Replacement Annual Project
Description
Approximately 1 to 2 miles of undersized or aging water distribution mains throughout the water distribution system will be replaced annually. No dig pipe bursting technology will be utilized where possible. Pavement will be replaced where pipe bursting technology is not utilized.
Justification
Many of the City’s existing water mains were installed mid 1900’s constructed of undersized cast iron or cement asbestos pipes, making them unreliable and unpredictable. This project offers a proactive, business-like approach to replacing each water main by assessing pipeline
conditions and scheduling replacement efficiently. The City is working to eliminate costs of repeated pipeline repairs and disruptions to customers.
Category Water
Type Improvement
Total Cost $7,865,000
Progress Under Design
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
500,000100,000 100,000 100,000 100,000 100,000Planning/Design
6,865,0001,665,000 1,300,000 1,300,000 1,300,000 1,300,000Construction
500,000100,000 100,000 100,000 100,000 100,000Inspection
1,865,000 1,500,000 1,500,000 1,500,000 1,500,000 7,865,000Total
Total2016 2017 2018 2019 2020Funding Sources
3,000,0001,500,000 1,500,000Bond - Water
365,000365,000City Road Tax
4,500,0001,500,000 1,500,000 1,500,000Water Utility Fund
1,865,000 1,500,000 1,500,000 1,500,000 1,500,000 7,865,000Total
Page 852016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Waterline Replacement/Improvements
Description
Replace cast iron and asbestos cement or undersized waterline extensions.
Justification
Provide water line replacements and/or improvements to prevent costly repairs or damages to the system.
Category Water
Type Improvement
Total Cost $1,250,000
Progress Contingency Project
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
75,00015,000 15,000 15,000 15,000 15,000Planning/Design
1,125,000225,000 225,000 225,000 225,000 225,000Construction
50,00010,000 10,000 10,000 10,000 10,000Inspection
250,000 250,000 250,000 250,000 250,000 1,250,000Total
Total2016 2017 2018 2019 2020Funding Sources
250,000250,000Bond - Water
1,000,000250,000 250,000 250,000 250,000Water Utility Fund
250,000 250,000 250,000 250,000 250,000 1,250,000Total
Page 862016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Agua Viva Well No. 1 Replacement
Description
Abandon well no. 1 and replace it with a well that produces a minimum flow of 3.0 million gallons per day.
Justification
The Agua Viva Water Treatment Plant wells are the City's primary emergency water supply if the Colorado River supply were disrupted. Well no. 1 is not capable of pumping significant quantities of water without pulling large amounts of sand. Well replacement is needed as iron and
bacteria have deteriorated the well screens. Other external funding is actively being pursued.
Category Water
Type Construction
Total Cost $1,070,000
Progress Planning
Department UtilitiesRelated Projects
Location Agua Viva Water Treatment Plant
Active
Total2016 2017 2018 2019 2020Expenditures
70,00070,000Planning/Design
950,000950,000Construction
50,00050,000Inspection
70,000 1,000,000 1,070,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,000,0001,000,000Other - Proposed
70,00070,000Water Utility Fund
70,000 1,000,000 1,070,000Total
Page 872016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Main Street WTP Chlorine System Modification
Description
Replace the existing gaseous chlorine system with a new sodium hypochlorite (bleach) disinfection system.
Justification
The Main Street WTP utilizes chlorine gas as part of the water treatment process. Current consumption mandates 8 to 10, one ton, cylinders of chlorine gas be stored on site, this represents a significant risk as chlorine gas is toxic. There are several regulatory requirements associated with
the use and storage of gaseous chlorine. In comparison to chlorine gas, the storage and handling of sodium hypochlorite (bleach) is significantly safer, and for this reason many systems that chlorinate their water utilize sodium hypochlorite disinfection systems.
Category Water
Type Improvement
Total Cost $780,000
Progress Planning
Department UtilitiesRelated Projects
Location Main Street Water Treatment Plant (WTP)
Active
Total2016 2017 2018 2019 2020Expenditures
100,000100,000Planning/Design
650,000650,000Construction
30,00030,000Inspection
780,000 780,000Total
Total2016 2017 2018 2019 2020Funding Sources
780,000780,000Water Utility Fund
780,000 780,000Total
Page 882016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Chlorine Booster Pump Stations
Description
Install liquid chlorine booster pump stations at strategic locations in extremities of the water distribution to maintain effective chlorine residual within the distribution system.
Justification
Environmental Protection Agency stage 2 disinfection by-product rules have altered how the department can add chlorine to treated water. In order to maintain safe and effective chlorine levels within the system's extremities small chlorine booster stations are needed.
Category Water
Type Improvement
Total Cost $700,000
Progress Planning
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
700,000350,000 350,000Construction
350,000 350,000 700,000Total
Total2016 2017 2018 2019 2020Funding Sources
700,000350,000 350,000Water Utility Fund
350,000 350,000 700,000Total
Page 892016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Avenue 4E and 36th Street Water Main Intersection
Description
Install a 10 inches of polyvinyl chloride pipe water main from 36th Street and Avenue 4E west approximately 760 feet and connect to existing blow-off valve.
Justification
The existing waterline installed on 36th Street terminates approximately 760 feet west of Avenue 9E. It is necessary expand the water main in this area in order to improve water quality and ensure system reliability as this main feeds large production facilities in the area.
Category Water
Type Construction
Total Cost $250,000
Progress Design Complete
Department UtilitiesRelated Projects
Location Avenue 4E and 36th Street
Active
Total2016 2017 2018 2019 2020Expenditures
245,000245,000Construction
5,0005,000Inspection
250,000 250,000Total
Total2016 2017 2018 2019 2020Funding Sources
250,000250,000Water Utility Fund
250,000 250,000Total
Page 902016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Avenue C - 16th to 18th Street Waterline
Description
Replace approximately 1,000 lineal feet of 12 inch polyvinyl chloride pipe along Avenue C from 16th Street to 18th Street.
Justification
The existing polyvinyl chloride pipe has failed. The failure is believed to be attributable to inconsistencies in the pipe material composition. The line is splitting along the length of the pipe in several locations. Line failure has resulted in shut-downs and isolations of the affected line
and created water quality issues in this area.
Category Water
Type Construction
Total Cost $400,000
Progress Planning
Department UtilitiesRelated Projects
Location Avenue C - 16th to 18th Street
Active
Total2016 2017 2018 2019 2020Expenditures
30,00030,000Planning/Design
350,000350,000Construction
20,00020,000Inspection
400,000 400,000Total
Total2016 2017 2018 2019 2020Funding Sources
400,000400,000Water Utility Fund
400,000 400,000Total
Page 912016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
Strategic Groundwater Wells and Filtration System
Description
Design and construct new groundwater wells, filtration systems and storage tanks for minimum capacity of 20 mgd at strategic locations throughout the distributions system.
Phase I - Feasibility and site locations (2020)Phase II - Design and land acquisition (20221)Phase III - Construct Well Field No. 1 (2022)Phase IV - Construct well field No. 2 (2024)
Justification
The City's potable water source is the Colorado River. In case of drought, delivery system outages or contamination which may force a temporary or extended loss of river water. The City would then be required to rely exclusively on groundwater wells to meet demands.
Currently the wells at Agua Viva Water Treatment Plant can only produce a maximum of 9.0 million gallons per day (mgd), which is less than half the average daily demand of approximately 20 mgd. This project will determine the feasibility and strategic location for emergency wells, filtration systems and pumping stations Citywide. The wells could also be utilized in summer months to reduce total trihalomethane (TTHMs) levels in the distribution system.
Category Water
Type Construction
Total Cost $11,010,000
Progress Planning
Department UtilitiesRelated Projects
Location Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
250,000250,000Planning/Design
250,000 250,000Total
Total2016 2017 2018 2019 2020Funding Sources
250,000250,000Water Utility Fund
250,000 250,000Total
Page 922016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam Water Utility
TTHM Air Stripping Tank System
Description
Install new or upgrade existing potable water storage tank mixers and aeration units in order to volatize and remove TTHM's from the potable water supplies.
Phase I - Friendship Tower (2020)Phase II - Agua Viva Water Treatment Plant Tanks 1 & 2 (2021)
Justification
The Environmental Protection Agency and Arizona Department of Environmental Quality stage 2 disinfection by-product rules require water distribution systems maintain new, more stringent, trihalomethanes (TTHM) levels within the water distribution system. New aeration systems
installed in water storage tanks volatize and remove TTHM’s created as water ages in the tanks. By installing new or upgrading existing tank mixers the City will avoid installing costly upgrades at each of the City's water treatment plants.
Category Water
Type Equipment
Total Cost $745,000
Progress Planning
Department UtilitiesRelated Projects
Location Water Tanks Citywide
Active
Total2016 2017 2018 2019 2020Expenditures
10,00010,000Planning/Design
725,000725,000Construction
10,00010,000Inspection
745,000 745,000Total
Total2016 2017 2018 2019 2020Funding Sources
745,000745,000Water Utility Fund
745,000 745,000Total
Page 932016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam YCNHA
Downtown Revitalization
Description
The YCNHA and the City have worked to preserve green space in the downtown, encourage new sustainable and historically-sensitive development, and promote a more livable City center. However both the City and the Heritage Area’s plans for the historic downtown focus on the economic and community development challenges of its revitalization and do not address the environmental and public safety complications of the area’s many brownfield properties. This grant will enable the City to integrate its ongoing revitalization and community engagement efforts with a newfound focus on brownfield issues and provide a catalyst for new development and progress in the historic downtown. The City
has identified at least 15 potentially contaminated properties in the area that may require environmental remediation.
Justification
Building a more economically vibrant and sustainable Yuma cannot be accomplished without the revitalization of historic downtown. Unfortunately the presence of idle brownfields removes significant parcels of land from productive use and discourage nearby development by
blighting neighborhoods. The City proposed the use of an EPA Brownfields Assessment grant to begin the process of characterizing and redeveloping these sites. This will facilitate the historic downtown’s transition into a vibrant and mixed-use neighborhood.
Category Redevelopment
Type Improvement
Total Cost $125,000
Progress Planning
Department AdministrationRelated Projects
Location Historic Downtown/North End
Active
Total2016 2017 2018 2019 2020Expenditures
50,00050,000Planning/Design
75,00075,000Inspection
125,000 125,000Total
Total2016 2017 2018 2019 2020Funding Sources
50,00050,000Bond - General
75,00075,000Grant
125,000 125,000Total
Page 942016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam YCNHA
Fourth Avenue Gateway
Description
The Fourth Avenue Gateway project will rehabilitate the 1956 ADOT Port of Entry building (Façade Improvements); construct a 10 foot wide multi-use pathway with pedestrian lighting; add welcome and way finding signage; and beautify the entry gateway with landscape and hardscape features. The 10 foot wide multi-use pathway on the east side of the project will connect to the Yuma Canal Pathway (a completed transportation enhancement project) at its northern terminus to the existing sidewalk at its southern terminus. Pedestrian lighting will be added to enhance safety. Landscaping and decorative planter walls in the median will greatly enhance the historic Port of Entry and create a sense of
arrival for visitors. The project limits will begin at the Stateline on Business 8 and extend south for 0.28 miles, terminating at 1st Street.
Justification
This project funded by the Arizona Department of Transportation (ADOT) and Federal Highway Administration (FHWA) as it is important to improve the Gateway to Arizona and the Yuma Community. The project will also address the 4th Avenue right-of-way abandonment from
ADOT to the City and the underlying ownership of a 50 foot strip of land that was acquired from the U.S. Bureau of Reclamation as authorized by the US Congress in 2006.
Category Street Improvement
Type Improvement
Total Cost $669,000
Progress Design Complete
Department AdministrationRelated Projects
Location 4th Avenue - Business 8 to 1st Street
Active
Total2016 2017 2018 2019 2020Expenditures
112,000112,000Planning/Design
529,000529,000Construction
28,00028,000Inspection
669,000 669,000Total
Total2016 2017 2018 2019 2020Funding Sources
37,00037,000Bond - General
632,000632,000Grant
669,000 669,000Total
Page 952016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam YCNHA
West Wetlands Lower Bench Completion
Description
Lower Bench improvements will include two beaches, bank line restoration, trails, interpretive signs and pond restoration.
Justification
Expanding riverfront access for the public is a City priority. Gateway Park is often at capacity during the busy summer months. A relatively small investment can yield considerable benefits, as the existing parking, restroom, and road infrastructure are already in place.
Category Improvement
Type Improvement
Total Cost $85,000
Progress Design Complete
Department AdministrationRelated Projects
Location West Wetlands Park
Active
Total2016 2017 2018 2019 2020Expenditures
85,00085,000Construction
85,000 85,000Total
Total2016 2017 2018 2019 2020Funding Sources
85,00085,000Bond - General
85,000 85,000Total
Page 962016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam YCNHA
Yuma Multimodal Center
Description
Build a Multimodal Transportation Center at the vacant Hotel Del Sol, two grants have been awarded for design and preconstruction.
Justification
In 2000, the Yuma Metropolitan Planning Organization developed a plan to create a Multimodal Transportation Center in the vacant Hotel Del Sol located downtown. The City of Yuma purchased the facility in 2006 utilizing Transportation Equity Act for the 21st Century (TEA-21)
funds. Reclaiming this historic resource will dramatically enhance the appearance of the downtown area, while providing an important transit facility for the community. The environmental analysis and remediation is complete. Several grant opportunities are currently being pursued for the construction phase of this project, including Federal Transit Administration and Community Development Block Grant funds.
Category Buildings
Type Construction
Total Cost $9,163,000
Progress Under Design
Department AdministrationRelated Projects
Location 3rd Street between Gila Street and Maiden Lane
Active
Total2016 2017 2018 2019 2020Expenditures
1,460,0001,206,000 254,000Planning/Design
7,303,000903,000 6,400,000Construction
400,000400,000Inspection
1,206,000 1,157,000 6,800,000 9,163,000Total
Total2016 2017 2018 2019 2020Funding Sources
1,890,288964,800 925,488Grant
6,800,0006,800,000Other - Proposed
472,712241,200 231,512Two Percent Tax
1,206,000 1,157,000 6,800,000 9,163,000Total
Page 972016-2020 Capital Improvement Program Effective July 1, 2015
Capital Improvement Progam
YEARS 2021 THROUGH 2025
Project Name
City of Yuma, Arizona
Department
2021
Fire Station 7(D) - Avenue 8½E & 34th Street Public Safety
Storm Water Drainage - Del Oro Estates Stormwater Control
24th Street - North Frontage Road Widening Transportation
24th Street Right-Turn Lanes at Arizona Avenue Transportation
20th Street and 45th Avenue Signal Transportation
Figueroa WPCF Corrosion Control Wastewater Utility
Figueroa WPCF Power Improvements Wastewater Utility
Septic Waste Receiving Station Wastewater Utility
36th Street Waterline - 4th Avenue to 8th Avenue Water Utility
Loma Vista Subdivision Water Service Line Repl. Water Utility
Strategic Groundwater Wells and Filtration System Water Utility
2022
TRT Building Collapse/Confined Space Prop Public Safety
PS Training Facility Vehicle Shade Cover Public Safety
47th Avenue Drainage Improvements Stormwater Control
8th Street and Pacific Avenue Improvements Transportation
Del Oro Reconstruction Transportation
18th Avenue and 24th Street Realignment Transportation
20th Street and Avenue C Improvements Transportation
Figueroa WPCF Primary Clarifier Improvements Wastewater Utility
Desert Dunes WRF UV Disinfection System
Upgrades
Wastewater Utility
Strategic Groundwater Wells and Filtration System Water Utility
2023
PSTF Police Tactical Training Village Public Safety
West Mesa Drainage Improvements Stormwater Control
32nd Street and Avenue 7E Turn Lane Transportation
Avenue A - 32nd Street to 36th Street Transportation
3rd Street - 4th Avenue to Avenue A Transportation
4th Avenue and Giss Parkway Turn Lane Transportation
Figueroa WPCF Co-Gen Project Wastewater Utility
Desert Dunes WRF Solids Handling Upgrades Wastewater Utility
Augusta Drive - Waterline Replacement Water Utility
Strategic Groundwater Wells and Filtration System Water Utility
2024
West Wetlands Loop Road & Utility Build-Out Parks and Recreation
Yuma Civic Center Parking Lot Paving Parks and Recreation
Fire Station 8 (A) - 36th Street & Avenue 4E Public Safety
16th Street - 45th Avenue to Avenue D Transportation
4th Avenue - 32nd Street to 40th Street Transportation
56th Street - ASH to Ave 13E Transportation
40th Street - Arizona Avenue to Avenue A Transportation
Figueroa WPCF Administrative Building
Expansion
Wastewater Utility
Desert Dunes Water Reclamation Facility Wastewater Utility
Page 982016-2020 Capital Improvement Program Effective July 1, 2015
Project Name Department
Expansion
Avenue B & 16th Street Lift Station & Force Main Wastewater Utility
Main Street WTP Backwash Recovery Clarifier Water Utility
30th Street Water Main - Avenue 6¾E to Avenue
7E
Water Utility
2025
Yuma East Athletic Park Parks and Recreation
PSTF Educational Building Public Safety
32nd Street & Avenue B Intersection Improvements Transportation
Arizona Avenue - 32nd to 40th Street Transportation
Avenue 7E - Telegraph Street to U.S. Highway 95 Transportation
24th Street and Kennedy Lane Turn Lane Transportation
32nd Street and Arizona Avenue Turn Lane Transportation
Figueroa WPCF Capacity Improvements Wastewater Utility
Agua Viva Urban Lake Water Utility
Page 992016-2020 Capital Improvement Program Effective July 1, 2015
POTENTIAL INFRASTRUCTURE PROJECTSCapital Improvement Progam
City of Yuma, Arizona
General Government
Status Project Name
City Hall ModificationP.I.P.
East Mesa FacilitiesP.I.P.
Right-of-Way Improvements-Target Area 1P.I.P.
ITS
Status Project Name
Photogrammetric ServicesP.I.P.
Parks and Recreation
Status Project Name
Smucker Park ImprovementsP.I.P.
East Mesa Area ParkP.I.P.
Readiness Center Entry Way BeautificationP.I.P.
Historic Yuma Theatre Phase II PlansP.I.P.
Parks Maintenance Building Sewer ImprovementsP.I.P.
Sunrise Optimist Park ExtensionP.I.P.
Central Drain Linear Park - Avenue C to C¾P.I.P.
Avenue C¾ Alignment Park - 16th to 22nd StreetP.I.P.
45th Avenue & Central Drain Stub No. 1 Linear ParkP.I.P.
South Valley Recreation CenterP.I.P.
Civic Center Roof ReplacementP.I.P.
Public Safety
Status Project Name
Fire Station 9 - Avenue 6E & 36th StreetP.I.P.
Municipal Court ExpansionP.I.P.
City of Yuma Prosecutor OfficeP.I.P.
Fire Station E - I-8 and Fortuna RoadP.I.P.
Fire Station C - Avenue C and 8th StreetP.I.P.
Stormwater Control
Status Project Name
Storm Water Lift Station ConversionP.I.P.
Hacienda Estates SubdivisionP.I.P.
Del Oro Storm DrainageP.I.P.
Hacienda Estates Storm Drain UpgradeP.I.P.
Lynnwood Estates Storm DrainageP.I.P.
Storm Pump Station TelemetryP.I.P.
The Manors Storm Sewer SystemP.I.P.
8th Avenue Storm Sewer ExtensionP.I.P.
Fix Alley Drainage - 4th Avenue & Ave. AP.I.P.
Transportation
Status Project Name
Yuma ExpresswayP.I.P.
1st Street - Gila Street to Avenue CP.I.P.
36th Street - 4th Avenue to 8th AvenueP.I.P.
Subdivisions Street ResurfacingP.I.P.
Avenue A - 8th Street to 16th StreetP.I.P.
Giss Parkway Extension - I-8 to 16th StreetP.I.P.
Page 1002016-2020 Capital Improvement Program Effective July 1, 2015
24th Street - Avenue C to Avenue DP.I.P.
32nd Street - Avenue B to Avenue CP.I.P.
40th Street - Avenue A to Avenue BP.I.P.
32nd Street - Avenue C to Avenue DP.I.P.
33rd Drive (Ave. B½) - 28th Street to 32nd StreetP.I.P.
Avenue C - 24th Street to 32nd StreetP.I.P.
Avenue A - 40th Street to Airport Loop RoadP.I.P.
Avenue C - 32nd Street to 40th StreetP.I.P.
Avenue B - 24th Street to 32nd StreetP.I.P.
33rd Drive - 32nd Street to 40th StreetP.I.P.
12th Street - Avenue A to Avenue BP.I.P.
Avenue 3½E - Avenue 3E to 56th StreetP.I.P.
Avenue 6E Widening - 32nd Street to 40th StreetP.I.P.
32nd Street Widening - Avenue 3E to Avenue 5EP.I.P.
44th Street - Ave 3½E to 4½E & Ave 7E to 8½EP.I.P.
36th Street - Ave 3½E to 6E & Ave 7E to 10EP.I.P.
40th Street - Ave 3½E to Ave 10EP.I.P.
Avenue 8½E - 32nd St Expressway to 48th StP.I.P.
Avenue 8E - 32nd St Expressway to 56th StP.I.P.
16th Street Expressway - Avenue 2E to Avenue 10EP.I.P.
Avenue 7E - 32nd St Expressway to 56th StreetP.I.P.
Avenue 10E - 16th Street Expressway to 56th StreetP.I.P.
Avenue 4½E - 32nd St Expressway to 44th StreetP.I.P.
Avenue 4E - 28th Street to Yuma ExpresswayP.I.P.
Avenue 5½E - 32nd Street to 40th StreetP.I.P.
Avenue 5E - 16th St Expressway to Yuma ExpresswayP.I.P.
Avenue 7½E - 32nd St Expressway to 56th StP.I.P.
East Yuma FreewayP.I.P.
40th Street - Avenue B to Avenue DP.I.P.
45th Avenue - 5th Street to 28th StreetP.I.P.
52nd Street - Avenue 5E to Avenue 6EP.I.P.
16th Street Widening - 6th Avenue to 14th AvenueP.I.P.
28th St. - 4th Ave. to Alley West of Madison Ave.P.I.P.
Maiden Lane & Gila Street - 1st St to Giss PkwyP.I.P.
36th Street - Arizona Avenue to 4th AvenueP.I.P.
Elks Lane - 24th Street to 14th AvenueP.I.P.
Thacker Lateral Multi-Use Path (North)P.I.P.
Thacker Lateral Multi-Use Path (South)P.I.P.
Pacific Avenue SidewalksP.I.P.
Avenue A - 24th Street to 32nd StreetP.I.P.
East Palo Verde Street - Pacific Avenue to Ave 2½EP.I.P.
Engler Avenue - 24th St. & E. Palo Verde St.P.I.P.
Avenue D Bike PathP.I.P.
Avenue C½ - 36th Street to 40th StreetP.I.P.
Traffic Signal Install - Avenue C and 28th StreetP.I.P.
45th Avenue Bike PathP.I.P.
El Paseo Real ConstructionP.I.P.
Meadowbrook Subdivision Streets ReconstructionP.I.P.
Rancho Verde Subdivision Street ReconstructionP.I.P.
Magnolia Village Units 1-3 Street ReconstructionP.I.P.
28th Street Reconstruction - 8th Ave to 4th AveP.I.P.
Avenue B Turn LanesP.I.P.
Palo Verde Street ConstructionP.I.P.
Pacific Avenue Access Study & ImplementationP.I.P.
Automated Traffic Counting AdditionP.I.P.
38th Ave. Crossing of U.S.B.R. Central DrainP.I.P.
34th Drive Crossing of U.S.B.R. Central DrainP.I.P.
Page 1012016-2020 Capital Improvement Program Effective July 1, 2015
32nd Street Expressway ConstructionP.I.P.
Avenue 9½E ConstructionP.I.P.
Avenue 9E ConstructionP.I.P.
Pacific Avenue - 16th Street to 32nd StreetP.I.P.
Avenue 6E ConstructionP.I.P.
20th Street - Avenue B to Avenue DP.I.P.
24th Street - Avenue 3E to Avenue DP.I.P.
Avenue B - I-8 to 80th StreetP.I.P.
Avenue C - 1st Street to 24th StreetP.I.P.
24th Street / Avenue B Corridor StudiesP.I.P.
4th Avenue - 1st and 8th Streets IntersectionsP.I.P.
1st Avenue - 1st Street to Court StreetP.I.P.
28th Street - Avenue 9E to Avenue 9¾EP.I.P.
16th Street - Avenue B to Avenue CP.I.P.
16th Street - Avenue C to 47th AvenueP.I.P.
18th Avenue - Camino Alameda ConnectionP.I.P.
4th Avenue & 24th Street ImprovementP.I.P.
McPhauls SubdivisionP.I.P.
First Street Estates SubdivisionP.I.P.
36th Street - Arizona Avenue to Burch WayP.I.P.
8th Avenue - 24th Street to 32nd StreetP.I.P.
Villa Cordova Units 3 and 4P.I.P.
Villa Cordova Units 1 and 2P.I.P.
Hazelwood Estates Units 1 and 2P.I.P.
Trigg Subdivision and Sunset Heights Unit 2P.I.P.
Mesa Heights Subdivision Unit 3P.I.P.
Mesa Heights Units 2 and 3P.I.P.
Wastewater Utility
Status Project Name
Wastewater Utility SecurityP.I.P.
Upgrade Figueroa Service AreaP.I.P.
Diffused Air Flotation Unit ReplacementP.I.P.
Lift Station Flow Meter RetrofitP.I.P.
Cemetery/Main Street - 6th to 7th StreetsP.I.P.
Secondary Clarifier Upgrades & ImprovementsP.I.P.
4th Avenue - Sewer Line Repairs/ReplacementP.I.P.
Water Utility
Status Project Name
Agua Viva Water Treatment Plant ExpansionP.I.P.
24th Street 16" Waterline - 8th to Arizona AvenueP.I.P.
Main St. WTF Safe Drinking Water Act UpgradesP.I.P.
Environmental Laboratory EquipmentP.I.P.
Main Street WTF Operator Control CenterP.I.P.
Main Street WTF Sedimentation Basin CoversP.I.P.
Water Distribution System Monitoring (EWS)P.I.P.
1st Ave. Waterline - Giss Pkwy to 12th StreetP.I.P.
2nd Avenue Waterline - 12th Street to 16th StreetP.I.P.
3rd Street Watermain - Magnolia Ave. to Ave. BP.I.P.
Arizona Ave. Waterline - 5th Street to 24th StreetP.I.P.
12th Street Waterline - 14th Ave. to 21st Dr.P.I.P.
40th Street Waterline - E.M.C. to Avenue BP.I.P.
28th Street Waterline - 8th Ave to Ave AP.I.P.
19th Street Waterline - 4th Ave. to Arizona Ave.P.I.P.
10" Waterline at 28th St E. of 4th AvenueP.I.P.
5th Street 10" Watermain - Avenue B to Avenue CP.I.P.
Page 1022016-2020 Capital Improvement Program Effective July 1, 2015
24th St. Ground Storage Tank & Transmission LineP.I.P.
Orange Avenue Waterline - 4th St to 8th StP.I.P.
Carbon Feeder ImprovementsP.I.P.
Main Street WTF Yard Paving ImprovementsP.I.P.
Page 1032016-2020 Capital Improvement Program Effective July 1, 2015
Projects Year Department Page
2016 Wastewater Utility 61
2017 Transportation 42
2016 Transportation 26
2019 Transportation 50
2019 Transportation 51
2016 Water Utility 80
2018 Transportation 45
2019 Transportation 52
2018 Transportation 46
2016 Transportation 27
2018 Transportation 47
2020 Transportation 57
2016 Transportation 28
2016 Transportation 29
2019 Transportation 53
2020 Transportation 58
2016 Wastewater Utility 62
2018 Transportation 48
2020 Transportation 59
2019 Transportation 54
2020 Transportation 60
2017 Wastewater Utility 75
2018 Transportation 49
2019 Transportation 55
2016 Transportation 30
2016 Transportation 31
2016 Wastewater Utility 63
2016 Transportation 32
2016 Wastewater Utility 64
2017 Water Utility 87
2016 Transportation 33
2017 Stormwater Control 25
2016 Transportation 34
2017 Transportation 43
2016 Transportation 35
2020 Water Utility 90
2016 Transportation 36
2019 Transportation 56
2020 Water Utility 91
2016 Transportation 37
2019 Water Utility 89
2016 General Government 13
2016 General Government 14
2016 Transportation 38
10th Avenue and Avenue A Alley Sanitary Sewer 14th Street - 4th to 1st Avenue Paving
16th Street and 4th Avenue Intersection Improvements 16th Street and Arizona Avenue Improvements
16th Street and Pacific Avenue Turn Lane
16th Street Tanks and Pump Station Improvements 16th Street Turn Lane - Maple to 1st Avenue
18th Street and Avenue C Traffic Signal
1st Avenue - 12th Street to 16th Street Paving
1st Avenue - 24th to 26th Street Paving
1st Avenue - Orange Avenue to 9th Street Paving
1st to Colorado Street-Avenue A to 23rd Ave Paving 22nd Street - Avenue A to 4th Avenue Paving
24th Street - Avenue B to C Improvements
24th Street and 1st Avenue Turn Lane
24th Street and Pacific Avenue Turn Lane
24th Street Lift Station Replacement
28th Street - Avenue B to Avenue C Improvements 28th Street - 45th Avenue to Avenue C
32nd Street and Avenue 5E Turn Lanes
32nd Street and Pacific Avenue Improvements
32nd Street Manhole Rehabilitation
3rd Avenue - Orange Avenue to 14th Street Paving 4th Avenue and 8th Street Turn Lane
4th Avenue and Big Curve Turn Lane
4th Avenue Extension Pedestrian Pathway
4th Street & Avenue A Sewer Line Replacement 56th Street Pavement Overlay
5th Street Sanitary Sewer Replacement
Agua Viva Well No. 1 Replacement
Airport Loop Road Improvements
Arena Drive Storm Drain
Arizona Ave - Palo Verde to Country Club Dr Paving Avenue 10E Improvements
Avenue 3E and 16th Street Improvements
Avenue 4E and 36th Street Water Main Intersection Avenue 9E Railroad Crossing Quiet Zone
Avenue B and 16th Street Turn Lane
Avenue C - 16th to 18th Street Waterline
Catalina Drive - 32nd Street to 4th Avenue Paving Chlorine Booster Pump Stations
Citywide Development Fee Update
Citywide Energy Savings Project
Citywide Safety Improvements
Civic Center Sunset Terrace Expansion 2016 Parks and Recreation 17
ALPHABETIC INDEXCapital Improvement Progam
City of Yuma, Arizona
Page 1042016-2020 Capital Improvement Program Effective July 1, 2015
Projects Year Department Page
Desert Dunes Improvement Project 2016 Wastewater Utility 65
Desert Dunes WRF Reclaimed Water System 2020 Wastewater Utility 78
Downtown Revitalization 2016 Yuma Crossing National Heritage Area 94
Downtown Sewer Line Replacement 2016 Wastewater Utility 66
Ferrous Chloride Injection System Upgrade 2020 Wastewater Utility 79
Figueroa WPCF AZPDES Renewal 2017 Wastewater Utility 76
Figueroa WPCF Bar Screen Replacement 2016 Wastewater Utility 67
Figueroa WPCF Biosolids Dewatering Process 2016 Wastewater Utility 68
Figueroa WPCF Capacity Study 2016 Wastewater Utility 69
Figueroa WPCF On-Site Manhole Replacement 2016 Wastewater Utility 70
Financial Administration Software 2016 General Government 16
Fire Station 4 Remodel 2019 Public Safety 22
Fleet Services Maintenance Shop 2016 Transportation 39
Fourth Avenue Gateway 2016 Yuma Crossing National Heritage Area 95
Gila Street - 1st to 3rd Street Paving 2017 Transportation 44
Interceptor Sewer Flow Monitoring Upgrade 2016 Wastewater Utility 71
Joint Land Use Study 2016 General Government 15
Madison Avenue - 2nd to 3rd Street Waterline 2016 Water Utility 81
Main Street WTP Chlorine System Modification 2017 Water Utility 88
Main Street WTP Filter System Upgrade 2016 Water Utility 82
Manhole Rehabilitation/Reconstruction 2016 Wastewater Utility 72
New Water Services 2016 Water Utility 83
Pacific Avenue Athletic Complex 2016 Parks and Recreation 18
Palo Verde Street - Catalina Drive to Arizona Avenue Paving 2016 Transportation 40
Pecan Grove Neighborhood Waterline Replacement 2016 Water Utility 84
Police Station Cooling Towers and Chillers 2016 Public Safety 20
Police Station Parking Garage Repairs 2016 Public Safety 21
Police Storage Facility 2019 Public Safety 23
Sewer Line Replacement/Improvement 2016 Wastewater Utility 73
Smucker Regional Storm Drain Basin 2016 Stormwater Control 24
Stewart Vincent Wolfe Creative Playground 2016 Parks and Recreation 19
Strategic Groundwater Wells and Filtration System 2020 Water Utility 92
TTHM Air Stripping Tank System 2020 Water Utility 93
Wastewater Collection System Lift Station Upgrade 2016 Wastewater Utility 74
Wastewater Vac Truck Dump Station Upgrades 2018 Wastewater Utility 77
Water Main Replacement Annual Project 2016 Water Utility 85
Waterline Replacement/Improvements 2016 Water Utility 86
West Main Canal Multi-use Path 2016 Transportation 41
West Wetlands Lower Bench Completion 2016 Yuma Crossing National Heritage Area 96
Yuma Multimodal Center 2016 Yuma Crossing National Heritage Area 97
Page 1052016-2020 Capital Improvement Program Effective July 1, 2015
4TH AVE
Jo
int L
an
dU
se S
tud
y
SR 195 HIGHWAY
YUMA
COUNTY
CITY OF
YUMA
CITY OF SOMERTON
Fin
an
cia
lA
dm
inis
tratio
nS
oftw
are
§̈¦I8
AVE 9 E
8T
H S
TAVE B
AVE 1 E
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
CO
UN
TY
6T
H S
T
24
TH
ST
4TH AVE
AVE A
AVE C
AVE D
AVE 3 E
AVE 6 E
AVE 7 E
20
TH
ST
PIMA LN
COCONINO LN
10
TH
ST
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
19
TH
ST
WINSOR AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
25
TH
PL
18TH AVE
20
TH
ST
26
TH
PL
11
TH
ST
47TH AVE
10
TH
PL
14
TH
ST
38
TH
ST
39
TH
ST
PALM AVE
26
TH
ST
3R
D S
T
OTONDO DR
AVE 4 1/4 E
OLIVIA AVE
MARY AVE
17
TH
PL
18
TH
PL
AVE 10 E
31
ST
LN
46TH DR
25
TH
ST
ATHENS AVE
31
ST
PL
PARTYTIMEBLV
D
26
TH
ST
25
TH
ST
DORA AVE
3RD AVE
34
TH
ST
S
AN
MA
RC
OS
DR
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
23
RD
ST
4T
H S
T
15
TH
PL
13
TH
PL
AVE 7 E
33
RD
PL
PO
PP
Y S
T
26
TH
ST
VIRGINIA DR
20
TH
ST
30
TH
ST
27
TH
ST
4T
H S
T
13
TH
PL
17TH AVE
37
TH
ST
36TH DR
20TH DR
3R
D P
L
41
ST
ST
6T
H S
T
21ST AVE
12
TH
PL
ORANGE AVE
26
TH
ST
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
18
TH
ST
3R
D S
T
21
ST
PL
23
RD
LN
45TH DR
12TH AVE
1S
TS
T
16TH AVE
22
ND
ST
17TH AVE
22ND AVE
20
TH
ST
15
TH
ST
21
ST
LN
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
13TH AVE
45
TH
PL
30
TH
PL
10TH AVE
6TH AVE
36
TH
ST
25
TH
LN
27
TH
LN
JAMES DR
47
TH
ST
12
TH
PL
32ND AVE
34TH AVE
31ST AVE
34
TH
ST
37TH DR
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
13TH AVE
25
TH
ST
28
TH
PL
HA
CIE
NDA
DR
20
TH
PL
MARY AVE
30
TH
ST
14TH AVE
29
TH
LN
29
TH
ST
26
TH
ST
27
TH
ST
32ND AVE
36TH DR
19TH AVE
15TH AVE
12
TH
ST
34
TH
ST
5T
H S
TL
IND
A L
N
25
TH
ST 19TH AVE
16TH AVE
22
ND
LN
AVE 5 E
AVE 4 1/4 E
23
RD
ST
33
RD
LN
12TH AVE
ARENA DR
11
TH
ST
21
ST
ST
17
TH
ST
VE
NU
S D
R
DA
ISY
ST
CO
UN
TY
13 1
/2 S
T
1ST AVE
34TH DR
28T
H S
T
5TH AVE
6TH AVE
16
TH
PL
6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
MAIDENLN
9T
H S
T
23
RD
ST
15
TH
ST
36
TH
PL
14
TH
LN
34TH DR
3RD AVE3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
24
TH
LN
35
TH
RD
37
TH
ST
47
TH
ST
36
TH
ST
8TH AVE
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
RIOVISTADR
MAE WEST
18
TH
PL
LA
SL
OM
AS
ST
13
TH
ST
AVE 10 E
13TH
ST
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
25
TH
PL
LALINE DR
LASSIE
MADISON AVE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
5T
H P
L
21
ST
ST
MAINST
21ST AVE
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE C 1/4
AVE 3 E
42
ND
PL
KA
YE
DR
2ND AVE
21
ST
ST
RIH
O L
N
14TH AVE
15TH AVE
7TH AVE
9TH AVE
10TH AVE
11TH AVE
8TH AVE
5TH AVE
17TH AVE
11TH AVE17
TH
PL
6TH AVE
7TH AVE
2ND AVE
WALNUT AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
13
TH
PL
12
TH
LN
13
TH
ST
21
ST
LN
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
13
TH
LN
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
34
TH
ST
CO
LU
MB
IA A
VE
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
18
TH
ST
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
36
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
10
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
CO
UN
TR
Y L
N
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
INC
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
15
TH
ST
CO
UN
TY
12 1
/4 S
T
ARABY RD
10
TH
ST
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
LE
VE
E R
D
CO
UN
TY
14 1
/2 S
T
2ND AVE
8TH AVE
3RD AVE
28TH DR
17TH AVE
24TH AVE
ENGLER AVE
18TH AVE MAGNOLIA AVE
33RD DR
20TH AVE
ARIZONA AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE 9TH AVE
RIDGEVIEWDR
45TH AVE
AVE 5 1/4 E
13TH AVE
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
QUECHAN DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramGeneral Government
FY 2016Map-1
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
City of Yuma
Yuma County
*NOTE: Citywide Projects Citywide Development Fee Update Citywide Energy Savings Project
General Government Projects
4TH AVE
SR 195 HIGHWAY
YUMA
COUNTY
CITY
OF YUMA
CITY OF SOMERTON
Po
lice
Sta
tion
Pa
rkin
gG
ara
ge
Re
pa
irsP
olic
e S
tatio
n C
oo
ling
To
we
rs a
nd
Ch
illers
Pa
cific
Av
en
ue
Ath
letic
Co
mp
lex
Ste
wa
rt Vin
ce
nt W
olfe
Cre
ativ
e P
lay
gro
un
d
Civ
ic C
en
ter S
un
se
tTe
rrac
e E
xp
an
sio
n
YU
MA
INT
ER
NA
TIO
NA
L
AIR
PO
RT
§̈¦I8
AVE 9 E
8T
H S
TAVE B
AVE 1 E
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
CO
UN
TY
6T
H S
T
56
TH
ST
24
TH
ST
AVE 3 E
AVE A
AVE C
AVE D
AVE 6 E
4TH AVE
AVE 7 E
20
TH
ST
PIMA LN
COCONINO LN
10
TH
ST
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
19
TH
ST
WINSOR AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
25
TH
PL
18TH AVE
20
TH
ST
26
TH
PL
11
TH
ST
47TH AVE
10
TH
PL
14
TH
ST
38
TH
ST
39
TH
ST
PALM AVE
26
TH
ST
3R
D S
T
OTONDO DR
AVE 4 1/4 E
OLIVIA AVE
MARY AVE
17
TH
PL
18
TH
PL
AVE 10 E
31
ST
LN
46TH DR
25
TH
ST
ATHENS AVE
9T
H P
L
31
ST
PL
PARTYTIMEBLV
D
26
TH
ST
25
TH
ST
DORA AVE
3RD AVE
34
TH
ST
S
AN
MA
RC
OS
DR
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
23
RD
ST
4T
H S
T
15
TH
PL
13
TH
PL
AVE 7 E
33
RD
PL
PO
PP
Y S
T
26
TH
ST
VIRGINIA DR
20
TH
ST
30
TH
ST
27
TH
ST
4T
H S
T
13
TH
PL
17TH AVE
37
TH
ST
36TH DR
20TH DR
3R
D P
L
41
ST
ST
6T
H S
T
21ST AVE
12
TH
PL
ORANGE AVE
26
TH
ST
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
18
TH
ST
3R
D S
T
21
ST
PL
23
RD
LN
45TH DR
12TH AVE
16TH AVE
22
ND
ST
17TH AVE
20
TH
ST
15
TH
ST
21
ST
LN
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
45
TH
PL
30
TH
PL
10TH AVE
6TH AVE
36
TH
ST
25
TH
LN
27
TH
LN
JAMES DR
47
TH
ST
12
TH
PL
32ND AVE
34TH AVE
31ST AVE
34
TH
ST
37TH DR
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
13TH AVE
25
TH
ST
28
TH
PL
HA
CIE
NDA
DR
20
TH
PL
MARY AVE
30
TH
ST
14TH AVE
29
TH
LN
29
TH
ST
26
TH
ST
27
TH
ST
32ND AVE
36TH DR
19TH AVE
15TH AVE
12
TH
ST
34
TH
ST
5T
H S
TL
IND
A L
N
25
TH
ST
16TH AVE
MAIN ST
22
ND
LN
AVE 5 E
AVE 4 1/4 E
23
RD
ST
33
RD
LN
12TH AVE
21
ST
ST
17
TH
ST
VE
NU
S D
R
DA
ISY
ST
CO
UN
TY
13 1
/2 S
T
1ST AVE
34TH DR
28T
H S
T
6TH AVE
16
TH
PL
6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
MAIDENLN
9T
H S
T
23
RD
ST
15
TH
ST
36
TH
PL
14
TH
LN
MADISON AVE
34TH DR
3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
24
TH
LN
35
TH
RD
37
TH
ST
47
TH
ST
36
TH
ST
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
RIOVISTADR
MAE WEST
18
TH
PL
LA
SL
OM
AS
ST
13
TH
ST
AVE 10 E
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
25
TH
PL
LALINE DR
LASSIE
MADISON AVE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
5T
H P
L
21
ST
ST
MAINST
21ST AVE
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE C 1/4
AVE 3 E
42
ND
PL
KA
YE
DR
2ND AVE
21
ST
ST
RIH
O L
N
14TH AVE
15TH AVE
7TH AVE
9TH AVE
10TH AVE
11TH AVE
8TH AVE
5TH AVE
17TH AVE
11TH AVE17
TH
PL
6TH AVE
7TH AVE
2ND AVE
WALNUT AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
13
TH
PL
12
TH
LN
13
TH
ST
21
ST
LN
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
13
TH
LN
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
34
TH
ST
CO
LU
MB
IA A
VE
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
18
TH
ST
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
36
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
10
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
CO
UN
TR
Y L
N
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
INC
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
15
TH
ST
CO
UN
TY
12 1
/4 S
T
ARABY RD
10
TH
ST
FORTUNA AVE
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
CO
UN
TY
14 1
/2 S
T
2ND AVE
8TH AVE
3RD AVE
28TH DR
17TH AVE
24TH AVE
ENGLER AVE
18TH AVE MAGNOLIA AVE
33RD DR
20TH AVE
ARIZONA AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE 9TH AVE
RIDGEVIEWDR
45TH AVE
AVE 5 1/4 E
13TH AVE
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
QUECHAN DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramParks and Recreation/Public Safety-FY 2016
Map-2Police Department Projects
Parks and Recreation Projects
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
City of Yuma
Yuma County
Qu
iet Z
on
e - A
ven
ue
9E
16
th S
tree
t & 4
thA
ve
Inte
rse
ctio
nIm
pro
vem
en
ts
We
st M
ain
Ca
na
lM
ulti-U
se
Pa
th
24
th S
tree
t -A
ven
ue
B to
Ave
nu
eC
Imp
rove
me
nts
Pa
lo V
erd
eS
t. - Ca
talin
a D
rive to
Ariz
on
a A
ve
nu
e
Av
en
ue
3E
an
d16
th S
tree
tIm
pro
vem
en
ts
Airp
ort
Lo
op
Ro
ad
Imp
rov
em
en
ts
56
th S
tree
tP
av
em
en
t Ov
erla
y
4th
Av
en
ue
Ex
ten
sio
nP
ed
es
trian
Pa
thw
ay A
rizo
na
Av
en
ue
-P
alo
Ve
rde
to C
ou
ntry
Clu
b D
rive
Pa
vin
g
4th
Ave
nu
e a
nd
Big
Cu
rve
Tu
rn L
an
e
22
nd
Stre
et
-A
ve
nu
eA
to4th
Av
en
ue
Pa
vin
g
Fle
et S
erv
ice
sM
ain
ten
an
ce
Sh
op
1s
t Av
en
ue
- 24
thS
tree
t to 2
6th
Stre
et P
av
ing
Ca
talin
a D
rive
-32
nd
Stre
et to
4th
Av
en
ue
Pa
vin
g
SR 195 HIGHWAY
YUMA
COUNTY
CITY OF
YUMA
CITY OF SOMERTON
Sm
uc
ke
r Re
gio
na
lS
torm
Dra
in B
as
in
§̈¦I8
8T
H S
TAVE B
AVE 1 E2
4T
H S
T
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
LAGUNA DAM RD
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
CO
UN
TY
6T
H S
T
AVE 3 E
AVE A
AVE C
AVE D
AVE 6 E
4TH AVE
AVE 7 E
AVE 9 E
20
TH
ST
PIMA LN
COCONINO LN
10
TH
ST
MA DISON AVE
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
25
TH
PL
18TH AVE
26
TH
PL
11
TH
ST
47TH AVE
10
TH
PL
14
TH
ST
38
TH
ST
39
TH
ST
PALM AVE3R
D S
T
AVE 4 1/4 E
17
TH
PL
AVE 10 E
31
ST
LN
46TH DR
ATHENS AVE
31
ST
PL
PARTYTIMEBLV
D
26
TH
ST
25
TH
ST
3RD AVE
34
TH
ST
S
AN
MA
RC
OS
DR
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
23
RD
ST
4T
H S
T
15
TH
PL
13
TH
PL
AVE 7 E
33
RD
PL
PO
PP
Y S
T
26
TH
ST
VIRGINIA DR
20
TH
ST
30
TH
ST
27
TH
ST
4T
H S
T
CO
LO
RA
DO
ST
13
TH
PL
17TH AVE
37
TH
ST
36TH DR3R
D P
L
41
ST
ST
6T
H S
T
21ST AVE
PA
LO
VE
RD
E S
T
12
TH
PL
ORANGE AVE
26
TH
ST
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
3R
D S
T
21
ST
PL
23
RD
LN
45TH DR
12TH AVE
16TH AVE
22ND AVE
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
13TH AVE
45
TH
PL
30
TH
PL
10TH AVE
6TH AVE
36
TH
ST
25
TH
LN
27
TH
LN
47
TH
ST
12
TH
PL
32ND AVE
34TH AVE
27
TH
PL
31ST AVE
37TH DR
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
25
TH
ST
28
TH
PL
HA
CIE
NDA
DR
20
TH
PL
29
TH
LN
29
TH
ST
22
ND
ST
26
TH
ST
27
TH
ST
32ND AVE
MAPLE AVE
36TH DR
19TH AVE12
TH
ST
5T
H S
TL
IND
A L
N
25
TH
ST
MAIN ST
22
ND
LN
AVE 5 E
AVE 4 1/4 E
23
RD
ST
33
RD
LN
12TH AVE
ARENA DR
21
ST
ST
VE
NU
S D
R
DA
ISY
ST
CO
UN
TY
13 1
/2 S
T
34TH DR
28T
H S
T
5TH AVE
6TH AVE 6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
MAIDENLN
9T
H S
T
15
TH
ST
36
TH
PL
14
TH
LN
MADISON AVE
3RD AVE3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
35
TH
RD
37
TH
ST
47
TH
ST
36
TH
ST
8TH AVE
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
RIOVISTADR
MAE WEST
18
TH
PL
AVE 10 E
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
25
TH
PL
LALINE DR
LASSIE
MADISON AVE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
5T
H P
L
MAINST
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE 3 E
42
ND
PL
KA
YE
DR
2ND AVE
21
ST
ST
RIH
O L
N
14TH AVE
15TH AVE
7TH AVE
9TH AVE
10TH AVE
8TH AVE
5TH AVE
17TH AVE
11TH AVE17
TH
PL
6TH AVE
7TH AVE
2ND AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
13
TH
PL
12
TH
LN
13
TH
ST
21
ST
LN
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
34
TH
ST
CO
LU
MB
IA A
VE
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
18
TH
ST
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
IN C
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
15
TH
ST
CO
UN
TY
12 1
/4 S
T
ARABY RD
10
TH
ST
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
LE
VE
E R
D
CO
UN
TY
14 1
/2 S
T
2ND AVE
8TH AVE
3RD AVE
28TH DR
24TH AVE
ENGLER AVE
18TH AVE
33RD DR
14TH AVE
20TH AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE 9TH AVE
HIL
LS
IDE
PL
AVE 5 1/4 E
13TH AVE
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
QUECHAN DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramTransportation/
Stormwater Control-FY 2016Map-3
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
Stormwater Control Projects
City of Yuma
Yuma County
Transportation Projects
*NOTE: Citywide Projects Citywide Safety Study
Fig
ue
roa W
PC
FS
tud
y/C
ap
ac
ityIm
pro
vem
en
ts
Fig
ue
roa
Av
en
ue
WP
CF
Bio
-so
lids
De
wate
ring
Pro
ce
ss
Do
wn
tow
nS
ew
er L
ine
Re
pla
ce
me
nt
10
th A
ve
- Av
e A
Alle
y S
an
itary
Se
we
r
5th
Stre
et
Sa
nita
ry S
ew
er
Re
pla
ce
me
nt
Fig
ue
roa W
PC
FO
n-S
ite M
an
ho
leR
ep
lac
em
en
t
Fig
ue
roa
WP
CF
Ba
r Sc
ree
nR
ep
lac
em
en
t4th
Stre
et
&A
ve
nu
eA
Se
wer
Lin
eR
ep
lace
men
t
De
se
rt Du
ne
sIm
pro
vem
en
tP
roje
ct
Was
tew
ate
r Va
c T
ruc
kD
um
p S
tatio
n U
pg
rad
es
24
th S
tree
tL
ift Sta
tion
Ma
dis
on
Av
en
ue
- 2n
d S
tree
tto
3rd
Stre
et
16
th S
tree
t Ta
nk
san
d P
um
p S
tatio
nIm
pro
vem
en
ts
Pe
ca
n G
rov
eN
eig
hb
orh
oo
dW
ate
rline
Re
pla
ce
me
nt
Ma
in S
tree
tW
TP
Filte
r Sy
ste
mU
pg
rad
e
YUMA
COUNTY
CITY OF
YUMA
CITY OF SOMERTON
YU
MA
INT
ER
NA
TIO
NA
L
AIR
PO
RT
§̈¦I8
AVE 9 E
1S
T S
T
8T
H S
TAVE B
AVE 1 E
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
LAGUNA DAM RD
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
AVE C
CO
UN
TY
6T
H S
T
56
TH
ST
24
TH
ST
AVE 3 E
AVE A
AVE D
AVE 6 E
4TH AVE
AVE 7 E
20
TH
ST
PIMA LN
COCONINO LN
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
19
TH
ST
WINSOR AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
25
TH
PL
18TH AVE
20
TH
ST
26
TH
PL
47TH AVE
10
TH
PL
14
TH
ST
38
TH
ST
39
TH
ST
26
TH
ST
OTONDO DR
AVE 4 1/4 E
OLIVIA AVE
MARY AVE
17
TH
PL
18
TH
PL
AVE 10 E
31
ST
LN
46TH DR
25
TH
ST
ATHENS AVE
9T
H P
L
31
ST
PL
PARTYTIMEBLV
D
26
TH
ST
25
TH
ST
DORA AVE
3RD AVE
34
TH
ST
S
AN
MA
RC
OS
DR
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
GILA ST
23
RD
ST
15
TH
PL
37
TH
ST
13
TH
PL
AVE 7 E
33
RD
PL
26
TH
ST
VIRGINIA DR
37
TH
ST
20
TH
ST
34
TH
PL
30
TH
ST
27
TH
ST
AVE 8 1/2 E
7T
H S
T
4T
H S
T
13
TH
PL
17TH AVE
37
TH
ST
20TH DR
41
ST
ST
6T
H S
T
21ST AVE
12
TH
PL
26
TH
ST
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
21
ST
PL
23
RD
LN
45TH DR
12TH AVE
1S
TS
T
16TH AVE
22
ND
ST
20
TH
ST
15
TH
ST
21
ST
LN
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
45
TH
PL
30
TH
PL
10TH AVE
6TH AVE
36
TH
ST
25
TH
LN
27
TH
LN
JAMES DR
47
TH
ST
12
TH
PL
32ND AVE
34TH AVE
31ST AVE
34
TH
ST
37TH DR
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
40
TH
LN
25
TH
ST
28
TH
PL
HA
CIE
NDA
DR
20
TH
PL
MARY AVE
30
TH
ST
14TH AVE
29
TH
LN
29
TH
ST
26
TH
ST
27
TH
ST
32ND AVE
36TH DR
19TH AVE
34
TH
ST
LIN
DA
LN
25
TH
ST
22
ND
LN
AVE 5 E
AVE 4 1/4 E
23
RD
ST
33
RD
LN
12TH AVE
11
TH
ST
21
ST
ST
17
TH
ST
VE
NU
S D
R
CO
UN
TY
13 1
/2 S
T
1ST AVE
34TH DR
28T
H S
T
5TH AVE
6TH AVE
16
TH
PL
6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
MAIDENLN
9T
H S
T
23
RD
ST
15
TH
ST
36
TH
PL
14
TH
LN
3RD AVE3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
24
TH
LN
37
TH
ST
47
TH
ST
36
TH
ST
8TH AVE
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
18
TH
PL
LA
SL
OM
AS
ST
13
TH
ST
AVE 10 E
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
25
TH
PL
LALINE DR
LASSIE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
5T
H P
L
21
ST
ST
MAINST
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE C 1/4
AVE 3 E
42
ND
PL
KA
YE
DR
2ND AVE
21
ST
ST
RIH
O L
N
14TH AVE
15TH AVE
7TH AVE
9TH AVE
10TH AVE
11TH AVE
8TH AVE
5TH AVE
17TH AVE
11TH AVE17
TH
PL
6TH AVE
7TH AVE
2ND AVE
WALNUT AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
13
TH
PL
12
TH
LN
13
TH
ST
21
ST
LN
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
13
TH
LN
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
34
TH
ST
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
18
TH
ST
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
36
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
10
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
CO
UN
TR
Y L
N
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
INC
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
15
TH
ST
CO
UN
TY
12 1
/4 S
T
ARABY RD
10
TH
ST
FORTUNA AVE
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
LE
VE
E R
D
CO
UN
TY
14 1
/2 S
T
2ND AVE
8TH AVE
3RD AVE
28TH DR
17TH AVE
24TH AVE
ENGLER AVE
18TH AVE MAGNOLIA AVE
33RD DR
20TH AVE
ARIZONA AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE 9TH AVE
RIDGEVIEWDR
45TH AVE
AVE 5 1/4 E
13TH AVE
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramWater/
Wastewater Utility-FY 2016Map-4
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
Wastewater Utility Projects
Water Utility Projects
City of Yuma
YumaCounty
*NOTE: Citywide Projects New Water Services
Waterline Replacement/Improvements Water Main Replacement Annual Project
Interceptor Sewer Flow Monitoring Upgrades Manhole Rehabilitation/Reconstruction
Sewer Line Replacement/Improvements Wastewater Collection System Lift Station Upgrades
YUMA
COUNTY
CITY OF
YUMA
Fo
urth
Av
en
ue
Ga
tew
ay
Do
wn
tow
n R
ev
italiz
atio
n
Yu
ma
Mu
ltimo
da
lC
en
ter
We
st W
etla
nd
s L
ow
er
Be
nc
h C
om
ple
tition
§̈¦I8
16
TH
ST
AVE B1
ST
ST
AVE A
8T
H S
T
4TH AVE
ARIZONA AVE
GISSPKWY
12
TH
ST
PACIFIC AVE
MAGNOLIAAVE
DORA AVE
10
TH
ST
10
TH
S
T
MAY AVE
14
TH
ST
12
TH
ST
VAUGHN AVE
5T
H S
T
11
TH
ST
GEORGE BELLE AVE
MAPLE AVE
10
TH
PL
14
TH
ST
5TH AVE
6TH AVE
22ND AVE
7TH AVE
11
TH
PL
13TH AVE
9TH AVE
21ST DR
3R
D S
T
10TH AVE
14TH AVE
11TH AVE
17
TH
PL
PENDERGAST AVE
MAPLE AVE
9T
H P
L
15
TH
LN
CROWDER AVE
5T
H S
T
4T
H S
T
15
TH
ST
13
TH
PL
9T
H S
T
13
TH
ST
12
TH
LN
12
TH
PL
DORA AVE
12TH AVE
12TH DR
13
TH
ST
7T
H S
T
EAST ST
CO
LO
RA
DO
ST
13
TH
PL
12
TH
PL
24TH AVE
16
TH
PL
6T
H S
T
VIC
KY
LN
35TH DR
21ST AVE
12
TH
PL
ORANGE AVE
4T
H S
T
RA
MO
S S
T
14TH AVE
12TH AVE
1S
T S
T
HAUPT AVE
4T
H P
L
16TH AVE
17TH AVE
22ND AVE
15
TH
ST
NAPLES AVE
ATHENS AVE
31ST DR
13TH AVE
ARENA DR
6TH AVE
15
TH
ST
16
TH
PL
28TH AVE
11
TH
PL
13TH AVE
ALMONDAVE
5T
H S
T
14TH AVE
16
TH
LN
8T
H P
L
15
TH
PL
19TH AVE
28TH DR
15TH AVE
12
TH
ST
HETTEMA ST
15
TH
PL
6T
H S
T
17
TH
ST
3R
D P
L
5T
H S
T
TAMARACK AVE
19TH AVE
16TH AVE
10
TH
PL
14
TH
PL
8T
H P
L
15
TH
ST
12TH AVE
ARENA DR
4T
H S
T
11
TH
ST
17
TH
ST
11
TH
ST
CL
AX
TO
N S
T
16
TH
PL
27TH DR
6T
H P
L
4T
H S
T
8T
H S
T
7T
H S
T
CLIFFORD WY
9T
H S
T
PATE DR
2N
D S
T
LEE DR
CO
LO
RA
DO
ST
11
TH
ST
14
TH
ST
17
TH
PL
8T
H S
T
3RD AVE
CITY
PL
Z
24TH DR
22ND DR
24TH AVE
23RD DR
3RD AVE
SA
NTA
MA
RIA
WY
28TH AVE
12
TH
LN
13TH AVE
8TH AVE
7TH AVE
JEWEL AVE
MYRTLE AVE
FRANKLIN AVE
ARENA DR
CL
IFF
OR
D L
N
RIOVISTADR
11
TH
LN
LA
S L
OM
AS
ST
13
TH
ST
13TH S
T
17
TH
PL
YO
WE
LL
CT
19TH AVE
MADISON AVE
17
TH
ST
20TH AVE
JU
PI T
ER
DR
SAN JOSE DR
SA
TU
RN
DR
20TH AVE
15
TH
ST
4T
H S
T
5T
H P
L
5T
H S
T
9T
H S
T
20TH AVE
21ST AVE
2N
D S
T
4T
H S
T
4T
H P
L
3R
D P
L
MADISON AVE
19TH AVE
PH
OE
NIX
AV
E
2ND AVE
3RD AVE
14TH AVE
15TH AVE
8TH AVE
7TH AVE
9TH AVE
11TH AVE
10TH AVE
5TH AVE
17TH AVE
12TH AVE
5TH AVE
16
TH
PL
IRO
N
DR
1
1TH AVE
17
TH
ST
12
TH
ST
15
TH
ST
13
TH
ST
35TH AVE
16TH AVE
9T
H S
T
2N
D P
L
16
TH
PL
SUNRIDGE DR
17
TH
ST
16
TH
PL
15
TH
PL
12
TH
LN
ARCADIA LN
YU
MA
PA
LM
SP
KW
Y
13
TH
LN
WE
LL
ING
TO
N S
T
HEREFORD AVE
ANGUS WY
17
TH
ST
17
TH
PL
BRANGUS AVE
APPALOOSA LN
MUSTANG AVE
BRAHMA LN
12
TH
LN
12
TH
LN
10
TH
ST
15
TH
ST
CO
UN
TY
8T
H S
T
14
TH
PL
LE
VE
ER
D
14
TH
ST
15
TH
ST
14
TH
PL
14
TH
ST
23RD AVE
20TH AVE
21ST AVE
22ND AVE
GL
EN
AV
E
YUMAPALMSPKWY
DATE AVE
13
TH
LN
10
TH
ST
WA
TE
RS
T
MA
IN C
AN
AL
RD
INSPECTIONSTATIONRAMP
INSPECTIONSTATIONRAMP
LE
VE
E R
D
LE
VE
E R
D
2ND AVE
PRISO
NH
ILLRD
33RD DR33RD DR
MAGNOLIA AVEMAGNOLIA AVE
CENTER ST
24TH AVE
24TH AVE
1ST AVE
1ST AVE
3RD AVE
8TH AVE
RILEY AVE
GATE WY
GATE WY
20TH AVE20TH AVE
30TH AVE
SUNSET DR
13TH AVE
13THAVE
VIACIE
LO
MA
IN C
AN
AL
RD
10TH AVE
9TH AVE 9TH AVE
HIL
LS
IDE
P
L
RUBY AVE
BARDEAUX AVE
23RD AVE
13TH AVE 13TH AVE
AR
RO
YO
DR
MYRTLE AVE
DORA AVEDORA AVE
MAIN ST
CEMETERY AVE
PENITENTIARY AVE
27TH DR
QUECHAN DR
ARIZONA AVE
PACIFIC AVE
7T
H S
T
Capital Improvement ProgramYuma Crossing Heritage
(YCNHA)-FY 2016Map-5
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
roug
h th
eir u
se
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f acc
ura
cy o
f the
da
taeith
er p
ositio
na
l or fa
ctu
al.
01,4
00
2,8
00
700
Feet
Heritage Area Projects
City of Yuma
Yuma County
4TH AVE
SR 195 HIGHWAY
YUMA
COUNTY
CITY
OF YUMA
CITY OF SOMERTON Fire
Sta
tion
4R
em
od
el
Po
lice
Sto
rag
eF
ac
ility
Pa
cific
Av
en
ue
Ath
letic
Co
mp
lex
YU
MA
INT
ER
NA
TIO
NA
L
AIR
PO
RT
§̈¦I8
AVE 9 E
8T
H S
TAVE B
AVE 1 E
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
CO
UN
TY
6T
H S
T
56
TH
ST
24
TH
ST
AVE 3 E
AVE A
AVE C
AVE D
AVE 6 E
4TH AVE
AVE 7 E
20
TH
ST
PIMA LN
COCONINO LN
10
TH
ST
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
19
TH
ST
WINSOR AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
25
TH
PL
18TH AVE
20
TH
ST
26
TH
PL
11
TH
ST
47TH AVE
14
TH
ST
38
TH
ST
39
TH
ST
PALM AVE
26
TH
ST
3R
D S
T
OTONDO DR
AVE 4 1/4 E
OLIVIA AVE
MARY AVE
17
TH
PL
18
TH
PL
AVE 10 E
31
ST
LN
46TH DR
25
TH
ST
ATHENS AVE
31
ST
PL
PARTYTIMEBLV
D
26
TH
ST
25
TH
ST
DORA AVE
3RD AVE
34
TH
ST
S
AN
MA
RC
OS
DR
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
23
RD
ST
4T
H S
T
15
TH
PL
13
TH
PL
AVE 7 E
33
RD
PL
PO
PP
Y S
T
26
TH
ST
VIRGINIA DR
20
TH
ST
30
TH
ST
27
TH
ST
4T
H S
T
17TH AVE
37
TH
ST
36TH DR
20TH DR
3R
D P
L
41
ST
ST
6T
H S
T
21ST AVE
ORANGE AVE
26
TH
ST
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
18
TH
ST
3R
D S
T
21
ST
PL
23
RD
LN
45TH DR
12TH AVE
16TH AVE
22
ND
ST
17TH AVE
22ND AVE
20
TH
ST
15
TH
ST
21
ST
LN
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
13TH AVE
45
TH
PL
30
TH
PL
10TH AVE
6TH AVE
36
TH
ST
25
TH
LN
27
TH
LN
JAMES DR
47
TH
ST
12
TH
PL
32ND AVE
34TH AVE
31ST AVE
34
TH
ST
37TH DR
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
13TH AVE
25
TH
ST
28
TH
PL
HA
CIE
NDA
DR
20
TH
PL
MARY AVE
30
TH
ST
14TH AVE
29
TH
LN
29
TH
ST
26
TH
ST
27
TH
ST
32ND AVE
36TH DR
19TH AVE
15TH AVE
12
TH
ST
34
TH
ST
5T
H S
TL
IND
A L
N
25
TH
ST 19TH AVE
16TH AVE
MAIN ST
22
ND
LN
AVE 5 E
AVE 4 1/4 E
23
RD
ST
33
RD
LN
12TH AVE
ARENA DR
11
TH
ST
21
ST
ST
17
TH
ST
VE
NU
S D
R
DA
ISY
ST
CO
UN
TY
13 1
/2 S
T
1ST AVE
34TH DR
28T
H S
T
5TH AVE
6TH AVE
16
TH
PL
6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
MAIDENLN
9T
H S
T
23
RD
ST
15
TH
ST
36
TH
PL
14
TH
LN
MADISON AVE
34TH DR
3RD AVE3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
24
TH
LN
35
TH
RD
37
TH
ST
47
TH
ST
36
TH
ST
8TH AVE
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
RIOVISTADR
MAE WEST
18
TH
PL
LA
SL
OM
AS
ST
13
TH
ST
AVE 10 E
13TH
ST
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
25
TH
PL
LALINE DR
LASSIE
MADISON AVE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
5T
H P
L
21
ST
ST
MAINST
21ST AVE
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE C 1/4
AVE 3 E
42
ND
PL
KA
YE
DR
2ND AVE
21
ST
ST
RIH
O L
N
14TH AVE
15TH AVE
7TH AVE
9TH AVE
10TH AVE
11TH AVE
8TH AVE
5TH AVE
17TH AVE
11TH AVE17
TH
PL
6TH AVE
7TH AVE
2ND AVE
WALNUT AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
13
TH
PL
12
TH
LN
13
TH
ST
21
ST
LN
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
13
TH
LN
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
34
TH
ST
CO
LU
MB
IA A
VE
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
18
TH
ST
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
36
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
10
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
CO
UN
TR
Y L
N
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
INC
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
15
TH
ST
CO
UN
TY
12 1
/4 S
T
ARABY RD
10
TH
ST
FORTUNA AVE
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
LE
VE
E R
D
CO
UN
TY
14 1
/2 S
T
2ND AVE
8TH AVE
3RD AVE
28TH DR
17TH AVE
24TH AVE
ENGLER AVE
18TH AVE MAGNOLIA AVE
33RD DR
20TH AVE
ARIZONA AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE 9TH AVE
RIDGEVIEWDR
45TH AVE
AVE 5 1/4 E
13TH AVE
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
QUECHAN DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramParks and Recreation/
Public Safety-FY 2017-20Map-2
Parks and Recreation Projects
City of Yuma
Yuma CountyInformation Technology Services
Enterprise GISApril 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
Public Safety Projects
16
th S
tree
t & 4
thA
ve
Inte
rse
ctio
nIm
pro
vem
en
ts
Av
en
ue
3E
an
d16
th S
tree
tIm
pro
vem
en
ts
Av
en
ue
10
E Im
pro
ve
me
nts
32
nd
Stre
et &
Pa
cific
Av
en
ue
Imp
rov
em
en
ts
32
nd
Stre
et
an
d A
ve
nu
e5E
Tu
rn L
an
es
1s
t Av
en
ue
- 12
thS
tree
t to 1
6th
Stre
et P
avin
g
Fle
et S
erv
ice
sM
ain
ten
an
ce
Sh
op
14
th S
tree
t - 1s
tA
ve
nu
e to
4th
Av
en
ue
Pa
vin
g
28
th S
tree
t -A
ven
ue
B to
Av
en
ue
C Im
pro
ve
me
nts
3rd
Ave
nu
e -
Ora
ng
e A
ve
nu
e to
14
th S
tree
t Pa
vin
g
Gila
Stre
et -
1s
t Stre
et
to 3
rd S
tree
t Pa
vin
g
24
th S
tree
t an
d 1
st
Av
en
ue
Tu
rn L
an
e
4th
Ave
nu
ean
d 8
th S
tree
tTu
rn L
an
e
Av
en
ue
B a
nd
16
thS
tree
t Tu
rn L
an
e
18
th S
treet
an
d A
ven
ue
CTra
ffic S
ign
al
16
th S
tree
t Tu
rnL
an
e - M
ap
le A
ve
nu
eto
1s
t Ave
nu
e
16
th S
tree
tan
d A
rizo
na
Ave
nu
eIm
pro
vem
en
ts
28
th S
treet -
45
th A
ve
nu
eto
Av
en
ue
C
1s
tS
tree
tto
Co
lora
do
Stre
et
-A
ve
nu
eA
to23
rdA
ve
nu
eP
av
ing
16
th S
treet a
nd
Pa
cific
Av
en
ue
Tu
rn L
an
es
24
th S
tree
t an
dP
ac
ific A
ve
nu
eTu
rn L
an
e
1s
t Av
en
ue
-O
ran
ge
Av
en
ue
to9th
Av
en
ue
Pa
vin
g
SR 195 HIGHWAY
YUMA
COUNTY
CITY OF
YUMA
CITY OF SOMERTON
Sm
uc
ke
rR
eg
ion
al S
torm
Dra
in B
asin
Are
na
Driv
eS
torm
Dra
in
§̈¦I8
AVE 9 E
8T
H S
TAVE B
AVE 1 E2
4T
H S
T
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
LAGUNA DAM RD
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
CO
UN
TY
6T
H S
T
56
TH
ST
AVE 3 E
AVE 10 E
AVE A
AVE C
AVE D
AVE 6 E
4TH AVE
AVE 7 E
PIMA LN
COCONINO LN
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
WINSOR AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
25
TH
PL
18TH AVE
20
TH
ST
26
TH
PL
11
TH
ST
47TH AVE
10
TH
PL
14
TH
ST
38
TH
ST
39
TH
ST
PALM AVE
26
TH
ST
3R
D S
T
OTONDO DR
AVE 4 1/4 E
OLIVIA AVE
MARY AVE
17
TH
PL
18
TH
PL
AVE 10 E
31
ST
LN
25
TH
ST
ATHENS AVE
31
ST
PL
PARTYTIMEBLV
D
MARIONAVE
26
TH
ST
25
TH
ST
3RD AVE
34
TH
ST
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
GILA ST
23
RD
ST
15
TH
PL
37
TH
ST
13
TH
PL
AVE 7 E
33
RD
PL
PO
PP
Y S
T
26
TH
ST
VIRGINIA DR
37
TH
ST
20
TH
ST
34
TH
PL
30
TH
ST
27
TH
ST
AVE 8 1/2 E
4T
H S
T
17TH AVE
37
TH
ST
36TH DR
20TH DR
3R
D P
L
41
ST
ST
6T
H S
T
12
TH
PL
ORANGE AVE
26
TH
ST
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
3R
D S
T
23
RD
LN
45TH DR
22
ND
ST
20
TH
ST
21
ST
LN
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
13TH AVE
45
TH
PL
30
TH
PL
6TH AVE
36
TH
ST
25
TH
LN
JAMES DR
47
TH
ST
32ND AVE
34TH AVE
31ST AVE
34
TH
ST
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
25
TH
ST
HA
CIE
NDA
DR
20
TH
PL
MARY AVE
30
TH
ST
29
TH
LN
29
TH
ST
22
ND
ST
26
TH
ST
27
TH
ST
32ND AVE
36TH DR
12
TH
ST
34
TH
ST
LIN
DA
LN
25
TH
ST
MAIN ST
AVE 5 E
AVE 4 1/4 E
23
RD
ST
33
RD
LN
12TH AVE
21
ST
ST
VE
NU
S D
R
DA
ISY
ST
CO
UN
TY
13 1
/2 S
T
1ST AVE
28T
H S
T
5TH AVE
6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
23
RD
ST
15
TH
ST
36
TH
PL
14
TH
LN
MADISON AVE
3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
24
TH
LN
35
TH
RD
37
TH
ST
47
TH
ST
36
TH
ST
8TH AVE
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
MAE WEST
AVE 10 E
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
25
TH
PL
LALINE DR
LASSIE
MADISON AVE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
MAINST
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE 3 E
42
ND
PL
KA
YE
DR
RIH
O L
N
14TH AVE
15TH AVE
7TH AVE
9TH AVE
8TH AVE
17TH AVE
6TH AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
13
TH
LN
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
CO
LU
MB
IA A
VE
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
36
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
CO
UN
TR
Y L
N
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
INC
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
CO
UN
TY
12 1
/4 S
T
ARABY RD
10
TH
ST
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
LE
VE
E R
D
CO
UN
TY
14 1
/2 S
T
8TH AVE
28TH DR
24TH AVE
ENGLER AVE
18TH AVE
33RD DR
14TH AVE
ARIZONA AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE
RIDGEVIEWDR
AVE 5 1/4 E
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
QUECHAN DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramTransportation/
Stormwater Control-FY 2017-20Map-3
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
Stormwater Control Projects
City of Yuma
Yuma County
Transportation Projects
*NOTE: Citywide Projects Citywide Safety Study
16
th S
tree
tTa
nk
s a
nd
Pu
mp
Sta
tion
Imp
rov
em
en
ts
Ma
in S
tree
tW
TP
Filte
rS
ys
tem
Up
gra
de
Ma
in S
tree
t WT
PC
hlo
rine
Sy
ste
mM
od
ifica
tion
Av
en
ue
4E
an
d36
th S
tree
t Wa
ter
Ma
in In
ters
ec
tion
Ag
ua
Viv
a W
ell N
o.
1 R
ep
lac
em
en
t
Av
en
ue
C W
ate
rline
-16
th S
tree
t to18
th S
tree
t
Fig
ue
roa
WP
CF
AZ
PD
ES
Re
ne
wa
l
Fe
rrou
sC
hlo
ride
Inje
ctio
nS
ys
tem
Up
gra
de
Dese
rt Du
ne
sW
RF
Rec
laim
ed
Wate
r Sy
ste
m M
od
s
Wa
ste
wa
ter V
ac
Tru
ck
Du
mp
Sta
tion
Up
gra
de
s
32
nd
Stre
et M
an
ho
les
Re
ha
bilita
tion
YUMA
COUNTY
CITY OF
YUMA
CITY OF SOMERTON
§̈¦I8
8T
H S
TAVE B
AVE 1 E2
4T
H S
T
32
ND
ST
CO
UN
TY
13
TH
ST
AVE 5 1/2 E
LAGUNA DAM RD
CO
UN
TY
15
TH
ST
16
TH
ST
AVE 4 E
40
TH
ST
HW
Y 9
5
CO
UN
TY
6T
H S
T
56
TH
ST
AVE 3 E
AVE 10 E
AVE A
AVE C
AVE D
AVE 6 E
4TH AVE
AVE 7 E
20
TH
ST
PIMA LN
COCONINO LN
10
TH
ST
10
TH
ST
AVE 5 1/2 E
MAY AVE
1ST AVE
DRIFTIN AVE
19
TH
ST
WINSOR AVE
VAUGHN AVE
5T
H S
T
25
TH
ST
18TH AVE
20
TH
ST
26
TH
PL
11
TH
ST
47TH AVE
10
TH
PL
14
TH
ST
38
TH
ST
39
TH
ST
PALM AVE
26
TH
ST
3R
D S
T
OTONDO DR
AVE 4 1/4 E
OLIVIA AVE
MARY AVE
17
TH
PL
18
TH
PL
AVE 10 E
31
ST
LN
46TH DR
25
TH
ST
ATHENS AVE
31
ST
PL
PARTYTIMEBLV
D
26
TH
ST
DORA AVE
3RD AVE
34
TH
ST
S
AN
MA
RC
OS
DR
48TH WY
47TH DR
38
TH
LN
28
TH
ST
19
TH
PL
27
TH
ST
23
RD
ST
4T
H S
T
15
TH
PL
37
TH
ST
13
TH
PL
AVE 7 E
PO
PP
Y S
T
VIRGINIA DR
37
TH
ST
20
TH
ST
34
TH
PL
30
TH
ST
27
TH
ST
AVE 8 1/2 E
4T
H S
T
13
TH
PL
17TH AVE
37
TH
ST
36TH DR
20TH DR
3R
D P
L
41
ST
ST
6T
H S
T
21ST AVE
12
TH
PL
ORANGE AVE
15
TH
ST
4T
H S
T
26
TH
PL
18
TH
ST
3R
D S
T
21
ST
PL
23
RD
LN
45TH DR
12TH AVE
1S
T S
T
22
ND
ST
17TH AVE
22ND AVE
20
TH
ST
15
TH
ST
21
ST
LN
21
ST
ST
20
TH
PL
MA
E D
R
20
TH
ST
JE
AN
ST
TE
LE
GR
AP
H S
T
13TH AVE
45
TH
PL
30
TH
PL
10TH AVE
6TH AVE
36
TH
ST
27
TH
LN
JAMES DR
47
TH
ST
12
TH
PL
34
TH
ST
37TH DR
27
TH
ST
TO
PE
KA
PL
VIE
WPKW
Y
13TH AVE
40
TH
LN
25
TH
ST
28
TH
PL
HA
CIE
NDA
DR
20
TH
PL
MARY AVE
30
TH
ST
14TH AVE
29
TH
LN
29
TH
ST
26
TH
ST
27
TH
ST
32ND AVE
36TH DR
19TH AVE
15TH AVE
12
TH
ST
34
TH
ST
5T
H S
TL
IND
A L
N
25
TH
ST 19TH AVE
16TH AVE
22
ND
LN
AVE 4 1/4 E
23
RD
ST
12TH AVE
ARENA DR
11
TH
ST
21
ST
ST
17
TH
ST
VE
NU
S D
R
DA
ISY
ST
CO
UN
TY
13 1
/2 S
T
1ST AVE
28T
H S
T
5TH AVE
6TH AVE
16
TH
PL
6TH AVE
38
TH
LN
LO
RE
NZ
O L
N
OL
IVE
AN
NE
LN
MAIDENLN
9T
H S
T
23
RD
ST
15
TH
ST
36
TH
PL
14
TH
LN
MADISON AVE
34TH DR
3RD AVE3RD AVE
41
ST
PL
41
ST
LN
46
TH
LN
24
TH
LN
35
TH
RD
37
TH
ST
47
TH
ST
36
TH
ST
8TH AVE
7TH AVE
37
TH
ST
33
RD
PL
43
RD
PL
39
TH
ST
38
TH
PL
RIOVISTADR
MAE WEST
18
TH
PL
LA
SL
OM
AS
ST
13
TH
ST
AVE 10 E
13TH
ST
13
TH
ST
12
TH
LN
46T
HS
T
8TH AVE
LALINE DR
LASSIE
MADISON AVE
17
TH
ST
AVE 7 E
36
TH
ST
MIS
SIO
N S
T
47TH AVE
17
TH
LN
17
TH
PL
BU
CK
SH
OT
RD
47
TH
PL
33R
DR
D
5T
H P
L
21
ST
ST
MAINST
21ST AVE
AVE 4 E
30
TH
PL
FR
AN
CIS
ST
4T
H S
T
CO
UN
TY
14 1
/2 S
T
MOJAVE LN
24
TH
LN
25
TH
PL
24
TH
PL
YAVAPAI LN
24
TH
PL
26
TH
PL
AVE C 1/4
AVE 3 E
42
ND
PL
KA
YE
DR
2ND AVE
21
ST
ST
RIH
O L
N
15TH AVE
7TH AVE
10TH AVE
11TH AVE
8TH AVE
5TH AVE
11TH AVE17
TH
PL
6TH AVE
7TH AVE
2ND AVE
WALNUT AVE
CO
UN
TY
7T
H S
T
AVE 5 1/2 E
42
ND
ST
AVE 4 1/2 E
CO
UN
TY
14 1
/4 S
T
13
TH
PL
12
TH
LN
13
TH
ST
21
ST
LN
12
TH
ST
VICTORIA WY
13
TH
ST
39
TH
PL
CO
UN
TY
8T
HS
T
SHANNON WY
30
TH
ST
AVE 3 1/2 E
27
TH
LN
27
TH
PL
13
TH
LN
25
TH
ST
15
TH
ST
AVE 7 1/4 E
NAVEL AVE
34
TH
ST
CO
LU
MB
IA A
VE
CO
UN
TY
6 1
/4 S
T
42
ND
PL
AVE 2 3/4 E
CO
UN
TY
14 1
/4 S
T
4T
H S
T
18
TH
ST
JU
LIE
LN
27T
HP
L
23RD AVE
CO
UN
TY
12 1
/2 S
T
CARLOTA AVE
CO
UN
TY
13 1
/ 4 S
T
37
TH
ST
AVE B 1/2
38
TH
ST
30
TH
ST
40
TH
ST
CO
UN
TY
14 1
/2 S
T
AVE 3 3/4 E
40
TH
ST
33
RD
PL
43
RD
ST
14
TH
ST
39
TH
ST
29
TH
ST
13
TH
LN
28
TH
ST
30
TH
ST
45TH AVE
46TH AVE
45
TH
ST
14
TH
PL
48
TH
ST
LE
VE
E
AVE 10 E
LE
VE
E R
D
AVE D
SHARI AVE
CO
UN
TY
6T
H S
T
29
TH
ST
24
TH
ST
CO
UN
TR
Y L
N
AVE 4 1/4 E
36
TH
ST
AR
AB
YB
LA
ISD
EL
LR
D
AVE 9 E
WA
TE
R S
T
AVE 6 E
CO
UN
TY
6 1
/2 S
T
MA
INC
AN
AL
RD
AVE 3 E
CO
UN
TY
6 1
/4 S
T
AVE 4 3/4 E
HILLTOP RD
CO
UN
TY
8T
H S
T
AVE 9 E
15
TH
ST
CO
UN
TY
12 1
/4 S
T
ARABY RD
CO
UN
TY
12 1
/2 S
T
AVE 4 1/2 E
CO
UN
TY
71
/2S
T
CO
UN
TY
14 3
/4 S
T
LE
VEERD
CA
TT
LE
DR
CO
UN
TY
12T
H S
T
CATTLE
RD
CO
UN
TY
15T
H S
T
CO
UN
TY
9 1
/2 S
T
LE
VE
E R
D
CO
UN
TY
14 1
/2 S
T
2ND AVE
8TH AVE
3RD AVE
28TH DR
17TH AVE
24TH AVE
ENGLER AVE
18TH AVE MAGNOLIA AVE
33RD DR
20TH AVE
ARIZONA AVE
43
RD
ST
AVE D
9TH AVE
CROSSING AVE
MA
IN C
AN
AL
RD
AVE 4 1/2 E
AVE A 1/2
10TH AVE
9TH AVE 9TH AVE
RIDGEVIEWDR
45TH AVE
AVE 5 1/4 E
SATURN AVE
AVE 4 3/4 E
AVE 4 1/2 E
AVE 6 E
AVE 8 1/2 E
AVE 5 E
34
TH
ST
AVE 10 E
AVE 7 E
PATTON DR
QUECHAN DR
AVE 4 E
MESA DUNES RD
AVE 3 1/2 E
AVE 8 AVE 8
AVE 5 1/2 E
AVE 8
44
TH
ST
26
TH
ST
26
TH
ST
Capital Improvement ProgramWater/
Wastewater Utility-FY 2017-20Map-4
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
rou
gh
the
ir use
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f accu
racy
of th
e d
ata
eith
er p
ositio
na
l or fa
ctu
al.
05,0
00
10,0
00
2,5
00
Feet
Wastewater UtilityProjects
Water Utility Projects
City ofYuma
Yuma County
*NOTE: Citywide Projects Chlorine Booster Pump Station
New Water Services Strategic Groundwater Wells and Filtration System
TTHM Air Stripping Tank System Waterline Replacement/Improvements
Water Main Replacement Annual Project Manhole Rehabilitation/Reconstruction
Sewer Line Replacement/Improvements Wastewater Collection System Lift Station Upgrades
YUMA
COUNTY
CITY OF
YUMA
Yu
ma
Mu
ltimo
da
lC
en
ter
§̈¦I8
16
TH
ST
AVE B1
ST
ST
AVE A
8T
H S
T
4TH AVE
ARIZONA AVE
GISSPKWY
12
TH
ST
PACIFIC AVE
MAGNOLIAAVE
DORA AVE
10
TH
ST
10
TH
S
T
MAY AVE
14
TH
ST
12
TH
ST
VAUGHN AVE
5T
H S
T
11
TH
ST
GEORGE BELLE AVE
MAPLE AVE
10
TH
PL
14
TH
ST
5TH AVE
6TH AVE
22ND AVE
7TH AVE
11
TH
PL
13TH AVE
9TH AVE
21ST DR
3R
D S
T
10TH AVE
14TH AVE
11TH AVE
17
TH
PL
PENDERGAST AVE
MAPLE AVE
9T
H P
L
15
TH
LN
CROWDER AVE
5T
H S
T
GILA ST
4T
H S
T
5T
H S
T
15
TH
ST
13
TH
PL
9T
H S
T
13
TH
ST
12
TH
LN
12
TH
PL
DORA AVE
12TH AVE
12TH DR
13
TH
ST
7T
H S
T
EAST ST
CO
LO
RA
DO
ST
13
TH
PL
12
TH
PL
24TH AVE
16
TH
PL
6T
H S
T
VIC
KY
LN
35TH DR
21ST AVE
12
TH
PL
ORANGE AVE
4T
H S
T
RA
MO
S S
T
14TH AVE
12TH AVE
1S
TS
T
HAUPT AVE
4T
H P
L
16TH AVE
17TH AVE
22ND AVE
15
TH
ST
NAPLES AVE
ATHENS AVE
31ST DR
13TH AVE
ARENA DR
6TH AVE
15
TH
ST
16
TH
PL
28TH AVE
11
TH
PL
13TH AVE
ALMONDAVE
5T
H S
T
14TH AVE
16
TH
LN
8T
H P
L
15
TH
PL
19TH AVE
28TH DR
15TH AVE
12
TH
ST
HETTEMA ST
15
TH
PL
6T
H S
T
17
TH
ST
3R
D P
L
5T
H S
T
TAMARACK AVE
19TH AVE
16TH AVE
MAIN ST
10
TH
PL
14
TH
PL
8T
H P
L
15
TH
ST
12TH AVE
ARENA DR
4T
H S
T
11
TH
ST
17
TH
ST
11
TH
ST
CL
AX
TO
N S
T
16
TH
PL
27TH DR
6T
H P
L
4T
H S
T
8T
H S
T
MAIDEN LN
7T
H S
T
CLIFFORD WY
9T
H S
T
PATE DR
2N
D S
T
LEE DR
CO
LO
RA
DO
ST
11
TH
ST
14
TH
ST
17
TH
PL
8T
H S
T
MADISON AVE
3RD AVE
CITY
PL
Z
24TH DR
22ND DR
24TH AVE
23RD DR
3RD AVE
SA
NTA
MA
RIA
WY
28TH AVE
WA
TE
RS
T
12
TH
LN
13TH AVE
8TH AVE
7TH AVE
JEWEL AVE
MYRTLE AVE
FRANKLIN AVE
ARENA DR
CL
IFF
OR
D L
N
RIOVISTADR
11
TH
LN
3R
D S
T
LA
S L
OM
AS
ST
13
TH
ST
13TH S
T
17
TH
PL
YO
WE
LL
CT
19TH AVE
MADISONAVE
17
TH
ST
20TH AVE
JU
PI T
ER
DR
SAN JOSE DR
SA
TU
RN
DR
20TH AVE
15
TH
ST
4T
H S
T
5T
H P
L
5T
H S
T
9T
H S
T
MAIN ST
20TH AVE
21ST AVE
2N
D S
T
4T
H S
T
4T
H P
L
3R
D P
L
MADISON AVE
19TH AVE
PH
OE
NIX
AV
E
2ND AVE
3RD AVE
14TH AVE
15TH AVE
8TH AVE
7TH AVE
9TH AVE
11TH AVE
10TH AVE
5TH AVE
17TH AVE
12TH AVE
5TH AVE
16
TH
PL
IRO
N
DR
1
1TH AVE
17
TH
ST
12
TH
ST
15
TH
ST
13
TH
ST
35TH AVE
16TH AVE
9T
H S
T
2N
D P
L
16
TH
PL
SUNRIDGE DR
17
TH
ST
16
TH
PL
15
TH
PL
12
TH
LN
ARCADIA LN
YU
MA
PA
LM
SP
KW
Y
13
TH
LN
WE
LL
ING
TO
N S
T
HEREFORD AVE
ANGUS WY
17
TH
ST
17
TH
PL
BRANGUS AVE
APPALOOSA LN
MUSTANG AVE
BRAHMA LN
12
TH
LN
12
TH
LN
10
TH
ST
15
TH
ST
CO
UN
TY
8T
H S
T
14
TH
PL
LE
VE
ER
D
14
TH
ST
15
TH
ST
14
TH
PL
14
TH
ST
23RD AVE
20TH AVE
21ST AVE
22ND AVE
GL
EN
AV
E
YUMAPALMSPKWY
DATE AVE
13
TH
LN
10
TH
ST
WA
TE
RS
T
MA
IN C
AN
AL
RD
INSPECTIONSTATIONRAMP
INSPECTIONSTATIONRAMP
LE
VE
E R
D
LE
VE
E R
D
2ND AVE
PRISO
NH
ILLRD
33RD DR33RD DR
MAGNOLIA AVEMAGNOLIA AVE
CENTER ST
24TH AVE
24TH AVE
1ST AVE
1ST AVE
3RD AVE
8TH AVE
RILEY AVE
GATE WY
GATE WY
20TH AVE20TH AVE
30TH AVE
SUNSET DR
13TH AVE
13THAVE
VIACIE
LO
MA
IN C
AN
AL
RD
10TH AVE
9TH AVE 9TH AVE
HIL
LS
IDE
P
L
RUBY AVE
BARDEAUX AVE
23RD AVE
13TH AVE 13TH AVE
AR
RO
YO
DR
MYRTLE AVE
DORA AVEDORA AVE
MAIN ST
CEMETERY AVE
PENITENTIARY AVE
27TH DR
QUECHAN DR
ARIZONA AVE
PACIFIC AVE
7T
H S
T
Capital Improvement ProgramYuma Crossing Heritage
(YCNHA)-FY 2017-20Map-5
Information Technology ServicesEnterprise GIS
April 2015GPF287
5T
he
use
r(s) o
f this
ma
p a
ckn
ow
led
ge
s th
roug
h th
eir u
se
tha
t the
re a
re lim
itatio
ns to
the
da
ta p
rese
nte
d a
nd
the
re a
re n
o w
arra
ntie
s o
r gu
ara
nte
es o
f acc
ura
cy o
f the
da
taeith
er p
ositio
na
l or fa
ctu
al.
01,4
00
2,8
00
700
Feet
Heritage Area Projects
City of Yuma
Yuma County