47
//1 portfolio Architect ir. D.D. Lembekker //January 2011

Portfolio aca09architecture

Embed Size (px)

DESCRIPTION

Portfolio aca09architecture

Citation preview

//1

portfolioArchitect ir. D.D. Lembekker //January 2011

Picture front: still from movie “ underLINE “directed by Grady Gerbracht and Claudia Vieir, Brooklyn Arts Council International Film Festival, NY 2008

research + public building + interior

research + public building + interior

//2

content of the portfolioCurriculum Vitae //5

Competition Brussels Courthouse imagine the future! / Brussels, Belgium //8

na-ma architecture //10

Researchlab LAB01 / Amsterdam & Utrecht, The Netherlands //14 Competition Arquitectum 2009: Le Rouge Voilé - New Moulin Rouge Dance School / Paris, France //22

Graduation Project ExCiTe Ferryterminal Border Conditions / New York, USA //24

International Biënale Rotterdam 2007 : Indesem: The Legacy 2007 / Rotterdam, The Netherlands //38

Museum IJburg / Amsterdam, The Netherlands //40

Me, myself and I..... //44

research + public building

public building + interior

research + public building + interior

research

research

public building + interior

research + public building + interior

//3

//4

Architect Ir. Dion Danyanto LembekkerAddress J.P. Sweelinckstraat 41 1443 MB Purmerend Date of Birth 10th of February 1983Nationality DutchOfficial title Msc Architect Ir SBA regnr. 1.090715.003Email [email protected]

Architecture relavant experience

6/2010 - 6/2010 Projectmanager Dag van Architectuur Utrecht RWZI, BNA, freelance - Managed a project for creating visions for development of the site.

3/2010 - 10/2010 Architect, na-ma architecture i.c.w. Tom Bergevoet Architectecture, professional - At this office I am working on several projects like research for the possibilities of temporal use of the urban space tested on the Amsterdam area and the historical city center of Rome. Another project I worked on is the design study for the Olympic Stadium in Amsterdam for the coming World Championship Football and the Olympic games in 2018/2022 and 2028. -Competition Cruquisweg, Amsterdam

Design, rendering, final presentation

10/2009 - 2/2010 Researcher/architect at Research Lab, Atelier Rijksbouwmeester + VROM, professional - I worked with a team on a designstrategy for development for the Jaarbeurs area in Utrecht and managed

the complicated situation of the project. Furtermore we created plans how this area can be developed.

6/2009 - present Architect, ACA09, Amsterdam - Competition Brussels Courthouse imagine the future!, Brussel Concept developing, design en presentation -Renderering images A house in Luanda 2010, Angola Creating renders for the final presentation - Competition Groenbeton 2009, Amsterdam Concept developing, material research - Competition Arquitectum 2009, Parijs

Concept developing, design en presentation

6/2007 - 9/2007 Internship, Venhoeven CS, Amsterdam - National swimmingpool Ypenburg / Ypenburg, Nederland Working technical drawings

- Sportcentre Katwijk/ Katwijk, Nederland

Financial research for the project and design

9/2003 - 1/2004 Internship, HM Architekten, Amsterdam, semi-professional - Renovation of studenthousing at the Prinsengracht / Amsterdam, Nederland.

I have been working on the design phase till the construction phase.

Non-architectural relavant experience1/2010 - present Host at Holland Casino, Amsterdam - As a host of the casino I am responsible for the hospitality for the guest and have to observe gambling addiction.

6/2005 - 6/2006 Salesman Fashion, Peek&Cloppenburg, Amsterdam - Salesman and tailor at the boutique department

6/2002 - present Steward, Amsterdam Arena, Amsterdam - As a steward I am responsible for the hospitality for the guest during events

7/2004 - 3/2005 Waiter, Restaurant Maison Petit Provence, Purmerend - Working as a waiter at a french orientated restaurant

curriculum vitae

Education

9/2006 - 2/2007 Exchange study in Valéncià, UPV, Spain - Project Community House Malva Rosa / Valéncià, Spain

- Villa #2 / Cueta, Spain

- Villa #1 / no site

9/2005 - 6/2009 Master in Architecture, Urbanism and Building Sciences, TU Delft, The Netherlands - Graduation Project Border Conditions NY: ExCiTe Hunterspoint / New York, USA

- Project Museum IJburg / Amsterdam, The Netherlands

9/2001 - 6/2005 Bachelor Building Technology, HvA Amsterdam, The Netherlands - Graduation Project Bijlmermeer / Amsterdam, The Netherlands

2/2004 - 6/2004 Exchange study in Aberdeen,Robert Gordon University, Scotland - Studenthousing project / Dundee, Scotland

Awards

2007 First Prize International Biënale Rotterdam: Indesem: The Legacy 2007/ TU Delft, The Netherlands

Publication Nederland wordt anders magazine #1, februari 2010

Groen Beton 2009, november 2009

Arquitectumwebsite, http://www.arquitectum.com, september

2009

Public lecture, Architectencafe Utrecht, 22 februari 2010

Public lecture, Dag van de Architectuur in Utrecht http://www.dvda.myplaces.nl/index.php3?h=17647&s=5544, 2 juni 2010

Skills CAD: AutoCAD, Arkey, Rhincoceros, Sketchup Graphics: Adobe Photoshop, Illustrator, Indesign, V-ray, Artlantis Productivity: Microsoft Word, Excel, Powerpoint etc. Media: Macromedia Dreamweaver

Languages Dutch, English, Spanish and GermanInterests Travelling, photography, art and music

//5

//6

//7

Brussels courthouseaca09architectureBrussels, Belgium 2010

activities: - working on researches- design- presentation

Competition: Brussels Courthouse imagine the future!International ideas contest

CONCEPT:Buildings seeks societyIn search for societyBrussels courthouse becomes 1st European forum

The building has the potential to represent an important development of daily society. A Building, which makes people conscious of themes in society working on a much bigger scale, namely, the scale of Europe.The building will facilitate and stimulate the meaning and development of Europe. The building will become the 1st European Forum.

//8

//9

na-ma architectureAmsterdam, The Netherlands 2010

activities: - architect- working on researches- design projects

na-ma architecture

na-ma architecture is a small office focussed on urban studies, interior, public buildings and exhibitions. Momentary the office is working on research about pos-sibilities for temporal use of urban space. This research done within a temporary collaboration between na-ma architecture and Tom Bergevoet architecture. They research the possibilities about left overs of space and deserted spaces how to use those on temporary base without harming them. When such initiative will be placed it creates a temporary boost of initiatives and has the possibility to move away to another location easily.

//10

Project Research temporary use of public space

For the area Amsterdam we are investigating the possibilites of temporal use how it can be implemented. I have been working on ideas, concepts, present examples, visions, possibilities and tools.

Project Design for football court

For the commision of sport in Amsterdam we have been asked to design a football court with the aim to integrate community with football. It will be a design at the same scale as Johan Cruyff court but with integration possibilities for the surrounding. A design which generates a new and improved connection between different ages and users.

research TEMPORARY AMSTERDAM

TEMPORARY CANAL SQUARE

TEMPORARY BUBBLE

TEMPORARY CLIMBING WALL

TEMPORARY FASHION STAGE

TEMPORARY OLYMPIC VILLAGE

TEMPORARY PARK //11

Project Cityvision for Rome

To implement the idea of temporal use of public space we participated a competition called cityvi-sion for Rome. The idea was to create a vision for the citycentre of Rome for the future how to deal with the historical character of it and to which direction it might should go.The idea na-ma developed was to create temporal bubbles in different parts of the city. We de-fined for five types of context ideas how these bubbles can be used.

A. Forum RomanumB. Forrests around RomeC. River TiberD. Historical part from the Renaissence periodE. Roman wallF. Modern and contemporary parts of Rome

TEMPORARY ROME

//12

stadium WK2018 OS2028

Olympic Stadium Amsterdam

For the coming events the manucipality of Amsterdam decided to offer two stadiums to renovate. Beside the wellknown Amsterdam Arena the wanted to offer as well the Olympic Stadium at Stadionweg in Amsterdam Zuid. The idea for the stadium that it would be used for three tournaments. For each event the stadium would increase in capacity and stick on the need of the statium.The idea behind the design is that we would design temporary light tribunes which would be placed fixed on the need of capacity. For the first event World Championship Atletics, the will use 5 triubunes, for the second event World Championship Football the would use triubes so we would increase the capacity to 55000 seats. And for the last event we would use all the tribunes to have a capacity of 80000 seats. But after finishing the last event the tribunes could be easily removed to be used somewhere else.

//13

researchlab LAB01atelier rijksbouwmeester / VROMAmsterdam, The Netherlands 2009

activities: - architect- project manager - working on researches- design projects

Researchlab for Utrecht is founded in the start of October 2009. It was notated as LAB01. With this lab we participated the researchproject of Atelier Rijksbouw-meester. This initiative gives an oppurtunity for architects to cooporate temporarily within a group of fellow redundant architects. Architects who want to continue exploring new possibilities for architecture and urbanism issues of nowadays. With the aim of developing experiments and researches for issues of which most of the of-fices don’t have the occasion for it .

Our projectarea is the Jaarbeursterrein in Utrecht connected with the central station. Our goal was to research the possibilities to develop this area. We started with a bottom-up approach to gain data by making analyses of the area. With this data we developed four models for the area which might possible to use it. After analysing the possiblities of using these four models we eventually developed two types of scenario which eventually extended into six scenarios. Six scenarios which are seeking the extremes within themself. Extremes to extract questions and possibilities what if the scenario will be used.

//14

INTR

O

NElab

STRA

TEGI

E

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

PROCES

//15

INTR

O

NElab

INTE

GRAT

IE

CAMOUFLEREN

1. Hoe integreer je een groot commercieel programma in de stad?

INTEGRATIE

PROFILEREN

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

INTR

O

NElab

INTE

GRAT

IE

verwerken programma in grid-bepalen-samenvoegen-verkleinen/vergroten-versmallen/verbreden

korelgrote stedelijk leven definitie

grid is bepalend

programma is bepalend

WEEFSEL LEIDEND

PROGRAMMA LEIDEND

programma

stad

korrel

opwaarderen omgeving

C+

CAMOUFLEREN - OUTSIDE IN

CAMOUFLAGE :TOTAL INTEGRATION - study

Scenario Total IntegrationThis scenario will develop not from the inside (site itself) but from the outside. First we will develop the borders, upgrade it and eventually develop the Jaarbeursterrein.

//16

INTR

O

NElab

INTE

GRAT

IE

PROGRAMMA LEIDEND

P

P

P

P

P

PP

P

P

C

C

C

C C

C

C

C C

C

C

C

C

C

C

CCC

C

C

-1 0

1 2 lasagne-model

grachten-model

90˚

wonen

commercieel

parkeren

wonen

comm

ercieel

parkeren

onder

boven

voor achter

gesloten bouwblok

programma

500 %

100 %

p

c

c

FAIRTRADENElabCAMOUFLEREN

INTR

O

NElab

INTE

GRAT

IE

PROGRAMMA LEIDEND

P

P

P

P

P

PP

P

P

C

C

C

C C

C

C

C C

C

C

C

C

C

C

CCC

C

C

-1 0

1 2 lasagne-model

grachten-model

90˚

wonen

commercieel

parkeren

wonen

comm

ercieel

parkeren

onder

boven

voor achter

gesloten bouwblok

programma

500 %

100 %

p

c

c

FAIRTRADENElabCAMOUFLEREN

INTR

O

NElab

INTE

GRAT

IE

CAMOUFLEREN

1. Hoe integreer je een groot commercieel programma in de stad?

INTEGRATIE

PROFILEREN

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

CAMOUFLAGE :I LOVE FAIRTRADE - study

Scenario I love fairtradeCommercial is here the key. The key of developing the area, the key of gaining money and eventually the key to degentrificate the area. Back to the social possibilities of

commercial thinking.

//17

INTR

O

NElab

DICH

THEI

D

kerk Jaarbeurs+

casinoschool

Aa Bb

+ + +( )

( )

hotelretail

bios

megabioscoop

grondgebonden brugwoningappartement

++

+ + +

STAD IN DE STAD

SUPERBLOK

+

+

=

dakwoning

SUPERBLOK

SUPERBLOK

INTR

O

NElab

INTE

GRAT

IECAMOUFLEREN

1. Hoe integreer je een groot commercieel programma in de stad?

INTEGRATIE

PROFILEREN

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

PROFILE :SUPERBLOCK - study

Scenario SuperblockIn this scenario we investigate the possibilities of the max of living, public space and mass within one area.

//18

INTR

O

NElab

DICH

THEI

D

STRAATPROFIEL TRADITIONEEL

P PCollectieve parkeeroplossing in de rand

Program diagram Randen

VERDICHTING DOOR VERPLAATSEN AUTO

P

P/C

VERDICHTING DOOR VERPLAATSEN PRIVE-GROEN

INTENSE LAAGBOUW

INTENSE LAAGBOUW

INTR

O

NElab

DICH

THEI

D

Bioscoop

Hotel

Casino

P

WONEN JAARBEURS BOULEVARD STAD

GR.V. ROGGEWEG KANTOREN WONEN P V. ZEISTWEG

P

Bioscoop

Hotel

Casino

P

WONEN JAARBEURS BOULEVARD STAD

GR.V. ROGGEWEG KANTOREN WONEN P V. ZEISTWEG

P

AUTARKIE NElab AUTARKIE NElab

STRAATPROFIEL TRADITIONEEL

P PCollectieve parkeeroplossing in de rand

Program diagram Randen

VERDICHTING DOOR VERPLAATSEN AUTO

P

P/C

VERDICHTING DOOR VERPLAATSEN PRIVE-GROEN

INTENSE LAAGBOUW

FSI 5

FSI 4

FSI 3

FSI 2

FSI 1

JAARBEURS

LEISURE

HOTEL

WONEN

PARKEREN

VOORZIENINGEN

KANTOOR

PUBLIEKE RUIMTE

LOCATIE PROGRAMMA

U U U U

PARKEREN AUTARKIE INTEGRATIE SUPERBLOK FAIRTRADE PARK

U

U U

U U

PARKEREN AUTARKIE INTEGRATIE

SUPERBLOK FAIRTRADE PARK

U

FSI 5

FSI 4

FSI 3

FSI 2

FSI 1

JAARBEURS

LEISURE

HOTEL

WONEN

PARKEREN

VOORZIENINGEN

KANTOOR

PUBLIEKE RUIMTE

LOCATIE PROGRAMMA

U U U U

PARKEREN AUTARKIE INTEGRATIE SUPERBLOK FAIRTRADE PARK

U

U U

U U

PARKEREN AUTARKIE INTEGRATIE

SUPERBLOK FAIRTRADE PARK

U

PROGRAMMA FSI

JAARBEURS

CC

C

JAARBEURS

INTR

O

NElab

DICH

THEI

D

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

PROGRAMMA

FUNCTIE

DICHTHEID

2. Hoe creëer je een hoge dichtheid met behoud van een goede leefkwaliteit?

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

INTR

O

NElab

DICH

THEI

D

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

PROGRAMMA

FUNCTIE

DICHTHEID

2. Hoe creëer je een hoge dichtheid met behoud van een goede leefkwaliteit?

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

+

SEPERATION + SPRAWL :AUTARKIE - study

Scenario AutarkieIn this scenario the small community or the historical immunity will be the model for this area. Peaceful and small living combined with the big Jaarbeurs.

//19

INTR

O

NElab

DICH

THEI

D

BEWOOND LANDSCHAP

MOBILITEITNETWERKEN STEDELIJK WOONERF

A2

A12

stad

>>

BEWOOND LANDSCHAP

BEWOOND LANDSCHAP

INTR

O

NElab

DICH

THEI

D

BEWOOND LANDSCHAP

PARKINGNElab

FSI 5

FSI 4

FSI 3

FSI 2

FSI 1

JAARBEURS

LEISURE

HOTEL

WONEN

PARKEREN

VOORZIENINGEN

KANTOOR

PUBLIEKE RUIMTE

LOCATIE PROGRAMMA

U U U U

PARKEREN AUTARKIE INTEGRATIE SUPERBLOK FAIRTRADE PARK

U

U U

U U

PARKEREN AUTARKIE INTEGRATIE

SUPERBLOK FAIRTRADE PARK

U

FSI 5

FSI 4

FSI 3

FSI 2

FSI 1

JAARBEURS

LEISURE

HOTEL

WONEN

PARKEREN

VOORZIENINGEN

KANTOOR

PUBLIEKE RUIMTE

LOCATIE PROGRAMMA

U U U U

PARKEREN AUTARKIE INTEGRATIE SUPERBLOK FAIRTRADE PARK

U

U U

U U

PARKEREN AUTARKIE INTEGRATIE

SUPERBLOK FAIRTRADE PARK

U

PROGRAMMA FSI+

+

BEBOUWINGVELD

PUBLIEKE DOMEIN

PRINCIPE DOORSNEDE

PRINCIPE PLATTEGROND

BEWOOND LANDSCHAP

PLAN

PP

P

P

P

MIXING + SPRAWL :PARKING - study

INTR

O

NElab

DICH

THEI

D

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

PROGRAMMA

FUNCTIE

DICHTHEID

2. Hoe creëer je een hoge dichtheid met behoud van een goede leefkwaliteit?

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

INTR

O

NElab

DICH

THEI

D

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

PROGRAMMA

FUNCTIE

DICHTHEID

2. Hoe creëer je een hoge dichtheid met behoud van een goede leefkwaliteit?

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

+

Scenario ParkingAll of the parking possibilities of the centre of Utrecht will be places in this area. Area, mobil-ity, parking and living will be work together as partners.

//20

INTR

O

NElab

PUBL

IEKE

RUI

MTE

Concept doorsnede; wonen in het park Concept doorsnede; Continuiteit van het maaiveldPark als drager

Concept: “Ondergronds bouwen” continuiteit van het maaiveldpublieke ruimte als dragerFUNCTIE OP ZICHZELF

FUNCTIE OP ZICHZELF

WONEN IN PARK CONTINUITEIT MAAIVELD - PARK ALS DRAGER

INTR

O

NElab

PUBL

IEKE

RUI

MTE

plan

Huidige situatieJaarbeurs alleen

FUNCTIE OP ZICHZELF

FSI 5

FSI 4

FSI 3

FSI 2

FSI 1

JAARBEURS

LEISURE

HOTEL

WONEN

PARKEREN

VOORZIENINGEN

KANTOOR

PUBLIEKE RUIMTE

LOCATIE PROGRAMMA

U U U U

PARKEREN AUTARKIE INTEGRATIE SUPERBLOK FAIRTRADE PARK

U

U U

U U

PARKEREN AUTARKIE INTEGRATIE

SUPERBLOK FAIRTRADE PARK

U

FSI 5

FSI 4

FSI 3

FSI 2

FSI 1

JAARBEURS

LEISURE

HOTEL

WONEN

PARKEREN

VOORZIENINGEN

KANTOOR

PUBLIEKE RUIMTE

LOCATIE PROGRAMMA

U U U U

PARKEREN AUTARKIE INTEGRATIE SUPERBLOK FAIRTRADE PARK

U

U U

U U

PARKEREN AUTARKIE INTEGRATIE

SUPERBLOK FAIRTRADE PARK

U

VERSCHIL IN RITME

PROGRAMMA FSI

INTR

O

NElab

PUBL

IEKE

RUI

MTE

PUBLIEKE RUIMTE

FUNCTIE OP ZICHZELF FUNCTIE GERELATEERD

3. Hoe waarborg je de kwaliteit van publieke ruimte met een groot verschil aan intensiteit van gebruik?

1. INTEGRATIE

2. DICHTHEID

3. PUBLIEKE RUIMTE

THEMA’S

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

FAIRTRADE

PARK

U

UU

U

U

MACRO

STATION

GRENS

BEURS

EILAND

INTEGRATIE

PARKEREN

ANALYSE KARAKTER SCENARIO’S TACTIEK

AUTARKIE

SUPERBLOK

INTEGRATIE

INTEGRATIE

FAIRTRADE

PARK

U

MACRO

STATION

GRENS

BEURS

ANALYSE

SPREIDEN

SCHEIDENMIXEN

CONCENTREREN

CAMOUFLEREN

PROFILEREN

FUNCTIE OP ZICHZELF

FUNCTIE-GERELATEERD

LOCATION AS ONE FUNCTION :PARK - study

Scenario Central ParkPark as an gap within the urban tissue. With this scenario we investigate the possibilities of an urban park for Utrecht.

//21

Le rouge vouléaca09architecture Paris, France 2009

activities: - architect- project manager- design- visualisations

Temptation, history and entertainment are the keywords of the Moulin Rouge which was used to be. The new Moulin Rouge will contain these elements even more and better. Both during day and night.The design for the new Moulin Rouge and dance school is based on to work each other, physically and mentally. There will be a scenario for during the day and one for the night.

Day scenario is based on the secret, history and temptation of the building by telling the story of the Moulin Rouge of the past with a route right through the building. You will see the history of the dancers, the rise of the Moulin Rouge through time till now by taking the loop up towards the roof. Meanwhile people will catch a blimp of the dancers of today to catch the feeling of real heart of the Moulin Rouge. Past and present of the Moulin Rouge will meet each other here.

During night the original windmill of the past will show up behind the curtain of today to attract people to come to this place to experience the entertainment the Moulin Rouge can offer. From far the Moulin Rouge will be seen by the light the building will shine.. When you enter the building you will be gently guide to the auditorium to experience the warmth, exotic and tempting world the Moulin Rouge will give.Welcome to the new Moulin Rouge!!!Extremes to extract questions and possibilities what if the scenario will be used.

//22

DANSESCHOOL MOULIN ROUGE

//23

Excite Ferryterminalborder conditionsHunterspoint New York, NY, 2007 - 2009

activities: - architect- project manager- design- visualisations- research

This project for Studio Border Conditions is focused on the area of New York. The research started with a fascination you want to research about. Mine was the underground scene in New York. But instead of taking the contex of the underground scene in the art scene or music scene I took this literally by going underground, to the New York Subway stations.

In these areas happens streetperformances done by artists who are expressing their art to the public. Art expressions like dance, music or just entertainment performances. These performances are based on temporary time, unexpected and suprise and done on locations which are not really made to perform. But just because of these elements of suprise of these performances they are creating a transformation of space they are happening.

My research is focussing on the architectural and sociological elements of these performances mainly what this transformation is and the effect on the area and on the people.For this project this research will be done by making mappings to be nally the base and inspiration for the development of a building.

graduati

on proje

ct

//24

//25

This project for Studio Border Conditions is fo-cused on the area of New York. The research started with a fascination you want to research about. Mine was the underground scene in New York. But instead of taking the contex of the underground scene in the art scene or mu-sic scene I took this literally by going underground, to the New York Subway stations.

In these areas happens streetperformances done by artists who are expressing their art to the public. Art expressions like dance, music or just entertainment performances. These performances are based on temporary time, unexpected and suprise and done on locations which are not really made to perform. But just because of these elements of suprise of these performances they are creating a transformation of space they are happening.

My research is focussing on the architectural and sociological elements of these perfor-mances mainly what this transformation is and the effect on the area and on the people.For this project this research will be done by making mappings to be nally the base and inspiration for the development of a building.

// Mapping / map of all subway connections with their stations in

Manhattan, Long Island and Brooklyn

//26

After analyzing different performances I decided to study one performance in de-tail. So I decided to study the performance of a guitar player with a violin player.

I have been looking at the trajectories of the audience during the performance and how they went and added thefactor time. By inserting this factor the route/trajectory of the audience became a path based on time where increas-ing and decreasing of speed was present. This increasing and decreasing of speed do I notate as ‘rhythm’.

// Guitar and violin performance situated on a platform at the Time Square Subway station

Times squareh 1114 day 1 Mappin

g p

roc

es terminal space

// Trajectories and positions on platform

of people during performance

// Domains of circulation versus

domains of improvisation

// 3d mass model of the

trajectories of people

//27

The rhythm of this performance I got by making an ‘mapping’ (analyze) of the audiences’ behavior during this performance.

I notated their location, their trajectories and dierences between where they started and where they end, all during a certain period of 46 frames of 0.5 seconds. With this information I made a diagram of this information which ended up in a ‘structure’ of rhythms during time. This structure naly showed the basic structure for the design. This structure is notated asrhythm in time (transitions, increasing of speed, decreasing of speed) The structure which I finally got is a structure of peoples behavior disturbed by the performance and a structure of peoples behavior without any disturbing by the performance.

After doing this I finally got a structure which shows the transformation of the space by the performance. Which I used for the design of the building. For developing the reasearch procudure towards had I chosen to use the structure for a function which expressed the riged structure of traveling and a function which contains the elements being the opposit of it.I ended up in the function of a ferryterminal which contains spaces for art.

EXHIBTION VERSUS TERMINAL /// ExCiTé NY// diagram / Peoples behavior disturbed by performance versus behavior which is not disturbed by performance

//28

isolated spaces = transit stimulated spacesawareness spaces = connection with outside

RHYTHM # 2_ transit / place (gaps/closed)

�ows of indiv (expo)RHYTHM # 1_ connectivity

�ows of collective (terminal)

RHYTHM # 3_ individual/collective (functions)

entrance

entrance

terminal / parking

entrance

entrance

entrance

entrance

terminal / parking

terminal / parking

DIAGRAM OF RHYTHMS of the performanceThe next step to continue with the diagrams I deformed the structure of the normal sequential develop-ment of a transition by the improvisation. The deformation is done on a grid system of the frames versus distance towards the performance. This grid represents this sequential development of the performance.With this deformation or deconstruction of the sequential development I gained three parameters. These parameters are three rhythms which are coming out of the interaction (the transformation of the space during the performance). For the final step I took these three rhythms and merged them into one diagram which shows an abstract interpretation of the transformation by the performance. I called this interpretation the diagram of rhythms of the performance.

parameter #1: Rhythm of connectivity

parameter #2: Rhythm of the character of the transition

Parameter #3: Rhythm of the impact on the transition

//29

The location for the building will be situated at the riverside of Long Island, Hunterspoint.

The area of Hunterspoint is nowadays a deserted and desolated area where almost no development is. The area used to be a high industrial area where small but high industrial factories where operating. During time the area became more abandoned and need now aeconomical injection of new investments to grow and develop.

The mapping for the project is based on transition-al flows gained from the research about thetransitional versus improvised. To cope with this I will make a ferry terminal. The building will contain these transitional flows and is able to connect with the areas condition.

The areas condition contains five interesting places to connect with the terminal and Manhattan.One place is the trainstation (1) which is ending in this area. The other is the leisure area of sport facilities with park (2). The third interesting place is upcoming economic centre (3). The fourth place is the Long Island highway (4) which is going here under the river. And the last place is huge deserted space of nothing but sand, grass and mud (5).

These five places will be connected by the terminal with Manhattan to have a good intensive connection. A connection which can attract investments, visitors and tourists to this area.

//30

isolated spaces = transit stimulated spacesawareness spaces = connection with outside

RHYTHM # 2_ transit / place (gaps/closed)

�ows of indiv (expo)RHYTHM # 1_ connectivity

�ows of collective (terminal)

RHYTHM # 3_ individual/collective (functions)

entrance

entrance

terminal / parking

entrance

entrance

entrance

entrance

terminal / parking

terminal / parking

DIAGRAM OF RHYTHMS of the performance

ferryplatform

lobby

restaurant

expo

entrance

expo

bus taxi platform

parking space

expo

entrance

entrance

entrance

entrance

entrance

entrance

entrance

entrance

entrance

knot #9

knot #8

knot #7

knot #5

knot #6

knot #3

knot #4

knot #1

knot #2

1. diagram of rhythm of theperformance

2. diagram of knots

3. diagram of knots aplied to site

5. section model of tubes model

4. physical model from diagramto tube

6. deconstructed tube model

7. folded strip model

9. revised folded strips model

8. revised folded strips model

10. nish revised folded stripsmodel

The development from the structure towards the nal design of the terminal was based on certain steps. I made a diagram of the dierent rhythms of the structure and made him 3d. I implemented functions and tried to create a landscape /cityscape which provide the possibilities to use the terminal as it should be, (rigid / fast / no identity) by giving opportunities to improvise with art exhibitions (improvi-sition / delayed / identity based) on the terminal’ structure.

The building is made of concrete which made the smoothness for the terminal disturbed by the exhibitionspaces.

//31

// Drawing / horizontal section of main floor

//32

sec a_1

sec a_2

sec a_3

sec a_5

sec a_4

frag

men

t

Plan first floor/ TOPVIEWscale 1 : 200 (PLAN) / model x_60 / 29 06 09

Project Ex Ci Te Hunterspoint /// NYBorder Conditions NY 2007-2009 / Dion Lembekker, TU Delft

panoramadeck

exhibition space

exhibition space

exhibition corridor

exhibition space

exhibition space

exhibition space

art storages office facilities office

Passage

exhibition space

panoramadeck

exhibition space

rooflight rooflight

rooflight

rooflight

rooflight

rooflight

rooflight

void

void

void

void

void

void

void

toilets

// Drawing / horizontal section of first floor

//33

// Section / short vertical section

//34

Research on site 25 05 09

Project Ex Ci Te Hunterspoint /// NYBorder Conditions NY 2007-2009 / Dion Lembekker, TU Delft

// Drawing / short and long vertical section

//35

Project Ex Ci Te Hunterspoint /// NYBorder Conditions NY 2007-2009 / Dion Lembekker, TU Delft

Detailed fragment 1 : 10Final Presentation 29 06 09

1 Construction of the slab - 400mm steel trusses / 200mm and 100mm support tubes. -640 mm reinforced concrete, waterproof -2 x 30 mm EPS insulation -50 mm finishing layer; shotcrete2 Construction of glazed part - 400mm steel trusses / 200mm and 100mm support beams. - intervening profile, steel, provided with spider system. to support mulions and fasten glazing - 8 - 16 - 21 mm glass

MulionScale 1:5- 100mm beam, steel. provided with pins of thread bolt.- prefab concrete block, provided with shear connectors.- EPS insulation- 50 mm finishing layer; shotcrete.

1.

2.

// Construction / detail of the window

View from above

View from the front

//36

// Render / impression of the exhibitionspaces - transit zone

//37

Indesem 2007Delft, The Netherlands, 2007

activities: - design- visualisations

Indesem 2007 was focused on the issue of the future. Mainly on what architects from nowadays will leave behind for the next generation.

To give answer to this question several students from all over the world were invited to embody this question and try to give an aswer.The results of this question would be presented on a collection of billboards during the First International Bienale of Rotterdam.

The assignment was divided in several locations in Rotterdam. We had to make an image/ view for this location how this view would be over sixty years on that specific location. The group with the best vision would be published on the billboards.

Our group won finally two locations based on the vision how we can deal with religion and the rise of the level of the river Maas.

winner com

petiti

on

//38

indesem: the legacy

Indesem 2007

//39

for for

museum IJburgAmsterdam, The Netherlands, 2006

activities: - design- research- visualisations

Amsterdam needed an museum on the island IJburg. So we designed a museum for both historian objects and contemporary art pieces. Our idea was to place the museum on a small piece of land to control the whole island. The musuem would work as a keeper of peace and nature. A museum not just to store but als to create the connection between the area and art. Within the museum itself we created a continous route which connected all of the art pieces together with sneakpeaks of the outdoor.. The museum will be a adventure to visit and a moment of peace to experience.

//40

Museum IJburg//41

//42

Museum IJburg is a building situated on the peniscula part of IJburg. The design for both the building and the interior is based on transition. Transition from the external into the internal part of the build-ing. This transition start already with a ramp alongside the whole building. During this journey you seperate youself from the external and preparing yourself for the internal.

Inside the building a route is set up along all the rooms and end up where you start.

The collection of the museum was a given programme and is based on historical pieces of art and contemporary art. The collection is based on old Greek statues, Dutch paintings from the Golden Era and contemporary art like Giacometti.

The design for the interior is based on connection and slightly transition between different eras where art is coming from without disturbing them.

//43

me, myself and I...Purmerend, The Netherlands, 1983

//44

banksy corbijn sushi

steven holl g-star valéncià indonesia

photographylibeskindguitar ambition

tokyo

//45

//46

colofonPurmerend, January 2011

ARCHITECTEN COLLECTIEF ACA09architect ir. Dion D. Lembekkert_ 06 141 84 [email protected] make an image/ view for this location how this view would be over sixty years on that specific location. The

//47