64

Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding
Page 2: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Pre-Bid Conference regarding Pre-Bid Conference regarding International Bidding Document International Bidding Document Mkt-03 for Remote Meter Mkt-03 for Remote Meter Reading System (RMS)Reading System (RMS)

LAHORE ELECTRIC LAHORE ELECTRIC SUPPLYSUPPLY COMPANYCOMPANY

Page 3: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

LESCO is leap froging LESCO is leap froging towards a “Radical towards a “Radical

Change” with Change” with Breakthrough technology Breakthrough technology

of introducing Remote of introducing Remote Meter Reading System Meter Reading System

(RMS)(RMS)

Page 4: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Tender Document Mkt-03Tender Document Mkt-03

Salient Features of Tender DocumentSalient Features of Tender Document

SCOPE:SCOPE:Design, Supply, Installation and Commissioning Design, Supply, Installation and Commissioning of Remote Meter Reading System (RMS) of Remote Meter Reading System (RMS) inclusive of static energy meter as per Wapda inclusive of static energy meter as per Wapda Specifications by utilizing RF with GSM/GPRS Specifications by utilizing RF with GSM/GPRS based hybrid system or totally GSM/GPRS based hybrid system or totally GSM/GPRS based fixed network.based fixed network.

Page 5: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Salient Features of Tender Salient Features of Tender DocumentDocument

Proposed area Canal Road Sub-DivisionProposed area Canal Road Sub-Division

Approximate consumers 18,000 (single Approximate consumers 18,000 (single phase, three phase, CT , CT & PT phase, three phase, CT , CT & PT operated)operated)

Funds for procurement will be made from Funds for procurement will be made from LESCO own resources.LESCO own resources.

Single stage two envelop procedure will be Single stage two envelop procedure will be followed.followed.

Page 6: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Para wise reply of Quarries Para wise reply of Quarries raised by raised by

M/s SitronicsM/s Sitronics telecom solutiontelecom solution

Page 7: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.1Query No.1 ReplyReply

Does this mean that the Does this mean that the PLC is not expected or PLC is not expected or preferred ? We suggest preferred ? We suggest PLC as the main PLC as the main communication technology communication technology for its easy installation, low for its easy installation, low costs and high stability. costs and high stability. On hybrid network. GPRS On hybrid network. GPRS might be used as a might be used as a supplementary supplementary technology?technology?

At present situation, At present situation, LESCO is not inclined for LESCO is not inclined for the option of PLC as RMS the option of PLC as RMS System due to System due to reservations of PLC reservations of PLC System. However any System. However any prospective Bidder can prospective Bidder can offer PLC System with its offer PLC System with its enhanced technological enhanced technological benefits with proven track benefits with proven track record and up to date record and up to date technological standards. technological standards.

Page 8: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.2Query No.2 ReplyReply

It seems that there is It seems that there is some text missing some text missing between pages 4 and 5. between pages 4 and 5. Is this correct?Is this correct?

Nothing is missing b/w Nothing is missing b/w Page 4&5. Item 4&5 on Page 4&5. Item 4&5 on page 5 is in continuation to page 5 is in continuation to points 1,2,3 on page 4. points 1,2,3 on page 4.

Page 9: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.3Query No.3 ReplyReply

How will the installation of How will the installation of the hardware components the hardware components be proceeded? Will your be proceeded? Will your employees install the employees install the meters on customer sites? meters on customer sites? The installation of smart The installation of smart meters with PLC unit does meters with PLC unit does not differ from any not differ from any standard meter installation standard meter installation and does not require any and does not require any specific training?specific training?

All the installation of All the installation of meters as well as removal meters as well as removal of old meters with all the of old meters with all the allied network allied network components like components like DCU,MIU and other allied DCU,MIU and other allied components will be components will be installed by the Bidders. installed by the Bidders.

Page 10: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.4Query No.4 ReplyReply

Who will install the other Who will install the other network components as network components as data concentrators data concentrators (DCU), GPRS modems (DCU), GPRS modems etc.? Proper installation of etc.? Proper installation of this equipment requires this equipment requires training. Our technicians training. Our technicians can install the first pieces can install the first pieces in the first stages of the in the first stages of the project and provide the project and provide the necessary training, necessary training, documentation and documentation and supervision for further supervision for further deployment. deployment.

The preferred sequence of The preferred sequence of commissioning of the commissioning of the project will be the energy project will be the energy meters, installed in first meters, installed in first phase which will be phase which will be followed by its integration followed by its integration with other components with with other components with communication devices. communication devices. However it will be the However it will be the choice of the Bidder to choice of the Bidder to proceed with any proceed with any sequence of sequence of commissioning. commissioning.

Page 11: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.5Query No.5 ReplyReply

The DCU description on The DCU description on chapter 1.1.1 of the Annex chapter 1.1.1 of the Annex “A” expects RF and GPRS “A” expects RF and GPRS communication technology communication technology for LAN and WAN. Is this for LAN and WAN. Is this strictly required or an strictly required or an example? We are example? We are expecting PLC for LAN on expecting PLC for LAN on most networks. There are most networks. There are also more options for the also more options for the WAN as mentioned in WAN as mentioned in 1.1.3. Do you have any1.1.3. Do you have any

The DCU is a provision for The DCU is a provision for the offered Hybrid solution the offered Hybrid solution based on GSM,RF etc. based on GSM,RF etc. However in case of exclusive However in case of exclusive offered technology, GSM or offered technology, GSM or RF (Fixed Network),it will be RF (Fixed Network),it will be the discretion of the Bidder to the discretion of the Bidder to install DCU or any network install DCU or any network communicating device. At communicating device. At the moment PLC is not the moment PLC is not preferable option. We do not preferable option. We do not have any Transformer station have any Transformer station with IT infrastructure with IT infrastructure connectivity network likeconnectivity network like

(Continue ..)

Page 12: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.5Query No.5 ReplyReply

transformer stations with transformer stations with existing IP connectivity we existing IP connectivity we could use? If yes, how could use? If yes, how often and what often and what technology? What technology? What interface? Will you provide interface? Will you provide IP connectivity on each DC IP connectivity on each DC or do you expect us to or do you expect us to offer a solution for WAN IP offer a solution for WAN IP network between DC and network between DC and the central server? the central server?

router switches etc.router switches etc.

Page 13: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.6Query No.6 ReplyReply

Hand-held data collection Hand-held data collection is mentioned, is this is mentioned, is this required and for what required and for what cases? Off line cases? Off line communication using hand communication using hand held is suitable for held is suitable for metering data collection metering data collection including load profiles but including load profiles but can not offer additional can not offer additional functionalities as remote functionalities as remote meter management, meter management, network management, network management, black out prevention, black out prevention, temper detection etc.temper detection etc.

This is an optional This is an optional provision can be offered provision can be offered as an additional feature as an additional feature as the part of the as the part of the proposal of the Bidder. proposal of the Bidder.

Page 14: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.7Query No.7 ReplyReply

The description of the SW The description of the SW components and its components and its functionalities in Annex A 2.6 functionalities in Annex A 2.6 goes in detail. Our approval for goes in detail. Our approval for the same functionalities is in the same functionalities is in some cases slightly different. Our some cases slightly different. Our UTILIS Metering Suite UTILIS Metering Suite (AMR/AMM SW) is offering wide (AMR/AMM SW) is offering wide range of functionalities including range of functionalities including tariff planning, meter tariff planning, meter configuration, network configuration, network management, data analyses, management, data analyses, meter reading scheduling etc. It is meter reading scheduling etc. It is possible to suggest alternative possible to suggest alternative SW architecture that would cover SW architecture that would cover all the requested system all the requested system functions?functions?

The Bidder can offer a The Bidder can offer a better software with more better software with more functionalities, parameters functionalities, parameters and flexibility for reporting. and flexibility for reporting. Data Management and Data Management and Data Analysis covering all Data Analysis covering all the requirements under the requirements under scope of work. scope of work.

Page 15: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.8Query No.8 ReplyReply

In paragraph 2.6.5 of Annex In paragraph 2.6.5 of Annex A the Billing interface A the Billing interface application is required. What application is required. What functions will be integrated, functions will be integrated, What data will be shared? What data will be shared? We suggest step-by-step We suggest step-by-step integration beginning with integration beginning with meter readouts to existing meter readouts to existing billing application and billing application and continuing with Customer continuing with Customer Information and Billing Information and Billing System innovations. Smart System innovations. Smart metering ismetering is

LESCO at present is not LESCO at present is not inclined to disturb its inclined to disturb its existing Billing and reporting existing Billing and reporting system. The acquired Data system. The acquired Data through the RMS network through the RMS network will be sufficient to run will be sufficient to run LESCO existing Billing LESCO existing Billing System. However the System. However the offered system should have offered system should have the flexibility to expand with the flexibility to expand with probable efficient Billing probable efficient Billing and reporting system (As and reporting system (As per Clause 2.1 of Wapda per Clause 2.1 of Wapda Specifications DDS 75-Specifications DDS 75-2004). 2004).

Page 16: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

offering new possibilities and offering new possibilities and functions that are now functions that are now probably not supported in probably not supported in existing LESCO’s existing LESCO’s applications. Our AMM applications. Our AMM software can provide these software can provide these functions to end users in our functions to end users in our UTILIS GUI, but customer UTILIS GUI, but customer related functions should be related functions should be operated on single place- in operated on single place- in the Customer Information the Customer Information and Billing system. Is and Billing system. Is innovation of the LESCO’s innovation of the LESCO’s Customer Information and Customer Information and Billing expected ? Billing expected ?

Page 17: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.9Query No.9 ReplyReply

The objectives in page 5 The objectives in page 5 include Demand and include Demand and Distribution Management. Distribution Management. Does this mean demand side Does this mean demand side management i.e remote management i.e remote demand control ? What kind of demand control ? What kind of demand control is expected ? demand control is expected ? What kind of interface on What kind of interface on meter is preferred ? We can meter is preferred ? We can offer M-Bus interface that offer M-Bus interface that enables that enables enables that enables communication with external communication with external control relays or internal control relays or internal secondary relay?secondary relay?

The basic parameters of the The basic parameters of the offered meters as per offered meters as per Wapda Specifications DDS-Wapda Specifications DDS-75,DDS-60, DDS-65 ,DDS-75,DDS-60, DDS-65 ,DDS-50, are the only 50, are the only requirements for the current requirements for the current logs and temper alerts. At logs and temper alerts. At this moments, the LESCO is this moments, the LESCO is not inclined for any inherent not inclined for any inherent load management build in load management build in devices in the meter. devices in the meter.

Page 18: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.10Query No.10 ReplyReply

The DCU described in The DCU described in paragraph 2.3 of A will be paragraph 2.3 of A will be installed on distribution installed on distribution transformer site or another transformer site or another architecture is expected? If architecture is expected? If the transformer placed is the transformer placed is outdoor, What standards outdoor, What standards for DCU’s housing are for DCU’s housing are expected ?expected ?

The DCU is preferably to The DCU is preferably to be installed at be installed at concentrated node of concentrated node of network. In case of network. In case of outdoor transformer it outdoor transformer it should be installed should be installed outside compliant to outside compliant to relevant protection clause relevant protection clause like IP-54.like IP-54.

Page 19: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.11Query No.11 ReplyReply

The minimum amount of The minimum amount of meters operated by one DCU meters operated by one DCU is 64. How many meters are is 64. How many meters are typically installed under one typically installed under one transformer station ? We transformer station ? We expect it to be more. Do you expect it to be more. Do you plan to install more DCU plan to install more DCU under one transformer under one transformer station in this cases ? We station in this cases ? We suggest using of DCU that suggest using of DCU that can handle about 1000 can handle about 1000 meters. This should be meters. This should be enough of any situation.enough of any situation.

The No of meters The No of meters communicating with one communicating with one DCU, the limit is 64. DCU, the limit is 64. However the bidder can However the bidder can enhance its capacity over enhance its capacity over this limit according to this limit according to design and topology of design and topology of network. network.

Page 20: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.12Query No.12 ReplyReply

Both single and poly phase Both single and poly phase DCU are requested. Why DCU are requested. Why you need single phase DCU you need single phase DCU ? If we install the DCU on ? If we install the DCU on transform site, this will transform site, this will always be site with all always be site with all phases. DCU with PLC phases. DCU with PLC modems are more powerful modems are more powerful if opened on all phases. Are if opened on all phases. Are for PLC poly pase DCUs for PLC poly pase DCUs preferred ?preferred ?

It is understood that It is understood that proposed DCU as a part of proposed DCU as a part of network has the ability to network has the ability to communicate its standalone communicate its standalone components irrespective of components irrespective of singly phase, three phase or singly phase, three phase or CT-operated meters. The CT-operated meters. The operational supply voltage of operational supply voltage of DCU is 240 volts and 410 DCU is 240 volts and 410 volts 50 Hz. volts 50 Hz.

Page 21: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.13Query No.13 ReplyReplyPoly phase DCU should be Poly phase DCU should be able to run also if two phases able to run also if two phases are lost. This is technically are lost. This is technically not possible? Since the DCU not possible? Since the DCU it self is powered on the T-it self is powered on the T-Phase. If the T-Phase is Phase. If the T-Phase is without power, the DCU is without power, the DCU is not operating. We can supply not operating. We can supply the DCU on the T-Phase with the DCU on the T-Phase with UPS to ensure its UPS to ensure its functionalities even in power functionalities even in power lost situations. Additionally lost situations. Additionally losing other R and S phases losing other R and S phases will causes an alarm to host will causes an alarm to host system?system?

The DCU preferably be The DCU preferably be operated on singly phase operated on singly phase 240V. However it will be 240V. However it will be the discretion of the bidder the discretion of the bidder to offer DCU with poly to offer DCU with poly phase or any redundancy phase or any redundancy option in case of failure of option in case of failure of supply for data storage. supply for data storage.

Page 22: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.14Query No.14 ReplyReply

Is on every transformer Is on every transformer station also a CT meter for station also a CT meter for overall energy overall energy consumption expected ? consumption expected ? This is required for energy This is required for energy lost detection. Do you lost detection. Do you provide the current provide the current transformers or shall we transformers or shall we deliver it with the CT deliver it with the CT meters ?meters ?

No, it will be installed at No, it will be installed at later stage. later stage.

Page 23: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.15Query No.15 ReplyReply

DCU is required to record DCU is required to record power outages. Is it power outages. Is it possible to record this possible to record this together with other power together with other power quality parameters in the quality parameters in the CT meter if DCU is CT meter if DCU is installed on TS and every installed on TS and every TS is equipped with CT TS is equipped with CT meter ? meter ?

The functions of the DCU is The functions of the DCU is to store the data & to store the data & Parameters received from Parameters received from the meters for onward the meters for onward communication to its Host communication to its Host which will include all the which will include all the three nodes of energy three nodes of energy meters, Normal, Alternative meters, Normal, Alternative and security.and security.

Page 24: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.16Query No.16 ReplyReply

The attached DDS-50 The attached DDS-50 specification describes specification describes also HT meters, but meter also HT meters, but meter table on page 27 does not table on page 27 does not include hem. Are HT include hem. Are HT meters also requested ?meters also requested ?

In this regard please refer In this regard please refer page # 32, item D and A-4 page # 32, item D and A-4 along with foot note. along with foot note.

Page 25: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.17Query No.17 ReplyReply

What stands “MDII/MDI” What stands “MDII/MDI” abbreviation for in meter abbreviation for in meter table on page 27 ?table on page 27 ?

MDI stands for Maximum MDI stands for Maximum Demand indicator & B-II Demand indicator & B-II Industrial connection (load Industrial connection (load from 41kW to 500 kW). from 41kW to 500 kW).

Page 26: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.18Query No.18 ReplyReply

Could you please explain Could you please explain the requests for MIU to the requests for MIU to form the local telecom loop form the local telecom loop mentioned in paragraph mentioned in paragraph 2.2 of Annex A ?2.2 of Annex A ?

The formation of telecom The formation of telecom loop by MIU is not a loop by MIU is not a required parameter. required parameter. However it depends on the However it depends on the proposed solution offered proposed solution offered by the bidder.by the bidder.

Page 27: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.19Query No.19 ReplyReply

What exact norms for What exact norms for meter housing protection meter housing protection level are expected.level are expected.

The specified meter as per The specified meter as per Wapda specifications Wapda specifications DDS-75, DDS-50, DDs-65, DDS-75, DDS-50, DDs-65, are well defined like fully are well defined like fully enclosed in poly carbonate enclosed in poly carbonate cover. cover.

Page 28: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Para wise reply of Quarries Para wise reply of Quarries raised by raised by SoftVerxSoftVerx

Page 29: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.1Query No.1 ReplyReply

Please give details of the Please give details of the "future meter reading "future meter reading needs”?needs”?

This is basically This is basically scalability and expansion scalability and expansion of the system of the system

Page 30: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.2Query No.2 ReplyReply

Please give details of the Please give details of the "more advance meter "more advance meter reading."reading."

These are the objectives These are the objectives to meet with the future to meet with the future requirements of LESCO.requirements of LESCO.

Page 31: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.3Query No.3 ReplyReply

Please elaborate Please elaborate improving revenue improving revenue collection methods. Please collection methods. Please also share your vision as also share your vision as to how this becomes an to how this becomes an objective of the RMS?objective of the RMS?

Prompt, correct and Prompt, correct and accurate reading will accurate reading will generate confidence of generate confidence of customer resulting quick customer resulting quick revenue collection and revenue collection and better services. At later better services. At later stage the ultimate goal stage the ultimate goal will be customer access to will be customer access to meter reading through meter reading through web. web.

Page 32: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.4Query No.4 ReplyReply

Item (i) to (iv) give a total Item (i) to (iv) give a total of 195 days. This excludes of 195 days. This excludes the approval time required the approval time required by LESCO for meter by LESCO for meter approval and the time approval and the time required to install the required to install the system for subsequent system for subsequent feeders. How can the feeders. How can the entire project be entire project be completed in 180 days?completed in 180 days?

The item wise time period The item wise time period mentioned are the mentioned are the maximum time limits maximum time limits however these tasks can however these tasks can easily be achieved in 180 easily be achieved in 180 days. Any prospective days. Any prospective delay can be justified by delay can be justified by the project Manager.the project Manager.

Page 33: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.5Query No.5 ReplyReply

In 21.1 it is mentioned that In 21.1 it is mentioned that FCS will be used for FCS will be used for evaluation on the other evaluation on the other hand it is mentioned in hand it is mentioned in 21.3 that for domestic 21.3 that for domestic preference evaluation will preference evaluation will be made on the basis of be made on the basis of ex-factory prices. Please ex-factory prices. Please explain how will this be explain how will this be done?done?

It is well defined that for It is well defined that for evaluation purpose only evaluation purpose only FCS unit price/ total price FCS unit price/ total price will be the considered will be the considered criteria. As per clause criteria. As per clause 21.3, which are the factors 21.3, which are the factors to be considered.to be considered.

Page 34: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.6Query No.6 ReplyReply

External MIUs are used External MIUs are used worldwide due to a number worldwide due to a number of technical reasons such of technical reasons such as no interference with the as no interference with the meter function (interference meter function (interference results in accuracy loss). results in accuracy loss). Normally CT/PT operated Normally CT/PT operated meters will be mounted meters will be mounted inside a metal enclosure, inside a metal enclosure, making internal MIU less making internal MIU less suitable communication. Is suitable communication. Is internal /built-in MIU a internal /built-in MIU a preference or a compulsion preference or a compulsion in LESCO's case?in LESCO's case?

It is agreed that built in It is agreed that built in MIU in energy meter will MIU in energy meter will be the preferable option. be the preferable option. However its external However its external installation according to installation according to network topology will be network topology will be optional.optional.

Page 35: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.7Query No.7 ReplyReply

It is mentioned that meter It is mentioned that meter data will be sent to the data will be sent to the Host System using hand Host System using hand held devices. Reference of held devices. Reference of use of hand held devices use of hand held devices is also mentioned in P 21, is also mentioned in P 21, 1.4 and on P 48. Please 1.4 and on P 48. Please explain what is the vision explain what is the vision behind mentioning the use behind mentioning the use of hand held device of hand held device whereas at other places it whereas at other places it is specifically mentioned is specifically mentioned that the system should that the system should use only RF/GPRS/GSM.use only RF/GPRS/GSM.

The scope of Hand held The scope of Hand held unit has already been unit has already been withdrawn. withdrawn.

Page 36: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.8Query No.8 ReplyReply

It is mentioned that It is mentioned that MIU/LAN should use MIU/LAN should use telecom technologies such telecom technologies such as RF, Bluetooth, Wi-LAN as RF, Bluetooth, Wi-LAN etc. and WAN should use etc. and WAN should use technologies GSM, GPRS, technologies GSM, GPRS, CDMA, fiber Optic etc. CDMA, fiber Optic etc. Please explain what is the Please explain what is the vision behind monitoring vision behind monitoring multiple telecom multiple telecom technologies whereas at technologies whereas at other places it is other places it is specifically mentioned that specifically mentioned that the system should use the system should use only RF/GPRS/GSM. only RF/GPRS/GSM.

It is an optional It is an optional technological advantage technological advantage that a bidder can utilize that a bidder can utilize while preparing its while preparing its solution. solution.

Page 37: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.9Query No.9 ReplyReply

Will LESCO provide the Will LESCO provide the XML format for XML format for communication between communication between telecom software and telecom software and polling system now or polling system now or later?later?

NoNo

Page 38: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.10Query No.10 ReplyReply

Please provide technical Please provide technical requirements and details requirements and details of the RMS interface with of the RMS interface with interface with Customer interface with Customer Information and Billing Information and Billing System. This information System. This information is required for cost is required for cost calculation.calculation.

LESCO at present is LESCO at present is running its own billing running its own billing system which requires to system which requires to be interfaced with the be interfaced with the RMS host server, the RMS host server, the detail of which can be detail of which can be obtained from LESCO obtained from LESCO computer section (o/o of computer section (o/o of Director MIS) Director MIS)

Page 39: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.11Query No.11 ReplyReply

Meter reading frequency is Meter reading frequency is not provided. It is definitely not provided. It is definitely required to calculate the required to calculate the amount of data for amount of data for Database capacity and Database capacity and telecom network capacity. telecom network capacity. Both are directly related to Both are directly related to the solution to be offered the solution to be offered and its cost.and its cost.

The acquisition of data The acquisition of data frequency is well defined frequency is well defined in Wapda DDS-75 2004. in Wapda DDS-75 2004.

Page 40: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.12Query No.12 ReplyReply

When will be the query-When will be the query-response data structure response data structure be provided?be provided?

The acquisition of data The acquisition of data frequency is well defined frequency is well defined in Wapda DDS-75 2004. in Wapda DDS-75 2004.

Page 41: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.13Query No.13 ReplyReply

There is a contradiction There is a contradiction between number of years between number of years the data is be kept current. the data is be kept current. At one place it is At one place it is mentioned as 03 years mentioned as 03 years and at the other place it is and at the other place it is 01 year. Please clarify? 01 year. Please clarify?

The Data storage will The Data storage will initially be done for one initially be done for one year, the main server, year, the main server, while the same data will while the same data will be replicated to additional be replicated to additional storage server for three storage server for three years & ten years. years & ten years.

Page 42: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.14Query No.14 ReplyReply

Type wise number of Type wise number of customers for each customers for each transformer is not transformer is not provided. This information provided. This information is mandatory to design the is mandatory to design the telecom network (LAN and telecom network (LAN and WAN) and also for the WAN) and also for the choice of telecom choice of telecom hardware including MIU hardware including MIU and DCU. A realistic, and DCU. A realistic, practice and cost-efficient practice and cost-efficient solution can not be offered solution can not be offered without this information.without this information.

The detail information of The detail information of the mentioned area of the mentioned area of sub-division can be sub-division can be verified at site. verified at site.

Page 43: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.15Query No.15 ReplyReply

Lot 2 items A & C are not Lot 2 items A & C are not mentioned else where. mentioned else where. Please clarify.Please clarify.

Agreed, already deleted. Agreed, already deleted.

Page 44: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.16,17 & 18Query No.16,17 & 18 ReplyReply

These are the optional These are the optional requirement to be offered requirement to be offered by the bidder. by the bidder.

Page 45: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.19 to 29Query No.19 to 29 ReplyReply

Please refer page 41, Please refer page 41, “However the Bidder may “However the Bidder may come up with better come up with better computer hardware computer hardware specifications meeting the specifications meeting the latest international latest international standard compatible to his standard compatible to his system to be offered.system to be offered.

Page 46: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Para wise reply of Quarries Para wise reply of Quarries raised by raised by SIEMENSSIEMENS

Page 47: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.1Query No.1 ReplyReply

Please refer page 04 Please refer page 04 under the clause IT-(1) under the clause IT-(1) which states the system which states the system provided with the meters provided with the meters may use RF with may use RF with GSM/GPRS based hybrid GSM/GPRS based hybrid fixed system." The details fixed system." The details given in Annex-A page 20 given in Annex-A page 20 under section 01 under section 01 contradicts with the scope contradicts with the scope

As it is very much clarified As it is very much clarified in the scope of tender that in the scope of tender that at this moment LESCO is at this moment LESCO is inclined for acquiring a inclined for acquiring a system based on RF/GSM system based on RF/GSM technology or hybrid. technology or hybrid. Annex-A is in continuation Annex-A is in continuation to the scope of work.to the scope of work.

Page 48: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.1Query No.1 ReplyReply

of the tender described of the tender described under clause IT- 1 (1). The under clause IT- 1 (1). The referred annex- binding referred annex- binding impression to the vendors impression to the vendors for RF based system. We for RF based system. We may suggest that LESCO may suggest that LESCO should amend Annexure-A should amend Annexure-A to keep tender document to keep tender document open for any kind of open for any kind of system may be offered by system may be offered by the vendor.the vendor.

Page 49: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.2Query No.2 ReplyReply

Kindly refer page 20 under Kindly refer page 20 under the section 1.3.2., the the section 1.3.2., the customer details such as customer details such as quantity, type of quantity, type of connection and location in connection and location in the sub-division has not the sub-division has not been provided by LESCO. been provided by LESCO. Due to importance of this Due to importance of this point it should be provided point it should be provided prior to the bidding stage.prior to the bidding stage.

Please refer Page 26/27 Please refer Page 26/27 the area of the proposed the area of the proposed project is well defined. project is well defined. However, as per existing However, as per existing policy of LESCO energy policy of LESCO energy meters are to be installed meters are to be installed out side customer's out side customer's premises.premises.

Page 50: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.3Query No.3 ReplyReply

Statement regarding Statement regarding connections under Canal connections under Canal Road Sub-Division Road Sub-Division mentioned on Page 26 & mentioned on Page 26 & 27 contradicts with each 27 contradicts with each other. Please issue other. Please issue amendment//correction amendment//correction accordingly.accordingly.

The detail of the The detail of the connections mentioned is connections mentioned is well elaborated. However, well elaborated. However, any particular clarification any particular clarification will be answered.will be answered.

Page 51: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.4Query No.4 ReplyReply

Please delete point at Please delete point at serial No 04 under Note serial No 04 under Note titled on page 33. titled on page 33.

Point 04 page 33 may be Point 04 page 33 may be deleted.deleted.

Page 52: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.5Query No.5 ReplyReply

Since the Radio Frequency Since the Radio Frequency based hybrid system is based hybrid system is being emphasized in the being emphasized in the tender documents, please tender documents, please intimate us what frequency intimate us what frequency band (frequency spectrum) band (frequency spectrum) LESCO will prefer for LESCO will prefer for communication between communication between the energy meters and the energy meters and between the energy meters between the energy meters & DCU. Further what & DCU. Further what maximum power is allowed maximum power is allowed in that frequency band?in that frequency band?

The Radio Frequency The Radio Frequency preferably being offered preferably being offered from a free band. However, from a free band. However, over its particular frequency over its particular frequency selection range will depend selection range will depend on the choice of the bidder .on the choice of the bidder .

Page 53: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.6Query No.6 ReplyReply

Kindly refer clause IT-10.3 Kindly refer clause IT-10.3 (ii) the sample of a meter (ii) the sample of a meter compliant to WAPDA, IEC compliant to WAPDA, IEC standards or ANSI may be standards or ANSI may be acceptable instead of acceptable instead of WAPDA and IEC only.WAPDA and IEC only.

The bidder has the option The bidder has the option to supply the sample to supply the sample meters compliance to IEC meters compliance to IEC standards. However, in standards. However, in case of successful case of successful qualifying bidder the meter qualifying bidder the meter should be supplied exactly should be supplied exactly according to WAPDA according to WAPDA mentioned specification. mentioned specification.

Page 54: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.7-AQuery No.7-A ReplyReplyA- Please refer clause IT-A- Please refer clause IT-

21 (B) on page 16 we 21 (B) on page 16 we suggest that payment suggest that payment should be as per given should be as per given belowbelow

a)a) All payment should be All payment should be made through confirm made through confirm irrevocable letter of irrevocable letter of credit.credit.

b)b) 80% payment to be 80% payment to be released upon delivery released upon delivery of the meters to the of the meters to the consignee store.consignee store.

c)c) 10% upon installation of 10% upon installation of complete system.complete system.

The terms of payment as The terms of payment as mentioned are firm and mentioned are firm and final.final.

Page 55: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

a)a) 05% upon 05% upon commissioning of commissioning of complete system.complete system.

b)b) Remaining 05% will be Remaining 05% will be kept as retention kept as retention money for defect money for defect liability and will be liability and will be released against released against submission of submission of retention bond for 12-retention bond for 12-months.months.

Page 56: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Query No.7-BQuery No.7-B ReplyReplyB- B- 100 % delivery of 100 % delivery of meters shall be completed meters shall be completed within 180 days after within 180 days after opening of L/C and prototype opening of L/C and prototype approval which ever is later. approval which ever is later. Since the installation of Since the installation of meters at consumer meters at consumer premises is dependent upon premises is dependent upon LESCO convenience LESCO convenience therefore the meter therefore the meter installation work will be installation work will be completed within 150 days completed within 150 days (Uninterrupted by LESCO) (Uninterrupted by LESCO) after the commencement of after the commencement of installation work.installation work.

The terms of payment as The terms of payment as mentioned are firm and mentioned are firm and final.final.

Page 57: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding
Page 58: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Issues with Stand-alone meter readingIssues with Stand-alone meter reading

Highly Person dependant.Highly Person dependant.Human errors cannot be avoided.Human errors cannot be avoided.Accessibility of meters in rural/ Agricultural zones.Accessibility of meters in rural/ Agricultural zones.Energy Audits performed based on bill collection which Energy Audits performed based on bill collection which is highly inaccurate.is highly inaccurate.Billing done mainly on estimated/ monthly average basisBilling done mainly on estimated/ monthly average basisInability to monitor and control discrete loadsInability to monitor and control discrete loadsBilling cycle requires excessive time.Billing cycle requires excessive time.Meter data used only for billing, cannot help in analysis Meter data used only for billing, cannot help in analysis like demand analysis, energy audit, pinpointing losses, like demand analysis, energy audit, pinpointing losses, etc.etc.

Page 59: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Smart Metering and IT: An opportunity to Smart Metering and IT: An opportunity to LeapfrogLeapfrog

PASTPAST

ELECTRO-MECHANICALLow AccuracyControl – NILCommunications - ExpensiveTheft Detection – Poor

ELECTRO-MECHANICALLow AccuracyControl – NILCommunications - ExpensiveTheft Detection – Poor

CURRENT CURRENT

DIGITAL SOLID STATEHigh Accuracy Control – LIMITEDCommunications – External through RetrofitTheft Detection – Node only

DIGITAL SOLID STATEHigh Accuracy Control – LIMITEDCommunications – External through RetrofitTheft Detection – Node only

LEAPFROG LEAPFROG

NEXT GEN SMART METER & IT SYSTEMVery High AccuracyControl – FULLCommunications – Built in (on chip / PCB)Theft Detection – High (Network level)

NEXT GEN SMART METER & IT SYSTEMVery High AccuracyControl – FULLCommunications – Built in (on chip / PCB)Theft Detection – High (Network level)

Page 60: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Why RMS ?

Page 61: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Ability to detect tamper events and outage occurrences. Remotely Connect/ disconnect power supply through

meter. Calculate transformer loading and sizing from interval

data 15 minute interval data gives accurate load information

for supply scheduling, switching operations, planning etc Monitor voltage at each premise to know conditions

when to operate capacitor switches or regulators Consistent and granular data for improved accuracy

Critical Benefits from RMSCritical Benefits from RMS

Page 62: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Connectivity in AMR Connectivity in AMR ArchitectureArchitecture

1. GSM Based Communication 1. GSM Based Communication

Single stage communication between Meter and Single stage communication between Meter and central station through GSM Modem central station through GSM Modem

22.. Hybrid CommunicationHybrid Communication Two stages of communication in AMR SystemTwo stages of communication in AMR System

Page 63: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

GSM Based Communication

Page 64: Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS) Pre-Bid Conference regarding International Bidding

Hybrid CommunicationHybrid Communication

Two stages of communication in AMR SystemTwo stages of communication in AMR System

Stage-1 Stage-1 Meters and Data Concentrator Unit Meters and Data Concentrator Unit (DCU)(DCU)::

Communication channel used between Communication channel used between meters meters

and DCU is power Line. and DCU is power Line.

Stage-2Stage-2 DCU and Host Central Station (HCS): DCU and Host Central Station (HCS):

Communication channel used between Communication channel used between DCU DCU

and HCS is the standard GSM, CDMS, RFand HCS is the standard GSM, CDMS, RF Network.Network.