Prefeasibility ReportFor Environment Clearance from MOEF under EIA

Notification Dated 14th September, 2006 as Amended

Page 2: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

1. SUMMARY

-

-

Village - Ranijaroud

-

-

-

1. -

2. Geographical Co-ordinates LATITUDE

21°38'07.94"N 21°38'08.46"N 21°38'08.22"N 21°38'07.77"N 21°38'07.40"N 21°38'07.11"N 21°38'06.50"N 21°38'04.91"N 21°38'06.25"N 21°38'07.68"N

River -

Nalla - 2.75 km

Tanks - 1.00 km

Canal - 1.40 km

4. -

-

6. -

7. -

8. -

9. -

Reservoir - 2.00km Reservior towards south-west near

Lohari village area

Chhattisgarh

BL7BL8

81°58'57.54"E 81°59'00.29"E 81°59'00.24"E 81°58'54.27"E 81°58'54.59"E

Scientific mining of Limestone for proposed capacity of

maximum 5815.37 MT per year.

Project Proposal

Name of Mineral Mined

Flat Land devoid of vegitation

Altitude - Max. 278 aMSL and Min. 276 aMSL

Surface slop - Towards North-West

-

BL9BL10

District

BOUNDRY POINT

BL1BL2BL3BL4BL5BL6

1.000 hect. / Private Land

Toposheet No.- 64 G/14

Mineral Reserve (in tons)

3.

Topography of the area

Limestone

Maximum 5815.37 MT/year

Banjari Nala towards south-east

Pond towards south-east

Towards east near Rani jaroud

village area

-Name of River/ Nallahs /Tanks /Spring /

Lakes etc.

5.

No such area lies around the project area.

Pre - Feasibility Report

LONGITUDE

81°58'53.41"E 81°58'53.66"E 81°58'55.50"E 81°58'55.56"E 81°58'57.58"E

State

For Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

Ranijaroud Limestone Mine

Shashi kant Tiwari

Simga

Balodabazar-Bhatapara

Name of Company/Mine

Project

Tehsil/Taluka

Mining Lease Area & Type of Land

3.90 km (Jamuniya river at north-west) & 32.35

km ( Hasdoe river at east)

Geological Reserve (till 6m depth) - 118199.77 tons.

Recoverable Reserve (till 6m depth) - 58138.89 tons.

Name of Reserve Forest(s), Wild Life

Sanctuary/National Park

Rate of Production (in tons)

Signature of Project Proponent

_________________________________________________________________________________________________

2

Page 3: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

10. -

11. -

12. -

13. -14. -

15. 1. 1 Hect.2. 0.595 Hect.3. 0.405 Hect.4. 0 Hect.5. 0 Hect.6. 0 Hect.

1 Hect.

7. 0.243 Hect.

8. 0.243 Hect.

9. 0.162 Hect.

16. -

17. -

18. -19. -20. -

Registered office

S/o. Shri Lallan Tiwari

Village/Post - Raipur

Tehsil - Raipur

District - Raipur

State - ChhattisgarhMine Office Village - RanijaroudE-MailProspecting Agency

Type of Activity

Utilities (Power, Water Requirement)

Manpower requirement 12 workers per day

Below 30 meter from surface levelNatural drainage towards North-West

Solid waste/Tailings

No Activity Zone on Mine Boundary

as per MMR 1961

-

Life of Mine

Mining Method

Ground Water table Intersection

Drilling/Blasting

Drainage Pattern/ Water Courses

10 years for the excavation of recoverable reserve of

58138.89 MTNo Blasting is proposed.

Open Cast Semi Mechanized

Dumping Area proposed within

proposed Statutory/mine BoundaryPlantation Area proposed over the

dump on dumping area

Break-up of Land Utilization Pattern

Total Area (2+3+4+5+6) =

Water Requirement & Source Requirement - 5 kilo litre per day, Source - Mine

pit/Setting tank, dug well and tube well of nearby village

within permited limits.

Open Cast Semi Mechanized Limestone Quarry Mining

Power- 5 HP

Water – 5 KLD for Domestic, Dust Suppression &

Plantation Purpose

NilNot Applicable

Top Soil & OB - total 5740.16 cum (Maximum yearly

generation @ 1291.98 cum). IBM approval: Date Not ApplicableCost of Project (Rs. Lacs)

NIL

Name and Address of the company /

Proponent

Shashi kant Tiwari

Shashi kant Tiwari

Rs. 20 lacsAny Other (Specify)

Total Lease AreaArea under mining pitsArea covered by statuary/mine Area covered by crusherArea Kept for storage of stoneUnused Area within Lease area

Signature of Project Proponent

_________________________________________________________________________________________________

3

Page 4: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

2. INTRODUCTION OF PROJECT/BACK INFORMATION

Shashi kant Tiwari

S/o. Shri Lallan Tiwari

Village/Post - Raipur

Tehsil - Raipur

District - Raipur

State - Chhattisgarh

(ii) Brief Description of Nature of the Project

Identification of Project and Project Proponent

(a) Name of the Project: Ranijaroud Limestone Mine

(b) Project Proponent : Shashi kant Tiwari

(c) Postal /Correspondence Address of Project Proponent:

The proposed project is mining activity of Limestone with the name of 'Ranijaroud Limestone

Mine' which is situated at Khasra no. 112 & 113 at village Ranijaroud, tehsil Simga and district

Balodabazar-Bhatapara (C.G.). This site is 17.00 km away from district office Balodabazar-

Bhatapara. The quarry lease of Limestone mining was sanctioned for Lease period of 10 year from

14.02.2011 to 13.02.2021 which is subject to extension for 30 years from first commencement of

lease as per rule 38A of MMR 2015 as ammended to project proponent Shashi kant Tiwari

resident of Raipur district Raipur (C.G.). The granted lease area is 1.000 hectare and the proposed

maximum production capacity is 5815.37 t. per annum. The excavation of Limestone will be done

by Open Cast Semi Mechanized method without blast.

For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan

before mining authorities and the plan so submitted has been duly approved by the sanctioning

authority vide letter no. 1606/Kha.li./Tin-1/2017, Balodabazar dated 05/01/2018.

(i)

Proposed Limestone Deposit is located at village Ranijaroud, Tehsil Simga, District Balodabazar-

Bhatapara and state Chhattisgarh over land area of 1.000 ha. The proposed capacity of the project is

maximum 5815.37 tones/annum. Proposed land is Private non forest revenue land. Open Cast Semi

Mechanized without blast method of mining is the most suitable mining procedure for this mine. This

method of mining is used for highest productivity and the lowest cost of any of the broadly used

mining methods Brief description of the project is described below –

Signature of Project Proponent

_________________________________________________________________________________________________

4

Page 5: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(iii)

(iv)

(v)

Therefore application is being filed before jurisdictional DEIAA of district Balodabazar-Bhatapara

for getting permanent environmental clearance before starting of mining activity on granted

lease area.

The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as

“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th

September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi

by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.

Need for the Project and its Importance to the Country and/or Region

Demand - Supply Gap

All the other necessary permission and noc’s has been taken by the proponent. Consent to

establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by

jurisdictional DEIAA.

Mineral resources of any country are the “TREASURE-TROVE” of its national economy;

Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The

Chhattisgarh State has enormous reserves of stone & its variety of varies grades spread over

mainly in Raipur, Raigarh, Balodabazar-Bhatapara, Janjgir-Champa, Durg, Rajnandgaon, Sarguja,

Surajpur, Balrampur and Bilaspur districts. Stone is basic material for civil building & civil

construction works. The project shall also provide additional revenue to State Government and

create direct and indirect employment opportunities, which will catalyze overall growth of the

State and improve the quality of life of the people living in the region and transform the region’s

economy from predominantly agricultural to significantly industrial and accelerate the pace of

regional development of region. There is huge demand of stone chip in the region as well as

throughout country for the use in construction of House, Canal, Dam, Pachri and other

infrastructure etc.

Stone Chip is basic raw material of civil construction works likes building, dams, roads, etc. for

construction of walls/base.

Chhattisgarh is a developing state in map of India. Considering the growth, State Government has

divided the state in 27 districts out of which 9 are recently declared districts. State Government,

is carrying on various Infrastructure development projects in all districts, like Pachri Nirman,

Dams, Over bridge on rivers/nalla, approach roads etc. in addition to these various power plants,

steel plant and cement plants in private sectors are under implementations, all above civil works

require stone boulders in different sizes which is in huge in demand. However supply of stone

boulder & chip in the above sectors are in huge shortage.

Demand - Supply Analysis

Exploiting this Limestone deposit is important for the country’s long term economic growth and

regional growth. By mining the deposit, the lessee acts as bridge and fills the gap between

demand and supply of Limestone in the market surrounding the area.

Therefore, a ready market is available for the proposed unit hence looking to the use and

demand of Limestone boulders which exist a good scope for the proposed project.

Signature of Project Proponent

_________________________________________________________________________________________________

5

Page 6: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(vi)

a) Direct Employment

S.N.

1

2

3

b)

3. PROJECT DESCRIPTION

(i)

(ii)

The details of the lease area are as under:

Ranijaroud

1.000 hect.

Village

Area(ha)

Indirect employment - Driver, cleaner for loader & dumper are the points were labors are

required. Moreover, manager, accountants will also be appointed as per need.

Skilled labours

The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as

“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th

September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi

by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.

Location (map showing general location, specific location, and project boundary & project site

layout) with coordinates.

1

1

12

Mining mate (Qualified)

Tehsil

No of Workers

Labors will be required for various purposes like excavation of stone and loading of stone in

various vehicle, management, maintenance & development of mine, making & maintenance of

ramp, transportation of material and book keeping. Experienced personals will be employed as

per the requirement.

Type of Project (Including interlinked and interdependent projects, if any):

10

The mining establishment presents opportunities of employment to various posts under various

cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen beside

casual workmen. However the maximum required labours at the site to justify the production of

stone at applied land are detailed below-

Taking standard O.M.S. to be one the strength of labour, a labour can work for 2 tons of mineral

in one sift of 8 hours a day. Considering this parameter the manpower need for project is –

Particulars

Chowkidars (Experienced)

Total

Simga

District / State

Employment Generation (direct and indirect) due to the Project

Balodabazar-Bhatapara / Chhattisgarh

Signature of Project Proponent

_________________________________________________________________________________________________

6

Page 7: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

The Coordinates of the area are:

LATITUDE

21°38'07.11"N

21°38'06.50"N 21°38'04.91"N 21°38'06.25"N

21°38'07.68"N

(iii)

(iv)

Waste in Stone

in cum

258.4

258.4

258.4

258.4

258.36

258.39

258.39

258.39

258.39258.46

2583.98 cum

(v)

- It is proposed to carry out mining operation Open Cast Semi Mechanized method. The

development has been proposed for systematic and scientific mining.

81°59'00.29"E

BL5 21°38'07.40"N 81°58'57.58"E BL10 81°58'54.59"E

The total applied lease area is 1.000 hectare and total proposed maximum production capacity

will be 5815.37 TPA through Open Cast Semi Mechanized method of mining without blast.

Proposed production details during lease period are shown in below -

Size or Magnitude of Operation:

The site can be depicted in the toposheet number 64 G/14 of Survey of India. Study area map in

Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -4

of enclosed mine plan respectively.

Details of alternate sites considered and the basis of selecting the proposed site, particularly

the environmental considerations gone into should be highlighted:

8th Year

7th Year

5813.715815.37

--

9th Year10th Year

Project description with process details (a schematic diagram/flow chart showing the project

layout, components of the project etc. should be given)-

-5813.71

5813.71

BOUNDAR

Y POINT

BL1

BL2BL3BL4

Top Soil & OB

in cum

Stone (ROM)

in tonne

Production During Plan Period

LONGITUDE BOUNDARY

POINT

5813.06

5813.71

21°38'07.94"N

21°38'08.46"N

-

It is naturally occurring rocks which is site specific due to its geological origin. Mining is site

specific project. This lease is being granted by the state govt., hence alternative site is not

applicable.

1291.98

6th Year -

1st Year

2nd Year

Total 58138.91 t 5740.16 cum

21°38'08.22"N 21°38'07.77"N

81°58'53.41"E

81°58'53.66"E 81°58'55.50"E 81°58'55.56"E

BL6

BL7BL8BL9

1291.98

3rd Year

4th Year

5th Year

5813.91

LONGITUDE

81°58'57.54"E

LATITUDE

5813.91

5813.91

5813.91

1291.98

Year

81°58'54.27"E 81°59'00.24"E

1291.98

572.24

Signature of Project Proponent

_________________________________________________________________________________________________

7

Page 8: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

-

-

-

-

-

-

-

-

(vi)

Bench Height

3.00 mSoil + Mineral Bench

Raw material/consumables required along with estimated quantity, likely source, marketing

area of final products/s, Mode of transport of raw Material and Finished Product.

Bench Width along

the periphery of

mine3.00 m

No raw material is required for the mining of Limestone.

Marketing area: Limestone will be used in form of stone chips as building material in civil

constructions activity.

1st Quarry Bench

Mineral Bench 3.00 m

Bench Specification

-

The quarry will be worked in 2 benches 3m height x 3 m width in total during advancement of

mining the mine will be worked into 1.5m x 1.5 m sub-benches. But at the final stage of mining

the benches will be of 3m x 3m each as detailed in table below-

Bench Number

Resizing of stone manually

Drilling & Blasting : Not Applicable

Overall bench slope will be less than 450 with the horizontal.

The excavated mineral will be transported to the destination by tipper/dumper/trucks and

broken Limestone will be loaded manually or by loaders.

Loading by Excavator or Manually

Transportation by Tractor or Tipper

Flow chart of the Project

Loading will be done manually or with the help of excavator and J.C.B and the transporting will be

done by 4.5 tones tractor or 10 tones tippers.

Removal of Overburden & Top Soil

Various deduction in lease area were considered while measuring to arrive the " benchwise

available area for mining" i.e. Area occupied for maintaining statutory boundary and area

occupied by stone crusher (If Any).

Adequate slope and water sump will be gradually developed at the working pit.

Large size of stone boulders will be manually sized in to 10 to 12 inches as per the demand.

The excavation activity will be carried out till the depth of 6 m below general ground level or

occurrence of ground water table at the site which ever encountered earlier.

2nd Quarry Bench

7.50 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for

safety provisions, dumping of top soil & OB and afforestation.

Signature of Project Proponent

_________________________________________________________________________________________________

8

Page 9: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(vii)

Mine Site

Dust Suppression 2.00 KLD

Green Belt 2.00 KLD

Domestic

Sanitation & Drinking 1.00 KLD

Total 5.00 KLD

I)

II)

A)

B)

S.N. Power

requirement

1 5 HP

C)

Quantity for fuel will depend upon the usage of transportation vehicle and other machineries and

level of achievement of estimated production. Diesel will be outsourced from nearby diesel

pumps.

Source of Electricity:

For Green belt and dust suppression: Water will be made available from quarry mine pit which is

accumulated during the rainy season and shall be collected in settling tank for utilization in green

belt and dust suppression. However, if required, water might be supplied from tube well.

Domestic usage: Water will be supplied from tube well.

It is expected that the total water need is about 5 kilo litter per day in the mine. The details of

water balance of existing / proposed mining project are given below:

Availability of Water, its source, Energy/power requirement and source should be given -

Water Requirement:

Domestic Purpose

Total (KLD- Kilo Litter Per Day)

Electricity will be required for pumping of water and for administrative building & rest shelters.

The requirement of Power is estimated as under-

Fossil Fuels :

Electricity :

Process

The power requirement for the project will be met by electricity lines of Chhattisgarh State Power

Distribution Copany Limited available at village or nearby site area.

Particulars

Fuel is to be used in form of diesel for mining operations and running of tractors and other

transportation vehicles.

Water Balance of Project

Sources of water:

Energy & Power Requirement and Source

Signature of Project Proponent

_________________________________________________________________________________________________

9

Page 10: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(viii)

a)

b)

c)

a)

b)

Top Soil & overburden:

Mining Loss or Unusefull Waste Material:

Whatsoever quantity of top soil and overburden generated during the quarrying operation will be

stacked at the periphery of mine along the statutory/mine boundary in such manner that no

stacking will be done at the edge of quarry pit.

Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)

owned or controlled by the lessee will be utilised with due permission of district mining office for

dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the time

of reclalation of mine.

Mine/Statutory boundary is 7.50 m wide in order to comply the rules of MMR1961. Out of this

mine/statutory boundary 3.0 m wide area from the edge of mine pit is proposed to left to comply

the provisions of MMR1961. Dumping area is proposed on balance outer 4.50 m wide area of

mine/statutory boundary i.e. after 3.0 m of no activity zone. Threfore saperate dumping area in

the mine is not proposed. Rather outer 4.50 meter wide area under mine/statutory boundary is

itself considered as dumping area. plantation is also proposed on the same dumping area over

the dump. Roads within mine area is also proposed to be constructed within mine boundary only.

Top soil & OB. 5740.16 cum will be generated in total at the rate of maximum 1291.98 cum per

year for period of approved mine plan.

All ROM mineral is useful and saleable. 2583.98 cum material may be generated or could not be

recovered as unusefull waste material or mining loss respectivelly during the plan period.

Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal –

Sub grade material:

Top Soil & overburden:

Waste:

No sub-grade mineral will be generated during excavation of stone. All ROM mineral will be used.

Only domestic effluent is expected to be generated which will be treated through septic tank

followed by soak pits.

No mining waste except from mining losses & OB will be generated during excavation of

Limestone. All ROM mineral will be used. Limestone is usable as building material hence saleable

therefore no mineral waste will be generated which requires their due management.

Solid Waste:

Liquid Effluent:

Selection of Dumping Site:

Signature of Project Proponent

_________________________________________________________________________________________________

10

Page 11: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

c)

a) Top Soil & Overburden :

b) Waste & Subgrade Material :

4. SITE ANALYSIS

Connectivity

(i)

Form & Use : Flat, Non Forest, Revenue land.

Ownership : Private land.

Forest - Nil Area (ha)- Nil 1.000 Hect. Area

Nil

Nil

Nil

(iii) Agriculture land,

Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)

owned or controlled by the lessee will be utilised with due permission of district mining office for

dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the time

of reclalation of mine.

Sub grade material:

Land form, Land Use & Land Ownership

Existing land use pattern: Existing land use pattern of the proposed mining area is given in below

table.

(i) waste land (Private),

Top Soil initially removed will be temprerorly stacked on mine boundary or other location within

lease area. Then whatsoever quantity of overburden & unusefull waste generated during the

quarrying operation will be spread at the periphery of mine along the mine boundary on specified

dumping areas. After proper dumping of OB and unusefull waste on mine boundary the

preserved Top Soil will be spreyed over the OB and/or unsuefull waste dump. Stack of dump OB,

waste & Top soil so developed is proposed to be stabilized the by grass plantation or cutting of

local bushes and dence plantation on it as per plantation programme so that spillage of dump

does not occur in the surroundings.

No need of planing for dumping management of waste and subgrade material as all ROM is

saleable except Top Soil and Overburden.

The area is approachable from district office Balodabazar-Bhatapara by fair weather road. The

area is 17.00 km from Balodabazar. The applied area is 2.50 km away from Suhela bus stand.

Hospital is available at Ranijaroud at 500 m/Suhela at 2.30 km distance. The nearest railway

station is at Bhatapara (11.40 km) (S.E.C.RLY) and Nearest active airport is Raipur (56.00 km).

Forest Area Non-forest Area

(iv) others (specify)

(ii) grazing land,

No sub-grade mineral will be generated during excavation of Limestone. All ROM mineral will be

used. Limestone is usable as building material hence saleable therefore no mineral reject will be

generated which requires their due management.

Manner of waste disposal & configuration:

Signature of Project Proponent

_________________________________________________________________________________________________

11

Page 12: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(ii)

(iii)

5. PLANNING BRIEF

(i)

(ii)

Proposed Land Use Pattern of Proposed Quarry Lease Area

1. 1 Hect.

2. 0.595 Hect.

3. 0.405 Hect.

4. 0 Hect.

5. 0 Hect.

6. 0 Hect.

1 Hect.

The road facility is already available which shall be used and properly maintained. Preference will

be given to local labor from nearby villages. Other requisite infrastructure as transport of mine

labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at project

site.

Climate Data from Secondary Sources:

Topography:

Social Infrastructure Available

Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at Suhela.

Proposed Land Use Planning

Planning concept: It is a Limestone mining project, for safe, scientific & systematic working to

follow the principles of safety & conservation of human health & mineral the planning for mining

of stone shall be governed by the approved Quarry Plan under Chhattisgarh Minor Mineral Rules,

2015 vide letter no. 1606/Kha.li./Tin-1/2017, Balodabazar dated 05/01/2018.

Population projection:

The project is very small in magnitude. The project will employ most of the workers from nearby

villages. There will not be any increase in population of the area due to the establishment of

project. However, few people from other area may migrate in this area for business

opportunities.

Area Kept for storage of stone

Total Area (2+3+4+5+6) =

Total Lease Area

Area under mining pits

Area covered by statuary/mine boundary

Area covered by crusher

Unused Area within Lease area

Planning concept (type of industries, facilities, transportation etc.) Town and country

Planning/Development authority Classification-

The climate of Balodabazar-Bhatapara district in general and the Simga in particular is

characterized by a hot summer and a well-distributed rainfall during the southwestern monsoon

season extending from end of June to October. The area has 4 well-defined seasons in a year. The

winter season commences from early December and continues up to the end of February,

summer season extends from March to early June, rainy season generally from mid-June to

September and the post-monsoon season from October to November.

The study area consists of essentially Flat land with a very small pit. Gentle slope towards North-

West, Maximum elevation of the lease area is 278 meters above MSL towards South-East while

the lowest elevation is 276 m in the North-Western part of lease area.

Signature of Project Proponent

_________________________________________________________________________________________________

12

Page 13: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

7. 0.243 Hect.

8. 0.243 Hect.

9. 0.162 Hect.

(iii)

6. PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing Area)

Not Applicable

(ii)

Specific amenities / facilities are not required in this mining project. However the same can be

provided as per prescribed instructions.

Road & Connectivity:

Manpower Requirement:

Site Services:

No Activity Zone on Mine Boundary as per MMR 1961

Dumping Area proposed within proposed

Statutory/mine Boundary

Assessment of infrastructure demand (physical and social)

Plantation Area proposed over the dump on dumping

area

Site services are required per the statutory provisions i.e rest shelters, toilets, drinking water

facilities, safety appliances, and regular medical checkup facilities are suitably needs to be

provided for labors and their families. The health and safety of the employees is required to be

given first priority during the mining operation. Training program organize for first aid.

Specified first Aid station is needed to be maintained at the site office and the rest shelter as per

applicable statutory provision.

Office and stores is needed to be provided as per applicable statutory provision.

First aid:

Office and stores:

Amenities / Facilities:

The road facility is already available around 80 m from the site which shall be used and properly

maintained.

Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,

accountants; approx. 12 labours will be required directly for mining operation.

Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-wheeler.

Medical facility is available for first aid at project site.

Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other

requisites needed for mine operation and social facilitation.

Residential Area (Non Processing Area)

No residential area is proposed for the project except temporary rest shelters proposed for

labors.

Signature of Project Proponent

_________________________________________________________________________________________________

13

Page 14: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(iii)

No. OF SAPLING

(iv)

OCCUPATIONAL HEALTH AND SAFETY

Occupational Health and Safety works as follow-

1)

2)

Afforestation program shall be started with the commencement of mining operation with

simultaneous clearing of land by spreading of clay lumps along barrier of proposed lease

boundary. 2.5m X 2.5m spacing with 0.6m depth have been suggested for sapling pits on which

local species will be planted as the following manner-

SPECIES

Awareness program be conducted about likely occupational health hazards so as to have

preventive action in place.

Under the afforestation plan, plantation in nearby villages and connecting roads be undertaken.

The implementation for development of greenbelt will be of paramount importance as it will not

only add up as an aesthetic feature but will also act as a pollution sink. The species to be grown in

the areas should be dust tolerant and fast growing species so that a permanent greenbelt is

created. Plantation in the barrier zone and roads is necessary as these areas will contain fine

particulates resulting from mining operation and vehicle movement Plantation will also be carried

out as social forestry programme in village, school and the areas allocated by the Panchayat/State

authorities. Native plants like Neem, Peepal, Khejri and other local species will be planted. A

suitable combination of trees that can grow fast and also have good leaf cover shall be adopted

to develop the greenbelt.

Occupational Health and Safety are important. Periodic assessment of it will be useful. Identifying

workplace hazards, assessing risks to employee health and safety, are important. Health and

Safety points are also important in many of the environmental aspects of the workplace.

Social infrastructure

Year

1st Year

PROPOSED SITE

Along boundary of quarry area 135

For the social developmental program on the need base assessment some development program

will be undertaken by the project proponent i.e. development of or maintenance of urinals,

toilets, safety appliances & training program, confirming availability of pure and clean drinking

water, periodic health checkup program, transportation facility to labours and their children’s to

schools etc.

If/Where no plantation is possible within the mine due to rocky nature of lease area or top soil

has been already removed from boundary of mining area then plantation will be done on

transportation road or on the Government waste land as suggested/demarked by Gram

Panchayat/Nagar Panchayat/ local body will be done.

Green belt

Seesam, Bargad, Neem, Aam,

Pipal, etc.

Except dust generation there is no source which can show a probability for health related

diseases and proper dust suppression will control dust generation and dispersion.

Signature of Project Proponent

_________________________________________________________________________________________________

14

Page 15: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

3)

4)

(v)

(vi)

(vii)

(viii)

A)

B)

S.N. Power

requirement

1 5 HP

C)

Drinking Water Management (source & supply of water):

Develop and implement training sessions for management, supervisors and workers on

health and safety practices and legislation;

Promote occupational health and safety within workers in mine and develop safer and

healthier ways of working;

Fossil Fuels :

Electricity :

Particulars

Domestic Purpose

Source of Electricity:

Fuel is to be used in form of diesel for mining operations, compressors and running of tractors

and other transportation vehicles. Quantity for fuel will depend upon the usage of transportation

vehicle and other machineries and level of achievement of estimated production. Diesel will be

outsourced from nearby diesel pumps.

Electricity will be required for pumping of water and for administrative building & rest shelters.

The requirement of Power is estimated as under-

The power requirement for the project will be met by electricity lines of Chhattisgarh State Power

Distribution Copany Limited available at village or nearby site area.

Industrial waste management: No industrial waste will be generated.

Power requirement & supply/source:

Drinking water is available in dug well and tube well at nearby village of the applied area which is

portable, pure and clean. It is also proposed to provide hand pump if needed in the lease area for

mitigating of drinking water, such hand pump will be arranged after taking statutory permission.

Sewerage System: No construction or sewage waste is expected from the mining process.

However the domestic waste from the toilets shall be given treatment through septic tank and

soak pit arrangement.

Signature of Project Proponent

_________________________________________________________________________________________________

15

Page 16: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:

8. PROJECT SCHEDULE AND COST ESTIMATES

A)

B) Estimated project cost of the project -

S.N. Amount in Lacs

1 7.00

2 1.00

3 10.00

4 1.00

5 1.00

20.00

9. CONCLUSION

Mining Machineries & Equipment’s and Crusher

Land Development & Establishment cost

Others

Total Cost of Project :

In any human activity there are always possibilities of finding various options. Project proponent has

decided to examine and adopt one such option that will be both environment friendly and best suited

for Limestone production. Various alternatives in terms of site, technology, and equipment are

considered. A final selection is thus arrived–

Likely date of start construction and likely date of completion (time schedule for project) –

Particulars

Land Cost (market value)

Administrative Building & Rest Shelters

No R&R plan is required as the mine area does not cover any habitation. Hence the mining

activity does not involve any displacement of human settlement. No public buildings, places,

monuments etc. exist within the lease area or in the vicinity of the mine lease area. The mining

operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is

anticipated.

Impact of the stone mining will be positive, as it will upgrade the socio-economic status of local

inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due to

this positive impact the living standard will increase and will lead to educational upliftment.

The proposed mining project will be started after obtaining Environmental Clearance of quarry

lease and order to enter in lease area by District Collector (Mining Branch). Consent to establish &

operate from CGCECB will also be taken if instructed by DEIAA.

Effect on Flora & Fauna:

Mining is restricted to very small area. No study have been conducted or record found on effect

on Floora & Fauna for mine area. However mining activity causes impact on flora and fauna due

to land degradation/deforestation etc.,

Signature of Project Proponent

_________________________________________________________________________________________________

16

Page 17: Prefeasibility Reportenvironmentclearance.nic.in/writereaddata/District/pfr/09012018RJLXJEB7PFR.pdfName of Company/Mine Project Tehsil/Taluka Mining Lease Area & Type of Land 3.90

Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud

Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.

(a)

(b)

(c)

(d)

(e)

Date : / /2017

Place : Raipur

Shashi kant Tiwari

The Project is viable and environmental friendly as it’s a development project for the State &

Country.

Increased financial benefits accruing to state and central agencies by ways of taxes, royalties,

cesses etc.

Signature of the applicant

The Proposal is for the Environment Clearance of the Proposed Mine.

The quarry project will create local employment to the villagers and they will get employment

in nonagricultural season.

The Proposal does not require further Infrastructure facilities other than few Mining

Machineries.

Raipur

Signature of Project Proponent