PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITIONINTRODUCTION
Planning permission was granted by the City of London on 14th February 2018 for a scheme by Hugh
Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project will
help the Inn to meet its needs and Royal Charter obligations through the creation of a new Education and
Training Centre, partly within the existing building and partly within a new mansard roof extension. The
project is known within the Inn under its working title as “Project Pegasus”.
This exhibition illustrates the proposals for the temporary structures that will provide continuity to the Inn’s
daily life and supply member facilities that would otherwise be unavailable because of the Treasury Building’s
closure during the construction works.
The aim of this exhibition is to inform Members about the temporary works required to facilitate Project
Pegasus and to give them an opportunity to comment.
Comments can be sent to [email protected]
Artist’s impression of the consented proposals from Inner Temple Gardens.
Artist’s impression of the consented proposals from the South of Kings Bench Walk.
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
For the anticipated construction period of 22 months the Treasury Building will be closed. To maintain the
Inn’s activities, the intention is to install temporary buildings in two locations. The Temporary Hall & Treasury
Building will be a single storey structure positioned upon the main lawn of the Inner Temple Garden. The
Temporary Library & Offices Building will be a two storey structure positioned at the northern end of the Kings Bench Walk car park.
SITE PLAN
Site Plan.
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
DRAFT
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
Proposed Site Plan
1:500@ A1, 1:1000 @A3
Planning
1074/03/0110 P1
Site Boundary
Fountain Court
Pump Court
Elm Court
Middle Tem
ple Lane
Temple Church
Church Court
FrancisTaylor
Building
Inner Temple Hall
South Terrace
Victoria Embankment
Tudor Street
King'sBenchWalk
TempleChambers
1-2 Crown Office Row
3 TempleGarden
Buildings
1-2 TempleGarden
Buildings
1-2 HarcourtBuilding
Inner Temple Treasury& Library
1-5 PaperBuilding
King's Bench Walk
Crown Office Row
SundialHigh Border Pathway
Main Lawn
Paper Buildings Pathw
ay
The PeonyGarden
The Broadwalk
The
Kin
gs B
ench
Wal
kG
arde
n Pa
thw
ay
South Lawn
East Lawn
Harcourt B
uildings Pathway
Extent of Site
Temporary Library & Offices BuildingTemporary Hall & Treasury Building
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITIONEXISTING SITE
Main Lawn of the Inner Temple Gardens.
Kings Bench Walk car park.
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
This single storey structure will provide key function and event spaces to largely replicate those temporarily
closed in The Treasury Building. They will include the Main Hall, the Luncheon Room, the Parliament
Chamber and the Drawing Room.
The building is a fully reusable proprietary temporary structure designed to sit lightly upon the lawn
without need for any excavated foundations. It will be quick to erect and remove and great care has been
taken to keep the scale of the building to the minimum required to provide the essential range of facilities
required by the Inn. The Garden Team has been closely involved in the design process to ensure that the
impact on the Garden is minimised and will not cause any long-term harm. A full lawn restoration strategy
has also been formulated.
PROPOSED TEMPORARY HALL & TREASURY BUILDING
Artist’s impression of the proposed Temporary Hall & Treasury Building from The Main Lawn.
Artist’s impression from Victoria Embankment. Artist’s impression from the High Border Pathway.
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
DRAFT
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
20/04/2018P1 Preliminary Issue
Ground Floor Plan
1:100 @A1, 1:200 @A3
Planning
1074/03/0220 P1
N 0 1 2 3m1:100
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
DRAFT
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
20/04/2018P1 Preliminary Issue
Ground Floor Plan
1:100 @A1, 1:200 @A3
Planning
1074/03/0220 P1
N 0 1 2 3m1:100
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
DRAFT
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
20/04/2018P1 Preliminary Issue
Ground Floor Plan
1:100 @A1, 1:200 @A3
Planning
1074/03/0220 P1
N 0 1 2 3m1:100
PROPOSED TEMPORARY HALL & TREASURY BUILDING
1234567
Main HallLuncheon RoomParliament Chamber Furniture Cloakroom Porters Drawing RoomChef’s Office Kitchen Cold Room Dry Goods Store Beverage Store Laundry Chem. Store Staff Area Staff - Female Lockers
Key
8
14
910111213
1516
1718
Proposed Temporary Hall & Treasury Building Ground Floor Plan.
Staff - Female WCStaff - Female Shower Staff - Male Lockers Staff - Male WCStaff - Male Shower Male WCFemale WCUA WCCleaner’s Cupboard Planted Screen Services Compound External Area (Plastic Trackway)WC Plant Compound Route to Services Compound / Harcourt Building Pathway Route to Paper Buildings PathwayDrainage Storage Tank
Artist’s impression of the proposed Drawing Room.
2322
24252627
2
1
345
6
7
8
9
1011
12
1314
1516 17 1810
10
19 20 21
22 2324 25
26 2627
28
26
27
29
30 30
31
192021
28
3029
3132
32
Gross Internal Area : 1,080 m2
Gross External Area : 1,100 m2
Area of external compounds : 160 m2
Access to the Temporary Hall & Treasury Building will be down the steps from Crown Office Row via the High Border Pathway, in a similar manner to that used for the annual summer pavilion. Level access will
be via a walkway from the Paper Buildings Pathway using the existing accessible route into the Garden.
Pathways and the external margin around the building will be constructed from a resilient load spreading
matting system to protect the ground beneath: care has been taken to lay out the access routes to avoid
the root and canopy zones of the surrounding mature trees.
The building has been designed to orientate the main spaces along the eastern and southern elevations,
providing the best views of the Garden, with kitchen, service and ‘back of house’ spaces arranged along the
western elevation.
The relative height for the Temporary Hall & Treasury Building is taken from existing ground level at the
northern end of each building : Eaves ( main building ) : 3.7 m
Eaves ( wc enclosure ) : 2.6 m
Ridge : 6.3 m
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
This two storey building is to be sited in the north eastern corner of the Kings Bench Walk car park and
will temporarily house the Library (including offices and support spaces) on the ground floor and the Treasury and Catering offices and meeting rooms on the first floor. The entrance will be at the northern end of the building and access to the first floor will be via an internal staicase and passenger lift. There is an external staircase but this is for emergency egress only.
The building is a fully reusable proprietary temporary structure designed to sit lightly upon the car park
surface without need for any foundations. It has been sited to allow for access from the existing pavements
and to minimise impact on trees and parking provision (29 parking spaces will be suspended). Two of the
gas lamps will be carefully removed and stored to be reinstated upon the end of the temporary period;
similarly one young tree will be removed and replaced upon completion of Project Pegasus.
PROPOSED TEMPORARY LIBRARY & OFFICES BUILDING
Artist’s impression of the proposed Temporary Library & Offices Building on Kings Bench Walk.
Proposed elevation of Temporary Library & Offices Building through Kings Bench Walk car park.
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
Existing and Proposed Section B-B
1:250 @A1, 1:500@A3
Planning
1074/03/0420 P1
24.04.18P1 PLANNING ISSUE
King's Bench Walk Tudor Street King's Bench Walk
King's Bench Walk Tudor Street King's Bench Walk
01 Proposed Section B-B
02 Existing Section B-B
1:2500 2.5 5 7.5 10 12.5m
TemporaryLibrary & Offices
Artist’s impression of the proposed Temporary Library & Offices Building through Kings Bench Walk car park.
7.4
m
9.6
m
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
Proposed Temporary Library & Offices Building Ground Floor Plan.
PROPOSED TEMPORARY LIBRARY & OFFICES BUILDING
Proposed south elevation.
Proposed Temporary Library & Offices Building First Floor Plan.
Ground Floor Key1234567
LibraryLobbyEnquiries Desk Deputy Librarian’s Office Aquisitions Office Library AdminCopier RoomUA WCServices Compound Planted ScreensKing’s Bench WalkFalse platform and stairs to allow for temporary services to run underneath
89101112
First Floor Key1234567
Treasury Office Head of Treasury RegistrarEA Office Store Sub TreasurerMeeting Room Catering Office Staff Kitchen WCKing’s Bench Walk
891011
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
Existing and Proposed Section D-D
1:100 @A1, 1:200@A3
Planning
1074/03/0425 P1
24.04.18P1 PLANNING ISSUE
0 1 2 3m1:100
King's Bench Walk
01 Proposed Section D-D
TemporaryLibrary & Offices
King's BenchWalk
King's Bench Walk
Inner TempleTreasury & Library
King's BenchWalk
Inner TempleTreasury & Library
Artist’s impression of the proposed Library interior.
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
Existing and Proposed Section D-D
1:100 @A1, 1:200@A3
Planning
1074/03/0425 P1
24.04.18P1 PLANNING ISSUE
0 1 2 3m1:100
King's Bench Walk
01 Proposed Section D-D
02 Existing Section D-D
TemporaryLibrary & Offices
King's BenchWalk
King's Bench Walk
Inner TempleTreasury & Library
King's BenchWalk
Inner TempleTreasury & Library
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
Temporary Library & Offices:Ground & First Floor Plan
1:100 @A1, 1:200 @A3
Planning
1074/03/0225 P1
24.04.18P1 PLANNING ISSUE
0 1 2 3m1:100
N
01 Proposed Lower Floor 02 Proposed Upper Level
1
2
3
4 5
7
8
9
10
6
11
12
NOTESDo not scale from this drawing. All dimensions to be confirmed on site. Architect to be informed of any discrepancies before any action is taken. This drawing is copyright © Manalo & White Ltd.
PROJECT
DRAWING
SCALE
STATUS
REVISIONDRAWING No.
INNER TEMPLE
DATEREV COMMENT
UNIT 301, METROPOLITAN WHARF BUILDING,70 WAPPING WALL, LONDON E1W 3SS T 02072654945 E [email protected]
Temporary Library & Offices:Ground & First Floor Plan
1:100 @A1, 1:200 @A3
Planning
1074/03/0225 P1
24.04.18P1 PLANNING ISSUE
0 1 2 3m1:100
N
01 Proposed Lower Floor 02 Proposed Upper Level
1
2
3
4
5
6
7
8
9
10
10
11
Gross Internal Area : 750 m2
Gross External Area : 770 m2
Area of external compound : 45 m2
7.4
m 9.6
m
PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
Plan showing proposal for temporary structure hla 285 01 NH 14-05-18
Key
The Honourable Society of the Inner Temple
Harper Landscape Architecture LLPHarper Landscape Architecture LLP
Chartered Practice of the Landscape Institute
www.harperlandscapearchitecture.co.uk
Tel 01424 442 842
0 20m
Relevant buildings
Hard surfacing on car park
Tarmacked car park
Pavements
Terraces (location of site compound and
hoarding)
Kings
Bench
Walk
Francis
Taylor
Kings
Bench
Walk
Kings
Bench
Walk
Paper
Buildings
Treasury
Library
Hall
Tudor St
Gate
Mitre Court
Gate
Temple
Church Court
Gate
Gardens
Gardens
Crown
OfficeRow
Area for proposed temporary structure Area for proposed temporary structure
KING’S BENCH WALK PARKING LAYOUT
Plan showing proposal for temporary structure.
Drawing produced by Harper Landscape Architecture LLP.
Plan showing proposal for temporary structure hla 285 01 NH 14-05-18
Key
The Honourable Society of the Inner Temple
Harper Landscape Architecture LLPHarper Landscape Architecture LLP
Chartered Practice of the Landscape Institute
www.harperlandscapearchitecture.co.uk
Tel 01424 442 842
0 20m
Relevant buildings
Hard surfacing on car park
Tarmacked car park
Pavements
Terraces (location of site compound and
hoarding)
Kings
Bench
Walk
Francis
Taylor
Kings
Bench
Walk
Kings
Bench
Walk
Paper
Buildings
Treasury
Library
Hall
Tudor St
Gate
Mitre Court
Gate
Temple
Church Court
Gate
Gardens
Gardens
Crown
OfficeRow
Area for proposed temporary structure
Relevant buildingsTarmacked car park Hard surfacing on car parkPavements Terraces (location of site compound and hoarding)
Key
Plan showing proposal for temporary structure hla 285 01 NH 14-05-18
Key
The Honourable Society of the Inner Temple
Harper Landscape Architecture LLPHarper Landscape Architecture LLP
Chartered Practice of the Landscape Institute
www.harperlandscapearchitecture.co.uk
Tel 01424 442 842
0 20m
Relevant buildings
Hard surfacing on car park
Tarmacked car park
Pavements
Terraces (location of site compound and
hoarding)
Kings
Bench
Walk
Francis
Taylor
Kings
Bench
Walk
Kings
Bench
Walk
Paper
Buildings
Treasury
Library
Hall
Tudor St
Gate
Mitre Court
Gate
Temple
Church Court
Gate
Gardens
Gardens
Crown
OfficeRow
Area for proposed temporary structure
Plan showing proposal for temporary structure hla 285 01 NH 14-05-18
Key
The Honourable Society of the Inner Temple
Harper Landscape Architecture LLPHarper Landscape Architecture LLP
Chartered Practice of the Landscape Institute
www.harperlandscapearchitecture.co.uk
Tel 01424 442 842
0 20m
Relevant buildings
Hard surfacing on car park
Tarmacked car park
Pavements
Terraces (location of site compound and
hoarding)
Kings
Bench
Walk
Francis
Taylor
Kings
Bench
Walk
Kings
Bench
Walk
Paper
Buildings
Treasury
Library
Hall
Tudor St
Gate
Mitre Court
Gate
Temple
Church Court
Gate
Gardens
Gardens
Crown
OfficeRow
Area for proposed temporary structure
Plan showing proposal for temporary structure hla 285 01 NH 14-05-18
Key
The Honourable Society of the Inner Temple
Harper Landscape Architecture LLPHarper Landscape Architecture LLP
Chartered Practice of the Landscape Institute
www.harperlandscapearchitecture.co.uk
Tel 01424 442 842
0 20m
Relevant buildings
Hard surfacing on car park
Tarmacked car park
Pavements
Terraces (location of site compound and
hoarding)
Kings
Bench
Walk
Francis
Taylor
Kings
Bench
Walk
Kings
Bench
Walk
Paper
Buildings
Treasury
Library
Hall
Tudor St
Gate
Mitre Court
Gate
Temple
Church Court
Gate
Gardens
Gardens
Crown
OfficeRow
Area for proposed temporary structure
Plan showing proposal for temporary structure hla 285 01 NH 14-05-18
Key
The Honourable Society of the Inner Temple
Harper Landscape Architecture LLPHarper Landscape Architecture LLP
Chartered Practice of the Landscape Institute
www.harperlandscapearchitecture.co.uk
Tel 01424 442 842
0 20m
Relevant buildings
Hard surfacing on car park
Tarmacked car park
Pavements
Terraces (location of site compound and
hoarding)
Kings
Bench
Walk
Francis
Taylor
Kings
Bench
Walk
Kings
Bench
Walk
Paper
Buildings
Treasury
Library
Hall
Tudor St
Gate
Mitre Court
Gate
Temple
Church Court
Gate
Gardens
Gardens
Crown
OfficeRow
Area for proposed temporary structure