Technology Department Vacuum, Surfaces & Coatings Group Interlocks , Controls and Monitoring Section Project presentation PJAS – Polytechnic Institute of Leiria - CERN 1 Author: Alexandre Mateus Correia Work under supervision of: Mr. Nikolaos Chatzigeorgiou 20 September 2019 Supervisor: Mr. Gregory Nicolas Pigny

Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

Technology DepartmentVacuum, Surfaces & Coatings Group Interlocks, Controls and Monitoring Section

Project presentationPJAS – Polytechnic Institute of Leiria - CERN

1

Author:Alexandre Mateus Correia

Work under supervision of:Mr. Nikolaos Chatzigeorgiou

20 September 2019

Supervisor:Mr. Gregory Nicolas Pigny

Page 2: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

Presentation

• Name: Alexandre Mateus Correia;

• Home Institution: Polytechnic Institute of Leiria;

• Course: Electrical and Computer Engineering;

• Start Date: February 2019;

• At:• Department: Technology (TE);

• Group: Vacuum, Surfaces and Coatings (VSC);

• Section: Interlock, Controls and Monitoring (ICM);

2

TE/VSC/ICM20 September 2019

Page 3: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

Importance of Vacuum

Vacuum in the LHC is crucial to:

• Minimize beam – gas interactions;

• Thermal insulation of cryostats & helium distribution lines;

More than 6000 vacuum instruments to be controlled and monitored:

• Gauges: 3000 (pressure range from 1000 mbar down to 10-12 mbar)

• Pumping groups: 250

• Ion pumps: 2700

• Sector valves: 500

• PLC: 300

• SCADA (Supervisory Control And Data Acquisition): 7

320 September 2019TE/VSC/ICM

Page 4: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

Project context – Present situation in the LHC ARC/DS

420 September 2019

Signal (Penning)

Signal cable (Pirani)

Signal cable (Piezo)

ARC: 2 460 mDS (Dispersion Suppressors): 170mLSS (Long Straight Section): 540m

Pirani +Penning gauge

Piezo gaugeTE/VSC/ICM

Page 5: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

Project motivation – R2E (Radiation to electronics)

Radiation levels will greatly increase during HL-LHC era.

In the LHC ARC/DS areas, the present system is not designed to withstand such doses.

520 September 2019

Therefore, new radiation tolerant conditioning electronics for vacuum measurements are required to withstand such conditions,

while improving accuracy reading and reliability.

TE/VSC/ICM

Page 6: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

620 September 2019

Penning

Pirani

Piezo

Power

Supply

Auxiliary electronics

By-Pass valve local control

Profibus Active Termination

Project R2E – As a whole

TE/VSC/ICM

Page 7: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

Contribution and status of the project

720 September 2019

• Electronic design modifications;

• Prototype Testing – Vac Test bench;

• Series Assembly;

• Series Test & calibration;

• Tunnel Installation;

• Testing & Commissioning;

• Several weeks;• Several days;• Few days;

TE/VSC/ICM

Page 8: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

820 September 2019

Project R2E – Design modificationPenning

HV module:• Tested several components to match the desired transfer function;• HV output characterization;Regulation:• Over current protection modification;Conditioning electronics:• Transfer function matching – trough different slopes overlapping;• Measurement characterization;

Test Penning Card strongly

modified

Penning Card prototype

(without cover)

TE/VSC/ICM

Page 9: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

920 September 2019

Contribution to the project

Testing and Pre calibration. Mechanical crates assembly.

Minirack placed under the magnet with new electronics.

Gauge reading PLC’s & controls installation.

This work will continue! TE/VSC/ICM

Page 10: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

1020 September 2019

Cabling Minirack – Boxes containing old electronics.

Communication check. Gauge reading PLC’s & controls installation.

Gauge reading check.

Contribution to the project

This work will continue! TE/VSC/ICM

Page 11: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

1120 September 2019

• Electronic Design;• Electronic Production;• Mechanical Design;• Mechanical Assembly;

Other task – Side project

With the knowledge acquired from R2E Piezo Cards, a 4 channel fine tune piezo redundant power supply was designed.

TE/VSC/ICM

Page 12: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

• Strong increase of technical knowledge:

• Advanced printed circuit board (PCB) design software course (Altium);

• Good practices in PCB design;

• Linear and non-linear analog electronics, signal conditioning circuits, very low level signals (pA, nA);

• On field intervention, installation and tests;

• Transmission of knowledge from more experienced people;

• Very good resources available to carry out work and tasks:

• Development tools (e.g. Altium, OrCAD);

• Measurement and simulation equipment (e.g. scope, high precision SMU, bench multimeters);

1220 September 2019

Conclusion – Personal experience

TE/VSC/ICM

Page 13: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

• Privilege of working with people with capabilities to assist you;

• Good work environment with respectful people;

• New ways of thinking – Different approaches to solve setback/issues;

• Challenges & Difficulties:

• Specific analog electronics with very low level signals;

• A lot of changes in a small time frame: new “home”, new people to deal with, new work place, new culture, new language, new city …;

1320 September 2019

Conclusion – Personal experience

TE/VSC/ICM

Page 14: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

• Finish the R2E Project (HL-LHC):• Series Assembly, Test & calibration;

• Tunnel Installation;

• Testing & Commissioning;

• Development, implementation and test of new Interlock and valve controllers for HL-LHC;

1420 September 2019

Future

TE/VSC/ICM

Page 15: Project presentation - Indico · Contribution to the project Testing and Pre calibration. Mechanical crates assembly. Minirack placed under the magnet with new electronics. Gauge

15

Thank you for your attention.Questions?