6 WEEKS SUMMER TRAINING PRESENTATION
RAIL COACH FACTORYKAPURTHALA, PUNJAB
VIVEK TURAN REG. NO. 11007981
Company Profile1. Foundation laid in 1986 by Lt. PM Mr. RAJIV GANDHI.2. Second coach manufacturing unit of the Indian Railways.3. Manufactured around more than 25,000 passenger coaches.
4. Total area of complex : 1178 Acres
5. Workshop : 335 Acres6. Types of coaches manufactured:General second classSleeper classAccident relief train/Staff vanParcel vanPostal van1st,2nd 3rd tiers AC coachesDouble Decker coaches
WORKSHOPS IN RCF
1. Sheet metal shop2. Fabrication shop3. Shell assembly shop4. Welding shop5. Paint shop6. Bogie shop7. Furnishing shop8. Finishing shop
STUDY PROJECT
BogieControl Discharge Toilet SystemAir Brake systemLHB Coach
BOGIE
Part on which the coach rests.The coach runs on the rail line due to Bogie.
Two Versions of Bogie CurrentlyManufactured in RCF
I.C.F All Coiled Bogie FIAT Bogie
ICF All Coiled BogieDeveloped/Built:
ICF & Swiss Car & Elevator Manufacturing Co. Schlieren Switzerland. Introduced on Indian Railway in 1965.Current status: Productions continue by ICF & RCF.
Main Units of I.C.F BogieBogie bolster centre pivot pinBogie frameWheel and axleSecondary suspension (between bogie bolster & bogie frame)Primary suspension (between bogie frame & axle)
FIAT BogieDeveloped/Built : FIAT Switzerland. Introduced on Indian Railway in 2001 24 coaches imported from SwitzerlandCurrent status: Productions continue in RCFFit to run up to 180 km/hSuperior ride quality
BUMP STOPS IN PRIMARY AND SECONDARY SUSPENSION NESTED SPRING SETS WITH 2 HELICAL AND ONE RUBBER SPRING IN
SECONDARY Less wear and tear
Main Units of FIAT Bogie
Bolster and Bogie FramePrimary SuspensionSecondary SuspensionWheel and AxleDisc Brake SystemAxle BearingBolster
Bogie Frame
Wheel & Axle
Secondary Suspension Primary
Suspension Disc Brake unit
Complete Assembly of FIAT
Bogie
COMPARISION OF SALIENT FEATURES OF FIAT BOGIE AGAINST I.C.F. BOGIE
S.N. I.C.F. FIAT
1 SPEED=140 KMPH MAX OPERATING SPEED=160 KMPH TESTED SPEED=180 KMPHPOTENTIAL FOR OPERATION=200 KMPH
2 BOGIE FRAME I TYPE H TYPE CONSTRUCTION3 WHEEL BASE =2896 MM WHEEL BASE = 2560 MM4 WHEEL DIA =915 MM 915 MM(NEW) 845 MM (WORN)5 CLASP TYPE BRAKE AXLE MOUNTED DISC BRAKE
6 SPHERICAL ROLLER BEARING
TAPERED ROLLER BEARING
Control Discharge Toilet System
About CDTSControlled discharge toilet units are fitted to avoid soiling of track in station and inhabited areas. Waste is stored into an immediate tank, which is closed off by microprocessor-controlled slide valves. The slide valve for waste tank outlet opens automatically at speeds above 30 km/h. The toilet units are fitted with button operated flush valves that flush with water, which is pressurized using compressed air. The tanks have a capacity of storage of material for 15 flushes and must be emptied before use.
CDTS (Continued…)
Components of CDTS
AIR BRAKE SYSTEM
1. In Air Brake system compressed air is used for operating the brake system. 2. The locomotive compressor charges the feed pipe and the brake pipes throughout the length of the train. 3. The feed pipe is connected to the auxiliary reservoirs and the brake pipe is connected to the brake cylinders through the distributor valve. 4. Brake application takes place by dropping the pressure in the brake pipe.
Main Parts of Air braking System
CompressorFeed ValveEqualizing ReservoirBrake Pipe Brake CylinderCoupled HosesAngle CocksAuxiliary ReservoirBrake BlockBrake RiggingTriple Valve
Air Brake System continued…
LHB COACH
LHB stands for LINKE HOFMANN BUSCH. It is a railway Coach Manufacturing unit Situated at Germany.The coaches manufactured by LHB/Germany are called LHB Coaches. These coaches are now being manufactured at RCF Kapurthala after getting the transfer of technology from GERMANY.
Why LHB Coaches?Indian Railways have been transporting passenger traffic mainly
through coaches of ICF design.These type of coaches are having limitations in terms of
Speed potential;Heavy corrosion;Poor riding comfort;Wearing of parts in the under gear;
To overcome these limitations, Indian Railways entered into supply and technology transfer contracts with M/s. ALSTOM LHB/Germany to initially supply 24 coaches.
THANK YOU