33
2012 Report on Roundtable Discussion on Contract Management for Municipal Solid Waste Management, Shimla Submitted by: Paradigm Environmental Strategies Pvt. Ltd.

Report on Roundtable Discussion on Contract Management for ...€¦ · 1 2012 Report on Roundtable Discussion on Contract Management for Municipal Solid Waste Management, Shimla Submitted

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    2012

    Report on Roundtable Discussion on Contract

    Management for Municipal Solid Waste Management, Shimla

    Submitted by: Paradigm Environmental Strategies Pvt. Ltd.

    Paradi

  • 2

    Table of Contents

    1 Introduction .................................................................................................................................... 3

    2 Objectives ........................................................................................................................................ 3

    3 Target group .................................................................................................................................... 4

    4 Expected outcome ........................................................................................................................... 4

    5 Feedback/ Outcome/ way forward .................................................................................................. 5

    Annexure:

    Annexure I: Contract Checklist

    Annexure II: Checklist for the MSWPP performance and operation

    Annexure III: Agenda

    Annexure IV: Photographs

    Annexure V: List of participants

    Annexure VI: Presentation

  • 3

    Roundtable Discussion in Shimla on Contract Management for Municipal Solid Waste Management

    Person Present at Roundtable Meeting:

    1. Dr. D. P Singh, Project Cordinator, MCS

    2. Dr. Praveen Gupta, Environmental Engineer, HP State Pollution Control Board

    3. Mr. Rajendra Chauhan, Department of Urban Development, HP

    4. Mr. Ram Singh Thakur, Chief Sanitary Inspector, MCS

    5. Mr. Shaked Ahmed, Admin I/C, HBEPL

    6. Mr. Shekhar, DGM, Hanjer Biotech Energies Pvt. Ltd

    Resource persons

    1. Ms. Regina Dube, GIZ Delhi

    2. Ms. Vaishali Nandan, GIZ, Delhi

    3. Mr. Bernhard, International Expert, GIZ

    4. Mr. Pravinjith, Paradigm Environmental Strategies Pvt. Ltd., Bangalore

    5. Ms.Shweta Dua, GIZ, Delhi

    6. Mr. Vibhor Sood, GIZ Shimla

    1 Introduction

    Municipal Corporation Shimla has chosen Hanjer Biotech Energies Pvt. Ltd as private

    operator to design, development, construction, operation and maintenance of

    Municipal Solid Waste processing facility. Aerobic Invessel technology has been selected

    for the same.

    2 Objectives

    The main objectives of this rountable discussion are:

    1. To get instill role clarity and responsibilities among various Stakeholders

  • 4

    2. To clarify system procedure for smooth contract function

    3. Operationlise the contract

    3 Target group

    The target groups were:

    1. Municipal Corporation Shimla

    2. Hanjer Biotech Energies Pvt. Ltd

    3. Himachal State Pollution control Board

    4. Department of Urban Development, Shimla

    4 Expected outcome

    The workshop proceedings/ discussion during the workshop

    The rountable discussion began with an introduction by Ms. Regina Dube on the

    cooperation extended by GIZ and the activities carried out so far. She recalled back the

    RFP for the MSW plant which was prepared by GIZ and consequently Hanzer Biotech has

    been selected in the evaluation process. Lots of thought have been incorporated to the

    RFP and which will be meaningful only the contract is managed effectively.

    After that Mr. Pravinjith K P from Paradigm Environmental Strategies Pvt Ltd. informed

    the audience that Hanjer has been selected through a transparent bidding process and

    he is now a key partner to the corporation in ensuring safe management of MSW. It is

    the responsibility of the MCS and the other stakeholders that Hanjer gets a fair chance

    to deliver according to contract. Since the contract document and its clauses are going

    to bind each of the parities. This roundtable has been convened to quickly go through

    the most important clause which have a bearing on daily basis. The implementation of

    relevant clauses and remedial measures to avoid was discussed. The following points

    were highlighted by him:

    Hanjer should get valid consent to establish/operate, Environmental clearance

    Valid Performance guarantees, Insurances, Public liability Insurance of Rs. 5.0

    crores and their timely renewal is needed

    Issues regarding environmental and social compliance risks permits

    Quality and quantity of rejects to landfill and as percentage of incoming waste

    Disputes between contractual and actual performance

  • 5

    Implemented recording system should be able to accurately measure each of

    nine service level indicators. This should be signed off by the MCS representative

    as well as the Hanjer Plant representative.

    Preferably in triplicate and two copies to be maintained at MCS and one with

    Hanjer at the plant. Monthly Consolidated copy of compliance to the service

    levels should be annexed with bills for ease in processing

    Mr. Bernhard promised to prepare and give ready recknor for the inspection,

    verification and maintenance of data by MCS which will prevent any contractual

    differences.

    The audience Regional Environmental Engineer of Himachal state pollution control

    board reassured both MCS and Hanjer about full cooperation from their side. He

    requested Hanjer to apply for all the consent which will be cleared fast.

    5 Feedback/ Outcome/ way forward

    Contract Checklist has been developed

    Checklist for performance and operation of Municipal Solid Waste Processing Plant

    has been prepared.

    MCS to adopt the tools immediately

    Hanjer to obtain all clearance immediately

    Hanjer to keep in force all required insurance and guarantee insurance

  • 6

    Annexure I: Contract Checklist

    Sl No Contract Clauses Activities Primary responsibility

    To be ensured by

    3.4 Applicable permits List applicable permits and respective Authorities, validity, responsibility

    Hanjer MCS

    4.1 Appointment of Project engineer

    Identified IE during operation and information to Hanjer. IE site office

    MCS

    5.1 Performance bank Guarantee

    PBG of Rs 40. Lakhs and its validity Hanjer MCS

    5.3 Implementation of WPF

    Approved design drawings, Equipment data specifications, Spares list, Electrical drawings, Oil and lubricant data and stocks, Equipment Maintenance manual, Approved Standard Operating Plans

    - All signed by MCS

    Hanjer MCS

    5.4 Insurance Valid insurance, Insurance declared value, coverage and risks, validity

    Hanjer MCS

    5.5 Environmental Compliance

    Regular Social and HSE audits, safety and first aid trainings, List and Use of PPEs, ESI –PF payments

    Hanjer MCS

    5.9 General Obligations

    Valid Public Liability Insurance of Rs 5.0 Crores and renewal List of Authorised persons and signing authority to be informed to Hanjer personnel and displayed at the gate

    Hanjer MCS

    5.12 Maintenance of records

    Daily record of Vehicle no, Driver, Net weight of incoming/ outgoing waste, timing of entry/ exit. Separate registers for Raw waste, outgoing products and Outgoing rejects with triplicate gatepass, signed off by IE/ MCS representative

    Hanjer MCS

  • 7

    6.1 Specific Obligations

    Declaration and enforcement of a NO Development Zone BY MCS, Ensuring SEHB does not transport to WPF- Biomedical/ Hazardous/ Construction and demolition waste, Timely written notice on events of defaults / force majeure

    MCS Hanjer

    7.2.1 Payments Determine and display Formal commissioning date, End date of concession, Opening of MSWP bank account for the remitting the post concession expense deduction and deduction of relevant 2% for 18 years and 5% for last two years

    MCS Hanjer

    Schedule 3.8 Standard Operating procedures

    Approved SOP, Recommended spare list and minimum inventory, regular audit of these stocks

    Hanjer MCS

    Schedule 3.10 Service levels

    Verifying and certifying claims/ defaults, issue notice, Minutes of meeting, Checking compliance scheduled , randomly, follow up on previous notices etc

    MCS Hanjer

  • 8

    Annexure II

    CHECKLIST FOR MONITORING OF PERFORMANCE OF OPERATION OF MSWPP

    Task Place Indicator PRIMARY

    RESPONSIBLE

    TO BE

    ENSURED

    BY

    FREQUENCY

    Waste quantities

    delivered to plant At weighbridge

    Tons/day

    Origin

    Truck license plate

    Driver Name

    Rejected waste

    MCS PROJECT

    ENGINEER DAILY

    Compost output Storage of product

    Tons/day

    Compost quality

    End user data

    HANJER MCS DAILY

    RDF output Storage of product

    Tons/day

    RDF quality

    End user data

    HANJER MCS DAILY

    Plant rejects Storage of rejects Tons/day HANJER MCS DAILY

    Waste quantities

    delivered to plant At weighbridge Tons/month

    Rejected waste MCS

    PROJECT

    ENGINEER MONTHLY

    Availability of

    plant/operation hours Log machines Operation hours/month HANJER MCS MONTHLY

  • 9

    Balance of quantities of

    input and

    products/rejects

    Weighbridge,

    register of

    products/rejects

    Tons/month HANJER MCS MONTHLY

    Operational health and

    safety At plant

    Safety records

    Disability adjusted labour

    years

    HANJER MCS MONTHLY

    Odour At plant

    Complaints of odors,

    Action taken to prevent

    recurrence

    HANJER MCS MONTHLY

    Upkeep of records To be sent to MCS

    Record of all data as

    stipulated in concession

    agreement

    HANJER MCS MONTHLY

    Compost quality At plant Batch certificates

    End user data HANJER MCS MONTHLY

    RDF quality

    Output quality control

    International standards HANJER MCS MONTHLY

  • 10

    Annexure III

    Roundtable Workshop for Contract Management on Municipal Solid Waste Management

    Venue; Rotary Town Hall, Mall Road Shimla Date: 28th March,

    2012

    Target group: Representative of MCS, Hanjer, SEHB and SWM expert team

    Date Time Agenda

    28-3-12

    9.30 am Hanjer Site Visit

    11.30 -11.40 am

    High Tea at Rotary Hall

    11.40- 11.50 am Welcome Address by Ms Regina Dube, GIZ Delhi

    11.50 -12.15 pm Scope of the MSW processing plant by –

    12.15 – 12.35 pm Processing Technology in brief by - Mr.Bernard Shenk, GIZ International Expert

    12.35- 12.55 pm Responsibilities of Stakeholders by-

    12.55- 13.25 Typical Contractual Issues and how to resolve

    13.25-13.30 pm Vote of Thanks

    ***

  • 11

    Annexure IV : Photographs

    Brief introduction about project by Ms. Regina Dube Stakeholders participation in meeting

    Mr. Pravinjith is briefing about contract management Discussion among stakeholders regarding contractual

    issues

  •  

  • Roundtable Discussion in Shimla on Contract Management for Municipal Solid

    Waste Management

    Pravinjith KP

    Paradigm Environmental Strategies Pvt. Ltd

  • Salient features

    Name of Operator: Hanjer Biotech Energies (P) Ltd Scope: Design, development, construction, operation and

    maintenance of municipal solid waste processing facility Technology: Aerobic Invessel compost plant, RDF, Recyclable

    and inert processing, Environment Management: leachate treatment, etc Concession period – 20 years Start of concession – 270 days from work order date of 28 July

    2010,----- ie 28 Apr 2011

  • Detailed Scope

    to receive MSW at the Receipt Point of the WPF to inspect the MSW and to identify Rejected Waste

    as per the provisions of Article 5.7 in such manner as it deems fit, and refuse to accept the Rejected Waste

    to process the Solid Waste in the WPF to receive all fiscal incentives and commercial

    benefits accruing in respect of or on account of the MSWPP including the CDM benefits as per the agreed ratio and also benefit from sale of all byproducts / recyclables

  • Key Clauses - 3.4 Applicable permits

    The Concessionaire shall obtain and maintain the applicable permits

    responsible and ensure compliance with the permit terms and conditions.

    Indicators: List applicable permits, Authorities, validity, responsibility

  • Key Clause 4.1 Procedure for Appointment

    MCS will appoint Project Engineer for the construction The cost of Rs 2.0 lakhs/ month for the Project Engineer

    shall be borne by Hanjer. Costs shall be deducted from the fees payable to Hanjer. Hanjer shall provide office space and basic amenities

    within the project site.

    Indicator: Identified IE and information to Hanjer. IE site office

  • Key clause 5.1 Performance Bank Guarantee (PBG)

    Hanjer shall deliver to MCS,a bank guarantee from a scheduled bank (“Performance Security”) for a sum of Rs. 40,00,000/- (Rupees forty lakhs) only.

    The PBG shall be kept valid throughout the term of the Agreement. The renewal of the PBG is to be done by Hanjer at least one month prior to the date of expiry of the existing PBG, failing which, MCS would be entitled to invoke the PBG.

    Indicators: PBG validity and renewal

  • Key clause- 5.3 Implementation of WPF

    The Concessionaire shall adhere to the Construction Requirements and O&M Requirements and shall adhere to the standards and guidelines for construction as per MSW Rules 2000.

    The Concessionaire shall submit the design and specifications for each of the component as per Volume II and get them approved by the Project Engineer. The designs and construction shall conform to relevant Bureau of Indian Standards Specification and good engineering practice.

    Indicators: Approved design drawings, Equipment data specifications, Spares list, Electrical drawings, Oil and lubricant data and stocks, Equipment Maintenance manual, Approved Standard Operating Plans

  • Key clause 5.4 Insurance

    The Concessionaire shall purchase and maintain a valid insurance, during the Concession Period

    The Concessionaire shall maintain records of such Insurance and the same shall be submitted to MCS officials

    Indicator: Valid insurance, Insurance declared value, coverage and risks, validity

  • Key clause 5.5 Environmental Compliance

    The Concessionaire shall conform with the laws pertaining to environment, health, safety and labour aspects including rules such as MSW Rules, policies and guidelines.

    The Concessionaire shall be liable to meet any expenses / compensation to be paid due to pollution / environmental damage or remediation caused by the WPF attributable to the failure of the Concessionaire in meeting its obligations.

    Indicators: Regular Social and HSE audits, safety and first aid trainings, List and Use of PPEs, ESI –PF payments

  • Key clause 5.9 General Obligations:

    Hanjer shall afford access to the MSWPP to the authorized representatives of MCS and member of the Regulatory Panel and other person authorized by the concerning authority (MCS), for the purpose of ascertaining compliance with the terms, covenants and conditions off this Agreement.

    Hanjer shall maintain and keep in force a Public Liability Insurance for a minimum of Rs.5.0 crore as per The Public Liability Insurance Act, 1991, for the entire period of concession agreement and post closure period.

    Indicators: Valid Public Liability Insurance of Rs5.0 Crores and renewal, List of Authorisedpersons and signing authority to be informed to Hanjer personnel and displayed at the gate

  • Key Clause 5.12 Maintenance of Records

    Hanjer shall maintain records of the quantum (measured in Metric Tonnes) of waste supplied to the facility, waste processed, rejects disposed to the Landfill Facility,

    Project engineer shall countercheck Hanjer provide monthly, quarterly and annual reports of the

    same to the Project Engineer and the MCS along with any other details sought by MCS for documentation.

    Indicator: Daily record of Vehicle no, Driver, Net weight of incoming/ outgoing waste, timing of entry/ exit. Separate registers for Raw waste, outgoing products and Outgoing rejects with triplicate gatepass, signed off by IE/ MCS representative

  • Key clause 6.1 Specific Obligations

    MCS shall pay the Fee to the Concessionaire, on a monthly basis within 30 days

    MCS shall not transport non acceptable waste MCS shall declare and maintain a No-

    development zone around the site MCS shall give timely notice of the happening or

    likely happening of an Event of Default or breach or default on the part of the Hanjer

    Indicators: Declaration and enforcement of a NO Development Zone BY MCS, Ensuring SEHB does not transport to WPF- Biomedical/ Hazardous/ Construction and demolition waste, Timely written notice on events of defaults / force majeure

  • Key Clause-7.2.1 Payments during Term of Concession

    Pay to Hanjer , an amount equal to 98% of the total amounts payable for year 1 to 18

    Pay an amount equal to 95% of the total amounts during the last two years of the Term of Concession.

    Transfer the deducted amounts into a separate bank account named “Municipal Solid Waste Processing Plant Account” for meeting the Post Concession Performance of processing plant related expenses

    Deduct penalties if any MCS shall pay 8% per annum interest for payments made after 30

    days from date of certification of bill.

    Indicator: Determine and display Formal commissioning date, End date of concession, Opening of MSWP bank account for the remitting the post concession expense deduction and deduction of relevant 2% for 18 years and 5% for last two years

  • SCHEDULE- 3.3Sl No Year Cost Rs./ MT on

    input MSWRemarks

    1 1 1502 2 1623 3 1754 4 1895 5 2046 6 2207 7 2388 8 2579 9 278

    10 10 30011 11 32412 12 35013 13 37814 14 40815 15 44116 16 47617 17 51418 18 55519 19 60020 20 64821 21 Nil Post concession

    This is reference to RFP No. MCS/COM/JNNURM/10-196 dated 25-03-2010 Volume 1 Para 8.1.2(d) financial offer i.e. “There is a possibility of extending financial assistance to the project in the form of capital grant. In the event of the project securing a capital grant, an amount equal to 0.989 % of the grant amount shall be recovered from the tipping fee payable every month.. Viz: If Grant amount is G, then the monthly billing shall be paid after effecting a deduction of = Rs. (G x 0.989%)

  • Schedule 3.8 Standard Operating Procedure for Maintenance of Compost Plant.

    Indicators: Approved SOP, Recommended spare list and minimum inventory, regular audit of these stocks

  • Sl No. Function Service Level Default Penalty Periodicity ofinspection

    1. Receipt of MSW The operator shallaccept the MSW at thegate of the facilityduring the workinghours of the plant.

    Event of default occurswhen the Operatorrefuses to accept MSWas per the OperatingPlan for a continuousperiod of 48 hours in ablock of 30 days.

    Rs.5,000/- per default.The penalty would bedoubled for eachsubsequent default if itrecurs within 30 days. Inaddition, demurragecharges for trucks shouldbe paid by the Operator.

    Daily bymunicipalemployee at plantentrance

    1. Mechanical availability ofthe processing plant

    Bidder to indicate annualavailability in hoursoperation/year:

    The operator shallensure that the plantavailability at thefacility on all workingdays in accordance withthe MSW Rules.

    Equipment breaksdown for a continuousperiod of more than 7days in a block of 30days in respect ofCompost Plant,Leachate Treatmentfacility as notified bythe authorizedpersonnel of theCorporation (Excludingthe scheduledpreventive maintenanceclosure of the plant).

    Rs.200000 per defaultand doubled for eachsubsequent default

    Monthly by projectengineer

    1. Upkeep and maintenanceof records.

    The Operator shallmaintain records ofreceipt of waste andsuch other details asprescribed by theCorporation in the RFP.

    Failure to furnishupdated daily records tothe authorizedpersonnel of thecorporation within 48hours of notice to theOperator.

    Rs.1,000 per incident anddouble subsequently if itrecurs within 30 days

    1. Leachatemanagement

    The Operator shallmaintain theleachate treatmentplant and dischargeat standards as

    Failure to complywith the stipulations

    Rs 100000/- perincident and doublesubsequently if itrecurs within 30 days,in addition to any

    As per Consentconditions

    Key Clause Schedule 3.10 Service levels

  • Sl No. Function Service Level Default Penalty Periodicity of inspection

    1. Compost Quality The Operator shallproduce compost as perthe quality specifiedunder the Schedule IVof MSW Rules 2000

    Failure to comply withthe stipulations

    Rs 100000/- per incidentand double subsequentlyif it recurs within 30 days,in addition to any otherpenalties specified by theHPSPCB

    As per Consentconditions

    1. Safety in Operations The Operator shallcomply with therelevant regulationsregarding OSHA

    Failure to comply withthe stipulations

    Rs1000000/- perincident plus any othercharges related to themitigation of theproblems caused

    7. Percentage of rejects fromWPF.Bidder to indicate percentageof rejects according to histechnology:

    The rejects shall not bemore than 20% or asper Consent conditionswhichever is lower

    Failure to comply withthe stipulations

    Rs 50 / MT plus the costpaid to the SanitaryLandfill operator fordisposing the same

    Computed as permaterial balance

    8 Percentage of Organics withinthe rejects.Bidder to indicate percentageof organics within rejectsaccording to his technology:

    The percentage of theOrganics within therejects shall not exceed10% or as per consentconditions whichever islower

    Failure to comply withthe stipulations

    Rs 50/MT Once every 60days

    9 Odor Nuisance The Operator shalloperate andmaintain the WPFin a Odor freeenvironment asspecified under theSchedule IV of MSWRules 2000 or theConsent conditions

    Failure to complywith the stipulations

    Rs.5,000/- perdefault. The penaltywould be doubled foreach subsequentdefault if it recurswithin 30 days.

    Once in 60 days

  • Key Contractual Issues

    • Waste Processing facility

    Valid Consent to establish/ operate Valid Performance guarantees, Insurances, Public

    liability Insurance of ₹5.0 crores and their timely renewal

    Issues regarding environmental and social compliance risks permits

    Quality and quantity of rejects to landfill and as percentage of incoming waste

    Disputes between contractual and actual performance

  • Key Contractual Issues

    •Waste Processing facilityValid Consent to establish/ operateValid Performance guarantees, Insurances, Public liability Insurance of ₹5.0 crores and their timely renewalIssues regarding environmental and social compliance risks permitsQuality and quantity of rejects to landfill and as percentage of incoming wasteDisputes between contractual and actual performance

  • Schedule 3.10 Service levels and penalties

    • Implementation of recording system which can accurately measure each of the 9 service level indicators

    • This should be signed off by the MCS representative as well as the Hanjer Plant representative.

    • Preferably in triplicate and two copies to be maintained at MCS and one with Hanjer at the plant

    • Monthly Consolidated copy of compliance to the service levels should be annexed with bills for ease in processing

  • Thank you for your attention

    SWM_contract_shimla-Reportparticipantssheet_28th_March2012[1]Contract ManagementSlide Number 1Salient featuresDetailed ScopeKey Clauses - 3.4 Applicable permits �Key Clause 4.1 Procedure for Appointment�����Key clause 5.1 Performance Bank Guarantee (PBG) ��Key clause- 5.3 Implementation of WPF�Key clause 5.4 Insurance �Key clause 5.5 Environmental Compliance �Key clause 5.9 General Obligations: �Key Clause 5.12 Maintenance of Records�Key clause 6.1 Specific Obligations� Key Clause-7.2.1 Payments during Term of Concession�SCHEDULE- 3.3Slide Number 15Slide Number 16Slide Number 17Slide Number 18Key Contractual IssuesSchedule 3.10 �Service levels and penaltiesSlide Number 21