RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci

RPC project status report

  • Upload
    eitan

  • View
    64

  • Download
    1

Embed Size (px)

DESCRIPTION

RPC project status report. RPC IB meeting 28 June 2011 Pigi Paolucci. Outline. CMS and RPC news Organization chart Manpower issues Upgrade structure 2011 ESP. CMS reached the fb -1. LHC plans. No any significant RPC downtime & dead time during the last 3 months. - PowerPoint PPT Presentation

Citation preview

Page 1: RPC project status report

RPC project status report

RPC IB meeting28 June 2011

Pigi Paolucci

Page 2: RPC project status report

RPC IB meeting - Pigi Paolucci 2

Outline

CMS and RPC news Organization chart Manpower issues Upgrade structure 2011 ESP

29/03/11

Page 3: RPC project status report

CMS reached the fb-1

Page 4: RPC project status report

LHC plans

Page 5: RPC project status report

Trigger L1-RPC : 0:04:02min/ 535 hours A closer look to that 0% !....

No any significant RPC downtime & dead time during the last 3 months

Page 6: RPC project status report

RPC IB meeting - Pigi Paolucci 6

Trigger history plot

29/03/11

Full Barrel Endcap

Mu 10Beam Halo

Page 7: RPC project status report

Run 2011 RPC shift The present table contains the requested shift per institution. The shift are calculated considering 48 weeks of runs and 3 shifter per week (DOC, DM and CAF) plus 15% of contingency. The request is to provide 2 shift(weeks)/EPS

Shifts done or assigned up to 06/30/2011

M&O 2010 # ESP Number of required 2011 shifts (weeks)

DOC 2011 (weeks)

DM 2011 (weeks)

CAF 2011 (weeks)

Total shift done up to 06/30/2011

Peking univ 2 4 1.4 1.4SKK Univ (Korea) 2 4 1 1Korea Univ (Korea) 10 20 3.6 3.6Chonnam (Korea) 0 0Mumbai-Barc (India) 1 2Chandigarh (India) 3 6 6.4 6.4Ghent (Belgium) 9 18 6 4.6 2 12.6Brussel Univ (Blgium) 1 2Uniandes 2 4Pakistan 6 12 5 5Asrt-Enhep (Egypt) 3 6 1 1CERN 4 8Bari 12 24 1 4 5INFN - LNF 5 10 7 7Napoli 9 18 5.9 5.9Pavia 3 6 2 2 1 5Sofia Univ 6 12 6 3 3 12Sofia INRE 6 12 2 3 5RPC TOTAL 84 168 29 22.5 19.4 70.9

See Gabriella talks

Page 8: RPC project status report

RPC IB meeting - Pigi Paolucci 8

Project Manager P. Paolucci

M. Tytgat & G. Pugliese

Run Coordinator L. BenussiH. Shahzad

N. Zaganidis

DPG D. PiccoloK. Bunkowski

C. Carillo

Upgrade G. IaselliA. Sharma

S. Buontempo

Institution BoardL. Litov

Resource manager A. Colaleo

Steering committeeW. Van Doninck, M. Maggi

H. Hoorani, A. Colaleo,A. Sharma

(PM+DPM+RC+TC+DPG)

29/03/11

Tech. CoordinationS. Buontempo

A. Dimitrov

Conference Committee

S. Park, B. Pavlov

Editorial boardS. Qian, M. Abbrescia

S. Bianco

Page 9: RPC project status report

RPC IB meeting - Pigi Paolucci 929/03/11

Technical CoordinationS. Buontempo

A. Dimitrov

Mainten. & repair. (RE,RE)

Dimitrov & Shahzad

UpgradeG. Iaselli

A. Sharma S. Buontempo

Bakelite HPL

CERN test standCERN

Gap production

Chambermechanics

Ghent siteM. Tytgat

India siteL. Pant

CERN siteCERN

Chamber QC at CERN

Chamber design

Off-detectorelectronic

CoolingJ. Crotty

GasBenussi

TriggerWarsaw

DocumentationDimitrov

Equipment DBD. Uzunova

ElectronicsF. Loddo

DCS hardware

Resp.

Test beamNicolas

R&DN. Zaganidis

GIF activity

Power system

Power cable

Signal cable Chamber production

High eta

Chamber instal.

Cable instal.

Commissioning at P5RE1/1 at P5

Run coordination & Upgrade

Manpower needed

Not covered

Covered

Page 10: RPC project status report

RPC IB meeting - Pigi Paolucci 10

Critical task (March 2011)

• We still have few important tasks not covered:

– Online Database (Warsaw is looking for a student)– Detector Control System (none)– Power system (temporary solution)– Offline Database (Bari group)– WMB (none from July 2011)

29/03/11

Page 11: RPC project status report

RPC IB meeting - Pigi Paolucci 11

Critical tasks (Today)

• 2 tasks have been now covered:– Online Database (Warsaw is looking for a student)– Detector Control System

– Electronic Coordinator (F. Loddo) • Power system (Hassan and Anton)

– Offline Database (Korea Univ & Bari group) • Time needed to have experts

– WMB (covered until October 2011)• Mihee will work with Umberto on noise in WMB

29/03/11

Page 12: RPC project status report

RPC IB meeting - Pigi Paolucci 12

Next issues (March 2011 and now)

WBM deployment at CAF/P5 !!! manpower needed Working at CAF/P5 very well OK Historical plots and noise have to be included

DQM efficiencies and DB Under test

Noise and DB Geometry and noise per roll ready Noise per strip asap

CMS center instructions for shifters OK Upgrade schedule and milestones – under definition Upgrade money matrix - still under discussion in CMS

29/03/11

PVT

Page 13: RPC project status report

RPC IB meeting - Pigi Paolucci 13

2011 manpower

• Cimmino 2 months Feb RC/DPG• Mircho3 months May RC/DPG• Umberto 3+3 months (RPC & CERN) June RC/DPG

– 1+1 month (CERN + RPC) Sept

• Alaa 3+3 months (RPC & Egypt) Aug DPG

• Uzunova 5 months (RPC & upgrade) July TC/Up– 2 months from CMS TC– 2 months from RPC upgrade Dec

• Anton 12 months Dec TC

29/03/11

Page 14: RPC project status report

RPC IB meeting - Pigi Paolucci 14

2011-2012 manpower news

• We have two very critical position to assure for the next two year:– Detector expert & Trigger and DAQ expert

• positions are now covered in the best way by– Anton and Karol

• Karol fellow has been extended to Dec 2011– Project associate for the 2012

• Anton contract finish in June 2011– Project associate for the 2012

29/03/11

Page 15: RPC project status report

4th RPC General Meeting - Pigi Paolucci 15

News about RPC organization

28/06/11

• RPC MB, coordinators and experts have access to a shared google documents used to prepare the weekly report to the XEB meeting:

• Very good way to share info ! Please ask to have access• June 14th:

TC:Everything was perfectly stable before the gas kill on 31th May. Then after a power-cut in SG5 and a gas kill we had 5 trips in the barrel and 1 in the endcap.All have been recovered. One chamber temporarily in SG mode till next access.

Trigger: Muon Trigger rate variations observed (~9%) in last weeks, the most probable reason is variation of the RPC chamber efficiency (by 2-3%) with the pressure variation (impacting the trigger efficiency in the endcaps by 3-4%, and thus the rate). Still not clear is the variation of the cluster size could impact the probability of promoting the low pt muons to high pt (impacting the rate on given threshold). Variation is not present with low PT cut (Mu0 and Mu7) and increase from Mu16 to Mu20RC: stable since the HV scan - no problem with the new set of WP and efficiency very stable in time (2-3% of variation due to the pressure)

• P/T correction in PVSS has been discussed and defined and will be tested during the next TSDPG:DQM: experts are investigating in the offline DQM to speed-up it. Right now we are using 4MB and we already deleted 4.000 histograms. Work is on going.

• MC: Comparison of number of RPC hits in Muon Reco of 2011 data with summer2011 MC, show nice agreement in barrel and endcap. Some small discrepancy in overlap region under studyUpgrade: MB:

Page 16: RPC project status report

4th RPC General Meeting - Pigi Paolucci 16

News about RPC organization

28/06/11

• Shared google calendar with meetings and vacation (Pigi and Gabriella)– please ask to be included in the list

• Minutes provided by all the coordinators – thanks a lot

• XEB and XEC minutes circulates in real time• MB and FB minutes and news in a week• All info sent to Group Leader (we ask to

circulate)

Page 17: RPC project status report

4th RPC General Meeting - Pigi Paolucci 17

Action Items

28/06/11

1. HV setting with P/T correction – approved by CMS but in a human version

2. Improve history plots monitoring (current, noise, efficiency) using WBM and database

3. Include DQM trigger check in CAF duties 4. Spare components procurement5. Long 2012shut-down plan

6. Bakelite and gap production7. Link and Control board prototype tests at 904 (Oct-Dec)

Page 18: RPC project status report

RPC IB meeting - Pigi Paolucci 18

ESP 2011

• ESP 2011 have been approved by RPC and CMS• Most of the RPC pledges have been approved after having consulted

TC/RC/DPG/Upgrade– Some DPG task to be checked:

• PVT 6 needed 13.6 pledge• Analysis 36 56• Up soft4 0• Gap prod 8 16

• End of the year RPC MB will fill the work done with the help of the coordinators

• Few tasks without any results. To be double checked

29/03/11

Page 19: RPC project status report

RPC IB meeting - Pigi Paolucci 19

Project Activity Task Needed (months) Fte Total x cat.

Muon-RPC Detector Hardware Technical coordinator 6,00 0,50Muon-RPC Detector Hardware Chamber 10,00 0,83Muon-RPC Detector Hardware Electronics 3,00 0,25Muon-RPC Detector Hardware Services 3,00 0,25

Muon-RPC Electronics and DAQ Power System 3,00 0,25Muon-RPC Electronics and DAQ DCS-DSS 3,00 0,25Muon-RPC Electronics and DAQ Electronic configuration 10,00 0,83Muon-RPC Electronics and DAQ Gas Gain Monitor 3,00 0,25Muon-RPC Electronics and DAQ DAQ and online DB 4,00 0,33

45,00Muon-RPC Software and DQM DPG coordinator 6,00 0,50Muon-RPC Software and DQM DQM 12,00 1,00Muon-RPC Software and DQM DCS & WBM 12,00 1,00Muon-RPC Software and DQM PVT 6,00 0,50Muon-RPC Software and DQM Simulation 4,00 0,33Muon-RPC Software and DQM Database 10,00 0,83Muon-RPC Software and DQM Prompt Analysis 36,00 3,00

86,00Muon-RPC Operation Run coordinator 6,00 0,50Muon-RPC Operation Operation Manager shift* 11,00 0,92Muon-RPC Operation CAF shift* 11,00 0,92Muon-RPC Operation Data Manage shiftr* 11,00 0,92

39,00Muon-RPC Operation Upgrade coordinator 6,00 0,50Muon-RPC Upgrade Software 4,00 0,33Muon-RPC Upgrade Bakelite production and test 3,00 0,25Muon-RPC Upgrade Gap production 8,00 0,25Muon-RPC Upgrade Chamber design 2,00 0,25Muon-RPC Upgrade Chamber construction 24,00 2,00Muon-RPC Upgrade Chamber test at 904 7,00 0,58Muon-RPC Upgrade Front-end electronic 3,00 0,25Muon-RPC Upgrade Trigger electronic 7,00 0,58Muon-RPC Upgrade Services 4,00 0,33Muon-RPC Upgrade R&D at high eta 2,00 0,17Muon-RPC Upgrade Simulation at high eta 2,00 0,17

72,00Muon-RPC Management LV3 24,00 2,00Muon-RPC Management LV2 IB - CC - EB chairman 3,00 0,25Muon-RPC Management LV2 steering committee 3,00 0,25

   272,00 21,33

29/03/11

Page 20: RPC project status report

RPC IB meeting - Pigi Paolucci 20

ESP status (June 2011)

29/03/11

Page 21: RPC project status report

RPC IB meeting - Pigi Paolucci 21

2011 ESP status (country & institution)

29/03/11

Page 22: RPC project status report

RPC IB meeting - Pigi Paolucci 22

EPS hot task

29/03/11

Page 23: RPC project status report

RPC IB meeting - Pigi Paolucci 23

Conclusion Project is in good shape and many improvements

have been done during the 2010-2011 shut-down

ESP pledge letters deadline is in 2 weeks. Manpower: DCS – WBM – Online experts –

detector expert 2010 expenditure were in line with our budget

269 KCHF 2011-2012: we have to cover 2 critical tasks 2011 budget is necessary – contribution request

in few days29/03/11