37
52BI0SE0191 2.13488 MOSS 010

RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

52BI0SE0191 2.13488 MOSS 010

Page 2: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

kTION and ACCESS .13488The Moss Township area covered by this portion of the study

is located approximately 130 kilometers west of the City of

Thunder Bay in the Thunder Bay Mining District. The two mining

claims covered by this report (T.B. 1142404 and 1142405) are

located along the Hermia Lake Road, south of the Hermia Lake Road

between the 7 and 8 kilometer marks, three miles southwest of the

town of Burchell Lake. The mining claims are south west of the

westerly tip of Burchell Lake, one-half mile west of Span Lake

and one mile north of the Wawieg river. At present the two claims

border the Central Crude/Tandem-Storimin and Broad Horizon Moss

Township mining properties.

From Thunder Bay the general area is accessed from highway

11-17 to the Atikokan highway which is highway 11. From highway

11 take Highway 802 which passes by the Hermia Lake Road. The

Hermia Lake Road borders both claims to the north and a winter

bush road provides access to the west boundary of claim 1142405.

An alternate route from the Atikokan highway is to take the Swamp

Lake Road which intersects the Hermia Lake Road at about the ten

kilometer mark. Another less preferable route can be taken

through the Boreal forest access road through Begin and Powell

Townships.

Access by air can be made using a straight portion of highway

802 as a runway and numerous lakes in the area provide access for

float equipped aircraft. Traversing the two mining claims in the

study area on foot is quite easily accomplished as the

topographical relief is moderate.

Page 3: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

.OGY

Ahern (1988) partly describes the geology oF the project area

as being composed of a unit of undifferentiated metavolcanics and

metasediments which strike northeastward with acid metavolcanics

[rhyolite and trachyte) south of the first unit. Underlying the

north portion of the study area, undifferentiated metavolcanics

are in contact with metasedimentary rocks. A major fault crosses

this area in a northeasterly direction with a strike roughly

parallel to the Knife Lake Fault. Gold mineralization has been

discovered along this same fault to the south.

Two miles to the south of this property, a past producing

mine known as the Kerry Mine (A.K.A. Moss Mine) recovered 29,948

ounces of gold and 172,375 ounces of silver between 1932 and

1942. Here an auriferous quartz vein and northeast trending

feldspar dike cutting Pre-Kenoran mafic to intermediate

metavolcanics was traced for more than 3,000 feet. (Now traced

over 10,000 feet.) These two claims lay roughly along strike of

the old Moss Mine.

Six miles southwest of the study area, the Lobanor prospect,

at the northern tip of Snodgrass Lake, contains three auriferous

zones which returned economic gold values. The Western shores of

Burchell Lake contain two copper occurrences.

Central Crude and Tandem-Storimin Ltd. are currently drilling

3 km to the south of the proposed study area. Narrow wedges of

property are being staked where previously missed. Other economic

gold values have recently been discovered in the vicinity of

Burchell Lake.

Page 4: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

Mining claims 1142404 and 1142405 where exposed are composed

mainly of rhyolite and associated felsic (clastic) flows. Orange

to pink granite borders the rhyolite flows to the west, north and

south; heavy overburden lies to the east. A flat, low marshlands

area covers the central border between the two claims. Numerous

quartz veins are found in the rhyolite where fractured. On claim

1142405 the quartz veins have a trace of copper mineralization in

the form of a green colored sulphide and at the same location a

rhyolitic clastic flow associated with sericite schist and minor

sulphides hosts gold mineralization.

Page 5: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

DONE

The proposed work was performed in the northeastern corner of

Moss Township. A 1988 airborne geophysical survey by H. Ferderber

Geophysics Ltd. had revealed possible bedrock conductors which

warranted further work. VLF-Electromagnetic and Magnetic data

were gathered to delineate the geological structure and locate

economic concentrations of mineralization. According to Ahern

(1988) these surveys outlined conductive geological zones "which

may represent shear zones and/or metallic sulphide deposits

containing gold mineralization."

A systematic program of sampling and assaying was performed

on this claim group in an attempt to further evaluate the

economic potential of the area. Fifty-five rock specimens were

taken from rhyolite and quartz veins in the study area for

analytical work to determine their gold content. Most of the

outcrops encountered in the study area were subjected to

traditional prospecting methods of rock breaking. Approximately

ten percent of the specimens visually inspected with a 16 X power

hand lens were submitted for assay. Assay number coded field tags

were left in place in the field at each sample location for

future reference. Acid tests were used to determine the presence

or absence of carbonates.

Several quartz veins in the area were stripped of overburden

by hand. Traverses made on these two claims covered nearly all of

the land area bounded by them.

At the location of the highest gold values (329 ppb)(758 ppb)

overburden was stripped by hand with a shovel. 5 orf pffb'

f

j*

Page 6: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

:SULTS and RECOMMENDATIONS

From the traverses made throughout the two mining claims

several previously overlooked quartz veins were Found. One such

quartz vein, bordering the two mining claims, is 14 centimeters

in width and assayed 163 ppb Gold. The gold mineralization in the

sample appears to be associated with the deposition of massive

sulphides along one contact of the vein. The zone oF massive

sulphides is however quite narrow.

The Felsic clastic rhyolitic Flow which produced the higher758 ppb^

gold values of i 329 ppb jAu had numerous elevated gold values Found

in the rook surrounding it. This location was Further explored by

stripping with a high pressure water pump in an attempt to locate

higher gold values. The presence oF sericite schist and massive

sulphides at this location show a Favorable environment For gold

deposition. A similar outcrop oF the Felsic clastic rhyolitic

Flow was Found one quarter mile to the east, suggesting some

strike length to the Formation.

According to Ahern (1988) "The structural and lithologic

complexity oF the property as indicated by the magnetic data

suggests that the claims are located in a good geologic

environment For gold and/or base metal mineralization. Further

work is warranted on the property especially in the areas oF the

possible bedrock conductors . "

This area shows high potential For mineral deposition and

should be Further investigated. A large scale gold deposit, now

being delineated by drilling, lies immediately to the southeast

oF this area along the same geological units. A program oF Field

Page 7: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

lapping should be carried out on the property and a soil

geochemistry program may prove beneficial in locating more zones

of anomalous gold values.

Page 8: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.fwf.

P.O. BOX 604KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5

TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M.SC., Ph. D., c. Chem (Ont.i, c. chem IU.K.i, M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of Analysis

30338 Ken Kukkee 90 Minot Avenue THUNDER BAY, ON P7A 6N9

SAMPLE NUMBERS Accurassay

519213519214519215519216519217519218519219519220519221519222519222519223519224519224

Date: April 5

Page: l

___19 _9J1

Work Order # Project

T900170

IERSCustomer

ATH-01-QV211N3-405-

240E4-405-OATH"

114W2-404-145N3-405-231N3-405-

QV183N3-405-95W2-404-

170S1-404-170S1-404 10W2-404-

QV223N3-405-Awoo'su'j-^nt; ..

Goldppb

^<5<5<5<5^80<5<5101 111

^<5y c

GoldOz/T

<0.001^.001<0.001<0.001<0.001<0.0010.002^.001<0.001<0.001\UiUUi unec<0.001<0.001

- . -j Ci n ni . . nVt^,o

tF-30

ORIGINAL

Page 9: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 604

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5 TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M .SC., PH. D., c. Chem (Om.i, c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of Analysis30341 Ken K ukkee

90 Minot Avenue THUNDER BAY, ON P7A 6N9

SAMPLE NUMBERS Accurassay Customer

519214519216519224

QV211N3-405-BATH-

QV223N3-405'

Silver ppm

242

Date: April 5

Work Order # : T900170 Project :

Page: l

___19 90

LF-30

ORIGINAL

Page 10: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY UBORATORIES LTD.P.O. BOX 604

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5 TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M .SC., PH. D., c. Chom iom.), c. chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of AnalysisPage: l

Ken Kukkee Date: April 25J W -T U -L

SAMPLEAccurassay

519559519560519561519562519563519564519565519566519567519568519568519569519570519571519572519573C1 Q H I O

90 Minot AvenueTHUNDER BAY, ONP7A 6N9

NUMBERSCustomer

170N3-405-228N3-405-100S1-404-1MLE-405-

QV(W)180N3-405~3MLD-404QV-

RD-1-2MLE-405—

170S1-404-B-1MLB-404--iMLB-404

2MLD-404(QV)—l-MLC-404—2-MLB-404-

190S15W1-404-3-MLB-404-*

—— -UT P- jn^ —

Goldppb

65^<5

**Jff < 5i-rt. \ ffr 7 8

<5131517-14——

HftyCf- 9

<52066

f f

Work Order tt : T900191Project :

GoldOz/T

<0.001^.001<0.001<0.001<0.0010.002^.001<0.001<0.001<0.001<0.001 — Chech<0.001<0.0010.001^.001<0.001

— /n . nm — pkai-v

19 90

tF-30

ORIGINAL

Page 11: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 604

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5 TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M .SC., PH. D., c . Chem (Om.i, c. Chem IU.K.I, M.C.I.C., M.R.S.C., A.R.C.S.T.

30426

Certificate of AnalysisKen Kukkee 90 Minot Avenue THUNDER BAY, ON P7A 6N9

SAMPLE NUMBERS Accurassay Customer

519563519564519569

QV(W)180N3-405- 3MLD-404QV

2MLD-404(QV)-

Silver ppro

l l l

Date: April 36

Page: l

__19 __9J)

Work Order tt : T900191 Project :

LF-30 Per:

ORIGINAL

Page 12: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 604

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5 TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M .SC., Ph. D., c. Chem (Ont.i, c. chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of RnolysisPage: l

Ken Kukkee patn . May 23_______ 19 ___90 go Minot Avenue THUNDER BAY, ONP7A 6N9 Work Order tt : T900218

Project :

SAMPLE NUMBERS Silver Accurassay Customer ppm

519859 1MLD-404QV- 2519881 STR4QV7519882 STR73

,

LF-30

ORIGINAL

Page 13: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 604

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5 TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M .SC., Ph. o., c. chsm (Om.i, c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of AnalysisKen Kukkee Date: June l

sj W U W*

SAMPLEAccurassay

520600520601520602520603520604520605520606520607520608520609520609520610520611520612520613520614520615520616nonfii fi

90 Minot AvenueTHUNDER BAY, ONP7A 6N9

NUMBERSCustomer

67N3-051^284W2-139 )

SWPRD9K (TP1 \ 0*1

275N3-139 C353SI-138 \SWPRD4.5 J100N2-051'3MLJ-404-

210E4-139210D4 130 ———

H700A2MLJ-404—MLJ-404—

H700BHI—

H700CCMTX

Goldppb

^<5<5

"to#8146

<5<5<59

J C

<5^<5<5<5<5^X C

Work Order # : T900294Project :

GoldOz/T

^.001<0.001<0.0010.024

*:o.ooi<0.001<0.001<0.001<0.001^.001— (0.001 — Cheek^.001<0.001<0.001<0.001<0.001xtO.OOl<0.001/A 001 Oh c n k

Page: l

19 90

LF-30

ORIGINAL

Page 14: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 426

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1 TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M .SC., Ph. D., c. Chem (Ont.i, c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of Analysis

Ken Kukkee3881 i0 Minot Avenue

THUNDER BAY, ON P7A 6N9

SAMPLE NUMBERS Accurassay Customer

527941527942527943527944 '27945 j27945

HGO VM-1 VM-2

UPPER VMO SPLO SPLO

Page: l

Date: August 10________ 19

Work Order # : T900639 Project :

Gold Gold ppb Oz/T

163 0.00592 0.00349 0.00171 0.002

549 0.016758 0.022 Check

LF-30Per: V^jfem^A. VajLvsZ^r"^-^

ORIGINAL

Page 15: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 426

, . KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1 ; V TEL: (7tt) 567-3361

President: h GEORGE DUNCAN, M .SC., Ph. o!/; c. ct*m (Om.), c. ctwm (U.K.), M.C.I.'C., M.B.S.C., A.R.C.S.T.

Certificate of AnalysisKen Kukkee

QQQQ7 90 Minot Avenue OoacJ l THUNDER BAY, ON

P7A 6N9

SAMPLE NUMBERS Accurassay Customer

528696528699528700528701528702528703528704528705528706528706

OBBVM-2

SPL-OASPL-OBSPL-OCSPL-ODSPL-OEHVM-1HVM-2HVM-2

Gold ppb

30440897

1344242.74155

118288229020

Date: August 21

Page:' "l

___19_20.

Work Order ft Project

Gold Oz/T

0.009 0.012 0.003 0.004 0.012 0.008 0.005 0.034 0.257 0.262 Check

T900672

LF-30 Per: C

CUSTOMER COPY

Page 16: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.P.O. BOX 604

KIRKLAND LAKE, ONTARIO, CANADA P2N 3J5 TEL.: (705) 567-6343

President: Dr. GEORGE DUNCAN, M .SC., Ph. o ., c . Chem tom.), c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

Certificate of Analysis

30500 Ken Kukkee 90 Minot Avenue THUNDER BAY, ON P7A 6N9

SAMPLE NUMBERS Accurassay

519856519857519858519859519860519861519862519863519864519865519865519866519867519868519869519870519871519872519873519874519874519875519876519877519878519879519880519881519882519883519883

Page: l

Date: May 14 19 90

Work Order # Project

T900218

RSCustomer

2MLF-405-3MLF-405-1MLF-405-

1MLD-404QV- /V2MLG-405- '

231N3405F-231N3405B-

3MLG-405-231N3405D-231N3405C-*^ "5 1 fct O j* A C /^" c 'j JLri j * v 3 w231N3405E-

6MLG-405-7MLG-405-5MLG-405-8MLG-405-4MLG-405-

231N3405G-1MLG405-

231-13, i

RSTlRST2R ST 3,

IP1STR6STR8

STR4QV ,;STR7 /?vBRD4 /:apn/l ————

Goldppb

<57

<5163

6237514

3291321 1 OJL J t

47767

269

16113

141^.... 1.7JQ -..

291711

9170

55

2514s C.

GoldOz/T

<0.001^.001<0.0010.005

<0.0010.0010.002

^.001cTToinr^NOTTKH ————— 0.004 — Check

0.001^.001<0.001<0.0010.001

<0.0010.005

^.0010.004

—— — Or-065 — Ghoolt0.001 A0.001 )

<0.001 (<o.ool \ D 1F0.005 ^ ,

^.001 \ (<0.001 )o.ooi y<0.001 '^0 001 Check

LF-30 Per

ORIGINAL

Page 17: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

^SPECTING DAILY LOG PAGE 1

PROJECT AREA; DATE WORK PERFORMED Km

Moss Township April 2/90 Prospecting 260

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- east claim line of claim number 1142404- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

ATH-01 chip quartz pyrite ^ ppb Au

0ATH grab quartz pyrite O ppb Au, 4 ppm Ag

170S1-404 grab rhyolite pyrite 10 ppb Au

10W2-404 grab rhyolite pyrite *;5 ppb Au

N

QfiTHf— rtru-oi

h M 2,404

Scale 1:4000

Page 18: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

WORK PERFORMED

Prospecting

Km

260

DSPECTING DAILY LOG PAGE

PROJECT AREA; DATE

Moss Township April 3/90

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- south claim line of claim number 1142404- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

114W2-404 grab rhyolite sulphides ^5 ppb Au

95W2-404 grab rhyolite sulphides ^ ppb Au

M

MHZMOM45iV2-Y0y

l*HP-

RoflD

Scale 1:4000 LrtkE

Page 19: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

DAILY LOG PAGE

PROJECT AREA: DATE WORK PERFORMED

Moss Township April 4/90 Prospecting

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- wset claim line of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

Km

260

240E4-405

145N3-405

231N3-405

QV183N3-4Q5

QV223N3-405

quartz

rhyolite

rhyolite

rhyolite

quartz

quartz green pyrite

1

/:w

ppb Au2 ppm Ag

ppb Au

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

QV211N3-405 grab

grab

grab

grab

grab

chip

green pyrite

sulphides

sulphides

sulphides

none

ppb Au

80 ppb Au

O ppb Au

^5 ppb Au 2 ppm Ag

Page 20: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

PAGE

Kjn

260

^ISPECTING DAILY LOG

PROJECT AREA; DATE WORK PERFORMED

Moss Township April 10/90 Prospecting

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- centre of claim number 1142404- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

100S1-404 grab rhyolite minor sulphides O ppb Au

1MLB-404 grab rhyolite minor sulphides 17 ppb Au

2-MLB-404 grab rhyolite minor sulphides 20 ppb Au

3-MLB-404 grab rhyolite minor sulphides B ppb Au

NIOOSI-MO*4

J-rviuB-WOM

Scale 1:4000

Page 21: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

3SPECTING DAILY LOG PAGE

WORK PERFORMED

Prospecting

Km

260

PROJECT AREA; DATE

Moss Township April 11/90

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- north centre of claim number 1142404- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

3MLD-404QV

2MLD-404QV

1-MLC-404

chip .2m

grab

grab

quartz

quartz

rhyolite

sulphides

sulphides

sulphides

781

9 1

5

ppb ppm

ppb ppm

ppb

Au Ag

AuAg

Au

1MLD-404QV grab

N

quartz sulphides

IfVlLC-HOH

CUHM*

Scale 1:4000

163 ppb Au 2 ppm Ag

Page 22: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

3SPECTING DAILY LOG PAGE 6

PROJECT AREA:

Moss Township

DATE

April 12/90

WORK PERFORMED

Prospecting

Km

260

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- claim number 1142404- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

170S1-404B grab rhyolite pyrite 15 ppb Au

190S15W1-404 grab rhyolite pyrite B ppb Au

N

Scale 1:4000LAKE.

Page 23: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

WORK PERFORMED

Prospecting

Km.

260

SPECTING DAILY LOG PAGE

PROJECT AREA; DATE

Moss Township April 17/90

LOCATION OP PROSPECTING- area outlined on previously submitted claim map- west claim line of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

170N3-405

228N3-405

RD-1

grab

grab

grab

rhyolite minor sulphides B ppb Au

rhyolite minor sulphides 5 ppb Au

rhyolite minor sulphides 45 ppb Au

Page 24: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

SPECTING DAILY LOG

PROJECT AREA;

Moss Township

DATE

April 18/30

WORK PERFORMED

Prospecting

PAGE S

Km

Z50

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- centre of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

1MLE-405 grab

QV(W)180N3-405 grab

2MLE-405 grab

rhyolite minor sulphides 5 ppb Au

quartz none 5 ppb Au1 ppm Ag

rhyolite minor sulphides 13 ppb Au

Page 25: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

DAILY LOG PAGE

WORK PERFORMED

Prospecting

Km

260

PROJECT AREA; DATE

Moss Township April 19/90

LOCATION DF PROSPECTING- area outlined on previously submitted claim map- centre of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

1MLF-405

2MLF-405

3MLF-405

grab

grab

grab

rhyolite minor sulphides 5 ppb Au

rhyolite minor sulphides 5 ppb Au

rhyolite minor sulphides 7 ppb Au

Page 26: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

PROSPECTING DAILY LOG PAGE 10

PROJECT AREA; DATE WORK PERFORMED Km

Moss Township April 20/90 Prospecting 260

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- centre of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

1MLG-405 grab rhyolite pyrite 13 ppb Au

2MLG-405 grab rhyolite pyrite B ppb Au

3MLG-405 grab rhyolite pyrite 14 ppb Au

4MLG-405 grab rhyolite pyrite 9 ppb Au

N

Page 27: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

SPECTING DAILY LOG

PROJECT AREA; DATE WORK PERFORMED

Moss Township April 21/90 Prospecting

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- centre of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

PAGE 11

Km

260

SAMPLE No.

5MLG-405

6MLG-405

7MLG-405

8MLG-405

SAMPLE TYPE ROCK

grab

grab

grab

grab

rhyol

rhyol

rhyol

rhyol

TYPE

ite

ite

ite

ite

MINERALIZATION ASSAY RESULTS

pyrite

pyrite

pyrite

pyrite

7

7

6

26

ppb Au

ppb Au

ppb Au

ppb Au

- vos

I'-Hooo

Page 28: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

WORK PERFORMED

Prospecting

INSPECTING DAILY LOG

PROJECT AREA; DATE

Moss Township April 23/90

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- south west quadrant of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

PAGE 12

Km

260

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

141 ppb Au231

231N3-405B

231N3-405C

grab

grab

grab

rhyolite and quartz

massive sulphides

rhyolite massiveand quartz sulphides 75 ppb Au

rhyolite massive sulphides 132 ppb Au

Page 29: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

OSPECTING DAILY LOG

PROJECT AREA; DATE WORK PERFORMED

Moss Township April 24/90 Prospecting

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- south west quadrant of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

PAGE 13

Km

260

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

231N3-405D grab rhyolite massive and quartz sulphides 329 ppb Au

231N3-405E grab rhyolite massive and quartz sulphides 47 ppb Au

231N3-405F grab rhyolite massive sulphides 23 ppb Au

231N3-405G

, ^-3nj/

grab quartz minor sulphides

LrtEJL ftWQ- — —— - —— ————

V^'y^/

(LUfHvt ImxHb^

SCALE f -'^ooo

161 ppb Au

Page 30: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

WORK PERFORMED

Prospecting

PAGE 14

Km

260

tOSPECTING DAILY LOG

PROJECT AREA; DATE

Moss Township April 2B/90

LOCATION OF PROSPECTING- area outlined on previously submitted claim map- south west quadrant of claim number 1142404- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

MLJ-404

2MLJ-404

3MLJ-404

H1

grab

grab

grab

grab

rhyolite minor sulphides -C5 ppb Au

rhyolite minor sulphides 45 p pb Au

rhyolite minor sulphides 9 ppb Au

quartz none 45 ppb Au

h

\\

Cunrt *i'.

Page 31: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

^OSPECTING DAILY LOG

PROJECT AREA: DATE

PAGE 14.1

WORK PERFORMED

Moss Township August 7/90 Prospecting and stripping (shovel)

Km

250

LOCATION OF WORK

- area outlined on previously submitted claim map- western claim boundary of claim number 114E405- detailed sketch attached

Page 32: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

miOSPECTING DAILY LOG PAGE 14.2

PROJECT AREA:

Moss Township

DATE

August 8/90

WORK PERFORMED

Prospecting and stripping (shovel)

Km

260

LOCATION OF WORK

- area outlined on previously submitted claim map- western claim boundary of claim number 1142405- detailed sketch attached

DESCRIPTIONS OF SAMPLES

SAMPLE No. SAMPLE TYPE ROCK TYPE MINERALIZATION ASSAY RESULTS

HG

VM-1

VM-2

UPPERVM

SPL

X '

chip C. 25m) rhyolite and sulphides sericite schist

chip (1m)

chip (1m)

grab

grab

rhyolite and sulphides sericite schist

rhyolite

rhyolite

sulphides

arsenopyrite

rhyolite and arsenopyrite sericite schist

163 ppb Au

92 ppb Au

49 ppb Au

71 ppb Au

758 ppb Au

A

N

Page 33: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

ACCURASSAY LABORATORIES LTD.' ' CHARTERED CHEMISTS, ASSAYERS. ANALYTICAL CONSULTANTS

Box S**; 3 Industrial Di., Kirkland Lake . Ontario, Canada P2N fcfS

301 l 790827

TOTEL : (70S) 667-W4S - FAX: (706) 668-8368

Ken Kukkee 90 Mlnot Avenue THUNDER BAY, ONTARIO P7A 6N9

""April27, 1990

CUSTOMER ORDER N*

WORK ORDER N*T900191

DATE SUBMITTED

net 30 days, 2.OX per month on overdue accounts.

KWNT'TV'

15153

Gold Assays W.O. IT900191Sample Prep. cert.l 30421Silver Analyses cert.l 30426

Please note: Accounts more than 45 days past dwill lose any price discounts

•g

•^mct*^

7.503.952.00

ie

•"•""AMbl

112596

,( 177

NT '

50 A25 "r-00*

} \75

•ACCURASSAY LABORATORIES LTD.'CHARTERED CHEMISTS. ASSAYERS. ANALYTICAL CONSULTANTS

Box (g*, 3 Industrial Dr., Kirkland Lake 420* Ontario, Canada P2N 3J5 l 790867

TO . TEL.: (706) 567-1343 - FAX: (70S) 668-8368

Ken Kukkee 90 Minot Avenue THUNDER BAY, ONTARIO P7A 6N9

MT! May 24, 1990

CUSTOMER ORDER w* -

T900218DATI SUBMITTED

net 30 days, 2.0* per month on overdue accounts.

39393

25251

352

373

Gold AssaysSample Prep.Silver AnalysesGold AssaysSample Prep.Silver Analysis Gold AssaysGold, Platinum, Pa Had i urnSample Prep.Silver Analyses

mount due before June

W.O.certcertS.O.certcert W.O.

Assayscertcert

77 loon

y,.!.M|W!f,.MSVIT900218

.t 30500-01

.1 30554IT900223

.1 30514

.1 30566 IT900240

.1 30515-16

.1 30567

Please note: Accounts more than 45 days past dwill lose any price

(

discounts

7.503.952.007.503.952.00 7.50

13.003.952.00

ae

^T*AMOUNt"^|

292154

6187982

26226

1466

1181

50^05^-00. V-75""*OO-i" 50-fc.oo-k00^

45

Page 34: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

^

ACCURASSAY LABORATORIES LTD.CHARTERED CHEMISTS. ASSAYERS. ANALYTICAL CONSULTANTS

Box 426, 3 Industrial Dr., Kirkland Lake Ontario, Canada P2N 3J1

TO .TEL.: (705) 667-3361 - FAX: (706) 667-6368

Ken Kukkee 90 Minot Avenue THUNDER BAY, ONTARIO P7A 6N9

tm August 23, 1990

net 30 days, 2.0* per month on (overdue accounts

IT900512 l 38594 IT900596A l 38610 i IT900639 '

Ooid Assays Sample Prep Gold Assays Sample Prep Ooid Assays Sample Prep Ooid Assays Sample Prep

cert.l 38611 H.O. IT900672 cert.l 38997

Cyanide Leach Assays

Amount due before September 22

Please note: Accounts nore than 45 days past (vlll lose any price discounts

Page 35: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

LABORATORIES LTD.ITERED CHEMISTS, ASSAYERS, ANALYTICAL CONSULTANTS

ft , f 4 Box 426, 3 Industrial Dr., Kirkland Lake

•to.

1 Ontario, Canada P2N 3J1

"K."

TEL.: (705) 567-3361 - FAX: (705) 567-836*8

Ken kukkee 90 Minot Avenue THUNDER BAY, ONTARIO P7A 6N9

tt 790909

DATE Juhe 8, 1990 , v ,,; ,;v ^ ;CUSTOMER ORDER l

WORK ORDER N"

DATE SUBMITTED

't.' -. : . '.''.'

TERMS net 30 days, 2^ per month on 'overdue accounts.

1717

7

Ooid Assays Sample Prep. Silver Analyses

Wi-0';. MT900294 cert.# 30653 cert.#30677

50/&V:

j? - - ' ' ~ . . ' .". f ' ' \ -i. --'. -Amount 'due before July 8;- 1990^*^ *;.-.;....

Please note t Accounts more than r45 days past will lose any price discounts' '

••'.-...'. - v;* 1 -.".-.- -••^^M^

IF-1297

Page 36: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

Ministry ofNorthern Developmentand Mines

Ontario

Report of Work 'ig Act (Expenditures, Subsection 77(19))

52BieSEei91 2.13488 MOSS

anu uanos orancn.

900

Type of Work Performed

/?rssyJMining Division Township or Area

Vork Performed By

-Tte/WName and Address of Author (of Submission) Date When Work WM Performed

From: .To:•*. oy to \ /f 00 ftDay 1 M6. 1 '7r. | Day | Mo. | 'Vr.

\\\ the work was performed on Mining Claim(s): ridicate no. of days performed on each claim. 'See Note No. 1 on reverse side

Mining Claim No. of Days Mining Claim .No. oTDays

.jfe.Mining Claim No. of Days Mining Claim No. of Days

fining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Ctalm .No. of Days: Mining Claim No. of Days

lining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. Of Days Mining Claim No. o(0*yi Mining Claim No. of Days

InstructionsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column

Calculation of Expenditure Days Credits Total Expenditures

S

Total Days Credits

Total Number of Mining Claims Covered by this Report of Work

ming Claims (List in numerical sequence). If space is insufficient, attach schedules with required InformationMining Claim

Prefix

V,rf.

Number

//^Z fe y .

f'/ 2, *y#S~

Expend. Days Cr.

"^ f t ^^v ?

39.2.S

Mining ClaimPrefix

^

(

otal Number of Days Performed

f** r

NumberExpend. Days Cr.

e* AMining Claim

Prefix

V4242

Number

#6 fr/fS*

Total Number of Days Claimed

T&.-sr

Expend. Days Cr.

j*-V*/

Mining ClaimPrefix

* ^^

Number

(•^ ^fatyjfr--

.. ;*

W

Expend. Days Cr.

JS

Total Number of Days to be Claimed at a Future Date

0

edification of Beneficial Interest 'See Note No. 2 on reverse sidel hereby certify thai, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder.

Dale Record*!

edification Verifying Report of Workhereby certify that l have a personal and Intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same

iuring and/or after its completion and the annexed report is true.Jame and Address of Person Certifying

or Office Use Only

Page 37: RPT ON RX SAMPLING & ASS PROG · Ahern (1988) partly describes the geology oF the project area as being composed of a unit of undifferentiated metavolcanics and ... DONE The proposed

3 Q

'SO M

G 23

TIL

L Y

*-L

AK

E .

G-5

62

ir

G'oTo

'o

f^rn

fii

-y i

'F

C?. .^

.j,..—

v?.

t-

BU

RC

HE

LL L

AK

E

G..7

06

MARC 9S2

Q *5)

•"to

,' W

.

0 w 01 -t

tt 3

:O

. P

tfl

ae

Oae

S 38

C z oID m

2 ST

•" "

^ a

D rn

s DO

n •K

l V,

';W

3 x

5

ac c o m 37 ea >

M a

M -4

O

D , 2

METRES"

x

Ml

:*1

LA

IG

T

CT. VEST

ED IN

O"

NDS

A, W.S.O. 1 li ^f,

C

.-S

SOdSiO

O o

o as •Z

o

HAVEP.SE

ORIGINAL SHOR

MARS

H OR

MUS

IN

G

F

S'j SlO

RA

UT

WO

L OD

daI

N

O G OR

FLOODI?.

OR

CQMPO

tWAV

LITY

P ER

AND

R

LINES

CNNIAL

STREAM

s; n

ft "

O'r

i- J*

o7x3

Iff

cO

r-

^

f)

CD ^

r; O

w2

C;*

2

in

Pm

J*

-t

3Dn -

c

••l -j

t l

JO

H

C.

t-

S

Hr-

-4

n

>

7-O

Q c

*

r;--4

g

m

JT

j?.^

Ir

K w

-,

^. vi

m

,\S: i

o

PZ1

^

r- 5 m

wI

S

C LA r y* m -4 r;

W-'i

5V

) D

atfi m

.r

*

31 m r*T

r: