Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
WT
G
W
W
W
W
20.9
21.0
14.914.8
12.3
17.3
15.0
11.6
13.6
10.0
10.6
15.9
10.9
10.3
L
LH
E
E
EE
E
E
E
12.117.7
17.0
14.6
19.620.7
13.0
14.9
13.3
13.117.5
13.314.6
25.3
16.7 12.8
12.1
17.4
16.314.1
12.6
15.2
11.411.4
20.514.210.8
13.9
13.412.3
13.8
9.8
13.19.7
11.1
12.1
9.2
15.511.2
19.5
17.1
10.0
9.29.6 18.5
11.1
H
E
L
L
E
L
E
E
E
L
L
E
H
E
E E
E
L
L
E
E
E
E
CUL
52.2
54.7
51.3
56.6
59.2
61.1
86.1
63.1
64.8
85.1
97.1
98.4
69.5
79.9
91.2
88.8
89.2
87.8
95.3
E
E
E
E
q…Temple
CUL
CUL
CUL
CUL
CUL
CUL
G
G
W
10.7
7.3
54.5
35.9
7.6
40.759.6
68.9
8.0
9.6
7.469.5
67.3 9.866.8
68.2
67.4
72.7
8.0
7.6
62.685.6
46.480.9
79.8
7.5
79.9
8.9
10.2
54.9 8.9
50.3
56.7
11.4
9.3
46.6
12.8
15.8
12.7
10.2
36.9
13.5
12.8
19.8
13.417.2
12.912.4
13.113.7 22.1
16.511.1
22.5
28.4
17.919.3
18.8
21.916.1
16.8
12.6
14.2
19.8 15.7
16.814.2
11.512.120.5
14.913.0
12.5
12.9
16.520.314.616.4
18.8
13.5
12.0
13.7
12.7
13.3
13.113.1
13.720.3
13.7
13.5
12.820.4
14.8
17.316.8 12.2
17.115.8 13.6
20.2
E
E
E
E
E
H E
E
E
E
L
E
H L
ET
L
E
EE
H
E
L
E
E
ETE
E
E
EH
L E
E
EL
E
E
E
H
EE
EEL
E
L E
H
EE
E
61
11572
129
72
61
11572
129
72
N
ˆ„·ò
LO WU
MAN KAM TO
⁄åÀA·ç
‹I⁄u°ˇ‹É››
LOCATION PLAN
ƒì‚m„ˇ
⁄æ¤Ò SCALE
LIMIT OF
WORKS AREA
A1 1:20000
LEGEND:
ORIGINAL:
NOTE:
SCALE DOWN 80%
1. °£ƒb¤ä¥L⁄Ł›–«ü'w¥~¡A¥þ‡¡¥HƒÌ‹°¶q«×‡æƒì¡C
ALL DIMENSIONS ARE IN METRES UNLESS
OTHERWISE STATED.
3. ƒpƒ‡»Ý›n¡A‹I⁄u°ˇ‹É››⁄”†{ƒ‡ƒæ¤fi„D⁄˛ƒæ⁄H‚ô
'˛•|⁄À¶¥‹q…¨fiÉ«˚‡‹¡C
2. 'Òƒ‡⁄ô¥›§¡‹°‹ø…˘,¥HƒÌ‹°‡æƒì,¤ˆƒb›»·ä⁄ô¥›
°ò•˙¥H⁄W(+)'˛¥H⁄U(-)¡C
ALL LEVELS ARE APPROXIMATE VALUES AND IN
METRES ABOVE (+) OR BELOW (-) HONG KONG
PRINCIPAL DATUM.
µø
„ˇ¤Ò:
LIMIT OF WORKS AREA
‹I⁄u°ˇ‹É››
†{ƒ‡ƒæ¤fi„D–N…¨fiÉ«˚‡‹⁄˛›««Ø
†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹⁄˛§ï«Ø
‹°ƒæ⁄H‚ô
†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹⁄˛'
›ìƒ‡‡¡¥÷:
†{ƒ‡ƒæ⁄H‚ô–N¥ˆ⁄[«˚‡‹⁄˛§ï«Ø
‹°ƒæ¤fi„D
†{ƒ‡ƒæ⁄H‚ô–N…¨fiÉ«˚‡‹⁄˛›««Ø
ÀÀ«Øƒæ¤fi„D
PROPOSED CARRIAGEWAY
PROPOSED FOOTPATH
ÀÀ«Øƒæ⁄H‚ô
ÀÀ«Ø–×'Y⁄uµ{
PROPOSED SLOPE WORK
ÀÀ«Ø⁄⁄¥¡⁄À„j–a/ƒw¥þfiq
PROPOSED CENTRAL MEDIAN/
TRAFFIC ISLAND
ÀÀ«Øƒæ¤fi⁄Ѿô
PROPOSED FLYOVER
ÀÀ«Øƒæ¤fi⁄Ѿô⁄W“”ƒæ⁄H‚ô
PROPOSED FOOTPATH ON FLYOVER
ÀÀ«Ø“‰¥ßƒ¡„j›µ«Ì»Ù (°“‹ø2.5ƒÌ)
PROPOSED VERTICAL
NOISE BARRIER
(APPROXIMATELY 2.5 METRES HIGH)
PROPOSED VERTICAL
NOISE BARRIER
(APPROXIMATELY 3 METRES HIGH)
ÀÀ«Ø“‰¥ßƒ¡„j›µ«Ì»Ù (°“‹ø3ƒÌ)
EXISTING CARRIAGEWAY TO BE
TEMPORARILY CLOSED AND
RECONSTRUCTED
EXISTING FOOTPATH TO BE
TEMPORARILY CLOSED AND
RECONSTRUCTED
SECTIONS OF THE EXISTING CARRIAGEWAYS AND
FOOTPATHS WITHIN THE LIMIT OF WORKS AREA
MAY BE TEMPORARILY CLOSED IN PHASES AS
AND WHEN REQUIRED.
EXISTING CARRIAGEWAY TO BE
PERMANENTLY CLOSED AND
CONVERTED INTO FOOTPATH
EXISTING CARRIAGEWAY TO BE
PERMANENTLY CLOSED AND
DEMOLISHED
EXISTING FOOTPATH TO BE
PERMANENTLY CLOSED AND
CONVERTED INTO CARRIAGEWAY
AMENDMENT:
›×›q‡¡¥÷:
ADDITION:
›ìƒ‡‹I⁄u°ˇ‹É››–N¤œfił
ORIGINALLY PROPOSED LIMIT OF
WORKS AREA TO BE DELETED
›ìƒ‡…¨fiÉ«˚‡‹⁄˛›««Øƒæ¤fi„D“”«Ø
˜‡–N¤œfił,§ï‹°†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[
«˚‡‹⁄˛§ï«Ø‹°ƒæ⁄H‚ô
›ìƒ‡¥ˆ⁄[«˚‡‹⁄˛§ï«Øƒæ¤fi„D‹°
ƒæ⁄H‚ô“”«Ø˜‡–N¤œfił,§ï‹°†{ƒ‡
ƒæ¤fi„D–N…¨fiÉ«˚‡‹⁄˛›««Ø
›ìƒ‡¥ˆ⁄[«˚‡‹⁄˛'ƒæ¤fi„D“”«Ø˜‡
–N¤œfił,§ï‹°†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹
⁄˛§ï«Ø‹°ƒæ⁄H‚ô
›ìƒ‡¥ˆ⁄[«˚‡‹⁄˛'ƒæ¤fi„D“”«Ø˜‡
–N¤œfił,§ï‹°†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹
⁄˛§ï«Ø‹°–×'Y⁄uµ{
›ìƒ‡…¨fiÉ«˚‡‹⁄˛›««Øƒæ¤fi„D“”«Ø˜‡
–N¤œfił,§ï‹°†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹
⁄˛§ï«Ø‹°⁄⁄¥¡⁄À„j–a/ƒw¥þfiq
›ìƒ‡ÀÀ«Øƒæ¤fi„D“”«Ø˜‡–N¤œfił
ORIGINALLY PROPOSED CARRIAGEWAY
TO BE DELETED
›ìƒ‡ÀÀ«Øƒæ⁄H‚ô“”«Ø˜‡–N¤œfił
ORIGINALLY PROPOSED FOOTPATH
TO BE DELETED
›ìƒ‡ÀÀ«Ø–×'Y⁄uµ{“”«Ø˜‡–N¤œfił
ORIGINALLY PROPOSED SLOPE WORK
TO BE DELETED
�Xœ^Ł
REVISION OF THE ORIGINALLY
PROPOSED LIMIT OF WORKS AREA
›×›q‹I⁄u°ˇ‹É››
PROPOSED CARRIAGEWAY
ÀÀ«Ø⁄§ƒæ¤fi„D
ÀÀ«Ø⁄§ƒæ⁄H‚ô
PROPOSED FOOTPATH
PROPOSED SLOPE WORK
ÀÀ«Ø⁄§–×'Y⁄uµ{
ORIGINALLY PROPOSED TEMPORARY
CLOSURE AND RECONSTRUCTION OF
EXISTING CARRIAGEWAY TO BE DELETED,
AND REPLACED BY EXISTING CARRIAGEWAY
TO BE PERMANENTLY CLOSED AND
CONVERTED INTO FOOTPATH
ORIGINALLY PROPOSED PERMANENT
CLOSURE AND DEMOLITION OF EXISTING
CARRIAGEWAY TO BE DELETED, AND
REPLACED BY EXISTING CARRIAGEWAY
TO BE PERMANENTLY CLOSED AND
CONVERTED INTO FOOTPATH
ORIGINALLY PROPOSED PERMANENT
CLOSURE AND DEMOLITION OF EXISTING
CARRIAGEWAY TO BE DELETED, AND
REPLACED BY EXISTING CARRIAGEWAY
TO BE PERMANENTLY CLOSED AND
CONVERTED INTO SLOPE WORK
›ìƒ‡ÀÀ«Ø–×'Y⁄uµ{“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Øƒæ⁄H‚ô
ORIGINALLY PROPOSED SLOPE WORK
TO BE DELETED, AND REPLACED BY
PROPOSED FOOTPATH
›ìƒ‡ÀÀ«Øƒæ⁄H‚ô“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Øƒæ¤fi„D
ORIGINALLY PROPOSED FOOTPATH
TO BE DELETED AND REPLACED BY
PROPOSED CARRIAGEWAY
›ìƒ‡ÀÀ«Ø–×'Y⁄uµ{“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Øƒæ¤fi„D
ORIGINALLY PROPOSED SLOPE WORK
TO BE DELETED, AND REPLACED BY
PROPOSED CARRIAGEWAY
›ìƒ‡ÀÀ«Øƒæ¤fi„D“”«Ø˜‡–N¤œfił,
§ï‹°⁄⁄¥¡⁄À„j–a/ƒw¥þfiq
ORIGINALLY PROPOSED CARRIAGEWAY
TO BE DELETED, AND REPLACED BY
PROPOSED CENTRAL MEDIAN/
TRAFFIC ISLAND
›ìƒ‡ÀÀ«Øƒæ⁄H‚ô“”«Ø˜‡–N¤œfił,
§ï‹°⁄⁄¥¡⁄À„j–a/ƒw¥þfiq
ORIGINALLY PROPOSED FOOTPATH
TO BE DELETED, AND REPLACED BY
PROPOSED CENTRAL MEDIAN/
TRAFFIC ISLAND
›ìƒ‡ÀÀ«Øƒæ¤fi„D“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Ø–×'Y⁄uµ{
ORIGINALLY PROPOSED CARRIAGEWAY
TO BE DELETED AND REPLACED BY
PROPOSED SLOPE WORK
›ìƒ‡ÀÀ«Øƒæ⁄H‚ô“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Ø–×'Y⁄uµ{
ORIGINALLY PROPOSED FOOTPATH
TO BE DELETED AND REPLACED BY
PROPOSED SLOPE WORK
›ìƒ‡ÀÀ«Øƒæ¤fi„D“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Øƒæ⁄H‚ô
ORIGINALLY PROPOSED CARRIAGEWAY
TO BE DELETED AND REPLACED BY
PROPOSED FOOTPATH
›ìƒ‡ÀÀ«Ø–×'Y⁄uµ{“”«Ø˜‡–N¤œfił,
§ï‹°ÀÀ«Ø⁄⁄¥¡⁄À„j–a/ƒw¥þfiq
ORIGINALLY PROPOSED SLOPE WORK
TO BE DELETED, AND REPLACED BY
PROPOSED CENTRAL MEDIAN/TRAFFIC
ISLAND
›ìƒ‡¥ˆ⁄[«˚‡‹⁄˛'ƒæ¤fi„D“”«Ø˜‡
–N¤œfił,§ï‹°†{ƒ‡ƒæ¤fi„D–N…¨fiÉ«˚‡‹
⁄˛›««Ø
ORIGINALLY PROPOSED PERMANENT
CLOSURE AND DEMOLITION OF EXISTING
CARRIAGEWAY TO BE DELETED, AND REPLACED
BY EXISTING CARRIAGEWAY TO BE
TEMPORARILY CLOSED AND RECONSTRUCTED
ORIGINALLY PROPOSED PERMANENT
CLOSURE AND RECONSTRUCTION OF EXISTING
CARRIAGEWAY TO BE DELETED, AND REPLACED
BY EXISTING CARRIAGEWAY TO BE
PERMANENTLY CLOSED AND CONVERTED
INTO CENTRAL MEDIAN/TRAFFIC ISLAND
ORIGINALLY PROPOSED PERMANENT
CLOSURE AND CONVERSION OF EXISTING
CARRIAGEWAY INTO FOOTPATH TO BE
DELETED, AND REPLACED BY PERMANENT
CLOSURE OF EXISTING CARRIAGEWAY AND
CONVERTED INTO CENTRAL MEDIAN /
TRAFFIC ISLAND
›ìƒ‡¥ˆ⁄[«˚‡‹⁄˛§ï«Øƒæ¤fi„D‹°ƒæ⁄H
‚ô“”«Ø˜‡–N¤œfił, §ï‹°†{ƒ‡ƒæ¤fi„D
–N¥ˆ⁄[«˚‡‹⁄˛§ï«Ø‹°⁄⁄¥¡⁄À„j–a/
ƒw¥þfiq
ORIGINALLY PROPOSED PERMANENT
CLOSURE AND CONVERSION OF
EXISTING CARRIAGEWAY INTO FOOTPATH
TO BE DELETED, AND REPLACED BY
EXISTING CARRIAGEWAY TO BE
TEMPORARILY CLOSED AND RECONSTRUCTED
PLAN NO. æ⁄ SCALE
ˇ„h« PLAN TITLE
u⁄{µ PROJECT TITLE
CIVIL ENGINEERING ANDDEVELOPMENT DEPARTMENT
g⁄ �ì⁄ �u⁄ �{
ˇ„h«
⁄g⁄ì⁄uµ{‡B ⁄gƒa⁄uµ{‡¡
LAND WORKS DIVISION
CIVIL ENGINEERING OFFICE
OFFICE¿º¤˘‡B
fiÚ¾Ú¡m„D‚ô(⁄uµ{¡B¤ˇ¥˛⁄˛‚ÉÀv)–ł¤Ò¡n(†˜370‡„)
ƒÓƒb¾¸‡ł⁄‰¥‹⁄§›×›q„ˇ«h
AMENDMENT PLAN FOR GAZETTING UNDER
ROADS(WORKS, USE AND COMPENSATION)
ORDINANCE (CHAPTER 370)
⁄u°¨›p„”¶µ¥Ø†˜5758CL‚„
�l”]‡X4X��œ^¤�pp��
“”⁄gƒa¥›¾ª⁄˛‹Ûˆö°ò«Ø⁄uµ{
- ´X`ï¤FÀ›„D⁄˛¿‡«Ø„D‚ôB ⁄˛ C
(«e”Ù⁄u°¨›p„”¶µ¥Ø†˜5758CL‚„
�l”]‡X4X��œ^¤�pp��
“”⁄gƒa¥›¾ª⁄˛‹Ûˆö°ò«Ø⁄uµ{
ôd˚��l”]S�˚S��œ^S�
PWP ITEM NO. 5758CL
SITE FORMATION AND ASSOCIATED
INFRASTRUCTURAL WORKS FOR DEVELOPMENT
OF COLUMBARIUM, CREMATORIUM AND RELATED
FACILITIES AT SANDY RIDGE CEMETERY
- WIDENING OF SHA LING ROAD AND
CONSTRUCTION OF ROADS B AND C
(FORMERLY KNOWN AS PWP ITEM NO. 5758CL
SITE FORMATION AND ASSOCIATED
INFRASTRUCTURAL WORKS FOR DEVELOPMENT
OF COLUMBARIUM, CREMATORIUM AND RELATED
FACILITIES AT SANDY RIDGE CEMETERY
WIDENING OF SHA LING ROAD AND
CONSTRUCTION OF ROADS A, B AND C)
51.3
59.2
N
1:1000 @ A1231448/GAZ-A/103
PROPOSED PICK-UP/
DROP-OFF POINT
ÀÀ«Ø⁄W‚¤«¨´I
‡s–µ‰uB-B‡s–µ„ˇ«h‰s‚„
231448/GAZ-A/101
‡s–µ‰uC-C‡s–µ„ˇ«h‰s‚„
231448/GAZ-A/004
DETAIL D
‚Ô„ˇD
DETAIL E
‚Ô„ˇE
‚Ô„ˇD
SCALE 1:200
DETAIL D
‚Ô„ˇE
SCALE 1:200
DETAIL E