  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    1/13

    STEPS FOR COMMISSIONING OF DRIVE ,

    PUMPS AND FANSSIGNING OF SRCC(SAFETY RULES CLEARANCE

    CERTIFICATE) BY ERECTION DEPT.

    CHECKING OF EQUIPMENT AS PER CHECK LIST.

    CLEARANCE FOR RUNNING OF EQUIPMENT S BY

    CONCERN GROUPS.

    PROTECTION CHECKING OF MOTOR

    CHECKING OF DIRECTION OF ROTATION

    TRIAL RUN OF MOTOR FOR 8HRSGREASING OF MOTOR BEARINGS

    LOGGING OF CURRENT ,BRG TEMP ,VIBRATION

    AND ABNORMILITY IF ANY.

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    2/13

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    3/13

    STEPS FOR COMMISSIONING OF FANS

    CHEMICAL CLEANING OF LUBE OIL SYSTEM

    OIL FLUSHING OF LUBE OI L SYSTEM(BYPASSING BRG

    AND THRG BRG)

    CHECKING OF FAN PROTECTION COMMISSIONIG OF LUBE OIL SYSTEM AND

    INSTRUMETATION

    TRIAL RUN OF FAN FOR 8 HRS LOGGING OF BRG TEMP,VIBRATION, RUNNING

    CURRENT

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    4/13

    CHEMICAL USEDSL NO ACID

    Blr water

    Concentr

    ation in

    %

    Quantity

    required

    Used for

    ProcessSL NO ACID

    Blr water

    Concentr

    ation in

    %

    Hydrochl

    oric acid

    (HCL)

    5 % + 1 % 70 tons

    Acid

    pickling

    & soaking

    Hydrochl

    oric acid

    (HCL)

    5 % + 1 %

    Rodine 0.20 % 800 lts Rodine 0.20 %

    Ammoniu

    m

    Bifloride

    0.25 % 1000 kg

    Ammoniu

    m

    Bifloride

    0.25 %

    Ammonia

    ted Citric

    Acid

    0.2 % 800 kg

    Ammonia

    ted citric

    acid rinse

    Ammonia

    ted Citric

    Acid

    0.2 %

    Di/Trisod

    ium

    phosphat

    e

    0.1 % &

    0.2 % in

    the boiler

    800 &

    1500 kgs

    Neutraliz

    ation

    process

    Di/Trisod

    ium

    phosphat

    e

    0.1 % &

    0.2 % in

    the boiler

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    5/13

    PROTOCOLPROTOCOL

    SL.

    No.

    Protection Alar

    m

    Tripping Delay/status

    1. 1 Post purge trip checked

    1. 2 Both ID off checked

    1. 3 Both FD ON

    and ID B off

    checked

    1. 4 and O/L gateclosed.

    checked

    1. 5 Motor bearing

    Temp.

    80 > 90 C 2 sec.

    1. 6 Fan bearing

    Temp.

    65 > 75 C 2 sec

    1. 7 Winding Temp. 100 > 110 C 2 sec.

    1. 8 Motor brg.

    vibration

    5

    >7.1mm/sec

    10 sec.

    1. 9 Fan brg

    vibration

    12 >19.8mm/se

    c

    -

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    6/13

    SLNo

    TIME

    LUB-OILSYSTEM

    BEARINGTEMPERATURE

    VIBRATION

    PU

    MPDischargePressure

    FilterDP

    Lub-OilPressure

    Controloilpressure

    Oil Tempcooler

    Tank

    OilLevwael

    Motor Fan

    Bef Aft DENDE

    DE

    NDE

    (3)

    MOTOR FAN

    Th(1)

    Jr(2)

    DE NDE

    H V aH V A H V A

    1

    2

    3

    4

    5

    6

    7

    8

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    7/13

    STEPS FOR COMMISSIONING OF BCW

    PUMPS CHECKING OF EQUIPMENT AS PER CHECK LIST TO

    ENSURE HEALHTINESS OF ERECTION.

    SIGNING OF SRCC(SAFETY RULES CLEARANCE

    CERTIFICATE) BY ERECTION DEPT. CLEARANCE FOR RUNNING OF EQUIPMENT BY

    CONCERN GROUPS.

    FLUSHING OF FILL AND PURGE LINE.

    FLUSHING OF AUXILLARY COOLING CIRCUIT.

    CONTINOUS PURGING TILL CONDUCTIVITY

    COMES TO DESIRED VALUE.

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    8/13

    MEGGERING OF MOTOR.

    PROTECTION CHECKING OF MOTOR.(CAVITY

    TEMP,WINDINGS TEMP AND COLLING WATER FLOW)

    LOW PRESSURE COOLING WATER SHOULD BE

    CHARGED.

    DISCHARGE VALVE SHOULD BE OPEN.

    ENSURE THAT MOTOR HAS BEEN VENTED.

    THREE FLICK START FOR 5SEC WITH 10 MINUTES

    INTERVAL FINAL START RUN FOR 20 MINUTES.

    CHECK FOR DISCGARGEPR. AND DP.

    CHECKING OF VIBRATION,CAVITY TEMP.

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    9/13

    BCW PUMP

    BCW PUMP IS SINGLE STAGE, GLANDLESS

    ,SINGLE SUCTION DOUBLE DISCHARGE,

    CENTRIFUGAL PUMP.

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    10/13

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    11/13

    TECHNICAL DATA SHEET

    Type:Single Suction - Double Discharge

    Design Pressure:213.5 kg/cm2

    Design Temperature:370C Hydrostatic Test Pressure:320 kg/cm2

    Suction Pressure:198 kg/cm2

    Quantity Pumped:3021 m3/hr

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    12/13

    . BCW P/P START PERMISSIVES

    Pump protection criteria not present AND

    LP cooling water flow > 1.26 lps AND

    Pump casing to suction manifold DT < 38 degc AND

    Motor Cavity temp >2 degc & < 63 degc AND

    Discharge Valve Stem-1 open AND

    Discharge Valve Stem-2 open AND

    Switchgear available AND

    Boiler drum vent valves closed AND

    Switchgear not disturbed AND

    CW supply to BCW pumps normal

    CW SUPPLY TO BCW PUMPS

    BCW EMG CW tank level not low

  • 7/31/2019 Steps for Commissioning of Drive , Pumps And

    13/13

    ) TRIP PROTECTION

    1) Motor Cavity temp very high ( > 66 degc)

    2) Discharge Valve Stem-1 not open

    3) Discharge Valve Stem-2 not open

    4) Electrical Protection acted

    BCW CW BOOSTER PUMP

    AUTO START

    1) Other running booster pump tripped 2) Other booster pump ON AND discharge press < 3ksc

    3) Overhead tank level low