7/31/2019 Steps for Commissioning of Drive , Pumps And
1/13
STEPS FOR COMMISSIONING OF DRIVE ,
PUMPS AND FANSSIGNING OF SRCC(SAFETY RULES CLEARANCE
CERTIFICATE) BY ERECTION DEPT.
CHECKING OF EQUIPMENT AS PER CHECK LIST.
CLEARANCE FOR RUNNING OF EQUIPMENT S BY
CONCERN GROUPS.
PROTECTION CHECKING OF MOTOR
CHECKING OF DIRECTION OF ROTATION
TRIAL RUN OF MOTOR FOR 8HRSGREASING OF MOTOR BEARINGS
LOGGING OF CURRENT ,BRG TEMP ,VIBRATION
AND ABNORMILITY IF ANY.
7/31/2019 Steps for Commissioning of Drive , Pumps And
2/13
7/31/2019 Steps for Commissioning of Drive , Pumps And
3/13
STEPS FOR COMMISSIONING OF FANS
CHEMICAL CLEANING OF LUBE OIL SYSTEM
OIL FLUSHING OF LUBE OI L SYSTEM(BYPASSING BRG
AND THRG BRG)
CHECKING OF FAN PROTECTION COMMISSIONIG OF LUBE OIL SYSTEM AND
INSTRUMETATION
TRIAL RUN OF FAN FOR 8 HRS LOGGING OF BRG TEMP,VIBRATION, RUNNING
CURRENT
7/31/2019 Steps for Commissioning of Drive , Pumps And
4/13
CHEMICAL USEDSL NO ACID
Blr water
Concentr
ation in
%
Quantity
required
Used for
ProcessSL NO ACID
Blr water
Concentr
ation in
%
Hydrochl
oric acid
(HCL)
5 % + 1 % 70 tons
Acid
pickling
& soaking
Hydrochl
oric acid
(HCL)
5 % + 1 %
Rodine 0.20 % 800 lts Rodine 0.20 %
Ammoniu
m
Bifloride
0.25 % 1000 kg
Ammoniu
m
Bifloride
0.25 %
Ammonia
ted Citric
Acid
0.2 % 800 kg
Ammonia
ted citric
acid rinse
Ammonia
ted Citric
Acid
0.2 %
Di/Trisod
ium
phosphat
e
0.1 % &
0.2 % in
the boiler
800 &
1500 kgs
Neutraliz
ation
process
Di/Trisod
ium
phosphat
e
0.1 % &
0.2 % in
the boiler
7/31/2019 Steps for Commissioning of Drive , Pumps And
5/13
PROTOCOLPROTOCOL
SL.
No.
Protection Alar
m
Tripping Delay/status
1. 1 Post purge trip checked
1. 2 Both ID off checked
1. 3 Both FD ON
and ID B off
checked
1. 4 and O/L gateclosed.
checked
1. 5 Motor bearing
Temp.
80 > 90 C 2 sec.
1. 6 Fan bearing
Temp.
65 > 75 C 2 sec
1. 7 Winding Temp. 100 > 110 C 2 sec.
1. 8 Motor brg.
vibration
5
>7.1mm/sec
10 sec.
1. 9 Fan brg
vibration
12 >19.8mm/se
c
-
7/31/2019 Steps for Commissioning of Drive , Pumps And
6/13
SLNo
TIME
LUB-OILSYSTEM
BEARINGTEMPERATURE
VIBRATION
PU
MPDischargePressure
FilterDP
Lub-OilPressure
Controloilpressure
Oil Tempcooler
Tank
OilLevwael
Motor Fan
Bef Aft DENDE
DE
NDE
(3)
MOTOR FAN
Th(1)
Jr(2)
DE NDE
H V aH V A H V A
1
2
3
4
5
6
7
8
7/31/2019 Steps for Commissioning of Drive , Pumps And
7/13
STEPS FOR COMMISSIONING OF BCW
PUMPS CHECKING OF EQUIPMENT AS PER CHECK LIST TO
ENSURE HEALHTINESS OF ERECTION.
SIGNING OF SRCC(SAFETY RULES CLEARANCE
CERTIFICATE) BY ERECTION DEPT. CLEARANCE FOR RUNNING OF EQUIPMENT BY
CONCERN GROUPS.
FLUSHING OF FILL AND PURGE LINE.
FLUSHING OF AUXILLARY COOLING CIRCUIT.
CONTINOUS PURGING TILL CONDUCTIVITY
COMES TO DESIRED VALUE.
7/31/2019 Steps for Commissioning of Drive , Pumps And
8/13
MEGGERING OF MOTOR.
PROTECTION CHECKING OF MOTOR.(CAVITY
TEMP,WINDINGS TEMP AND COLLING WATER FLOW)
LOW PRESSURE COOLING WATER SHOULD BE
CHARGED.
DISCHARGE VALVE SHOULD BE OPEN.
ENSURE THAT MOTOR HAS BEEN VENTED.
THREE FLICK START FOR 5SEC WITH 10 MINUTES
INTERVAL FINAL START RUN FOR 20 MINUTES.
CHECK FOR DISCGARGEPR. AND DP.
CHECKING OF VIBRATION,CAVITY TEMP.
7/31/2019 Steps for Commissioning of Drive , Pumps And
9/13
BCW PUMP
BCW PUMP IS SINGLE STAGE, GLANDLESS
,SINGLE SUCTION DOUBLE DISCHARGE,
CENTRIFUGAL PUMP.
7/31/2019 Steps for Commissioning of Drive , Pumps And
10/13
7/31/2019 Steps for Commissioning of Drive , Pumps And
11/13
TECHNICAL DATA SHEET
Type:Single Suction - Double Discharge
Design Pressure:213.5 kg/cm2
Design Temperature:370C Hydrostatic Test Pressure:320 kg/cm2
Suction Pressure:198 kg/cm2
Quantity Pumped:3021 m3/hr
7/31/2019 Steps for Commissioning of Drive , Pumps And
12/13
. BCW P/P START PERMISSIVES
Pump protection criteria not present AND
LP cooling water flow > 1.26 lps AND
Pump casing to suction manifold DT < 38 degc AND
Motor Cavity temp >2 degc & < 63 degc AND
Discharge Valve Stem-1 open AND
Discharge Valve Stem-2 open AND
Switchgear available AND
Boiler drum vent valves closed AND
Switchgear not disturbed AND
CW supply to BCW pumps normal
CW SUPPLY TO BCW PUMPS
BCW EMG CW tank level not low
7/31/2019 Steps for Commissioning of Drive , Pumps And
13/13
) TRIP PROTECTION
1) Motor Cavity temp very high ( > 66 degc)
2) Discharge Valve Stem-1 not open
3) Discharge Valve Stem-2 not open
4) Electrical Protection acted
BCW CW BOOSTER PUMP
AUTO START
1) Other running booster pump tripped 2) Other booster pump ON AND discharge press < 3ksc
3) Overhead tank level low