LHCb Storage status & forecast

Storage status & forecast

  • Upload
    perrin

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

Storage status & forecast. Reminder of CM policy. RAW data CERN + one additional copy @ Tier1 Share based on CPU pledges for a given year SDST/FULL.DST Only latest reconstruction Prevents re-stripping former reconstruction Pass n-1 removed as soon as pass n starts Stream DST One archive - PowerPoint PPT Presentation

Citation preview

Page 1: Storage status & forecast

LHCb

Storage status &forecast

Page 2: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 2

Reminder of CM policy

m RAW datao CERN + one additional copy @ Tier1

P Share based on CPU pledges for a given yearm SDST/FULL.DST

o Only latest reconstructionP Prevents re-stripping former reconstruction

o Pass n-1 removed as soon as pass n startsm Stream DST

o One archiveo Pass n: 4 replicas (CERN + 3)o Pass n-1: 2 replicaso Pass n-2: removed when pass n startso Incremental stripping: 4 replicas, but should be

<10% of nm MC DST

o One archiveo 3 replicaso How do we retire MC passes?

Page 3: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 3

Current tape status

Collision12

Collision11

RAW CERN

Page 4: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 4

Tape crisis

m As announced, tape is a real issue:o More data than expected: longer LHC run, higher HLT

rateo Usage of FULL.DST instead of SDST

P 5 GB instead of 2 GB for a 3 GB RAW fileP Mitigated by removing previous processing’s SDSTP FULL.DST on disk until stripping is complete

d Less stress on the tape cache disksm Mitigated by removing non-CERN archive of many

datasets (now only one archive for all datasets)o Stopped archiving at GRIDKA, IN2P3, PIC and SARA

m Sites have kindly agreed to let us use more than the pledge

o RAL provides an additional 1 PB of tapeo Other sites on best efforto Agreement between LHCb and ALICE for load of

tapesP GRIDKA, CNAF if needed

o SARA “very close” to the end

Page 5: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 5

Disk status

Collision12

Collision11

MC11aMC10

Collision12

Page 6: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 6

Situation w.r.t. pledges

m CERN and CNAF: some disk ready to be installedm Part of tape cache not included for dCache sitesm WARNING: decrease of requirements/pledges in

2013!!

Page 7: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 7

Pledges 2013 vs 2012

m 2012: 75.4% of requirements pledgedo Requirements were mitigated and reviewed

m 2013: new fraction at some Tier1so When applied to a “reduced” requirement, decrease

of pledgeso Proposal: use 2012 fraction of pledges for 2013

P More inline w.r.t. 2012 pledges

Page 8: Storage status & forecast

Stor

age

stat

us

NCB 26.11.2012, PhC 8

Tape staging

m 2012: max of (prompt + reprocessing)o Repro 2012-2: current phase (lower pace)

m Assuming 5 weeks for 2011 reprocessingo Lower pace than 2012 reprocessing