Upload
pauline-haynes
View
214
Download
0
Embed Size (px)
Citation preview
Telecom Costs - IAC
1
Telecom Cost Analysis – Rev. 1 Pat BurnsVP for IT
12/10/2008
Telecom Costs - IAC
2
FY 09 Monthly Cost for Basic Service
Campus Housing
Base monthly cost $11.13 $12.90
Number of units 7,525 3,813
Annual Revenue $1,005,039 $590,252
12/10/2008
Telecom Costs - IAC
3
FY
00
FY
01
FY
02
FY
03
FY
04
FY
05
FY
06
FY
07
FY
08
FY
09
0
2,000
4,000
6,000
8,000
10,000
12,000
Number of Basic Service Users - 10 Years
Campus
Housing
12/10/2008
Telecom Costs - IAC
4
FY
00
FY
01
FY
02
FY
03
FY
04
FY
05
FY
06
FY
07
FY
08
FY
09
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
Basic Service Revenue - 10 Years
Campus
Housing
Loan payoff
12/10/2008
Telecom Costs - IAC
5
FY
01
FY
02
FY
03
FY
04
FY
05
FY
06
FY
07
FY
08
FY
09
$0
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
$70,000
$80,000
$90,000
Operator Costs
12/10/2008
Telecom Costs - IAC
6
FY
00
FY
01
FY
02
FY
03
FY
04
FY
05
FY
06
FY
07
FY
08
FY
09
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
Project Expenses
Avg. = $521k
12/10/2008
Telecom Costs - IAC
7
FY
00
FY
01
FY
02
FY
03
FY
04
FY
05
FY
06
FY
07
FY
08
FY
09$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000 Annual Telecom Projects
Other
Equip.
Futures
E911
Switch
Phys. In-fra.
12/10/2008
Telecom Costs - IAC
8
Project Categories• Physical Infrastructure
▫ Wide area networking – fiber and optical gear
▫ Inter-campus fiber infrastructure - fiber
▫ Inter-building infrastructure – fiber and copper
▫ Building rewires• Switch – SL-100 upgrades• E911 – E911 phones,
video surveillance cameras
• Futures – Unified Messaging, VoIP
• Equipment▫ Vehicles & cable trailer▫ Fiber splicers▫ Fiber OTDR▫ Copper testers, 6a▫ Operator consoles
• Other▫ Internet costs in FY02▫ GSB shop remodel
12/10/2008
Telecom Costs - IAC
9
Average Annual Telecom Expenses
Phys. Infra.SwitchE911FuturesEquip.Other
12/10/2008
Telecom Costs - IAC
10
Project Details – Phys. Infra.• FY 99-00
▫ OIS Video $142,113▫ AS-12 $47,000 ▫ Clark $105,000
• FY 00-01▫ Wagar $42,000 ▫ Ayleswsorth $73,000 ▫ Atmos Sci Sim Lab $6,313 ▫ Weber $17,670▫ UV Phase 5 $15,529
• FY 01-02▫ OFCHS $25,507▫ CIRA $13,273▫ Chem Bio $5,188▫ Industrial Science $1,162▫ Weber AS.12 $3,000
• FY 01-02 (cont’d) - Fiber▫ Glover $3,019 ▫ Green Hall $2,480▫ Foothills $6,615 ▫ VTH $2,100 ▫ Rampart/Overland $2,175▫ Foothills $11,276▫ NRRC $972▫ NWRC $1,720
• FY 02-03▫ Tunnel Project $50,007▫ Gugg/Chem-Bio/VTH $1,349 ▫ Chem Bio $2,024▫ VTH $5,000▫ Foothills Generator $5,383 ▫ AS.12 Projects $299,000
12/10/2008
Telecom Costs - IAC
11
Project Details – Infrastructure (cont’d)
• FY 03-04▫ Housing
$13,253 ▫ Tunnel Project
$44,288▫ MRB CSUIITE
$4,109 ▫ ARBL to AIDL
$11,890▫ Aggie South
$5,023 ▫ AS.12 Projects
$369,768 ▫ CDOT
$23,493▫ Campus Fiber
Pitkin Ave
$17,540 Centre Ave
$15,917 Aggie North
$5,209 Campus Ring
$151,237
• FY 04-05▫ CSU/UW fiber
$185,000▫ CSUIITE Projects
$63,134▫ CDOT
$31,027 ▫ Tunnel Project
$380 ▫ Campus Fiber
Campus Ring
$8,887 Misc.
$27,199 • FY 05-06
▫ AS.12 Projects
$15,680▫ Campus fiber
Hughes
$2,007 Misc
$116,273
12/10/2008
Telecom Costs - IAC
12
Project Details – Infrastructure (cont’d)
• FY 06-07▫ CDOT $1,420▫ Campus fiber
Misc $59,921 555 S. Howes $8,119 Rampart Rd T $5,347 N. Lateral Loop $18,795 Pitkin Street $3,400 1500 UV $10,484
• FY 07-08▫ CSUIITE $30,000 ▫ CDOT $1,539 ▫ Glover $16,828▫ GSB $60,000
• FY 07-08 (cont’d) - fiber▫ Misc Fiber Projects $55,250▫ Overland Trail $47,309▫ 1500 UV
$43,027• FY 08-09 (budgeted)
▫ CSUIITE $100,000▫ Fiber Projects $150,000 ▫ CDOT $30,000 ▫ Adesta $215,000
12/10/2008
Telecom Costs - IAC
13
FY 09 BS Cost Comparison with CSU Peers(All currently have revenue from Housing)
Peer Institution Basic Serv. ($/mo.)Colorado State $11.13 Oklahoma State $17.50 Ohio State $17.65 Iowa State* $19.00 Michigan State* $20.50 Purdue $22.60 Univ. of Illinois, Urbana Cham. $22.60 Oregon State* $23.00 Univ. of Colo., Boulder* $23.89 Washington State* $25.00 Univ. of Calif., Davis $26.50 N. Carolina State* $34.00
12/10/2008
* Includes Voice Mail
Telecom Costs - IAC
14
FY 09 BS+VM Cost Comparison with Peers(All currently have revenue from Housing)Peer Institution Basic Serv. + VM ($/mo.)Colorado State $17.13 Iowa State* $19.00 Michigan State* $20.50 Oklahoma State $22.50 Oregon State* $23.00 Univ. of Colo., Boulder* $23.89 Ohio State $24.15 Washington State* $25.00 Univ. of Illinois, Urbana Cham. $26.60 Purdue $27.10 Univ. of Calif., Davis $29.50 N. Carolina State* $34.00
12/10/2008
Telecom Costs - IAC
15
Perspective – Most Successful Activities• AS.12 building rewires• On-campus fiber: buildings, backbone• Off-campus fiber: inter-campus, WAN• Optical networking
▫BiSON ring at multi Gbps• In a nearly cost neutral manner, the campus has
been provided▫Excellent physical infrastructure▫Excellent Internet access
• While maintaining the lowest basic service costs among all of our peers, with no additional funding!
12/10/2008
Telecom Costs - IAC
16
FY 10 Scenarios
•Scenario A: Housing eliminates room phones▫Loss in revenue = $590,252
•Scenario B: Housing retains ‘emergency’ phones in rooms▫At $6 per month for 9 months =
$205,902/yr.▫Loss in revenue = $384,350
•The following scenarios assume we eliminate the aforementioned telecom projects progressively
12/10/2008
Telecom Costs - IAC
17
Scenario A: No Phones in Housing(Cumulative Cost Reductions)
Monthly Net
Base (revenue neutral) $18.77 $18.77
- Phys. Infra. $3.17 $15.60
- Switch $1.31 $14.29
- E911 $0.35 $13.94
- Futures $0.33 $13.61
- Equip. $0.21 $13.40
- Other $0.20 $13.20
12/10/2008
Telecom Costs - IAC
18
Scenario B: ‘Emergency’ Phones in Housing
Monthly Net
Base (revenue neutral) $16.49 $16.49
- Phys. Infra. $3.17 $13.32
- Switch $1.31 $12.01
- E911 $0.35 $11.66
- Futures $0.33 $11.33
- Equip. $0.21 $11.12
- Other $0.20 $10.92
12/10/2008
Telecom Costs - IAC
19
Discussion of Scenarios A and B•Scenario A – range for monthly cost
increase▫Max = $18.77 - $11.13 = $7.64▫Min = $13.20 - $11.13 = $2.07
•Scenario B – range for monthly cost increase▫Max = $16.49 - $11.13 = $5.36▫Min = $11.92 - $11.13 = $0.79
•Question – what do we value, and what do we agree to fund?
12/10/2008
Telecom Costs - IAC
20
Upcoming Transition Costs• Telephone switch end of life in 2011• In 1993, costs for current telecom infrastructure
▫Switch cost = $3.0 million Enhanced to keep current @ $2.5 million
▫Octel VM system cost = $1.5 million▫Underground copper cost = $3.5 million (Qwest)
• 1-time costs for VoIP may be ~$3-5 million▫ ‘Hardening’ the network▫Backbone switch upgrade▫Adding UPSs and POE in the closets▫May be otherwise funded – consider separately?▫TBD in FY 2010
12/10/2008
Telecom Costs - IAC
21
Discussion• How do we fund
▫Wide area fiber and equipment▫Physical IT infrastructure upgrades▫Hardening the existing network
• Transition to integrated VoIP system or maintain analog phones?▫Adding VoIP infrastructure
Power over Ethernet UPS End user devices Aggregate VoIP infrastructure
12/10/2008
Telecom Costs - IAC
22
ConsequencesItem to be Eliminated Consequence
Phys. Infra. - $3.17/mo. Reduced ability to maintain IT physical infrastructure, both on and off campus
Switch - $1.31/mo. Transitional funding
E911 - $0.35/m. Liability and safety
Futures - $0.33/mo. How do we effect a transition to VoIP?
Equipment - $0.21/mo. Reduced ability to maintain infrastructure
Other - $0.20/mo. Reduced capacity to respond to immediate events
12/10/2008
Telecom Costs - IAC
23
Recommendations
•Maintain operators @ $0.89/mo.•Maintain at full amounts:
▫‘E911’ @$0.35/mo.▫‘Equipment’ @$0.21/mo.
•Redirect into VoIP portions of $4.77/mo.?▫‘Phys. Infra.’ @ $3.11/mo.▫‘Futures’ @ $0.33/mo.▫‘Switch’ @ $1.31/mo.
•Eliminate ‘ Other’ @ $0.20/mo.•Reduce VM/UM costs by ~$1/mo.
12/10/2008