67
NATIONAL HIGHWAYS AUTHORITY OF INDIA M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V TABLE OF CONTENTS TABLE OF CONTENTS.....................................i CHAPTER - 1: PROJECT OVERVIEW.........................1 1.1 INTRODUCTION....................................................1 1.1.1 Introduction.....................................................1 1.1.2 General Information on Project Road.................................1 1.1.3 Brief Description................................................. 1 1.1.4 Project Location:................................................. 3 1.1.5 Road History:....................................................3 1.2 SALIENT FEATURES OF THE PROJECT.................................5 1.2.1 Name of the Project...............................................5 1.2.2 Length of the Road................................................5 1.2.3 Contract:....................................................... 5 1.2.4 Description of Project:.............................................5 1.2.5 Scope of Project..................................................6 1.3 THE SCOPE OF INDEPENDENT ENGINEER...............................8 1.3.1 Development Period Responsibility...................................8 1.3.2 Reporting Requirement............................................ 8 CHAPTER – 2 : PROJECT MOBILIZATION...................15 2.1 INDEPENDENT ENGINEER...........................................15 2.2 INDEPENDENT ENGINEER’S MOBILIZATION............................15 2.3 MOBILIZATION & DEMOBILIZATION OF STAFF.........................15 2.3.1 Mobilization of Staff:.............................................15 2.3.2 Demobilization of Staff........................................... 15 2.4 ORGANIZATION CHART.............................................15 Monthly Progress Report Nov. 2014 Page i of iii

The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

Embed Size (px)

Citation preview

Page 1: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

TABLE OF CONTENTS

TABLE OF CONTENTS...............................................................................i

CHAPTER - 1: PROJECT OVERVIEW......................................................1

1.1 INTRODUCTION.............................................................................................................11.1.1 Introduction.....................................................................................................................11.1.2 General Information on Project Road................................................................................11.1.3 Brief Description..............................................................................................................11.1.4 Project Location:..............................................................................................................31.1.5 Road History:...................................................................................................................3

1.2 SALIENT FEATURES OF THE PROJECT......................................................................51.2.1 Name of the Project..........................................................................................................51.2.2 Length of the Road...........................................................................................................51.2.3 Contract:..........................................................................................................................51.2.4 Description of Project:......................................................................................................51.2.5 Scope of Project................................................................................................................6

1.3 THE SCOPE OF INDEPENDENT ENGINEER.................................................................81.3.1 Development Period Responsibility....................................................................................81.3.2 Reporting Requirement.....................................................................................................8

CHAPTER – 2 : PROJECT MOBILIZATION...........................................15

2.1 INDEPENDENT ENGINEER..........................................................................................152.2 INDEPENDENT ENGINEER’S MOBILIZATION..........................................................152.3 MOBILIZATION & DEMOBILIZATION OF STAFF....................................................15

2.3.1 Mobilization of Staff:......................................................................................................152.3.2 Demobilization of Staff...................................................................................................15

2.4 ORGANIZATION CHART.............................................................................................152.5 MONTHLY INVOICE....................................................................................................162.6 CONCESSIONAIRE.......................................................................................................162.7 EPC/SUB CONTRACTOR..............................................................................................162.8 SIX LANING PROJECT STATUS..................................................................................16

CHAPTER - 3: PRE-CONSTRUCTION ACTIVITY.................................17

3.1 UTILITY RELOCATION AND TREES REMOVAL:.....................................................17

Monthly Progress Report Nov. 2014 Page i of iii

Page 2: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

3.1.1 Electric Poles:................................................................................................................173.1.2 Other Utilities:................................................................................................................203.1.3 Trees Removal:...............................................................................................................24

3.2 PROPOSED ROW – LAND ACQUISITION...................................................................253.3 RELOCATIONS OF COMMUNITY / RELIGIOUS PROPERTIES................................273.4 REHABILITATION OF EXISTING STRUCTURES......................................................273.5 CONDITION PRECEDENT............................................................................................27

3.5.1 Contractual Provisions....................................................................................................273.5.2 Status.............................................................................................................................28

3.6 DRAWING AND DESIGN...............................................................................................323.6.1 Topographic Survey........................................................................................................323.6.2 Geo-Technical Investigation............................................................................................333.6.3 Pavement Investigation...................................................................................................343.6.4 Drawing and Design Approval.........................................................................................353.6.5 Review of Structure Design & Drawing:..........................................................................37

LIST OF TABLES

Table - 1.1 Project Salient Features.....................................................................5Table - 1.2 Project Data Summary......................................................................6Table - 1.3 Concessionaire's Obligation Check List....................................................9Table - 2.1 Package wise EPC..........................................................................16Table - 3.1 Electric Utility Status......................................................................17Table - 3.2 Water Line Status..........................................................................20Table - 3.3 GAS Pipe Line Status......................................................................24Table - 3.4 Trees Removal Status......................................................................24Table - 3.5 Land Acquisition Status...................................................................26Table - 3.6 Encroachments / Obstruction Status......................................................26Table - 3.7 Summary of Conditions Precedent........................................................28Table - 3.8 Summary of Applicable Permits Status...................................................30Table - 3.9 Topographic Survey Status................................................................32Table - 3.10 Geo-Technical Investigation Status......................................................33Table - 3.11 Pavement Investigation Status...........................................................34Table - 3.12 Highway Drawing / Design Approval Status............................................35Table - 3.13 Structure Drawing / Design Approval Status...........................................37

LIST OF FIGURE

Figure - 1.1 Project Index Map........................................................................................................3Figure - 1.2 Project Location Map..................................................................................................4

Monthly Progress Report Nov. 2014 Page ii of iii

Page 3: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

List of Abbreviations

BC Bituminous ConcreteBM Bituminous Macadamcm Centimetrecum Cubic Metredia DiameterGI Galvanised Ironha HectareHMP Hot Mix PlantHP Horse Powerhr HourIRC Indian Roads CongressIS Indian Standardkg KilogramKL Kilo Litrekm KilometreKVA Kilo Volt Ampereltr Litrem Metremax Maximummin Minimummm MillimetreMORTH Ministry of Road Transport and HighwaysMS Mild SteelMT Metric Tonno. NumberOMC Optimum Moisture ContentPCC Plain Cement ConcretePSC Prestressed Cement ConcreteRCC Reinforced Cement ConcreteRs Rupeessqm Square Metret. km Ton- KilometreT&P Tools and Plant

Monthly Progress Report Nov. 2014 Page iii of iii

Page 4: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

TPH Tonne per HourWMM Wet Mix Macadam

Monthly Progress Report Nov. 2014 Page iv of iii

Page 5: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

CHAPTER - 1: PROJECT OVERVIEW1.1 INTRODUCTION

1.1.1 IntroductionNational Highways Authority of India (NHAI) has been entrusted with the Development, Maintenance and Management of National Highways by Ministry of Road Transport and Highways (MORT&H), Government of India. Under National Highway Development Programme (NHDP), Phase – V, Government has decided to convert some of the existing 4 lane highways into 6 lane Highways. These projects are to be executed through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern.

The National Highways Authority of India (NHAI) has taken-up Projects of certain selected stretches under NHDP Phase-V, BOT programme, out of which 555.500 Km. of NH-79A, NH-79, NH-76 and NH-8 from Kishangarh (km 0.000) to Ahmedabad (Km. 555.500) including Udaipur bypass is a part of this prestigious project. The project would envisage widening of existing Four- Lane highway into six Lanes with additional features, such as, providing of additional Service Roads, Underpasses, Flyovers and Bridges to enhance operational efficiency and safety for the Traffic & Road Users.

1.1.2 General Information on Project RoadThe 6 laning of NH-79A, NH-79, NH-76 and NH-8 on Kishangarh - Udaipur - Ahmedabad Section including Udaipur Bypass is intended to improve the economic and social welfare of the people. The main objective of 6-Laning of Kishangarh - Udaipur - Ahmedabad Section of NH - 79 A, NH -79, NH - 76 and NH – 8 including proposed Udaipur Bypass is to ensure:

Facilitate development of Delhi-Mumbai Segment of Golden Quadrangle by widening of Kishangarh-Nasirabad-Bhilwara-Chittorgarh-Mangalwar-Udaipur- Kaya - Khairwara – Shamlaji - Himmatnagar- Prantij Chiloda and Ahmedabad corridor i.e. NH-79A, NH-79, NH-76 and NH-8 from existing Four Lane to proposed Six Lane divided carriageway through DBFOT pattern,

To provide fast corridor for smooth flow of traffic, minimal adverse social and environmental impacts and reduce rate of accident with the proposed Six Lane widening and Road Strengthening,

Enhanced Safety of the Traffic, the Road Users and the People Living in proximity to the Project highway.

Enhanced Operational Efficiency of the highway,

Fulfilment of the access needed to the Local Population

Minimal adverse impact on the Road Users and the Local Population due to Construction, Feasible and Constructible options for the project with least cost option

1.1.3 Brief Description

The project road corridor is a section of NH-79A, NH-79, NH-76 and NH-8 starting from Kishangarh at km 364.000 of NH-8 (i.e. Km.0.830 of NH 79A). It meets with NH-79 at km

Monthly Progress Report Nov. 2014 Page 1 of 49

Page 6: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

14.100 after traversing 36.000 km length of NH-79A. Further at Km 183.000 of NH-79 Project Road meet at Km. 220.000 of NH-76 and go through the NH-76. The Project road passes via Chittorgarh and meets Udaipur Bypass at km 117.800 of NH-76. The proposed new Six lane Udaipur Bypass starts at km 118.200 near Debari on NH-76 and end at km 286.800 near Kaya on NH-8. Subsequently, the road passes through urban section of Khairwara at km 351 and then passes through Ratanpur at km 388, Shamlaji at km 399 and Himmatnagar at km 447 of NH-8. Before ending at Ahmedabad it also passes through Prantij and Chiloda at km 469 and km 541 of NH-8 respectively.

Project corridor passes through Ajmer, Bhilwara, Chittorgarh, Udaipur and Dungarpur districts in the state of Rajasthan as well as Sabarkantha and Gandhinagar Districts in the State of Gujarat.

The existing road is 4-Lane divided carriageway throughout except at some section in Gujarat. The total By-pass length in the project is 26 km. The overall length of the Project Road including new By-passes is 555.550 Km. Out of which km 434.500 km is in State of Rajasthan and 121.0 km is in state of Gujarat.

In State of Rajasthan the Latitude and Longitude of Kishangarh is 26o 34’ 28” and 74o 52’ 11”, Chittorgarh 24o 53’, 74o 58’ and Udaipur is 24o 34’ 36” and 73o 41’ 52” Respectively. And in state of Gujarat the Latitude and Longitude of Ratanpur is 23o15’ 46” and 73o 17’ 20’’and Himmatnagar is 24o 23’ 00” and 73o 3’ 00’’respectively.

The project road traverse through major settlement stretches such as Nasirabad, Gulabpura, Bhilwara, Chittorgarh, Mangalwar, Udaipur, Ratanpur, Himmatnagar and Ahmedabad. The Nasirabad settlement starts from km 35+000 of NH 79 A and ends at km 16+000 of NH-79. Gulabpura settlement starts from km 64+000 and ends at 71+000 of NH-79, Bhilwara by-pass starts at km 120+000 and end at Km. 138+000 of NH-79 of the project road, Chittorgarh By-pass starts at km 164+000 of NH-79 and meets at km 213+000 of NH-76. From km 213+000, end of Chittorgarh bypass the project road is at decreasing chainage in left carriageway. Proposed Mangalwar Bypass starts at km 171+000 and ends at 169+000 of NH-76. In Mangalwar the existing alignment of project road traverses in highly congested area.

The present configuration of the road is 4-lane in rural and 4-lane plus service roads of 7.5 m width (7.0 m) carriageway+2 x 0.25m kerb shyness) on both sides in urban areas. At some places the services road is found to be 5.5.m (5.0 m carriageway+2 x 0.25m kerb shyness) and 3.5m (3.5m carriageway+2 x 0.25 m kerb shyness). From km 541(near Chilloda) to km 553 existing road is 2 lane carriageway lanes with paved shoulder.

The Existing Pavement of Left Carriageway is throughout Flexible except 25.900 Km in three different Stretches between Km. 9.600 to Km. 29.600 of chittorgarh bypass and between Km. 196.000 to Km. 193.000 of NH-76 which are Rigid Pavements. However approx. 100 Km. of Existing Pavement in Right carriageway is Rigid in 7 different stretches including existing Bhilwara and Chittorgarh Bypasses.

The railway line running parallel to the project road on left hand side of existing Four lane near km 24+000 of NH 79.

The land use pattern of the project area is mainly agriculture land, settlements, industrial and commercial areas including hilly terrain at some locations along the project road. In general, the terrain is plain, rolling and partly hilly.

Monthly Progress Report Nov. 2014 Page 2 of 49

Page 7: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

1.1.4 Project Location:

The Project Index Maps and Project Location Map are given in Fig. 1.1 and Fig.1.2 respectively. General Terrain

profile along the Project Corridor is shown in Fig. 1.3.

1.1.5 Road History:

The existing 2 lane road was widened to four in lanes in the year of 2003-2007.

Figure - 1.1 Project Index Map

Monthly Progress Report Nov. 2014 Page 3 of 49

Page 8: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Figure - 1.2 Project Location Map

Monthly Progress Report Nov. 2014 Page 4 of 49

Page 9: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

1.2 SALIENT FEATURES OF THE PROJECT

1.2.1 Name of the Project

Six Lanning of Kishangarh – Udaipur- Ahmedabad Section of NH-79 A, 79, 76 and 8 including new Udaipur Bypass in the state of Rajasthan and Gujarat (approx. Length 555.50 km) through PPP under NHDP V on DBFOTT pattern.

1.2.2 Length of the Road

The Total length of project corridor is 555.50 km (approx.)

1.2.3 Contract:

Design, Engineering, Finance, Construction, Operation and Maintenance of six laning of under NHDP Phase-V on Build, Operate and Transfer (BOT) Toll on DBFOT Pattern.

1.2.4 Description of Project:

Table - 1.1 Project Salient Features

S. No. Item Description

1 Employer NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI)

2 Name of Contract Package

Six Lanning of Kishangarh – Udaipur – Ahmedabad

Section of NH-79 A, 79, 76 and 8 including new Udaipur Bypass in the state of Rajasthan and Gujarat approx. Length 555.50 km) through PPP under NHDP V on DBFOTT pattern.

3 Location Kishangarh – Udaipur – Ahmedabad

4 Length Km 555.50 km

5 Name of the ConcessionaireGMR Kishangarh – Udaipur – Ahmedabad

Expressway limited

6 Concession Period 26 years from Appointed date

Monthly Progress Report Nov. 2014 Page 5 of 49

Page 10: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

7 Letter of Acceptance Date 30nd October 2011

8 Agreement Date 30th November 2011

9 Total Project Cost Rs. 5387.36 Crores

10 Premium Rs. 636 Crores by increasing additional 5 % to immediate Preceding year

11 Design and Construction Period 36 months

12 Construction Period 1095 days

13 Independent Engineer EUROESTUDIO S.L. -- THEME ENGINEERING SERVICES (P) Ltd

14 Commencement of IE Services 4th May 2012

1.2.5 Scope of Project

The scope of project includes performance and execution by the Concessionaire of all Design, Engineering, Finance, Construction, and Operation & Maintenance of the Project Highway. It shall also include Strengthening & Maintenance of the existing carriage way from Km 0+000 to 555+500 and Widening to 6 lane standards in accordance with the Specification and Standards and operation & maintenance. It shall also include the performance and fulfilment of other obligations by the Concessionaire under this Agreement. Salient scope of the Project works is given in Table 1.3.

Table - 1.2 Project Data Summary

S. No. Description of ItemLength in

Km / Nos.

1 Highway - Main carriageway  

  i) NH 79 A 35.270

  ii) NH 79 149.000

  iii) Chittorgarh Bypass 29.600

Monthly Progress Report Nov. 2014 Page 6 of 49

Page 11: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No. Description of ItemLength in

Km / Nos.

  iv) New Mangalwar Bypass 2.380

v) NH 76 92.870

vi) New Udaipur Bypass 23.580

vii) NH-8 222.295

  Total- 55500

2 Service Roads

  i) Widening of Existing Road 28.23+29.25

  ii) New Service Road 221.54+223.05

  iii) Cart Road 1.94+2.04

iv) Slip Road 0.97

v)

vi)

3Structures:

  i) New Flyovers 27

  ii) New Interchange 2

  iii) New Vehicular Underpass 38

  iv) New Pedestrian Underpass 113

v) New Major Bridge 7

4 Cross Drainage structures 

  i) New Box Culverts 30

  ii) Reconstruction of Slab Culverts 81

iii) Reconstruction Pipe Culverts to Box 56

5 Major Intersections 59

6 Minor Intersections 420

7 Major Interchange 2

8 Minor Bridge on MCW (reconstruction) 13+20

9 Minor Bridges on Service Road 41+44

10 ROB

Monthly Progress Report Nov. 2014 Page 7 of 49

Page 12: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No. Description of ItemLength in

Km / Nos.

a New 6 lane Structure 2

b New 3 lane Structure 3

11 Retaining Structures  

  i) Elevated Structure (repair & rehabilitation) 2

ii) VUP (widening) 1

  iii) Minor Bridge (MCW widening) 6+5

iv) Minor Bridge (SR widening) 2+2

v) Pipe Culvert (widening) 446

vi) Slab Culvert (widening) 356

vii) ROB (repair) 9+6

12 Others/Amenities

  i) Bus Bays 60+61

  ii) Truck Lay Byes 22+21

  iii) Toll Plaza 8

1.3 THE SCOPE OF INDEPENDENT ENGINEER

1.3.1 Development Period Responsibility

The Independent Engineer will be responsible for detailed review of Designs & Drawings furnished by the Concessionaire along with supporting data, including the Geotechnical and Hydrological investigations, characteristics of materials from borrow areas and quarry sites, Topographical Surveys etc. The review of submitted designs & drawings along with supporting data shall be completed and send their observations/comments to Concessionaire & copy to the Authority within 15 (fifteen) days from the receipt of the same.

The independent Engineer shall give its observations, if any, within 7 days of receipt of revised designs drawings submitted by Concessionaire based on above observation/comments. The review of the detailed design, construction methodology, quality assurance procedures and the procurement, engineering and construction time schedule sent by the Concessionaire will be furnished within 15 (fifteen) days of receipt thereof. Similarly, EPC Contract or any other contract for construction, operation and maintenance of the Project Highway submitted by Concessionaire, will be reviewed and commented within 7 (seven) days from the receipt thereof.

Monthly Progress Report Nov. 2014 Page 8 of 49

Page 13: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

1.3.2 Reporting Requirement

Independent Engineer shall prepare and submit the following reports in four copies to the NHAI and one copy to the Concessionaire.

a) Design Review Phase

Concessionaire is presently working on allocated activities of development period.

b) Construction Phase

Monthly and Quarterly Progress report covering all aspects such as progress monitoring, Quality Assurance (QA)/Quality control (QC) etc.

c) Operation and Maintenance Phase

Monthly and Quarterly report on existing condition of facility including advise on all aspects of operation and Maintenance. Toll Booths, Bridges or other Structures, Traffic Management & Safety, Telephone, Ambulance.

Monthly report on audit of the traffic using the Project Highway at least once a month.

Monthly and quarterly reports for lane availability.

The Check list to monitor Concessionaire’s obligation under the provision of CA is presented in Table 1.3.

Monthly Progress Report Nov. 2014 Page 9 of 49

Page 14: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Table - 1.3 Concessionaire's Obligation Check List

S. No.Requirement of Submission by Concessionaire

ReferenceSubmission Time Schedule Independent Engineer Action Remark

Document Clause No.

Development Period

1   Condition Precedent

Concession Agreement 4.1.3 Before Appointed Date

 Monitoring the status of Condition Precedent and subsequently applicability of claims, if any.

 

  a Performance Security

  b Escrow Agreement

  c Substitution Agreement

  d Applicable permits as in Schedule -E

  e Financing Agreement

  f

Confirmation of the correctness of their representation and warranties

 

  g Financial Package and Financial Model  

  h Legal opinion  

2   Quality Assurance Plan IRC SP 87 1.3

12.1 15 days before commencement of the Work

Monitor and review as per provisions of CA and technical

 

Monthly Progress Report Nov. 2014 Page 10 of 38

Page 15: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No.Requirement of Submission by Concessionaire

ReferenceSubmission Time Schedule Independent Engineer Action Remark

Document Clause No.

Specifications

3   Official Representation at site  

Before Appointed Date-  

4   Quarry approval Concession Agreement

Monitor and review as per provisions of CA and technical Specifications

 

5   Construction Methodology Before commencement of Work  

6   Inventory of Site 10.3.1 Before Appointed DateAssist Authority for establishing "The Appendix" as defined in CA

 

7 Detail Design of Highway and Structures

12.1 Before Construction Period First Review within 15 days and second review on resubmitted revised drawing with in 7th day from Date of Submission.

Schedule - L

  i Geotechnical Investigation Report  

  ii Hydrological Report  

  iii Topographical Surveys Report  

  iv Traffic Survey Report  

  v Material Report  

  vi Pavement Design  

Monthly Progress Report Nov. 2014 Page 11 of 38

Page 16: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No.Requirement of Submission by Concessionaire

ReferenceSubmission Time Schedule Independent Engineer Action Remark

Document Clause No.

  vii Typical Cross Section  

  viii Plan & Profile of MCW  

  ix Plan & Profile of Service Road  

  x Drainage Plan & Profile  

  xi Cross section at 50 m interval  

  xii

Detailed Drawing for individual Culvert Drawings (pipe , Slab & Box)

 

  xiii

Detail Design and Drawing of individual Bridges and structures (VUP, PUP, ROB)

Concession Agreement

12.1 Before Construction Period First Review within 15 days and second review on resubmitted revised drawing with in 7th day from Date of Submission.

Schedule - L

  xiv

Drawings for Road Sign, Markings Toll Plazas. Bus Bays, Parking Areas, Truck Lay Bys

 

  xv Detailed layout drawings for traffic circulation for

 

Monthly Progress Report Nov. 2014 Page 12 of 38

Page 17: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No.Requirement of Submission by Concessionaire

ReferenceSubmission Time Schedule Independent Engineer Action Remark

Document Clause No.

service roads, for vehicular including cross section Drawings through VUP/PUP at the Project road level and the structure bed level.

  xvi Street Lighting  

  xvii Landscaping and tree plantation  

  xviii Traffic Aid Post  

  xix Medical Aid Post  

  xx Vehicle Rescue Post  

  xxiTraffic Management drawings for safety in construction zones

 

  xxiiDetailed drawings of road side furniture and safety structures.

 

               

Construction Period

Monthly Progress Report Nov. 2014 Page 13 of 38

Page 18: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No.Requirement of Submission by Concessionaire

ReferenceSubmission Time Schedule Independent Engineer Action Remark

Document Clause No.

1   Insurances

Concession Agreement

32.3 30 days before Commandment Date of Construction or Operation.

Monitor and ensure obligation of each party is complied as per CA provisions

 

2   Monthly Progress Report 13.1 by 7th of every month

Review and Comment

 

3   Weekly / Monthly FEE Statement 19.5 by 7th of every month  

4  

3 hours Video Recording in compact disc or digital video disc, covering the status and progress of construction works.

13.6by 7th day from Appointed Date and subsequently by 15th day after end of each quarter

 

5 Audited Accounts        

  a Quarterly 33.1.2 30th Day after each Quarter Monitor and ensure obligation of each party is complied as per CA provisions

 

  b Yearly 33.1.3 on or before 31st of March of Each financial Year  

6 Safety Drawing          

Maintenance Period

1   Monthly Progress Report Concession Agreement

19.1 by 7th of every month Review and Comment as per provisions of CA and technical

 

2   Maintenance Manual 17.3 by 180th day from Appointed Date  

Monthly Progress Report Nov. 2014 Page 14 of 38

Page 19: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No.Requirement of Submission by Concessionaire

ReferenceSubmission Time Schedule Independent Engineer Action Remark

Document Clause No.

Specifications3   Maintenance Programme 17.4

by 45th day from start of each Accounting year during Operation Period

 

4   Daily, Weekly, Monthly Accident Report 19.6 daily , Weekly & Monthly

Review and comment 

5   Monthly FEE Statement 19.5 by 7th of every month  

6   Hand of Medical Aid Post and 2 quarters 21.2 120th Day after Appointed Date Monitor and ensure obligation of

each party is complied as per CA provisions

 

7   Ambulance 90th Day after Appointed Date     

Monthly Progress Report Nov. 2014 Page 15 of 38

Page 20: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll)

basis in DBFOT pattern under NHDP Phase- V

CHAPTER – 2 : PROJECT MOBILIZATION

2.1 INDEPENDENT ENGINEER

Independent consultant is appointed by client as per the provisions of CA. EUROESTUDIO in JV with THEME ENGINEERING SERVICES (P) Ltd. is selected for the IE services on the project. The IE is mobilized at site from 4th May 2012.

2.2 INDEPENDENT ENGINEER’S MOBILIZATION

Contract Agreement for Independent Engineer services was signed on 4th May 2012 and subsequently service was commenced along with mobilization of Team leader in Udaipur.

As per Contract Agreement one Office for Team Leader and 5 numbers Offices for RE is to be established in the Project Corridor. Five Offices are established to supervise work for respective packages. For Sub Professional staffs, CVs are being submitted for NHAI’s review and approval. Approvals for same are being done in phases as per submitted and mutually agreed mobilization Plan.

2.3 MOBILIZATION & DEMOBILIZATION OF STAFF

2.3.1 Mobilization of Staff:

The Team Leader Office is established in Udaipur amd RE Offices are established two in Udaipur and each in Bhilwara and Chittorgarh in the state of Rajasthan and 1 in Himatnagar in the State of Gujarat. Key Professional, Sub – Professionals and Support Staffs are mobilized at their respective offices.

2.3.2 Demobilization of Staff

As per direction of NHAI, HQ letter no. NHAI/Phase – V/Dmega/KUA/2009, dated 14.01.2013 & PIU Letter nos. NHAI/UDA/6-lane/Euro/2012/272, dated 28/01/2013 and NHAI/UDA/6-lane/Euro/2012/453, dated 16/02/2013 Key Professionals, Sub – Professionals, Support Staffs, Offices etc had been demobilized. Dy. Team Leader 1 no., Asst/Survey Eng. 3 nos., 1 office, Support Staffs etc are being retained as given in the aforesaid letters.

2.4 ORGANIZATION CHART

The Organization Chart of Independent Consultant is attached in Appendix – A.

Monthly Progress Report Nov. 2014 Page 16 of 38

Page 21: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll)

basis in DBFOT pattern under NHDP Phase- V

2.5 MONTHLY INVOICE

The status of monthly Invoice of administered under IE contract is given in Appendix – B.

2.6 CONCESSIONAIRE

Concessionaire has established it 3 nos. of Office for project coordination and monitoring. For finalizing Design & Project Coordination Concessionaire is coordinating from Udaipur office. Apart for office in Udaipur, concessionaire has established SPV 2 nos. office in Bhilwara and 1 nos. of office Himmatnagar.

The Concessionaire has appointed General Design Consultant for coordination and management of Design and drawings of the Project. Consulting Engineering Group Ltd., Jaipur is appointed as GDC and agreement is furnished to NHAI under CA clause 5.2.2.

2.7 EPC/SUB CONTRACTOR

The concessionaire has divided entire project road in to 5 packages for execution as given in Table below. NHAI has approved GMR Project Pvt. Ltd. (GPPL) as the EPC contractor for project corridor vide there letter no. NHAI/NHDP/-V/BOT(Toll)FR/10/UA/170 dated 9th

Aug-2012.Table - 2.1 Package wise EPC

S.

NoPackage

Design ChainageRemark

Start End Total Length (Km)

1 Package-1A* 0.000 90.000 90.000

2 Package-1B* 90.000 137.000 47.000

3 Package-2* 137.000 309.000 172.000

4 Package-3 309.000 363.000 54.000

5 Package-4 363.000 434.000 71.000

6 Package-5 434.000 555.480 121.480*Package chainage referred to submitted Design Philosophy Report

2.8 SIX LANING PROJECT STATUS

The Concessionaire has appointed General Design Consultant for coordination and management of Design and drawings of the Project. Consulting Engineering Group Ltd., Jaipur is appointed as GDC and agreement is furnished to NHAI under CA clause 5.2.2. To execute the entire project length Concessionaire has divided the corridor in 5 Packages. The

Monthly Progress Report Nov. 2014 Page 17 of 38

Page 22: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll)

basis in DBFOT pattern under NHDP Phase- V

Appointed Date is yet to be materialised, as obligation defined under Article 4 in Condition Precedent is not fully complied. The Details are given in next chapter.

Monthly Progress Report Nov. 2014 Page 18 of 38

Page 23: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

CHAPTER - 3: PRE-CONSTRUCTION ACTIVITY

3.1 UTILITY RELOCATION AND TREES REMOVAL:

3.1.1 Electric Poles:

The identification of electric lines has been completed and estimates are being submitted to NHAI by Concessionaire. The Original estimate submitted for Chittorgarh district was reduced to Rs. 6.88 Cr. from Rs. 17.93 Cr. after review & scrutiny. Similarly, in Udaipur & Dungerpur district estimate of Rs. 36.20 cr. was revised and reduced to Rs. 26.05 cr. & Ajmer district estimate of 28.57 Cr. Was revised & reduced to 6.50 Cr. & Bhilwara district estimate of 29.77 Cr. Reduced to 11.62 Cr. After revaluation

Table - 3.1 Electric Utility Status

Monthly Progress Report Nov. 2014 Page 19 of 38

Page 24: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No. Pa

ckag

e ChainageState Distt.

Estimate by Dept.

Revaluated Estimate

by IE

Proposed Shifting Work

Remark 33KV Pole

11 KV Pole

LT Pole

Transformer pole

U/g Cable

crossing

From To Amt (lacs) Amt (lacs) (Nos.) (Nos.) (Nos

.) (Nos.) (Nos.)

1

I

00 15

Raj

asth

an

Kishangarh, Ajmer

213.07 51.00 15 264 - 15 -

Submitted to RO NHAI Jaipur vide PIU Letter no.167 dated 15.01.2013 Estimate returned to PIU by RO, Jaipur vide letter no. NHAI/12022/5/2013-ROJ/Tech/1851 dt.20.09.2013 and same has been forwarded to SE, AVVNL vide this office letter No.2251 dated 01.10.2013 for revision of estimate due revision of SIR, if any.

2 15 64 Nasirabad, Ajmer 2409.47 598.82 17 316 - 50 16

Submitted to GM (Raj.) NHAI HQ vide PIU letter No.168 dated 15.01.2013

3 64 150.9 Bhilwara 2977.00 1162.00 178 549 - 59 36 Submitted to RO NHAI Jaipur vide PIU Letter No.169 dated 15.01.2013 Estimate returned to PIU by RO Jaipur vide letter No.NHAI/12022/5/2013-ROJ/Tech/1851 dt.20.09.2013 and same has been forwarded to SE, AVVNL Bhilwara vide this office letter no. 22512 dated 01.10.2013 for revision of

Monthly Progress Report Nov. 2014 Page 20 of 38

Page 25: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No. Pa

ckag

e ChainageState Distt.

Estimate by Dept.

Revaluated Estimate

by IE

Proposed Shifting Work

Remark 33KV Pole

11 KV Pole

LT Pole

Transformer pole

U/g Cable

crossing

From To Amt (lacs) Amt (lacs) (Nos.) (Nos.) (Nos

.) (Nos.) (Nos.)estimate due revision of SIR, if any.

4II

150.9 213Chittorgarh 1793.98 688.73 10 50 80 41 35

Submitted to GM (Raj.) NHAI HQ vide PIU Letter No. 2993 dated 23.10.20125 213 165

6

III

0 24

Udaipur&

Dungarpur

611.31 364.62 9 14 30 29 21

Submitted to GM (Raj.) NHAI HQ vide PIU Letter No.3148 Dated 07.11.2012

7 117 165 1156.9 948.87 58 185 170 60 408 286 317 657.31 340.38 18 107 94 19 12

9 317 388 1194.68 951.49 48 32 73 39 50

10IV

388 398

Guj

arat Sabarkantha

213.97 213.97 - 110 76 9 22Estimates submitted to R.O. Jaipur for approval which was returned vide letter no.1851dated 02.09.2013 for re-examination in view of revised scheduled rates by concern Utility department Accordingly the same have been forwarded to concern Utility department for revised the

11 401 421 284.06 284.06 - 148 32 112 2612 IV

& V 423 478 1268.46 1268.46 - 574 80 21 121V 478 491 Gandhinagar 180.06 180.06 - 148 5 3 20

Monthly Progress Report Nov. 2014 Page 21 of 38

Page 26: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No. Pa

ckag

e ChainageState Distt.

Estimate by Dept.

Revaluated Estimate

by IE

Proposed Shifting Work

Remark 33KV Pole

11 KV Pole

LT Pole

Transformer pole

U/g Cable

crossing

From To Amt (lacs) Amt (lacs) (Nos.) (Nos.) (Nos

.) (Nos.) (Nos.)

estimate as per revised scheduled 13 491 509 456.32 456.32 - 425 50 23 50

14 432.433+ 860 111.09 111.09 Shifting of 66 KV Line Himatnagar – Gabhoi &

Ransan Gabhoi (2 lines)

Estimates receive from GETCO & submitted to NHAI duly checked on dated 26.11.12

15

509+213, 509+119,509+203, 509+208,496+221

344.50 344.50Shifting of 66 KV Ransan – Reliance, Ransan Bhat,Ransan Narora – Dabhoda, Ransan Bhat Chiloda &Chiloda Solankipura line

Estimates receive from GETCO & submitted to NHAI duly checked on dated 26.11.12

Monthly Progress Report Nov. 2014 Page 22 of 38

Page 27: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

3.1.2 Other Utilities:

The Other Utilities like water pipe line and gas pipe line are identified and status is given in table below.For Bhilwara, Chittorgarh, Udaipur and Dungerpur district estimates are under review with the IE. For Sabarkantha and Gandhinagar district verified estimate is forwarded to RO, Jaipur.

a) Water Pipe Lines Table - 3.2 Water Line Status

S.No.

Pack

age Chianage

State Distt.

Estimate by

Dept.

Revaluated Estimate

by IE Remark

 Present Status

  Fro

m to Amt (lacs)

Amt(lacs)

1

I 0.830 of

NH-79A

36.100 of

NH-79A

Raj

asth

an

Ajmer     Status not available  15.000

of NH-79

43.000 of

NH-79

2 43.000 of

NH-79

129.900 of

NH-79

Bhilwara 1042.33 1021.14 Deduction:- HP: 2 nos - beyond ROW. Pipe line: 800m & 500m length (100mm & 150mm respective dia - calculation mistake)

Submitted estimates were reviewed. Some observation noticed on scrutiny has been sent to concern department for compliance/clarification vide letter no.2496, dated 15.09.2012

Monthly Progress Report Nov. 2014 Page 23 of 38

Page 28: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S.No.

Pack

age Chianage

State Distt.

Estimate by

Dept.

Revaluated Estimate

by IE Remark

 Present Status

  Fro

m to Amt (lacs)

Amt(lacs)

3

II

129.900 of

NH-79

164.000 of

NH-79Chittorgarh 160.68 132.32 Deduction:- HP: 7 nos, compound wall,

& 100 KL OH tank beyond ROW

Submitted estimates were reviewed. Some observation noticed on scrutiny has been sent to concern department for compliance/clarification vide letter no.2131, dated 13.09.2012

Km 0.000 to 29.600 Chittorgarh Bypass

Raj

asth

an

4

Km 0.000 to 24.000 (New Udaipur

Bypass )

Udaipur (Debari to

Baran incl.Udaipur

Bypass)

50.95 50.95 No Change Revised estimate submitted to PIU on dated 15.02.2014

287.000 of NH-8

317.000 of NH-8

5

III, IV

130.000 of

NH-76 (RHS)

163.000 of

NH-76 (RHS)

Udaipur (Mangalwar to Udaipur

Sub. Div.Mavli)

82.80 82.80 No change after revision Revised estimate submitted to PIU on dated 15.02.2014

6130.00

0 of NH-76 (LHS)

163.000 of

NH-76 (LHS)

Udaipur (Mangalwar to Udaipur

Sub. Div.Bhindr)

55.98 55.98 No change after revision Revised estimate submitted to PIU on dated 15.02.2014

Monthly Progress Report Nov. 2014 Page 24 of 38

Page 29: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S.No.

Pack

age Chianage

State Distt.

Estimate by

Dept.

Revaluated Estimate

by IE Remark

 Present Status

  Fro

m to Amt (lacs)

Amt(lacs)

7117.00

0of NH-76

130.000 of

NH-76

Udaipur (Govla to Debari on

NH-76

30.50 30.59 No change after revision Revised estimate submitted to PIU on dated 15.02.2014

8310.00

0 of NH-8

320.000 of NH-8

Raj

asth

an

Udaipur (Salumber

Dn.)44.86 44.86 No change

Submitted estimates were reviewed. Some observation noticed on scrutiny has been sent to concern department for compliance / clarification vide letter no.2270, dated 01.10.2013

9355.00

0 of NH-8

388.000 of

NH-8Dungarpur 21.24 21.24 No change after revision Revised estimate submitted to

PIU on Dated 14.02.2014

Monthly Progress Report Nov. 2014 Page 25 of 38

Page 30: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S.No.

Pack

age Chianage

State Distt.

Estimate by

Dept.

Revaluated Estimate

by IE Remark

 Present Status

  Fro

m to Amt (lacs)

Amt(lacs)

10 IV388.00

0 of NH-8

478.000 of

NH-8

Guj

arat

Modasa 83.19 83.19 No Change

Estimates of Rs. 80.97 Lacs approved by R.O. Jaipur vide letter no. 3285, dated 18.12.2012 Balance estimate of Rs. 2.22 Lacs has been sent to Concern department for re-examination vide S.O.Hmt letter no. 671, dated 18.10.2013

Guj

arat

Bhiloda 10.61 10.61 No Change

Estimates of Rs. 5.62 Lacs approved by R.O. Jaipur vide letter no. 3285, dated 18.12.2012 Balance estimate of Rs. 4.99 Lacs has been sent to Concern department for re-examination vide S.O.Hmt letter no. 671, dated 18.10.2013

Himmatnagar 93.56 93.56 No Change

Estimates of Rs. 92.31 Lacs approved by R.O.Jaipur vide letter no. 3285, dated 18.12.2012 Balance estimate of Rs. 1.25 Lacs has been sent to Concern department for re-examination vide S.O.Hmt letter no. 671, dated 18.10.2013

Monthly Progress Report Nov. 2014 Page 26 of 38

Page 31: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S.No.

Pack

age Chianage

State Distt.

Estimate by

Dept.

Revaluated Estimate

by IE Remark

 Present Status

  Fro

m to Amt (lacs)

Amt(lacs)

11 V478.00

0 of NH-8

509.000 of

NH-8Gandhinagar 166.48 166.48 No Change

Estimates of Rs. 166.48 Lacs approved by R.O. Jaipur vide letter no. 3285, dated 18.12.2012

Monthly Progress Report Nov. 2014 Page 27 of 38

Page 32: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

b) GAS Pipe Lines Table - 3.3 GAS Pipe Line Status

S. No. State Districts Status

1 Rajasthan

Ajmer 4 Crossing identified and concerned agency notified.

Bhilwara No Gas Pipe line found.

Chittorgarh -Do-

Udaipur -Do-

Dungarpur -Do-

2 GujaratSabarkantha 16 locations identified and concerned agency

notified. Protection work by concerned agency completed in 2 locations.Gandhinagar

3.1.3 Trees Removal:

The Trees coming inside the construction limit is identified and status is given in table below.

Table - 3.4 Trees Removal Status

S. No.

State Status

1 Rajasthan & Gujarat

Ministry of Environment and Forest vide letter F.No. 10-108/2011-IA-III dated 21.03.2013 has accorded Environmental Clearance for the whole Project.

Monthly Progress Report Nov. 2014 Page 28 of 38

Page 33: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No.

State Status

2 Rajasthan

Ministry of Environment and Forest vide letter No. 8/88/2012 – FC (I), dated – 26.02.2013 accorded Stage-I approval for diversion of 78.01 Ha. Of Forest Land in the state of Rajasthan. In compliance to the Stage-1 approval an amount of Rs. 10,27,54,096/- has been deposited with State CAMPA on 25.10.2013.The State Forest department has submitted the compliance report of Stage-I to MoEF New Delhi for Stage-II i.e. final approval vide letter no. F-14 (NH)/2011/FCA/Pramuvans/10188 dated 06.12.2013. The Assistant Inspector General of Forest MoEF return back the proposal with three short coming on vide File No. 8-88/2012-FC Dated 26.12.2013.The compliance of the three observation made and the PD Udaipur submitted the report to Nodal Officer (FCA), Jaipur vide Letter No.NHAI/UDR/1318 Dt. 29.05.2014 with required certificate for Schedule Tribes and other Traditional Forest dwellers Act 2006 from all the District Collector Dungarpur,Udaipur, Chittorgarh,Bhilwara andAjmer. The report from concern DCF has been submitted to Nodal officer for further submission to Asst. Inspector General of Forest MoEF in July 2014 . The M/s Louise Berger Group Inc. Plot No.3to6, Sector 32, Huda Shopping Centre, Gurgoan is following up the approval of Forest clearance as consultant.

3 Gujarat

Ministry of Environment and Forest vide their letter F.8-105/2013-FC dated NIL in April,2013 has accorded Stage I approval for diversion of 173.39 Ha. Of Protected Forest Land in the State of Gujarat in compliance to the Stage-1 approval an amount of Rs. 14,80,27,244/- has been deposited with State CAMPA on 02.09.2013. The State Forest department forwarding the compliance to MoEF, New Delhi for Final approval (Stage-II) in May.2014. Diversion of 173.39 Ha procted forest land in Gujarat state, for Stage-II. Proposal has been return back by MoEF New Delhi vide FNO 8-105/2812-fc July 2014 with three observation to Principal Secretary (Forest) Gujarat.

3.2 PROPOSED ROW – LAND ACQUISITION

The status of Land acquisition is given below in Table 3.6.

a) Land Acquisition

Monthly Progress Report Nov. 2014 Page 29 of 38

Page 34: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Table - 3.5 Land Acquisition Status

S. No. State Districts Status

1 Rajasthan

Ajmer

5.5923 Ha of 3 (D) published out of 38.9754 Ha. 19.00 Ha of 3 (A) for additional land is published out of 22.16 Ha, 0543 Ha of 3G Published, 17.61 Ha of 3D for additional land published.

Bhilwara2.528 Ha of 3 (D) published out of 14.5652 Ha. 20.83 Ha of 3 (A) for additional land is published out of 22.83 Ha, 19.896 Ha of 3D for additional land published.

Chittorgarh 23.424 Ha. Of 3 (D) published out of 23.424 Ha.

Udaipur223.167 Ha of 3 (D) published out of 223.167 Ha. 81.192 Ha of 3 (A) for additional land is balance to be published.

Dungarpur0.8131 Ha of 3 (D) published out of 0.8131 Ha. 13.667 Ha of additional land for 3A submitted to HQ for approval.

Gujarat

Sabarkantha27.58 Ha of 3 (D) published out of 56.108 Ha & 17.87 Ha of 3A for additional land published & 41.19 Ha of 3D for additional land published.

Gandhinagar20.23 Ha of out of 27.962 Ha & 4.76 Ha of additional for 3A Published & 4.76 Ha of additional land for 3D published.

b) Encroachment / Obstruction list

The identification of encroachment by various elements is to be started.

Table - 3.6 Encroachments / Obstruction Status

S. No. State Districts Status

1 Rajasthan Ajmer Project Inventory as per CA Clause 10.3.1 is yet to be taken up.

Bhilwara -Do-

Chittorgarh -Do-

Udaipur -Do-

Monthly Progress Report Nov. 2014 Page 30 of 38

Page 35: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

S. No. State Districts Status

Dungarpur -Do-

2 GujaratSabarkantha -Do-

Gandhinagar

-Do-

3.3 RELOCATIONS OF COMMUNITY / RELIGIOUS PROPERTIES

The identification by Concessionaire is to be started.

3.4 REHABILITATION OF EXISTING STRUCTURES

Assessment is to be initiated by Concessionaire.

3.5 CONDITION PRECEDENT

3.5.1 Contractual Provisions

Under the provision of Article 4 of CA, Concessionaire and Authority have obligation to be fulfilled before achieving of Appointed date. Clause 4.1 of CA illuminates respective rights and obligations of the both Parties and briefed as given below.

NHAI has obligation to fulfil following conditions

a) The Right of Way to the Site in accordance with the provisions of Clause 10.3.1 of CA.

b) issued the Fee Notification;c) Deletedd) Approval of the Railway authorities in the form of a General Arrangement Drawing

for Rail Over Bridges on the Project Highway e) Applicable Permits relating to Environmental Protection & Conservation of the Site:

Similarly Concessionaire has Obligation to be fulfilled prior to Appointed Date as given below:

a) Performance Security;b) Execution of the Escrow Agreement;c) Substitution Agreement;d) Applicable Permits specified in Schedule-E unconditionally or if subject to conditions,

then all such conditions shall have been satisfied in full and such Applicable Permits are in full force and effect;

e) The Financing Agreements;

Monthly Progress Report Nov. 2014 Page 31 of 38

Page 36: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

f) Financial Package and the Financial Model, which is acceptable to the Senior Lenders;g) Respective confirmation, in original, of the correctness of their representations and

warranties set forth in Sub clauses (k), (1) and (m) of clause 7.1 of CA.h) Legal opinion from the legal counsel of the Concessionaire with respect to the

authority of the Concessionaire to enter into this Agreement and the enforceability of the provisions thereof:

3.5.2 Status

The present status defined under Clause 4.1.2 for Authority and Clause 4.1.3 for Concessionaire is summarized in table below.

Table - 3.7 Summary of Conditions Precedent

Summary of Conditions Precedent & Current Status of the Project

Sr. No.

CADescription Status Remarks

Clause1 4.1.

2 a) Land Acquisition / Right of Way

3(D) Gazette notification for 378 Ha. out of 378.00 Ha. has already been published. 206.1655 ha. 3(G) (award) has already been declared and balance 3(G) is in process with Competent Authority.

b) Fee Notification Gazette Notification Published vide S.O. No. 4(E) on 01.01.2013

c) GAD approval from Railways All 5 GAD approved by CBE, NWR, Jaipur.Approved GAD issued to the Concessionaire

Forest & Environmental Clearance

Ministry of Environment and Forest vide their letter F.No. 10-108/2011-IA-III dated 21.03.2013 has accorded Environmental Clearance for the whole Project.

Ministry of Environment and Forest vide letter No. 8/88/2012 – FC (I), dated – 26.02.2013 accorded Stage-I approval for diversion of 78.01 Ha. Of Forest Land in the state of Rajasthan. In compliance to the Stage-1 approval an amount of Rs. 10,27,54,096/- has been deposited with State CAMPA on 25.10.2013.The State Forest department has submitted the compliance report of Stage-I to MoEF New Delhi for Stage-II i.e. final approval vide letter no. F-14 (NH)/2011/FCA/Pramuvans/10188 dated 06.12.2013. The Assistant Inspector General of Forest MoEF return back the proposal with three short coming on vide File No. 8-88/2012-FC Dated 26.12.2013.The compliance of the three observation made and the PD Udaipur submitted the report to Nodal Officer (FCA), Jaipur vide Letter No.NHAI/UDR/1318 Dt. 29.05.2014 with required certificate for Schedule Tribes and other Traditional Forest dwellers Act 2006 from all the District Collector Dungarpur,Udaipur, Chittorgarh,Bhilwara andAjmer. The report from concern DCF has been submitted to Nodal officer for further submission to Asst. Inspector General of Forest MoEF in July 2014 . The M/s Louise Berger Group Inc. Plot No.3to6, Sector 32, Huda Shopping Centre, Gurgoan is following up the approval of Forest clearance as consultant.Ministry of Environment and Forest vide their letter F.8-105/2013-FC dated NIL in April,2013 has accorded Stage I approval for diversion of 173.39 Ha. Of Protected Forest Land in the State of Gujarat in compliance to the Stage-1 approval an amount of Rs. 14,80,27,244/- has been deposited with State CAMPA on 02.09.2013. The State Forest department forwarding the compliance to MoEF, New Delhi for Final approval (Stage-II) in May.2014. Diversion of 173.39 Ha procted forest land in Gujarat state, for

Monthly Progress Report Nov. 2014 Page 32 of 38

Page 37: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Stage-II. Proposal has been return back by MoEF New Delhi vide FNO 8-105/2812-fc July 2014 with three observation to Principal Secretary (Forest) Gujarat.

2 4.1.3

a) Performance security Fulfilled

b) Escrow agreement Fulfilled

c) Substitution agreement Fulfilled

d) Applicable permits Refer Sheet "Applicable Permit" In progress

e) Financing agreements Fulfilled

f) Financial Models Fulfilled

g) Correctness of their representations Fulfilled

h) Legal opinion Fulfilled

Current Status of The Project

(i) Letter of termination given by the concessionaire on Dt.21.12.2012 & 07.01.2013 based on non compliance of condition precedent for environment & forest clearance as per Agreement Article – 4 sub clause 4.1.2

(ii) The Concessionaire M/s. GMR has invoked Clause 37.2 of Concession Agreement and the matter is pending in High Court, New Delhi (OMP-1234/2012)

(iii) The policy for rationalization of premium quoted by the Concessionaire in respect of highway projects approved by MoRT&H Delhi and the concessionaire has been requested to submit the proposal by NHAI H.Q. on 2nd April 2014.

(iv) The NHAI HQ directed to prepare a Web Site for this project. The same has been prepared in consultation with PD Office in this month. Accident data fill in Web Site up to Sep.2014.

(v) The NHAI HQ also develop a Project Monitoring & Information System (PMIS) data entry software to monitor monthly progress of each on going PPP Project. As the concessionaire M/s GMR Kishangarh Udaipur Ahamedabad Expressways Ltd. Has

Monthly Progress Report Nov. 2014 Page 33 of 38

Page 38: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

issued terminate notice on Dated 07.01.13 and at present no work is in progress. Therefore the required data available in this office as well as in PD office has been entered in the system. Now before 25th date of each month, These datas are to be updated as per Target achieved in each sector of the Project in this month.

There was a Training at R.O.Office Jaipur on 17th,18th & 19th July 2014. In which M.S.Pandya, Sr. Pavement specialist (On 18 & 19th July’14), Praveen Jain, Survey Engineer (On 18 & 19th July’14), Mr. Sangram Singh (On 17th & 19th July’14) and Mr. Sanjay Sharma, Computer operator (17th to 19th July’2014) participated. The PMIS Data regarding L.A. has been updated up to Oct. 2014.

Monthly Progress Report Nov. 2014 Page 34 of 38

Page 39: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Concessionaire is in process of getting clearances / permits / licenses as required for executing the contract in compliance with Rules / Law of Local Government / Central Government. Many of such permits have been already procured by the concessionaire. Summary is presented in Table given below.

Table - 3.8 Summary of Applicable Permits Status

Summary of Applicable Permits Status       

Sr. No. Applicable Permits Status* Remarks

(a) Permission of State Government for Extraction of Boulders from Quarry 3 out of 6 Construction Contractors have obtained Permission

Partially Fulfilled

(b) Permission of Village Panchayat & Pollution Control Board for Installation of Crushers

VP : 5 out of 6 Construction Contractors have obtained Permission Partially

FulfilledPCB : 4 out of 6 Construction Contractors have obtained Permission

(c) License for use of Explosives

1 out of 6 Construction Contractors obtained permission & for 3 locations work sublet by Construction Contractors to Agencies possess Explosive License

Partially Fulfilled

(d) Permission of the State Government for drawing Water from River/Reservoir Not Obtained Not Fulfilled

(e) License from Inspector of Factories or other Competent Authority for setting up of Batching Plant

Not Required in the state of Rajasthan , since no. of laborers at this unit are less than 10. License for Gujarat state yet to be submitted

Partially Fulfilled

(f) Clearance of Pollution Control Board for setting up of Batching Plant 3 out of 6 Construction Contractors have obtained Clearance

Partially Fulfilled

(g) Clearance of Village Panchayat & Pollution Control Board for Asphalt Plant VP : 4 out of 6 Construction Contractors have obtained Clearance

Partially Fulfilled

Monthly Progress Report Nov. 2014 Page 35 of 38

Page 40: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

PCB : 2 out of 6 Construction Contractors have obtained Clearance

(h) Permission of Village Panchayat & State Government for Borrow Earth

VP : 2 out of 6 Construction Contractors have obtained Permission Partially

FulfilledState Govt. : 3 out of 6 Construction Contractors have obtained Permission

(i) Permission of State Government for Cutting of Trees, and Forest Clearance of Gujarat is under process with NOEF Not Fulfilled

(j) Clearances required under Applicable Laws – Permission on of CWC for drawing underground water Nil Not Fulfilled

* Notes

:

The GPPL is approved EPC Contractor, coveyed by NHAI HQ vide Letter no. NHAI/NHDP-V/BOT(Toll)/FR/10/UA/170, dated - 9th Aug'12. M/S. GPPL has further executed the Contract Agreement with M/S. L&T Ltd., M/S.GMRIL-EPC Division and M/S. Boyance Infrastructure Pvt. Ltd. & submitted vide their letter nos.GKUAEL/UDR-SPV/PIU/140 & 148, dated - 12th Sep'12 & 21st Sep'12 respectively without prior approval of NHAI. Albeit the approval of NHAI is still awaited, the permits obtained by the Construction Contractors are also considered in the above status.

.

Monthly Progress Report Nov. 2014 Page 36 of 38

Page 41: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

3.6 DRAWING AND DESIGN

3.6.1 Topographic Survey

Concessionaire has reported the completion of the entire activity of Topographic survey and joint verification of Udaipur Bypass is being taken up.

Table - 3.9 Topographic Survey Status

S. No. Package

Design Chainage Status*

From To Control Points/ Bench Mark Traversing DGPS

surveyTopographic

surveyBench mark

1 Package -10+000 90+000 completed completed completed completed completed

90+000 185+000 completed completed completed completed completed

2 Package -2 185+000 309+000 completed completed completed completed completed

3 Package -3 309+000 363+000 completed completed completed completed completed

4 Package -4 363+000 434+000 completed completed completed completed completed

5 Package -5 434+000 555+480 completed completed completed completed completed

Monthly Progress Report Nov. 2014 Page 37 of 38

Page 42: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

3.6.2 Geo-Technical Investigation

Table - 3.10 Geo-Technical Investigation Status

S. No. Pa

ckag

e Highway Construction Arrangement

SideFlyovers Interchanges

Rail Over

Bridge

Vehicular Under Pass

Pedestrian Under Pass

Major Bridges

Minor Bridges

Main CW Service Road

New New New New Wdn New New New Wdn New Wdn

1 I WideningLHS 5 - - 10 - 49 1 1 3 18 -RHS 5 - - 10 - 49 1 4 - 20 -

% 100% - - 100% - 100% 100% 100% 100% 100% -

2 II WideningLHS 2 - - 9 1 24 - - - 8 2RHS 2 - - 9 1 24 - - 1 8 2

% -

3 III

BypassLHS 1 - - 2 - 9 2 11 - - -RHS 1 - - 2 - 9 2 11 - - -

%

WideningLHS - 2 2 2 - 8 - - - 1 -RHS - 2 2 2 - 8 - - - 2 -

%

4 IV WideningLHS 7 - - 3 - 13 1 - - 3 -RHS 7 - - 3 - 13 1 - 1 3 -

%

5 V WideningLHS 12 - - 12 - 10 3 1 3 11 -RHS 12 - 3 12 - 10 3 5 3 11 -

%

Monthly Progress Report Nov. 2014 Page 38 of 38

Page 43: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

3.6.3 Pavement Investigation

Table - 3.11 Pavement Investigation Status

S. No. Package No.

Chainage Status*

From To Trial Pit BBD Survey Material Investigation BBD Analysis Pavement

Design

1 Package - 10+000 90+000 completed completed completed completed completed

90+000 185+000 completed completed completed completed completed

2 Package - 2 185+000 309+000 completed completed completed completed completed

3 Package - 3 309+000 363+000 completed completed completed completed completed

4 Package - 4 363+000 434+000 completed completed completed completed completed

5 Package - 5 434+000 555+480 completed completed completed completed completed

*status as reported by Concessionaire. Reports are yet to be offered for review

Monthly Progress Report Nov. 2014 Page 39 of 49

Page 44: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

3.6.4 Drawing and Design Approval

The Status of Drawing and Design submitted by Concessionaire/GDC is given in following table.

Drawing Summary

Highway Drawing Status for Current Month:

Status of Highway drawings is given as below:

Table - 3.12 Highway Drawing / Design Approval StatusSl. No. Description Status of the Drawing Remarks

1 Plan & Profile of Km 30+000 to 36+000 After Comments under Revision with Concessionaire

2 TCS of Km 0+000 to 23+000 Reviewed & Concurred

3 Plan & Profile of Km 147+000 to 157+000 After Comments under Revision with Concessionaire

4 Plan & Profile of Km 120+000 to 137+000 After Comments under Revision with Concessionaire

5 Plan & Profile of Km 100+000 to 110+000 After Comments under Revision with Concessionaire

6 TCS of Km 540+000 to 555+480 Reviewed & Concurred

Monthly Progress Report Nov. 2014 Page 40 of 49

Page 45: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Highway Drawing Status:

Up to date Status of Highway drawings is given as below:

Sr. No. Package No.

Design Chainage in Km Description

 Revision

No.Present Status

From To Date1 Package-2 185+000 309+000 Typical cross-section R1 29-Jun-12

Revisions of IE comments Pending with Concessionaire

2 Package-3 363+000 434+000 Typical cross-section R1 29-Jun-123 Package-5 434+000 555+480 Typical cross-section R1 29-Jun-124 Udaipur by Pass 000+000 023+300 Plan and Profile R1 1-Aug-125 Udaipur by Pass 001+000 002+000 Plan and Profile R1 1-Aug-126 Package-5 540+000 555+480 Plan and Profile R1 11-Aug-127 Pakage-1A 000+000 090+000 Typical cross-section R1 20-Oct-128 Pakage-2 137+000 185+000 Typical cross-section R1 26-Oct-129 Pakage-1B 90+000 137+000 Typical cross-section R1 29-Oct-1210 Pakage-1A 045+000 060+000 Plan and Profile R1 7-Nov-1211 Pakage-1A 000+000 030+000 Plan and Profile R1 9-Nov-1212 Pakage-1B 110+000 120+000 Plan and Profile R1 9-Nov-1213 Pakage-2 157+000 185+000 Plan and Profile R1 19-Nov-1214 Pakage-1A 036+000 045+000 Plan and Profile R1 21-Nov-1215 Pakage-1A 060+000 075+000 Plan and Profile R1 21-Nov-1216 Pakage-1A 075+000 090+000 Plan and Profile R1 24-Nov-12

Monthly Progress Report Nov. 2014 Page 41 of 49

Page 46: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Sr. No. Package No.

Design Chainage in Km Description

 Revision

No.Present Status

From To Date17 Pakage-2 137+000 147+000 Plan and Profile R1 26-Nov-1218 Pakage-1B 090+000 100+000 Plan and Profile R1 26-Nov-1219 Pakage-1A 030+000 036+000 Plan and Profile R1 3-Dec-12

20 Package-3 000+000 023+000 Typical cross-section R4 5-Dec-12 Reviewed & Concurred

21 Pakage-2 147+000 157+000 Plan and Profile R1 7-Dec-12Revisions of IE comments Pending with

Concessionaire22 Pakage-1B 120+000 137+000 Plan and Profile R1 10-Dec-1223 Pakage-1B 100+000 110+000 Plan and Profile R1 17-Dec-1224 Package-5 540+000 555+480 Typical cross-section R5 28-Dec-12 Reviewed & Concurred

3.6.5 Review of Structure Design & Drawing:

Table - 3.13 Structure Drawing / Design Approval Status

Type of Structure Package Description Present Status

Box Culverts 1 Miscellaneous drawings details of RCC Box Culverts from Km 0 to Km 90  Pending with Concessionaire 1 GAD of Culverts for Package 1A & 1B

1 Culverts GAD's between ch:0.000 to 15.000 km and 45.000 to 60.000 kmDesign & Drawing of RCC Box Culverts for Km 0-90

1 GAD of Culverts for mentioned chainages in Package 1A(R1)

Monthly Progress Report Nov. 2014 Page 42 of 49

Page 47: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Type of Structure Package Description Present Status

1 Design and Reinforcement Drawings of Box Culverts for Package 1A & 1B

1 GAD for Culverts with Pipe option on Service Road & Hydraulic Calculations for Culverts on Service Road for Package 1A

3 Design and Reinforcement Drawings of Box Culverts for Udaipur Bypass

3 Compliance on general arrangement drawing, design and reinforcement drawings of box culverts for udaipur bypass

Under review with IE (Note : The Ground level at D/S should be modified, so that there must be free flow of water)

3 Design &Drawings of Box Culverts (Udaipur Bypass) Review & Concurred on 31/12/12

5 GAD of Box Culvert Km. 505+165(DCH 551+204) for Package-5 Pending with ConcessionaireSlab

Culverts 1 GAD for widening of slab culverts at toll plaza (existing km 40.806) Review & Concurred

PUP 1 GAD's of Pedestrian Underpass of Package-I Level C1 Compliance on GAD of PUP for Package-1A(R3) Pending with Concessionaire1 General Arrangement drawing of PUP for Package 1A & 1B Pending with Concessionaire1 Design and RC Drawings for PUP: Package 1A & 1B Under review with IE1 GAD for PUPs for Package-1B (Ch.0+000 to 90+000) Pending with Concessionaire1 GAD for PUPs for Package-1B (Ch.90+000 to 137+000) Pending with Concessionaire2 GAD for PUPs for Package-2 (Ch.137+000 to 185+000) Pending with Concessionaire3 Design, GAD and Numeration Drawings of PUP for NH-8 (R1) Review & Concurred3 Design, GAD and Numeration Drawing of PUP for Udaipur Bypass (R1) Review & Concurred5 GAD of PUP from Ch. 540+000 to Ch. 555+480 for Package-5 Pending with Concessionaire5 Design & Drawing of PUP for Package - V

Monthly Progress Report Nov. 2014 Page 43 of 49

Page 48: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Type of Structure Package Description Present Status

Under review with IE

Minor Bridges

1 Compliance on Hydrology report of package 1A & 1B1 Hydrology Report for Major & Minor Bridges: Package 1A & 1B1 GAD of Minor Bridge Package 1A1 Hydrology and Hydraulic Report for Package 1B (R1)

Review & Concurred2 Hydrology and Hydraulic Report for Package 2 (R1)3 & 5 Hydrology Report of Minor Bridges(12 nos) for Package-3&5

Pipe Culvert

1 GAD of Pipe Culverts for Package 1A- Part Submission Pending with Concessionaire1 GAD of Pipe & Box Culverts for Package-1B Under review with IE2 GAD of Pipe & Box Culverts for Package-23 GAD of Pipe Culverts in NH 8 Section of Package 3 (R1) Pending with Concessionaire

All Structures 3,4 &5

List of Structures : From Ch.309+000 to Ch. 363+000 & from Ch.434+000 to Ch. 555+480 Site Verification in Pending

Major Bridge

1 GAD of Major Bridge at Km. 63.652 - Package 1APending with Concessionaire

5Permission of SSNNL for construction of Major Bridge across Sardar Sarovar Narmada Canal

Flyover 1 GAD's of Flyover at Ch: 4+938, 39+578.282 & 58+518 for Package-1A  

All Structures 1 List of Structures : From Ch.0+000 to Ch. 90+000 Site Verification in Pending

VUP

1 GAD for VUP Package 1A Under review with IE

3 Design, GAD and Numeration Drawings of VUP at Ch: 349+809 of NH-8 section and VUP at Ch: 10+555 of Udaipur Bypass (Package 3)(R1) Not matching with CA

3 Design, GAD and Numeration Drawings of VUP at Ch: 361+455 of NH-8 section (Package 3)(R1) Not matching with CA

Temporary Toll Plaza 1 Design & Drawing of Canopy and Space Frame of Temporary Toll Plaza at Km.

40+806 & Km.100+600 Reviewed & Concurred

Monthly Progress Report Nov. 2014 Page 44 of 49

Page 49: The Ministry of Shipping, Road Transport & Highways ...nhai.org.in/spw/IEReport/Nov.14 Index.doc.docx · Web viewMonthly report on audit of the traffic using the Project Highway at

NATIONAL HIGHWAYS AUTHORITY OF INDIA

M/s. EUROESTUDIOS, S.L. Spain - M/s. THEME ENGINEERING SERVICES Pvt. Ltd

Six laning of Kishangarh-Udaipur-Ahmedabad Section of NH-79A, 79, 76 & NH-8 including new Udaipur bypass in the state of Rajasthan & Gujarat (Approx Length 555.50 Km) on BOT (Toll) basis in DBFOT pattern under NHDP Phase- V

Type of Structure Package Description Present Status

Temporary Toll Plaza 1 Temporary Toll Plaza at Km.40+806 & Km. 100+600 & Design of Sign Board for

Package-1A Under review with IE