The Network Strategy Plan

José VarelaSenior ATM Expert

23/01/2013

User Forum 2013

Page 2: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

2

� EC nominated Eurocontrol as Network Manager for ATM network functions

� DNM exercises NM Functions inside the Agency (DG decision)

� EU Implementing rule: Functions of the NM � Route Design� Coordination of scarce resources (frequency and codes)� ATFM

� Preparing NSP (including NM PP) and NOP

� Specific Governance: NMB with SSC opinions� Adoption of Route design plan; ATFCM procedures; actions on scarce resources� Adoption of NSP ( including NM PP) and NOP� Adoption of NM Budget ( 85 to 90 % of DNM budget)

The NSP defines the guiding principles for the network operationand its long term perspective

Our Mandate as Network Manager

Page 3: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

3

CDM Consultation and Approval Process

NSP 0.1

NSP 0.2NSP 0.x

NSP 1.0

EC

SSC

NMB

NDOP

Teams

PRB

Endorsement

Consultation

Page 4: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

4

Develop, maintain and implement a Network Strategy Plan in compliance with the performance scheme provided for in Regulation (EU) No 691/2010 and the European ATM master plan and taking into account any relevant ICAO Air Navigation Plans

Network Management Function IR

NSP

ATM Master PlanPerformance targets

ICAO Air Navigation Plans

Page 5: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

5

Structure of NSP

6 Main OPS drivers from a network perspective

10 Strategic Objectives (SO)

Actions for SO implementation

7,000

8,000

9,000

10,000

11,000

12,000

13,000

14,000

15,000

16,000

17,000

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Year

Eu

rop

ean

IFR

Mo

vem

ents

(00

0s)

Actuals 2005 Forecast Latest Forecast

Growth from 2005 to 2020 now forecast at 29% vs 2005 forecast of 73%

2005 Forecast

Latest Traffic Forecast

Economy and traffic trends

Page 6: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

6

The Strategic Operational Drivers

Flexible Airspace Structure

Free Route implementation

Flexible& reactive Capacity

Management

IncreaseOperationalPredictability

MeasureOperational

Performance

Page 7: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

7

Main areas of work > Strategic Objectives

CDM

Information sharing

NM Performance Plan

Airports

Safety

Scarce Resources

Human Resources

Address RP2 (2015-2019)

Network Management

ATM Network Operations

Preparing the Future

Operations Planning

Operations

Page 8: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

8

� 2014: Cooperative Decision-Making process, able to amend the plans as required by the performance needs.

� 2013: All functions (ATFM, Scarce resources, RND, Crisis Mgt) and operational tasks (FPL, ASM, EAD) are covered by a Network Handbook

� 2013: Monitoring and reporting available at NMB and NDOP levels.

Page 9: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

9

� 2014: Network Information flows available to support Operations Planning and Operations (SO4 and SO5)

� 2014: Full deployment of IP network for ATM applications (FMTP/OLDI), VoIP, SUR data etc) and messaging directory services.

� 2015: VDL Mode 2 infrastructure deployed in support of CPDLC Datalink (EU IR)� 2014: Comply with the existing interoperability rules and to ensure a common

understanding of the new rules and standards being elaborated.� 2014: Improve interoperability by enabling use of services; providing evidence of service

performance.� 2014: Consolidate the use of EAD as a central reference for AIM data

Page 10: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

10

� 2014: NM to comply with the targets defined in the NMPP

Page 11: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

11

� 2014: Achieve the target for En-route Capacity

� 2014: Achieve the flight efficiency target for route design and for flight planning

� 2014: ATM local enablers implemented to achieve the performance objectives where required

� 2015: Data-Link available in all ATC Centres above FL 285 (EU IR)

Page 12: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

12

� 2014: Achieve the network capacity and flight efficiency targets

� 2014: Standard procedures available demonstrating benefits on ATM performance (network delay attribution)

� 2014: Short-Term ATFM Measures (STAMs) used for critical capacity areas.� 2104: Flight efficiency KPI (FPL) achieved

� 2014: Shared airspace situation available at network and FAB level

Page 13: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

13

� 2014: Reduce arrival delays to 0.5 minutes

� 2014: Agreed procedure between NM, ANSP and fully coordinated airports covering airport slots, analysis of turn-around related delays and their impact, operational relationship and KPIs

� 2014: 25% of traffic subject to DPI. � 2014: Airport CDM implemented on 20 of the top 40 traffic airports

� 2014: Agreed procedure for monitoring ASMA KPI

Page 14: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

14

� 2014: Deploy Risk Analysis Tool in all main ANSPs (to be used for assessing Separation Minima Infringements, Runway Incursions and ATM Specific Occurrences.)

� 2014: 3 million visitors of SKYbrary from 1 million visitors in 2011.� 2014: Establishment of a network Top 5 Operational safety risks and work on ATM

contributing factors to reduce the operational safety risks.� 2014: Define “level 3” ground-based safety nets by end of 2013� 2016: Implementation of effective "level 2" ground-based safety nets in all EUROCONTROL

member States.� 2014: All ANSPs and FABs Safety Management/Standard of Excellence Level 3. Support,

by the end of 2014, the measurement of Safety Culture within the remaining 14 ANSPs not yet covered..

� 2014: Safety Culture Measurement and Improvement plans in all ANSPs. ANSPs and NM will jointly develop and implement the Safety Human Performance Action Plan (up to 2014).

Page 15: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

15

� 2014: VHF frequencies assignment not creating critical delay for airspace improvements.

� 2014: Removal of Network capacity and safety constraints from the shortage of available transponder codes

Page 16: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

16

� 2014: Reduce ATFM delays by implementing capacity management processes.

� 2014: FAB report identifying capabilities, possibilities and limitations for staff mobility.

� 2014: Each FAB has completed a review to establish what is possible for cross unit ATS.

� 2014: NM has developed a common repository of policies and rules of implementation, including mitigations.

Page 17: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

17

SO 10: Prepare the Network Management and the Network Operations for RP 2

17

Management of ATM changes:

� A plan for implementation addressing RP2 performance Objectives;

� A concept for technology implementation at network level

Technology changes required to achieve 2019 network performance:

� ATC tools in support of Free Routeing;

� Initial Business Trajectory and support communication tools (initial SWIM) to improve Tactical Flow and Capacity Management;

� Network Operations Portal, Airport Operations Plan, structured aeronautical information and initial SWIM in support of the Network operations Planning;

�Data Link in support of Controller workload;

�Airport tools to optimise existing airport infrastructure;

�Improvement of Safety tools.

Page 18: The Network Strategy Planpublish.eurocontrol.int/.../130123-uf-md-jv-network-strategy-plan.pdf · The Network Strategy Plan José Varela ... ICAO Air Navigation Plans. 5 ... (FMTP/OLDI),

18

NSP Version 2

� The NSP will be updated to take account of technological, institutional and economic developments and the performance objectives of the second reference period.

� This will be achieved by December 2013.

� Economic context� Traffic decrease� Decreasing revenues

� Social issues