avi Energie Pvt. Ltd.202-2, Manubhai Towers-B,Sayajigunj,Vadodara - 390 005Telefax!9"-2#5-222#0#9 $ 23#"%&0
Mobile!9"-9'250 #'909(-)ail [email protected]
*+ 5"909./"99&T*022'"'
METHODOLOGY
Mobili1aion
lanningroje Monioring
.eneral
QUALITY CONTROL
roedureTesing 4or)as
*helis for onree wor, laser, Briwor, Seel e6
S. H. E. POLICY
List o Co!"#eted $ on%going "ro&e't
ENCLOSURES
*o)7any rofile
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
2/61
METHODOLOGY
A. Mobilization
. Planning
C. Pro!e"t Monitoring
#. $ualit%
E. &afet%
F. General
A. MOBILIZATION:
We will start mobilization with respect to machinery equipment and manpower to the site within 07 days
after receipt of LOI with advance.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
3/61
B. PLANNING:
On receipt of your LOI and Detail Drawings, a Detailed ar !hart will be provided by us who will spell
out the total plan for the pro"ect completion. #his Detail Bar Chart will be regularly updated indicating
the actual progress achieved vis$%$vis targeted plan both graphically as well as quantity wise and slippage&s
if any will be identified, highlighted and monitored and controlled. We will ensure that all
targets'milestone are continuously monitored and controlled.
Our planning team will plan the future activities, procurement of specialized materials, allocating the
specialized agencies and over all synchronizing of the various activities. #his planning shall be done in
consultation with site management.
Bar chart monitoring will be done on a Weekly basis.
(anpower mobilization chart along with (achinery mobilization chart will be prepared by us at the start
of the pro"ect and this will be continuously monitored and controlled to provide the necessary inputs.
C. METHODOLOGY
ASSUMPTION:). #ender Drawings i.e. *rchitectural +lan Drags issued along with
#ender Documents.. Owner shall hand over the site free from encumbrance and obstacle.
-. /ood for construction drawing from 0!! !onsultant ' *rchitect areIssued to us in advance and suitable time is given to plan and start
!onstruction *ctivity.
1. #emporary Water 2 +ower for construction purpose shall be given by
!lient free of cost.
3. !lient shall provide necessary land for building temporary site office,
!ement godown, 4ard for storing materials at free of cost.
5. +eriod of completion of proposed construction.
DEVELOPMENT / SUB-STRUCTURE / PLINTH:
a6 =e shall lear he enire lose soil and debris e6 fro) he onsruion >rea
)ehanially $ )anually as 7er sie re?uire)ens6
b6 The lo shall be filled u7 wih seleed exaaed earh aailable or )urru)
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
4/61
brough fro) ouside whereer leel has o be deelo7ed and leelling arried ou
wih 7ro7er onsolidaion6
6 Building :ine ou for 4oundaion of all sruure and 7er)anen Benh Mar shall
be go a77roed fro) >rhie $ *onsulan before exaaion6
d6 Based on 8** @esign @rawing and >rhieural :ayou 7lan, we shall sar
exaaion wor wih hel7 of (xaaors and dis7osal arried ou by engaging
suffiien du)7ers6
e6 +ndiidual 4ooings, Sub *olu)ns, =all fooings, of Main lan and on lan
bldg6 shall be onsrued and Bafilling arried ou by earh aailable a sie or
brough fro) ouside as 7er Awner $ *onsulan adie6
f6 8ubble Soling and .rade Slab of Bldg6 $ Sruure shall be arried ou afer duly
o)7aing he ba filed earh6
SUPER - STRUCTURE:
a6 Based on Sruural $ 8** @rawings, 4ra)ed sruure suh as olu)ns, bea)s,
slabs shall be onsrued wihin i)e shedule wih bes )aerial and
wor)anshi76b6 *enering and for) wor aiiy for 8** slab shall be arried ou wih
onenional 7lywood $ seel 7laes $ seel 7ro7 - su77or e6
6 The reinfore)en seel laying and onreing aiiy shall follow afer he
Shuering $ 4or)wor is o)7leed6
d6 =e shall 4abriae a sie sruural seel )e)bers and ereion arried ou as 7er
s7eifiaion laid ou in ender6
e6 Terrae =aer7roofing of Bldg6 shall be arried ou afer o)7leing errae slab
of >ll Bldg wih "0 years guaranee6
f6 >ll aboe wor shall be arried ou in 7resene $ guidane of Awner
re7resenaie $ 8** *onsulan6
g6 >ll safey )easures shall be aen during onsruion aiiy6BRICK / BLOCK MASONRY:
a< The Bri $ Blo wor shall sar si)ulaneously wih o)7leion of fra)ed
sruure and fron aailable floor $ area wise6
b< The Bri $ Blo wor shall be arried ou wih bes loally aailable Blos$bris
as 7er rogra))ed6
PLASTER [INTERNAL & EXTERNAL]
a< The inernal 7lasering wor shall be arried ou as 7er he Bar *har and uring
arried ou suffiienly6
b< The exernal 7lasering wor of Bri wall of Building and oher sruure shall be
arried ou as soon as inernal 7laser and fixing of @oor $ window Base fra)e is
o)7leed6 =e shall )obili1e ade?uae Man7ower $ saffolding )aerial for
arrying ou his aiiy6
OTHER MISC. STRUCTURE:
*onsruion of Aher Mis6 Sruure suh as underground ans, @rainage,8oads, aing,
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
5/61
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
6/61
36 =eigh Balane " os&6 *ubes, .lass /ar e6 2 Se56 *ube esing )ahine " o#6 *ube Mould "' o
6II7 !:(:=# /ODOW=>
$ !onsider )? days stoc@ will be -??? ags 9ize A B )? (eters.
6III7 L*O80 !*(+>
$ !onsider )3? +erson during +ea@ time, the area required for labor
!amp -?,??? 9qft.
IB7 9I#: 9#O0:> C?? 9qft. /eneral !ivil Items 9urvey Instruments : Lot. #heodolite,
Dumpy Levels, Level 9taff etc.7 9afety Items> Lot.
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
7/61
MONTHLY "EPO"T SHO%ING !PDATE P"OG"AMME COSTS # $O"CASTS
&A"IATION SA$ETY ETC.
8==*##I will prepare 9tatus 0eport on (onthly basis with following *nneEure>
*. *nneEure $I 0eview of +ending +oints on various meetings held with clients which are minted.
. *nneEure$II, +rocurement 9chedules, Drawings 9chedules and :rection, !ommissioning 9chedule.
!. *nneEure$III. Wor@ +rogress during and at the end of the month.
D. *nneEure$6. 8pdated construction schedule indicating upto date achievement'slippage vis$%$vis
planned for civil wor@s.
:. *nneEure$6III. +hotographs on progress at every month end.
G. P"OC!"EMENT P"OCED!"E:
8==*##I will wor@ out the requirement of rought out item required for the +ro"ect. With eEcellent
contacts 8==*##I has with the various suppliers, 8==*##I would be in a position to get more
attractive prices for these items.
). 8==*##I has a (aterial (anager at
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
8/61
I. SA$ETY :
*ll wor@ers shall be provided with necessary protective 2 safety equipments in the form of
a7 * hut of *rea of 51 sft. Inclusive of coo@ing place with minimum height C&$? at each level with
a coo@ing place ad"acent to the hut for each family.
b7 #emporary latrines and urinals for the use of wor@ers at the rate of four per each one hundred of
the total strength.
c7 #emporary bathing and washing places suitably screened one unit for every 3 persons residing
in the camp.
3 Dri,i,- %ater:
In every wor@ place, there shall be provided and maintained at suitable places easily accessible to
the wor@ers a sufficient supply of water fit for drin@ing.
9 Pr+i4i+, + 4helter *ri,- re4t:
*t every wor@ place shall be provided with suitable sheds for meals and for rest. #hese sheds shall
always be @ept clean.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
9/61
1111
; Cr. MEDICAL A""ANGEMENTS:
1 $ir4t Ai:
*t every wor@ place, there shall be provided and maintained in a readily available place ;irst *id
*ppliances including an adequate supply of sterilized dressings and sterilized cotton wool as prescribed in
the ;actory 0ules of the 9tate in which the wor@ is carried on. #he appliances shall be @ept in good order
and in large wor@ places, they shall be placed under the charge of a responsible person who shall be
trained in ;irst *id #reatments and who shall also to be readily available during wor@ing hours.
5 A,ti Malarial Pre6a*ti+,:
*ll anti malarial precautions will be ta@en including filing up any borrow pits which may lead to
ponding and to breeding of mosquitoes
1111
L. GENE"AL:
1 A66e44 +r i,4?e6ti+,>
During the progress of wor@s and maintenance period, proper means of access, ladders, gangways
etc. and necessary attendants to move and adapt the same will be provided for inspection or measurements
of wor@s.
5 Te?+rar2 %+r4@$a6ilitie4:
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
10/61
We will provide all such weather proof sheds for storage and protection of materials against the
effects of sun and rain. We will provide such temporary fences, guards, approaches, and roads as may be
necessary for eEecution of wor@ and for safeguarding the public.
3 Haar Ie,tii6ati+, @ "i4 A44e44e,t:
#his is covered under 9tandard 9afety 0ules.
9 Per4+,,el ?r+te6tie e*i?e,t:
#his is covered under 9tandard 9afety 0ules.
; Pla,t &ehi6le4 E*i?e,t # T++li,-:
We will provide necessary plant, concrete miEers, hoists, vibrators, scaffolding tac@les, cartage,
labour and removal of the same at the completion of wor@.
= E*i?e,t @ Material 4t+ra-e:
#his is covered under the temporary wor@s ' facilities
7 Y+*,- Per4+,4:
We have a strict control system pertaining to prohibition of employment of young children, non
adult wor@ers. =O young person shall be allowed to wor@ on any of our wor@ sites.
1111
LIST O$ D"A%INGS "E'!I"ED $O" E)EC!TION O$ P"OE/CT:
A"CHITECT!"AL D"A%INGS:
*7 /:=:0*L L*4O8# $ 9
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
11/61
LO!*#IO= O; :L:!. ;I##I=/9 :#!.
K7 +L8(I=/ L*4O8# ' +I+I=/ *00*=/:(:=# D0*WI=/.
J7 ;*L9: !:ILI=/ L*4O8# +L*= 9:!#IO=.L
L7 ;LOO0I=/ 2 D*DO D:#*IL9 $ +L*= 2 :L:6*#IO=.
(7 O#
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
12/61
PLANNING @ BAC>!P CALC!LATION.
1. E)CA&ATION @ SITE G"ADING %O">. #ender qty>
1;5=;3Output'+oclainM3??!um'A :
*ll reinforcement steel shall be stac@ed at steel yard i.e. near to site, cut with help of 0einforcement
!utting (achine, transported to wor@ place. #he steel shall be cut based on ar $ bending schedule
prepared by our G.9. at site. #ender qtyM 5;0MT Out put ) fittN) helpM)A?@g'days 3????')A?M)-AA
nos. )-AA'?daysM)3.1 say 1=,+4
C!"ING:
We plan to build loop line all around uilding with intermediate nozzles provides at every interval for
curing purpose.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
13/61
MASONA"Y %O">: Te,er t2
915;3
Output )massnN) helperM).m-'day 1)3').M-1-A nos
-1-A'13dayeMC5.1 say77 ,+4
INTE"NAL E)TE"NAL PLASTE": Te,er t2 1=57;5. Output )massnN)helperM)m'day
)5C3')M)-35nos )-35'13daysM30 ,+4
$O"M%O"> METHODOLOGY
GENE"AL
$+r+r 4hall 6+,4i4t + 4h+re4 8ra6i,-4 4ie4 + 8ea4 a, 6+l*,4 8+tt+4 + 4la84 et6
i,6l*i,- tie4 a,6h+r4 i,4ert4 et6. a, 4hall 8e ?r+?erl2 e4i-,e a, ?la,,e +r the +r.
$+r+r a2 8e + Ti8er Pl2++ etal et6.
1111
;ormwor@ shall be so constructed that vertical ad"ustments can be made to compensate for ta@e up and
settlements.
Wedges shall be used at the top or bottom of timber shores, to facilitate vertical ad"ustment or dismantling
of the formwor@.
G++ *alit2 FA6r+F spans, steel plates, steel props shall be mobilized for the provision of smooth
surface finishes.
We shall indicate quantities of such formwor@ and associated materials on mobilizing after award of wor@
and receipt of dregs.
;abricated structural steel sagging as read. based on structure7 and steel pipe scaffolding shall be used.
DESIGN O$ $O"M%O">
#he design and engineering of the formwor@ such as rai,-4 4et6h +r 6al6*lati+,4shall be submitted
to the !lient ' !onsultant :ngineer for approval before proceeding with the wor@. #he design shall ta@e
into account all the loads such as lie l+a4 4el ei-ht i8rati+, l+a4 et6. #he *d"ustable 9teel +rops
with stirrups heads shall carry vertical loads and steel pipes shall be clamped for horizontal bracings.
$O"M%O"> "E'!I"EMENTS
;ormwor@ shall conform to the shapes, lines, grades and dimensions including cambers of the concrete as
required by design.
A?le 4tr*t4 aler4 8ra6e4 tie4 4h+re4 et6. shall be used to hold the formwor@ in proper position
without any distortion whatsoever until the concrete has set sufficiently to permit removal.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
14/61
;ormwor@ shall be strong enough to permit the use of immersion vibrators. ;aces coming into contact
with concrete shall be free from adhering grout, plaster, paint, pro"ecting nails, splits or other defects.
Koints shall be sufficiently tight to present loss of water, cement and fine materials from concrete.
1111
*ll new and used timber shall be maintained in a good condition with respect to shape, strength, rigidity,
water tightness, smoothness and cleanliness of surfaces.
B"ACINGS ST"!TS AND P"OPS
;ormwor@ shall be braced, strutted, propped and supported so that it shall
withstand the load of concrete, movement of men and materials.
$+r+r t+ 8ea4 a, 4la84 4hall 8e 4+ ere6te that the +r+r +, the 4ie4 + 8ea4 a,*,er the 4+it4 + 4la84 6a, 8e re+e ith+*t i4t*r8i,- the 8ea4 8+tt+4.
6ertical props shall be supported on wedges or by means of ad"ustable stirrups head whereby props can be
gently lowered vertically while stri@ing the formwor@.
$+r +*8le hi-h 4*??+rt either H ( rae@6*?l+6 4hall 8e *4e +r +*8le 4ta-i,- 4*??+rt 4hall 8e
ere6te.
SHEA" %ALL @ COL!MNS ( TIES
Tie "+4 ( threae +, 8+th 4ie4 ith 8+lt4 a, 6+,eshall be used for :Eternal 9hear wall ' !olumns
of size greater than 5?? mm and #ie 0ods threaded on both sides with pipe sleeve shall be used for
internal 9hear wall '!olumns of size greater than 5?? mm. #he 9ide of 9hear wall ' !olumn will be made
out of +lywood or 9teel +lates.
CLOSING O$ GAPS
Ma4i,- ta?e shall be used for closing tags between steel plates and +atra patti used wherever +lywood is
used.
MO!LD OIL
1111
#he faces of formwor@ coming into contact with concrete shall be cleaned and +*l +ilor other equal
and approved material applied before fiEing reinforcement and pouring concrete.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
15/61
"EMO&AL O$ $O"M%O">
We shall @eep re6+r i, a re-i4terthe date upon which concrete is poured in each part of the wor@ and
the date on which the formwor@ has been removed there from.
#he formwor@ shall be struc@ only when concrete reaches the strength to withstand various loads while
stri@ing. *sper I9 code7.
9tri@ing
shall be
done slowly
with
outmost
care, to
avoid
damage to
any
pro"ectionsand without
shoc@ or
vibration.
*ny
embedded
timber shall
be removed
and made
good the
surface.
"E!SE O$
$O"M%O">
*ll formwor@ shall be thoroughly scraped, cleaned, nails removed, holes plugged, "oints eEamined and
repaired before reuse.
1111
!NNATTI CONST"!CTIONS P&T. LTD.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
16/61
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
17/61
$ MAINTAINING CHEC>LIST "EGISTE" $O" ALL CI&IL %O">S :
) 0!! WO0J (*9O=04 WO0J - +L*9#:0$ I=#:0=*L 1 +L*9#:0 $ :B#:0=*L 3
;LOO0I=/ WO0J 5 W*#:0+0OO;I=/ C +*I=#I=/ A +L8(I=/ :L:!#0I!*L )?
DOO09' WI=DOW9
1111
'!ALITY ASS!"ANCE $IELD TEST(SIE&E ANALYSIS(SAND
9L. =O.> D*#: >
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
18/61
1111
'!ALITY ASS!"ANCE $IELD TEST(SIE&E ANALYSIS(AGG"EGATE
9L. =O.> D*#: >
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
19/61
1111
CONC"ETE PO!" CA"D
9L. =O. .................D*#: ..................... =*(: O; !89#O(:0
.............................. =*(: O; WO0J ............................... WO0J9I#: >............... /0*D: O;
!O=!0:#: ............................... LO!*#IO= O; !O=!0:#I=/ ........................... 0:;:0:=!:
D0*WI=/ ............................... WI#< 0:6. =O.7 9L8(+ !:(:=# 0*#IO .................................
I=9+:!#IO= I#:(9 ................................. *7 !:(:=# 9*=D> ! (:#*L >
/rade> ul@age> 9ize' 6olume > !ompany > 9ilt !ontent> ++!'O+!'90! > 6olume>
)7 !O$O0DI=*#:9 > 7 L:6:L > -7
9 A7 (:*980:(:=# > 7
!O6:0 #O 0:I=;O0!:(:=# >
)7 +.!.!. G8*=#I#4 > 7 0.!.!. G8*=#I#4 >
7 #I(: O; !O((:=!: :(:=# > ;0O( > > #O> >
)?7 !:(:=# !O=98(+#IO= > :stimated *ctual */9 >
!8: ID:=#I;I!*#IO= =O9. >
#:9# 0:+O0#9 0:;. > *8#
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
20/61
of (iEer on +latform. d !ement ag weighing facilities. e !alibration of weight balance
?N?N)? Jgs.7
3 $INE AGG"EGATE :
a !onstant source chec@ 9and Pone or ;(7 b Washing facilities c 9creening facilities d
;*) 2 ;* separated by partition or separate bins.
9 COA"SE AGG"EGATE :
1111
a !onstant source ensure no !rusher /rit 2 Dust7 b !*) 2 !* separate by partition or
separate bins.
;. SAND B!L>AGE TEST :
a 9teel (easuring oE Q;arma watertight. b Large Q). E ). m plastic sheet. c uc@et of
Water. d (easuring #ape. e 9traight edge or ruler.
=. AGG"EGATES BATCHING :
a !alibrated Weigh batcher with aggregates in bins b 6arying (easuring oEes ;armas )
=s. c (iEer lac@board.
7. MI)E":
a !lean
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
21/61
1111
b #hic@ness stools Qghoddas.
13 %AL>%AY TOOLS :
a Width of wal@way plan@ minimum -? mm Q. b (aEimum length .1 m QA$?.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
22/61
19 &IB"ATION J?er MiKer.
a - =os. =eedle 6ibrators $ :lectric N ) +etrol. b =os. 9pare =eedles c 3 Litre tin with
petrol Qemergency. d Leveling eam. f (asons #rowel $ =os. g (asons ;loats +arts7. h
(asons Wooden ).? m long Wooden ;loat Qmothia. i 9ponge or Kute cloth to remove surplus
&leed& Water. "
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
23/61
8==*##I :ngineer RRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRR
!lient' !onsultant :ngineer > RRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRR
1111
CHEC> LIST $O" INTE"NAL PLASTE"
+ro"ect > RRRRRRRRRRRRRRR uilding =ame > RRRRRRRRRRRRRR Location > RRRRRRRRR
) !ompletion of concealed electrical'plumbing lines. *dequate hac@ing on all 0!! surface. -
/hadai Qcutting of bulges of 0!! Qif any. 1 Lea@ages if any Qtoilets'wc attended. 3 Window sill
completed. 5 Window plumb 2 level chec@ed. C 6ericality of window'door frames. A Watering
#arai7 is done on day before. ;iEing level pads QDhadas in plumb. )? *vailability of ;armas for
mortar miEing. )) !oncrete nails to door hold fasts on colomns side. ) ;iEing !hic@en mesh at
0!!'masonry "oins. )- *vailability of mortar trays Qoptional. )1 !hanges Q*lterations if any
completed. )3 ;an hoo@s on ceiling in position. )5 Kunctions boEed temporarily sealed. )C Whether
floor is clean before plaster.
=ame 9ignature
8==*##I :ngineer > RRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRR
!lient ' !onsultant :ngineer > RRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRR
1111
CHEC> LIST $O" E)TE"NAL PLASTE"
+ro"ect > RRRRRRRRRRRRRRR uilding =ame > RRRRRRRRRRRRRR Location > RRRRRRRRR
14t C+at :
) !lear upto )& $ ? below +.L. including leveling the area ............................. :recting Double
9caffolding '
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
24/61
corners ......................................................................... *dequate RRRRRRRRRRRRRRR uilding =ame > RRRRRRRRRRRRRR Location > RRRRRRRRR
) 9urface cleaned absolutely including removal of fungus. Qif necessary with
wire brush....
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
25/61
!hipped off set (ortar
-
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
26/61
available ................. > 1 Waterproofing compound
available .......................... > 3 +rovision'+ipe of wash basin toilet
laid > ..................
=ame 9ignature 8==*##I :=//. RRRRRRRRRRRRRRRRRRRRRRR
RRRRRRRRRRRRRRRRRRRRRRRR !lient ' !onsultant :ngineer > RRRRRRRRRRRRRR
RRRRRRRRRRRRRRRRRRRRRRRR
1111
CHEC> LIST $O" TILING :+ro"ect > RRRRRRRRRRRRRRR uilding =ame > RRRRRRRRRRRRRR Location > RRRRRRRRR
) 9urface is cleaned in advance.
edding (ortar proportion 2 thic@ness as per specification.
- 0equired door shutter height is available.
1 Defective tiles removed after chec@ing 2 tiles are of correct size as required.
3 Level pads for bedding mortar.
5 (ar@ing of level lines on all walls.
C 9offit of loft in toilet is in level, if not to be corrected as instructed.
A #oilet floor as per drawing
Dado as per drawing to match !.+. ;ittings, Window cill.
)? Dado to be in perfect plumb 2 right angle.
)) #ile "oints rac@ing, cleaning 2 later filling with matching cement 2 colour and removal of eEcess
material from "oints.
) !utting done in tiles for electric 2 plumbing points to be perfect.
)- !ut pieces where required made with machine.
)1 #iling wor@ is matching in colour'design.
)3 9@irting to be in plumb and right angle and flush with wall
)5 +olishing done with proper stone Qin case of Jota ' (arble any
)C
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
27/61
8==*##I :=//. RRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRR !lient '
!onsultant :ngineer > RRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRR
1111
CHEC> LIST O$ PL!MBING %O">S ( PA"T A :
+ro"ect > RRRRRRRRRRRRRRR uilding =ame > RRRRRRRRRRRRRR Location > RRRRRRRRR
) Drawing verified with site condition . Level of )s chamber to be chec@ed 2 verified - 9lope as
per Local *uthority rules available at size 1 (aterials available are as per standards 2 specifications.
3 9izes of man holes as required
CHEC> LIST $O" PL!MBING %O">S ( PA"T B
D+, tae JDrai,a-e :
) *ll shop drawings available (aterials at site as per
specifications - LIST O$ PL!MBING ( PA"T C :
G. I. L++?i,- # D+, tae :
) 9hop drawings available > a7 ;or #errace
looping b7 ;or #oilets details
(aterial as per specification
- Wall chasing to be verified for /I'!opper pipe layout inside toilets
Qconcealed
=ame 9ignature
8==*##I :=//. RRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRR
!lient ' !onsultant :ngineer > RRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRR
1111
STEEL "ECEIPT STATEMENT JMONTHLY
Date > RRRRRRRR
P"O/ECT B!ILDING ENGINEE"
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
28/61
DEAILS O$ "OLLING MA"GIN DONE !PTO
+ "+lli,- Mar-i, :
STATEMENT O$ "ECEIPT O$ STEEL :
S!MMA"Y :
"EMA>"S i a,2 :
!lient ' !onsultant :ngineer 8==*##I 9ite :ngineer 1?
1111
MATERIAL TESTING CEMENTI $IELD TESTS :
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
29/61
II LAB TESTS :
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
30/61
1111
CHEMICAL COMPOSITION IS 17= ( 1;
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
31/61
Peri44i8le liit4 +r P"OD!CT ANALYSIS
In case of deviation form the specified maE., two additional test samples shall be ta@en from the same
batch 2 sub"ected to tests in which original sample failed. 9hould both samples pass the test the batchshall be deemed to comply with I9. 9hould any one sample fail batch shall be deemed not to comply.
1111
FINE AGGRGATE
) 9IL# S I9 -A- $ )C? 9hould not be more than C$AS by vol.
;I=:=:99 (OD8L89 I9 -A- $ )C? ;( may range .5 to -.5S for concrete 8pto -S for
masonry 8pto ).5S for plaster.
- O0/*=I! I(+80I#I:9 > y visual inspection =o lumps 2 9hingles
COARSE AGGREGATE
$I)ED TESTS :
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
32/61
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
33/61
1111
LAB TESTS IS 1537 ( 10
1111
LAB TESTS IS 3105 ( 1=;
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
34/61
SOLID LOAD BEARING BLOCKS
!NNATTI CONST"!CTIONS P&T. LTD.
$IELD TESTS :
) 9ize !olour
ISO 001:5000
MOSAIC TILES
3 cm E 3cmE mm Q)? E )? -? cm E -? cm E 3 mm Q) E ) /rey'White.
WATER
'*alit2 : +otable water can be made use for concrete miEing. It should be clean and free from
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
35/61
in"urious amounts of oils, acids, al@alies, salt 2 organic material.
0evised I9 135 $ )CA gives maE possible limits for solids.
Details of permissible limits >
O
r
g
a
nic Inorganic 9ulphate !hloride
9uspended matters. + Lays down that average crushing strength of - =os. of )3 cm concrete cube made with
water proposed to be used should not be less than ?S of average strength of - similar cubes made
with distilled water.
!NNATTI CONST"!CTIONS P&T. LTD.ISO 001:5000
S. H.E. Policy (Safety, Health &
Environment)1111
CONTENTS). !ontrol
. !o$ordination (onitoring
-. (onitoring
1. 0ecords
3. *ccident +revention, Organization and ;acilities
5. ;ire +revention
C. +ersonal +rotection
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
36/61
A. :lectrical Installation
. +rotection
)?. Ladders
)). 9caffolding
).
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
37/61
ensure the effective co$ordination of the wor@ on site.
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
38/61
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
+OLI!:/*9 !O(+*=4
:L:!#0I! !O(+*=4W*#:0 !O(+*=4
#:L:+) Is waste accumulating in hoist shafts or other hidden places U
*re separate metal waste containers supplied for each of the following, oily rags, paint rags,paint scrapings, waste flammable liquids, wood shavings and off cuts U
- Is all waste regularly cleared U
1 *re all huts safely sited U
1111SA$ETY HEALTH EN&I"ONMENT POLICY
5.3 (eans of escape
) *re all gangways, stairs and platforms free from obstructions U
Does everyone @now what do in an emergency U
5.5 ;ire ;ighting
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
39/61
)
e fiEed near the top if practicable or near the bottom if notT if suspended they shall be secure,
e placed QeEcept when suspended on a firm level baseT they will not stand on loose [email protected]. bric@s
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
40/61
e immediately secured, where necessary, to prevent swaying and
sagging. c ladders shall >
:Etend at least ).?3 ( above any landing place beyond the highest rung from which a personmay be wor@ing or have a nearby handhold of equivalent height.
11.0 S6a+li,- :
)).) +rovision of 9caffolds > 9caffolds will be provided for all wor@ which cannot be safety done
from the ground or any part of the building. Ladders, properly secured, can be used but only
for light wor@ which can be done with one hand.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
)). 9upervision and Inspection of 9caffold (aterial
9caffolds will be erected, altered or dismantled under competent supervision and byeEperienced persons. *ll scaffolding materials shall be inspected before use to chec@ that they are
suitable and sound.
)).- !onstruction and (aterial >
9ufficient sound material will be provided for a scaffold to ensure that i is strong and stable
enough. 9caffold tubes and fittings will not be bent, distorted or rusty.
)).1 Defective (aterial
9caffold tubes, couplers and fittings that are bent, distorted or rusty shall not be used. #imbers
with splits and @nots shall not be used. 0opes and lashings showing signs of chafing through wear orof being corroded shall not be used.
)).3 9tandards or 8prights, Ledgers and +utlogs
9caffold standards shall be vertical and spaced closely enough for the intended use of the
scaffold. ase plates shall be used. #imber sole plates shall also be used to distribute the load
from the standard over a wider area, as well as to offset possible local subsidence.
Ledgers shall be level and fiEed to standards with right$angle couplers. +utlogs and transoms
shall be firmly fiEed to ledgers or standards. #he flattened end of the putlog shall be pushed
firmly into the wall to provide maEimum support.
+utlogs and transoms shall be spaced according to the eEpected load and thic@ness of he
boards o be used in the platform.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY)).5 9tability of 9caffolds.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
41/61
)).5.) *ll scaffolds shall be >
O= a solid, even base or suspended from a sound structure.
raced to prevent failure, and
#ied to the building or structure unless specially designed to be completely independent.
)).5. (obile 9caffolds shall >
e stable, weighted at the base, if necessary and be used only on a flat, level surface.
e strong enough
e properly secured to overhead anchorages and to the platform framee spaced so as to @eep the platform stable
e vertical, @ept taut.
=o rope other than wire rope shall be used for suspension and pac@ing will be used to preventdamage to suspension ropes or chains at any point where sharp or rough edged protrusions could
release chafing.
#he platform shall be secured to prevent swaying whilst in use.
)).5.1 !antilever, Kib, ;igure and rac@et 9caffolds
!antilever or "ib scaffolds shall be anchored to a structure which is strong enough to carry the
total load. Outriggers shall be long enough and strong enough and the scaffold shall be braced to
ensure stability. ;igure or brac@et scaffolds supported by dogs or spi@es will not be used if there is
any danger of these pulling out of the bric@wor@ or stone$wor@.
)).5.3 #he ropes, winches, bloc@s and tac@le shall be strong enough and correctly rigged. * safeanchorage for the suspension shall be provided.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
)).5.5 Winches or similar lifting devices will >
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
42/61
by the platform or other moving parts. /ates shall be @ept closed eEcept for the movement of persons
and materials.
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
43/61
)-.. :very stairway floor opening shall be guarded by a railing on all eEposed sides.
19. Ha,li,- # St+ra-e + Material4 :
)1.) !ement 9torage and 9tac@ing $ !ement shall be stored at the site in a building or a shed which is
dry, lea@ proof and as moisture $ proof as possible. !ement received in bags shall be stored in
such a way that the bags are @ept free from the possibility of any dampness or moisturecoming into contact with them.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
!ement bags shall be stac@ed off the floors on wooden plan@s in such a way as to @eep them
)3? to ?? mm clear from the floor and space of 13? mm minimum shall be left all$round
between the eEterior walls and the stac@s.
1;. $laa8le Material4 :
!ompressed gases and petroleum products shall not be stored in the same building or closed to
each other.
*ll trenches ).3 meter or more in depth shall at all times be
supplied with at least one ladder for each -? meters in length. Ladders shall be eEtended from the
bottom of the trench to at least ) meter above the surface of the ground. 9ides of trenches which are
).3 meters or more in depth shall be stepped bac@ to provide a suitable slope or securely held by
timber bracing, so as to avoid the danger of sides collapsing.
17.0 C+,6rete C+,4tr*6ti+,
)C.)
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
44/61
SA$ETY HEALTH EN&I"ONMENT POLICY)C. ;ormwor@.
;ormwor@ shall be designed after ta@ing into consideration the spans, setting temperature of
concrete, dead load and wor@ing load to be supported and the safety factor for the materials used. *ll
timber shall be carefully inspected before use and members having crac@s and eEcessive @nots shall
be discarded.
#he vertical supports shall be adequately braced or otherwise secured in position so that these do not
fall when the load is released or the supports are accidentally his. #ubular steel centering shall be used
in accordance with the manufacturer&s instructions.
*ll centering shall be inspected to ensure that
;ooting or sills under every post of the centering are sound,
*ll lower ad"ustment screws or wedges are snug against the legs of the panels,
*ll upper ad"ustment screws or heads of "ac@s are in full contact with the formwor@,
+anels are plumb in both direction. *ll cross braces are in place and loc@ing devices are in closed and secure position,
In case of chha"as and balconies, the props shall be adequate to transfer the load to the
supporting point.
)C.- :rection of +refabricated (embers.
* spreader beam shall be used wherever possible so that the cable can be as perpendicular as
practical to the members being lifted. #he angle between the cable and the members to be lifted shall
not be less than 5? degrees.
(ethods of assembly and erection specified by the designer, shall be strictly adhered to at site.Immediately on erecting any unit in position, temporary connections or supports as specified shall be
provided before releasing the lifting equipment. #he permanent structural connections shall be
established at the earliest opportunity.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
1.0 Ma4+,r2 :
)A.) Walls
/eneral $ Depending on the type of wall to be constructed the height of construction per day
shall be restricted to ensure that the newly constructed wall does not come down due to lac@ of
strength in the lower layers.
Openings in Walls $ Whenever the ma@ing of an opening in an eEisting wall is contemplated,
adequate supports against collapse or crac@ing of the wall portion above or roof or ad"oining walls
shall be provided.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
45/61
1.0 Health Sta,ar4.
).) Drin@ing Water
In every wor@ place there shall be provided and maintained at suitable places, easily accessible
to labour, a sufficient supply of water fit for drin@ing.
Where drin@ing water is obtained from an intermittent public water supply each wor@ placed
shall provided with storage where such drin@ing water shall be stored.
). Washing ;acilities.
In every wor@ place adequate and suitable facilities for washing shall be provided and
maintained for the use of labour employed therein. 9uch facilities shall be conveniently accessible and
shall be @ept in clean and hygienic condition.
).- Latrines and 8rinals.
8==*##I shall employ an adequate number of sanitation wor@ers to @eep the site clean at all
times, from all faces, eEcreta, urine, etc. Latrines shall be provided in every wor@ place on the
following scale.
Where females are employed there shall be at least one latrine for every 3 females.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
Where males are employed there shall be at least one latrine for every 3 males.
:very latrine shall be under cover and so partitioned off as to secure privacy and shall have proper
door fastenings. #he latrines and urinals shall be adequately lighted and shall be maintained in a clean
and sanitary condition at all times.
Water shall be provided by means of a tap or otherwise so as to be conveniently accessible in or near
the latrines and urinals.
).1 +rovision of 9helter During 0est.
*t every wor@ place there shall be provided, free of cost, suitable sheds for meals and for restseparately for he use of men and wo@en labour.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
46/61
months and where labour numbering )?? or more is ordinarily employed, an adequate canteen shall
be provided by the 8==*##I for the use of such labour.
#he premises of the canteen shall be maintained in a clean and sanitary condition.
9uitable arrangement shall be made for the collection and disposal of garbage. Waste water shall becarried away in suitable covered drains and shall not be allowed to accumulate so as to cause
nuisance.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
1.= A,ti(Malarial Pre6a*ti+,4.
8==*##I shall, at his own eEpense, conform to all anti$malarial instructions given to him by
:ngineer including the filling up of any borrow pits which may have been dug by him.
50.0 C+,iti+,4 "elate t+ E,ir+,e,tal Pr+te6ti+,.
8==*##I shall ensure that the following measures are implemented to protect the
environment and to mitigate adverse impacts all to the satisfaction of the :ngineer.
?.) *ir +ollution
Idling of truc@ engines and other equipment shall be avoided.
*ll stationery equipment shall be located as far away as possible from the sensitive receptors
such as schools, hospitals and religious places.
*reas prone to fugitive dust emission such as eEcavation, grading sites and routes of vehicles
across areas of eEposed earth shall be sprin@led with water as often as necessary to suppress dust.
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
47/61
!onstruction areas shall be enclosed wherever possible.
8==*##I shall ma@e regular arrangements for providing @erosene as @itchen fuel for use by
all the labourers employed by them for the wor@s and living in construction camps.
?. !ontrol of =oise Levels.
#he equipment and machinery to be used shall not generate at source a noise level of more
than ?d Q*.
8==*##I shall ensure, by providing temporary barriers, etc. that the noise level at nearby
schools,hospitals
and
religious places are @ept within the levels prescribed for these receptors.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
?.- +revention of 9oil :rosion
We shall ensure that all slopes in cut and emban@ment sections are stable. If necessarybenches, pitching etc. shall be provided.
Drainage of water from the land shall be so planned as to avoid flooding.
!utting and emban@ment wor@ shall not, as far as possible, be eEecuted immediately or during
monsoon periods.
9urplus eEcavated soil shall be dumped preferably in low$lying areas which will be away
from water bodies.
?.1 +rotection of ;lora and ;auna.
8==*##I shall be responsible and ensure that the construction wor@ers do not cut trees Qfor
use as fuel wood or for any other purpose, dig up or damage flora to be preserved or indulge
in poaching.
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
INCIDENT LOG
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
48/61
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
INCIDENT REPORTLog =o. ..............................................................
+olice !ontacted > 4es'=o. Date '#ime................................
=ame> .................................................................................................... Log
=o.> .................................................................................................... !ontractor&s
=ame> ....................................................................................................
*ddress> ....................................................................................................
+hone > ....................................................................................................
Witness > =ame > ....................................................................................................
*ddress> ....................................................................................................
+hone> ....................................................................................................
8==*##I
:=//................ .......................................................................................... ............................................
..............................................................................................
Pre?are 82 :
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
49/61
9ignature > ............................................... +osition...................................................
=ame> ............................................... Date > ....................................................
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
ACCIDENT REPORTC+,tra6t Detail4:
Log =o. ....................................................................................................................
+ro"ect> ....................................................................................................................
!ontractor> .................................................................................................................... Date of
*ccident. .............................................. #ime>........................................... Weather>
C+,tra6t+rF4 Per4+,,el +r E*i?e,t:
=ame or in"ured employee> .......................................................... *ge>.........................
Occupation> ................................................................................ 9eE>......................... =ature of in"ury >
............................................................................................................. Degree of in"ury> ;irst *id Q
............................................................................................................ =ame of property
owner>............................................ *ddress>.......................................
=ature and eEtent of damage>. ........................................................................................
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
50/61
Detail4 + A66ie,t:
Description> .........................................................................................................................................
+rimary
cause>................................................................................................................. .......................................
...................................................................................................
Aiti+,al I,+rati+,:
Was use or lac@ of safety equipment a factor in this accident>
If so, eEplain> ..........................................................................................................................................
Was safety regulations were
breached> ..........................................................................................................................................
What corrective action has been ta@en by the !ontractor................................................
"e?+rte 82>....................................................................................................................
9ignature>..................................................... +osition>.................................................
=ame> .......................................................... Date>......................................................
1111
%EE>LY S.H.E. "EPO"T9afety ). +0OK:!# =*(: *=D *DD0:99.........................................................................
. #4+: O; 8ILDI=/ *=D 9#08!#80:>............................................................
-. =*#80: O; WO0J>...............................................................................................
1. +0OK:!# D80*#IO=>............. 9#*0# D*#:>.............. !O(+L: D*#:..........
3. I=980*=!: +OLI!4 =O. *=D D*#:>...............................................................
5. *=4 *!!ID:=# # 4:9 =O
C. I; 4:9, I=K804> (I=O0 (*KO0 D:*# ........................................................................
. 0:*9O= ;O0 *!!ID:=# >...................................................................................
)?. 0:(:DI*L *!#IO= #*J:= >..............................................................................
)). =O O; D*49 +*99:D WI# .................................................). L*9# 9*;:#4 (::#I=/ ...................................................................
)-. ! +lease tic@ relevant oE7
* 9*;:#4 4:9 =O 9*;:#4 :L#9 89:D > 4:9 =O ! 9*;:#4
9 4:9 =O D 9*;:#4 4:9 =O : 9*;:#4 /O//L:9
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
51/61
89:D > 4:9 =O ; 9*;:#4 =:#9 +0O6ID:D > 4:9 =O / ;I09# *ID OB *# 9I#: > 4:9 =O
< !O((8=I!*#IO= #:L. K::+ :#!.7 > 4:9 =O I *00I!*D: D80I=/ :B!*6*#O= >
4:9 =O K *LL !8# O8# !LO9:D > 4:9 =O J !*8#IO= 9I/= =:*0 WO0J +L*!: > 4:9
=O L ;I0: :B#I=/8I9 4:9 =O ( 4:9
=O = *D:G8*#: LI/ 4:9 =O O 9*=I#*#IO= $ L*O80
!*(+ *=D 9I#: > 4:9 =O + +:0(I# #O WO0J $ 0:/I9#:0 (*I=#*I=:D > 4:9 =O G
0:/8L*0 9*;:#4 I=9#08!#IO= /I6:= > 4:9 =O
0:(*0J> ................................................................................................................. ...............................
.....................................................................................................
SA$ETY O$$ICE" P"O/ECT(IN(CHA"GE CLIENT@CONS!LTANT
=*(:, 9I/=*#80: =*(:, 9I/=*#80: =*(:, 9I/=*#8:
1111
SA$ETY HEALTH EN&I"ONMENT POLICY
DATE : WEEK NO.:
CHECK LIST FOR MONITORING SAFETY CODE AT SITE PROECT NAME:
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
52/61
!NNATTI CONST"!CTIONS P&T. LTD.ISO 001:5000
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
53/61
MONTHLY PROGRESS REPORT
SUBMISSION TO CLIENT/
CONSULTANT1111
PO!E"" EPOT NO. DATE :
MONTHLY PROGRESS REPORT
CONSTRUCTION OF P!"#"$%
AT
CLIENT : ......................................................................................................................
CONSULTANT ............................................................................................................
1111
WORKSITE : ......................................................................................................
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
54/61
1111
%O">SITE : ................................................................................................................ SITE E&ENT
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
55/61
1111
%O">SITE :................................................................................................................. MATE"IAL
STAT!S "EPO"T
1111
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
56/61
LIST O$ D"A%INGS $O" %O">SITE:...............................................................................................................
1111%O">SITE : ....................................................................................................
MONTHLY PROGRESS REPORT AS ON
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
57/61
1111
E'!IPMENTS DEPLOYED AT SITE
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
58/61
1111
%O">SITE ......................................................................................................
Density (aEimum Dry Density7
SA$ETY
)
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
59/61
wor@s at higher levels 1 ;irst *id oE provision is @ept.
1111
Li4t + Drai,-4 re*ire
A A"CHITECT!"AL
B ST"!CT!"AL
C MISC D"A%INGS
1111
WO0J 9I#: ....................................................................... D*#:>..........................
DAILY SITE "EPO"T A Material
Stat*4 :
B Ma, P+er Stat*4 :
8ai (nergie 6 :d6 ;Part of Ravi Energie Group of Companies registered with IFIA
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
60/61
C %+r Stat*4 re?+rt a4 +, ate :
D Criti6al Ite :
!NNATTI CONST"!CTIONS P&T. LTD.ISO 001:5000
List of Projects completed
.) #hermaE, 2 < Division, !hinchwad at +une.
. #hermaE, WW9 Division, hosari at +une.
.- ;ermenta io #ech Limited, #a@oli at (andi
8/12/2019 Unnatti Methodology and Quality Procedure (Repaired)
61/61
.1 International io$#ech +ar@