8
USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM INSTALLATION GUIDE ® ®

USG Libretto® Gridless Metal Ceiling System Installation

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: USG Libretto® Gridless Metal Ceiling System Installation

USG LIBRETTO®GRIDLESS METALCEILING SYSTEM

INSTALLATION GUIDE

®

®

Page 2: USG Libretto® Gridless Metal Ceiling System Installation

®

®

USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM

INDEX 3 Parts

3 Tools

4 Layout and Install Hanger Wires

5 Install Carrier Channels

5 Install "Start" Panel

6 Install "Field" Panel

6 Install "End" Panel

7 Install Trim Attachment Clips

7 Install Edge Trim

7 Final Detailing

FOR MORE INFORMATION Technical Service800 USG.4YOU (874-4968)

Websiteusg.com or cgcinc.com

Page 3: USG Libretto® Gridless Metal Ceiling System Installation

Sales Representative 877 874.4200 Customer Service 800 950.3839 Samples, Literature 888 874.2450 Technical Service 800 USG.4YOU Web Site usg.com

InstallationInstructions

Tip: Read all instructions before beginning work. Some parts can be permanently damaged if installed incorrectly.

PARTS:1) Carrier Channels 2) Channel Splice/Extensions 3) Panel Hangers 4) Panels (factory applied backer optional) 5) Profile Attachment Clips 6) Profile Splices 7) Perimeter Profile – PreMitered Corners 8) Perimeter Profile – Straight 9) Perimeter Profile – Custom Curved 10) Installation Plan* and these Instructions

In addition to the materials supplied, you will need an adequate supply of hanger wire and hardware as specified on the architectural plans and an adequate supply of self drill sheet metal screws (#8 x ½” pan head recommended).

* IMPORTANT: A custom engineered Installation Plan [10] is supplied with each Libretto project. The Instructions below refer to important diagrams and dimensions found in the Installation Plan that you will need for a successful installation. Review the “Bill of Material” section of the plan to confirm that all parts are present and undamaged. For additional help, contact your USG representative.

TOOLS:In addition to standard suspended ceiling installation tools, you will need 6 to 10 spring clamps and a laser plumb bob.

INSTALLATION:Layout and Install Hanger WiresTurn to the section in the Installation Plans titled “Suspension Plan”. Baselines and a grid pattern have been overlaid on these drawings to assist in the assembly process. Compare these to the architect’s plan and identify the locations of these baselines on the job site. Mark them on the floor as to use as a reference during installation.

1. Clear the floor area of any debris or obstacles. 2. Measure from the baselines to locate the

endpoints of the Carrier Channels. Mark them on the floor [Figure 1].

3. Lay out all the Carrier Channel sections on the floor end-to-end as indicated on the Suspension Plan. Part ID codes are labeled on the ends of the channel sections and are keyed to the Suspension Plan.

4. Prepare channel splices as needed by snipping the “ears” off of Channel Splice/Extensions [Figure 2] (The ears are useful only when using this part as a channel extension in later steps).

5. Install the splices using 4 self drill screws. Tip: For best results, use #8 x ½” self drill screws.

Figure 1 – Channel endpoints Figure 2 – Channel layout

baseline

baseline

channel splice/extension

remove "ears"to use as splice

baseline

baseline

channel splice/extension

remove "ears"to use as splice

TIP Read all instructions before beginning work. Some parts can be permanently damaged if installed incorrectly.

PARTS

In addition to the materials supplied, you will need an adequate supply of hanger wire and hardware as specified on the architectural plans and an adequate supply of self drill sheet metal screws (#8 x 1/2” Tek recommended).

* IMPORTANT: A custom engineered Installation Plan [10] is supplied with each Libretto project. The Instructions below refer to important diagrams and dimensions found in the Installation Plan that you will need for a successful installation. Review the “Bill of Material” section of the plan to confirm that all parts are present and undamaged. For additional help, contact your USG representative.

TOOLS In addition to standard suspended ceiling installation tools, you will need 6 to 10 spring clamps and a laser plumb bob.

SYSTEM OVERVIEW

1 Carrier Channels2 Channel Splice/Extensions3 Panel Hangers4 Panels (factory applied backer optional)5 Trim Attachment Clips

6 Trim Splices7 Edge Trim – PreMitered Corners8 Edge Trim – Straight9 Edge Trim – Custom Curved10 Installation Plan* and these Instructions

Sales Representative 877 874.4200 Customer Service 800 950.3839 Samples, Literature 888 874.2450 Technical Service 800 USG.4YOU Web Site usg.com

InstallationInstructions

Tip: Read all instructions before beginning work. Some parts can be permanently damaged if installed incorrectly.

PARTS:1) Carrier Channels 2) Channel Splice/Extensions 3) Panel Hangers 4) Panels (factory applied backer optional) 5) Profile Attachment Clips 6) Profile Splices 7) Perimeter Profile – PreMitered Corners 8) Perimeter Profile – Straight 9) Perimeter Profile – Custom Curved 10) Installation Plan* and these Instructions

In addition to the materials supplied, you will need an adequate supply of hanger wire and hardware as specified on the architectural plans and an adequate supply of self drill sheet metal screws (#8 x ½” pan head recommended).

* IMPORTANT: A custom engineered Installation Plan [10] is supplied with each Libretto project. The Instructions below refer to important diagrams and dimensions found in the Installation Plan that you will need for a successful installation. Review the “Bill of Material” section of the plan to confirm that all parts are present and undamaged. For additional help, contact your USG representative.

TOOLS:In addition to standard suspended ceiling installation tools, you will need 6 to 10 spring clamps and a laser plumb bob.

INSTALLATION:Layout and Install Hanger WiresTurn to the section in the Installation Plans titled “Suspension Plan”. Baselines and a grid pattern have been overlaid on these drawings to assist in the assembly process. Compare these to the architect’s plan and identify the locations of these baselines on the job site. Mark them on the floor as to use as a reference during installation.

1. Clear the floor area of any debris or obstacles. 2. Measure from the baselines to locate the

endpoints of the Carrier Channels. Mark them on the floor [Figure 1].

3. Lay out all the Carrier Channel sections on the floor end-to-end as indicated on the Suspension Plan. Part ID codes are labeled on the ends of the channel sections and are keyed to the Suspension Plan.

4. Prepare channel splices as needed by snipping the “ears” off of Channel Splice/Extensions [Figure 2] (The ears are useful only when using this part as a channel extension in later steps).

5. Install the splices using 4 self drill screws. Tip: For best results, use #8 x ½” self drill screws.

Figure 1 – Channel endpoints Figure 2 – Channel layout

baseline

baseline

channel splice/extension

remove "ears"to use as splice

baseline

baseline

channel splice/extension

remove "ears"to use as splice

1

3 4 10

2

5 6 7 8 9

USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM | INSTALLATION GUIDE 3

Page 4: USG Libretto® Gridless Metal Ceiling System Installation

finished ceilingheight + 2-1/2"

LAYOUT AND INSTALL HANGER WIRES

Turn to the section in the Installation Plans titled “Suspension Plan”. Baselines and a grid pattern have been overlaid on these drawings to assist in the assembly process. Compare these to the architect’s plan and identify the locations of these baselines on the job site. Mark them on the floor as to use as a reference during installation.

1. Clear the floor area of any debris or obstacles.2. Measure from the baselines to locate the

endpoints of the Carrier Channels. Mark them on the floor [Figure 1].

3. Lay out all the Carrier Channel sections on the floor end-to-end as indicated on the Suspension Plan. Part ID codes are labeled on the ends of the channel sections and are keyed to the Suspension Plan.

4. Prepare channel splices as needed by snipping the “ears” off of Channel Splice/Extensions [Figure 2] (The ears are useful only when using this part as a channel extension in later steps).

5. Install the splices using 4 self drill screws.

Tip: For best results, use #8 x 1/2” self drill screws.

6. Hanger wires are required every 4 feet along each channel but obstacles and site conditions may require improvisation in the field. With a laser plumb bob, trace along the length of the channels to spot convenient attachment points on the ceiling [Figure 3]. Mark these spots on the floor and on the channel.

7. Disassemble the channels and move them aside for later use. Using a laser plumb bob, transfer the location marks to the ceiling and attach hanger wires [Figure 4].

8. Using a rotary laser level, bend all hanger wires 2-1/2 inches above the finished ceiling elevation. This establishes the proper elevation for the Carrier Channels.

Figure 1 - Channel Endpoints

baseline

baseline

Figure 2 - Channel Layout

channel splice/extension

remove "ears"to use as splice

Figure 3 - Suspension Points

Figure 4

INSTALLATION

laser plumb bob

USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM | INSTALLATION GUIDE 4

Page 5: USG Libretto® Gridless Metal Ceiling System Installation

INSTALL CARRIER CHANNELS

1. Position and hang the Carrier Channels based on the Suspension Plan. Wrap hanger wire tightly around the channels. Connect the ends of channels by re-applying the channel splices [Figure 5].

STOP! Examine the finished suspension system. Extra care at this point will increase the speed and accuracy of complete installation.✔ Check to see that all hanger wires are

taught, straight, and plumb within 1:6 (about 10 degrees). If any wires need to be moved or adjusted, fix them now.

✔ Check the endpoint positions with a laser plumb bob. The endpoints of the carrier assemblies must be within ± 2” of plan. If adjustments are needed, make them now.

Tip: If necessary, short pieces of carrier channel may be cut off or spliced on so long as the general shape of the curve is not significantly changed.

✔ Check the elevations of all channels using a rotary laser. If any points are out of level, make final adjustments now.

Figure 5 - Installed Channels

Figure 6 - Channel Extensions

Figure 7 - Channel Extensions

INSTALL “START” PANEL Turn to the section in the Installation Plans titled “Panel Plan”. The “Start” Panel is labeled S1. If the project includes multiple islands, additional Start Panels will be labeled S2, S3, etc. Part ID codes labeled on the edges of the panels and are keyed to the Panel Plan.

1. Mark a line on the floor reflecting the edge and corners of the Start Panel. Exact dimensions are provided on the Panel Plan.

2. Apply Channel Splice/Extensions at the ends of the Carrier Channels. Temporarily secure them with spring clamps [Figure 6].

3. The lower hook on the Channel Extension should be 1/8” to the inside of the marked line. Use a laser plumb bob to gage position. Extend or retract the part to the right location.

4. Hook a Panel Hanger Clip on to each carrier channel at the approximate locations where the panel edge will intersect. Note the proper orientation of the clip in [Figure 7]. Bend the security tab upward as shown to trap the clip on the channel.

INSTALLATION

panel hanger clipcarrier channel

security tab(bend upward)

hanger wire

USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM | INSTALLATION GUIDE 5

Page 6: USG Libretto® Gridless Metal Ceiling System Installation

INSTALL “START” PANEL(CONT.)

5. Hook the outer edge of the Start Panel onto the lower ear of the Channel Extension and the opposite edge on to the panel hanger clips [Figure 8].

STOP! The accurate positioning of the Start Panel will prevent troublesome misalignments in later steps. The locations of the panel corners must be within 1/4” of plan. With a laser plumb bob, confirm/adjust the location of the panel corners now.

6. Fasten the Channel Extension in place with 2 self drill screws [Figure 9A] and remove the temporary clamps.

7. Install a self drill screw into the hole provided in the lower ear of the Channel Extension to lock the panel and prevent it from dislodging [Figure 9B].

8. Bend the unused (upper) legs of the Channel Extensions back and out of the way [Figure 9C].

Figure 8 - Start Panel

Figure 9 - Start/End Panel Attachment

Figure 10 - Field Panels

INSTALL “FIELD” PANELS Libretto® panels require progressive installation. Field Panels are labeled F1, F2, F3, etc. in the order they must be installed.

1. Install additional Panel Hanger Clips to each carrier channel at the approximate locations where panel edges will intersect them.

2. Hook the outside edge of the new panel over the vertical leg of the previous panel [Figure 10A] and the opposite edge on to the hanger clips.

3. Trap the nested panel edges by bending the panel locking tab on the Hanger Clips [Figure 10B].

4. Check end-to-end alignment of adjacent panels then bend the panel alignment tab to lock the panels in place [Figure 10C].

5. Repeat this process for the remaining Field Panels.

INSTALL “END” PANEL The “End” Panel is labeled E1. If the project includes multiple islands, additional End Panels will be labeled E2, E3, etc. Installation of End Panel(s) is similar to the Start Panel. Refer to [Figure 9] for construction details.

1. Apply Channel Extensions to the ends of the channels and temporarily secure them with spring clips.

2. Install the End Panel.3. Adjust the position of the Channel Extensions and

secure them with 2 self drill screws [Figure 9A].4. Install a locking screw into the Channel Extensions

to prevent the panel from dislodging [Figure 9B].5. Bend the unused (upper) leg of the Channel

Extensions back and out of the way [Figure 9C].

INSTALLATION

“Start” panel

panel hanger clip

panel hanger clip

panel alignment tab

nested panel edges

panel locking tabcarrier channel

install progressively

Libretto® panels

B

A

C

channel splice extension

Libretto® panel

attach locking screw

carrier channel

screw attachbend down unused "ear"C

A

B

USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM | INSTALLATION GUIDE 6

Page 7: USG Libretto® Gridless Metal Ceiling System Installation

INSTALL TRIM ATTACHMENT CLIPS

Trim Attachment Clips should be spaced no more 36 inches apart.

1. Apply clips to the ends of the panels along the edge of the island [Figure 11A]. If panels are narrow (18” or less), apply clips to EVERY OTHER panel provided maximum spacing does not exceed 36”a. Pivot the saddle and push the clip back on

the panel so that the lower flange overlaps the face of the panel [Figure 11B].

b. Apply a self drill screw in any one of the holes provided in the saddle [Figure 11C].

2. Apply Trim Attachment Clips along the edges of the Start and End panels [Figure 11D].a. Pivot the clip saddle 90° (counter clockwise

as viewed from above) and slip the saddle over the edge of the panel [Figure 11E].

b. Apply a clip within 1 foot from each corner and additional clips in between as necessary.

c. Apply a self drill screws to secure all clips in place.

Figure 11 -Trim Attachment Clips

Figure 12 - End Trim

Figure 13 - Side Trim

INSTALL EDGE TRIM Turn to the section in the Installation Plans titled “Trim Plan”. Part ID codes are labeled on the insides of all parts and are keyed to the Trim Plan. Libretto Edge Trim requires progressive installation. The last piece(s) are designed to be cut-to-fit so it is important to install them in the proper sequence.

1. Apply Edge Trim to the ends of the island [Figure 12].a. Connect the straight trim and corners with

splice clips.b. Center the assembly over the end of the

island and snap it over the Trim Attachment Clips

c. Repeat this process at the opposite end.2. Apply Edge Trim to the sides of the island

[Figure 13].a. Beginning at the Start Panel, apply trim

pieces and splices in progression working towards the End Panel.

b. Measure and cut the last piece of trim to fit.c. Repeat this process on the opposite side.

FINAL DETAILING 1. Check and adjust the alignment of all components. Eliminate any gaps using additional fasteners and/or clips.

2. Clean exposed surfaces as required. Parts may be wiped down with a mild household cleaner to remove fingerprints, oil, etc.

INSTALLATION

“End” panel

“Start” panel

trim attachment clip

trim attachment clip

A

D

trimsplice

trim splice

trim splicetrim corner

straight trim

trim splice

curved trim

cut o� excesstrim to fit cut o�

excesstrim to fit

install progressively

USG LIBRETTO® GRIDLESS METAL CEILING SYSTEM | INSTALLATION GUIDE 7

Page 8: USG Libretto® Gridless Metal Ceiling System Installation

IC5504/rev 6-21 © 2021, USG Corporation or its affiliates. All rights reserved.

Manufactured byUSG Interiors, LLC550 West Adams StreetChicago, IL 60661

NoticeThe information in this document is subject to change without notice. CGC Inc. or USG Corp. assumes no responsibility for any errors that may inadvertently appear in this document.

PRODUCT INFORMATIONData Sheet: IC526System Guide: IC525See usg.com or cgcinc.com for the most up-to-date product information.

NOTEAll products described here may not be available in all geographic markets. Consult your local sales office or representative for information

INSTALLATIONMust be installed in compliance with ASTM C636, ASTM E580, CISCA and standard industry practices, within all applicable code requirements. Alternative assemblies and installation methods may be utilized when approved by the authority having jurisdiction. USG recommends checking with the authority having jurisdiction prior to designing and installing a suspended ceiling system.

CODE COMPLIANCEThe information presented is correct to the best of our knowledge at the date of issuance. Because codes continue to evolve, check with a local official prior to designing and installing a ceiling system. Other restrictions and exemptions may apply.

NOTICEWe shall not be liable for incidental and consequential damages, directly or indirectly sustained, nor for any loss caused by application of these goods not in accordance with current printed instructions or for other than the intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from date it was or reasonably should have been discovered.

SAFETY FIRST!Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read SDS and literature before specification and installation.

WARRANTYOne (1) year limited warranty. See USG Ceilings Commercial Application Warranty (SC2102) for additional details. For Canadian product needs, please contact your local sales representative.

TRADEMARKThe trademarks USG, CGC, LIBRETTO, IT'S YOUR WORLD. BUILD IT., the USG logo, the design elements and colors, and related marks are trademarks of USG Corporation or its affiliates.

Technical Service

800 USG.4YOUWebsite

usg.comSamples/Literature E-mail

[email protected] 528.7089Customer Service

800 950.3839