Warwick Boulevard Townhall Meeting May 21, 2007. Thomas A. Druhot, P.E. VDOT Hampton Roads District Peninsula Area Construction Engineer. Agenda. General Overview of Project Project 1 Status Project 2 Status Project 3 Status Contact Information and Updates. Lauren Hansen - PowerPoint PPT Presentation

Citation preview

Page 1: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 2: Warwick Boulevard  Townhall Meeting May 21, 2007

Warwick Boulevard Warwick Boulevard

Townhall MeetingTownhall Meeting

May 21, 2007May 21, 2007

Thomas A. Druhot, P.E.Thomas A. Druhot, P.E.VDOT Hampton Roads DistrictVDOT Hampton Roads District

Peninsula Area Construction EngineerPeninsula Area Construction Engineer

Page 3: Warwick Boulevard  Townhall Meeting May 21, 2007

AgendaAgenda

• General Overview of ProjectGeneral Overview of Project

• Project 1 StatusProject 1 Status

• Project 2 StatusProject 2 Status

• Project 3 StatusProject 3 Status

• Contact Information and Contact Information and UpdatesUpdates

Page 4: Warwick Boulevard  Townhall Meeting May 21, 2007

Introductions to PlayersIntroductions to Players

Lauren Hansen Lauren Hansen VDOT Public Relations SpecialistVDOT Public Relations Specialist

W 757-925-2583 / F 757-925-1558 / C 757-W 757-925-2583 / F 757-925-1558 / C 757-619-4163619-4163

[email protected]@VDOT.Virginia.gov

Thomas A. Druhot, P.E. Thomas A. Druhot, P.E. VDOT Peninsula Area Construction VDOT Peninsula Area Construction EngineerEngineer

W 757-253-4832 / F 757-253-5148 / C 757-W 757-253-4832 / F 757-253-5148 / C 757-592-6068592-6068

[email protected]@VDOT.Virginia.gov

Page 5: Warwick Boulevard  Townhall Meeting May 21, 2007

Introductions to PlayersIntroductions to Players

Thomas Slaughter, P.E. Thomas Slaughter, P.E. Special Projects EngineerSpecial Projects Engineer

W 757-926-8611 W 757-926-8611

[email protected]@nngov.com

Everett Skipper P.E. Everett Skipper P.E. Assistant Director of EngineerAssistant Director of Engineer

W (757) 926-3778 W (757) 926-3778

[email protected]@nngov.com

Page 6: Warwick Boulevard  Townhall Meeting May 21, 2007

Aerial Photo Prior to ConstructionAerial Photo Prior to Construction

CNUCNU

HospitalHospitalMariner’s Mariner’s MuseumMuseum

Rte 17Rte 17

Rte 60Rte 60

Current Traffic Levels at 47,000 ADTWith Annual Growth Less Than 1% = 54,000 in 2026

PROJECT SCOPERemove Roadway Lights / Install New Lights

PROJECT SCOPERelocate Utilities and Improve Storm Drainage System

Page 7: Warwick Boulevard  Townhall Meeting May 21, 2007

January 2007January 2007May 2007May 2007

CNUCNU

HospitalHospital

Mariner’s Mariner’s MuseumMuseum

Page 8: Warwick Boulevard  Townhall Meeting May 21, 2007

Completion Completion Late Summer 2007Late Summer 2007

Page 9: Warwick Boulevard  Townhall Meeting May 21, 2007

• Construction Began in Construction Began in October 2006October 2006

• Upgrade all underground Upgrade all underground utilities throughout the 2.1 utilities throughout the 2.1 mile projectmile project C

UL

PE

PP

ER

CU

LP

EP

PE

R

Project 2 StatusProject 2 Status

WE

LL

ES

LE

YW

EL

LE

SL

EY

NE

TT

LE

SN

ET

TL

ES

TU

RL

ING

TO

N

TU

RL

ING

TO

N

AL

PIN

EA

LP

INE

ME

LLO

N

ME

LLO

N

DE

EP

CR

EE

KD

EE

P C

RE

EK

MID

DLE

SE

X/H

IDE

NW

OO

D

MID

DLE

SE

X/H

IDE

NW

OO

DP

EN

NIN

GTO

N

PE

NN

ING

TON

SW

EE

TB

RIA

RS

WE

ET

BR

IAR

UN

IVE

RS

ITY

UN

IVE

RS

ITY

PR

INC

E D

RE

WP

RIN

CE

DR

EW

GL

EN

DA

LE

GL

EN

DA

LE

NU

TM

EG

NU

TM

EG

HID

EN

HID

EN

MIN

TO

NM

INT

ON

WH

ITTI

ER

WH

ITTI

ER

Page 10: Warwick Boulevard  Townhall Meeting May 21, 2007

Building Building UnderUnder

Building OverBuilding Over

Page 11: Warwick Boulevard  Townhall Meeting May 21, 2007

Change, Adapt, OvercomeChange, Adapt, Overcome

Page 12: Warwick Boulevard  Townhall Meeting May 21, 2007

Change, Adapt, OvercomeChange, Adapt, Overcome

Page 13: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 14: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 15: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 16: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 17: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 18: Warwick Boulevard  Townhall Meeting May 21, 2007
Page 19: Warwick Boulevard  Townhall Meeting May 21, 2007

18 in Ø24 in Ø30 in Ø42 in Ø48 in Ø54 in Ø60 in Ø72 in Ø

Phase 2Phase 2

Completed Completed to Dateto Date

Scheduled Scheduled for Summer for Summer

20072007

Page 20: Warwick Boulevard  Townhall Meeting May 21, 2007

18 in Ø24 in Ø30 in Ø42 in Ø48 in Ø54 in Ø60 in Ø72 in Ø

Phase 2Phase 2

Requested Requested NN Sewer NN Sewer Repair LocRepair Loc

Page 21: Warwick Boulevard  Townhall Meeting May 21, 2007

Warwick Blvd WideningWarwick Blvd WideningProject 3Project 3

• Widen Warwick Boulevard to Widen Warwick Boulevard to three lanes in each directionthree lanes in each direction

• Replace the median barriersReplace the median barriers• Repave old lanesRepave old lanes• Bid Date September 2007Bid Date September 2007• Construction for this phase is Construction for this phase is

expected to take about 2 expected to take about 2 years.years.

Page 22: Warwick Boulevard  Townhall Meeting May 21, 2007

Warwick Blvd WideningWarwick Blvd WideningProjectsProjects

Update Information available at:Update Information available at:– www.warwickboulevard.org

ContactsContacts• VDOT Construction Project ManagerVDOT Construction Project Manager

– Tom Druhot, P.E.Tom Druhot, P.E.– [email protected] [email protected] – 757-253-4832757-253-4832

• Public AffairsPublic Affairs– Lauren HansenLauren Hansen– [email protected]@VDOT.Virginia.gov– 757-925-2583757-925-2583

Page 23: Warwick Boulevard  Townhall Meeting May 21, 2007