TEYSEER CONTRACTING COMPANY / CONSOLIDATED CONTRACTORS GROUP S.A.L. (OFFSHORE) (CCC) JV New Port Project Container Terminal, Infrastructure and Utility Buildings Contract No.: NPP/0026 Page 1 of 2 Title: New Doha Port Project Participants S.No Name Designation Status 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Edgardo De Francia Ronald Marteja Arnel L. Reyes Regino O. Rocamora Manu S. Pillai Ravindra Babu Sajan Peter F. Aquino Joel Catubig Vinay Varghese Arun Kumar Muzzafar Rahim Batcha Jarnail Singh Mohammed Abutaha Bader Eldeen Jarrar Amr Mahmoud Hussein Selem Ranjeet Kumar V. Prabakaran HSE Officer HSE Officer HSE Officer Sr. HSE Officer HSE Officer HSE Officer HSE Officer HSE Officer HSE Officer HSE Officer ERT Leader Sr. HSE Officer Sr. HSE Trainer HSE Officer Dy. HSE Manager Sr. Environmental Officer Sr. HSE Officer Sr. HSE Trainer HSE Manager Present Present Present Present Present Present Present Present Present Present Present Present Present Present Present Present Present Present Present Absentees: 1 Dionision Panganiban HSE Officer Distribution As per the direction Attachment Weekly HSE Officers Minutes of Meeting Prepared By Suresh Babu Minutes of Internal Weekly HSE Officers Meeting No. 16 02.03.2014 Date: 2 nd March, 2014 Time: 16:00 Location: DPCT Training Room

Weekly HSE Progress Meeting

Embed Size (px)

DESCRIPTION

Weekly HSE Progress Meeting

Citation preview

Page 1: Weekly HSE Progress Meeting

TEYSEER CONTRACTING COMPANY /

CONSOLIDATED CONTRACTORS GROUP S.A.L. (OFFSHORE)

(CCC) JV

New Port Project

Container Terminal, Infrastructure and Utility Buildings

Contract No.: NPP/0026

Page 1 of 2

Title: New Doha Port Project

Participants

S.No Name Designation Status

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Edgardo De Francia

Ronald Marteja

Arnel L. Reyes

Regino O. Rocamora

Manu S. Pillai

Ravindra Babu

Sajan Peter

F. Aquino

Joel Catubig

Vinay Varghese

Arun Kumar

Muzzafar

Rahim Batcha

Jarnail Singh

Mohammed Abutaha

Bader Eldeen Jarrar

Amr Mahmoud Hussein Selem

Ranjeet Kumar

V. Prabakaran

HSE Officer

HSE Officer

HSE Officer

Sr. HSE Officer

HSE Officer

HSE Officer

HSE Officer

HSE Officer

HSE Officer

HSE Officer

ERT Leader

Sr. HSE Officer

Sr. HSE Trainer

HSE Officer

Dy. HSE Manager

Sr. Environmental Officer

Sr. HSE Officer

Sr. HSE Trainer

HSE Manager

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Present

Absentees:

1 Dionision Panganiban HSE Officer

Distribution As per the direction

Attachment Weekly HSE Officers Minutes of Meeting

Prepared By Suresh Babu

Minutes of Internal Weekly HSE Officers Meeting No. 16

02.03.2014

Date: 2nd March, 2014 Time: 16:00

Location: DPCT Training Room

Page 2: Weekly HSE Progress Meeting

TEYSEER CONTRACTING COMPANY /

CONSOLIDATED CONTRACTORS GROUP S.A.L. (OFFSHORE)

(CCC) JV

New Port Project

Container Terminal, Infrastructure and Utility Buildings

Contract No.: NPP/0026

Page 2 of 2

Next Meeting: 17th Weekly HSE Meeting will be held on 9th March, 2014 @ 4 pm at

Main Office HSE Training Room

Minutes of Meeting No. 16

S.No Description Action 1 The meeting started at 4 pm and is chaired by HSE Manager

2 Ranjeet – Sr. Trainer shared his safety moments on Welding activity All to note

3 Last Minutes of Meeting were discussed elaborately and recorded. All HSE

Officers

4

HSE Manager has briefed the last week 2 incidents (RWC and

RTA) vide the presentation of slides for the information and

precautions to be taken by the HSE Officers to avoid such incidents

in future

All HSE Officers

5 Various lagging items raised in the last HSE Management Meeting

were discussed in detail and the relevant HSE Officers clarified the

reasons and the precautions required.

All HSE Officers

6

Sign ages - Lack of sign ages were reported by the Management on

Site. This was discussed and came to a conclusion that the

manpower and the resources has to be provided to HSE

Department, in order to dedicate a Carpenter and Helper for the

preparation/alterations of signs required for the Project. At present

such facility is not available.

HSE Manager

7

Banks Man ID – To be prepared internally - HSE Manager

authorized Ranjeet – Sr. HSE Trainer – to take necessary measures

to prepare the ID at the very earliest for the Banks Man those who

had training.

HSE Manager

8

Confine Space Training to be improved. Dy. HSE Manager

suggested calling PMV to arrange ventilation, etc. to be provided.

Until such action is taken, the training to be stopped. Since last week

no training is conducted.

HSE Manager

9

Mr. Bader Jarrar draws the attention to the work being done after the

duty hours and on lunch time without the coverage of HSE Officers.

He suggested that the Construction Team should inform in advance

to HSE with regard to the activity they are going to carry out after the

duty hours, in order to take sufficient measures to post the required

HSE Officers to cover the job.

HSE Manager

10 Heat Stress – Flag system to be established. Required Items to be

ordered without delay. HSE Manager

11 Mr. Bader Jarrar pointed out the non availability of Reflection Signs

for Night Works. Action to be taken without delay HSE Manager

12 The meeting adjourned by 5 pm