Page 1: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

‘Working for Desirable Future’:Transparency and participation

in electricity sector planning in ThailandSuphakit Nuntavorakarn

Healthy Public Policy Foundation, THAILAND26th September 2011 FESTI International Conference, Bishkek

Page 2: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Installed Capacity by Type of Producers, April 2011

Total 31,516.61 MWEGAT 14,998.12 MW 47.59%Import 2,184.60 MW 6.93%IPP 12,151.59 MW 38.56%SPP 2,182.30 MW 6.92%From www.egat.co.th

Page 3: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Power Development Plan (PDP)

• PDP is the long-term strategic plan of the Thai power sector (15-20 years timeframe)

• PDP determines the future investment on power generation - how many and which types of power plant – and the transmission network.

– For example, total investment of PDP2010 120 billion USD

• So PDP also determines the future impacts of the power sector, including environmental, economic, social, and health impacts

Page 4: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

60,000

65,000

70,000

2553 2554 2555 2556 2557 2558 2559 2560 2561 2562 2563 2564 2565 2566 2567 2568 2569 2570 2571 2572 2573

ดี�เซ ล พล�งงานหมุ นเวี�ยน น��ามุ�นเตา ซ�� อต�างประเทศก๊�าซ ธรรมุชาต� ถ่�านห�นน�า เข้"า ล�ก๊ไ นต$ น�วีเคล�ยร$ พล�งน��า

MWMW

ป&ป&

45%45%

49%49%

54%54%

61%61%64%64%68%68% 64%64%65%65% 66%66% 67%67% 63%63% 60%60%57%57%

51%51%51%51%

47%47%45%45%

44%44% 43%43% 43%43% 42%42%

5%5% 7%7% 7%7% 7%7% 7%7% 7%7% 7%7% 7%7% 7%7% 8%8% 8%8%9%9% 9%9% 12%12% 11%11% 11%11% 13%13% 13%13% 15%15% 15%15% 17%17%

7%7% 7%7% 6%6% 6%6% 5%5% 5%5% 5%5% 5%5% 5%5% 5%5% 5%5% 5%5% 4%4% 4%4% 4%4%

5%5% 5%5%6%6% 6%6% 7%7%

7%7% 7%7%

7%7%8%8%

8%8%8%8% 8%8%

4%4% 4%4% 6%6% 8%8% 7%7% 7%7% 8%8% 8%8% 8%8%4%4%

6%6% 8%8% 10%10% 11%11% 12%12% 13%13% 14%14%15%15% 15%15%

15%15%16%16% 17%17%

17%17%

6%6%

7%7%7%7%

11%11% 10%10% 10%10% 9%9% 9%9% 9%9% 8%8% 9%9% 9%9% 9%9% 9%9% 8%8% 8%8% 8%8% 7%7% 7%7% 7%7% 7%7% 6%6% 6%6% 6%6%

18%18%18%18%

18%18%18%18%7%7%

7%7%7%7%

8%8%

7%7%

5%5%

PDP2010 :PDP2010 : ( (GDP Base CaseGDP Base Case))

Power Development Plan 2010-2030 (PDP2010)Installed Capacity by fuel type

Renewables

Import

Natural Gas

Imported coal

Nuclear

2010 2030

Page 5: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Drivers and institutional improvements on PDP

Page 6: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Triggering the changes: local communities protesting against large power plant projects

• Concerns about negative impacts

• Is the project really necessary? Due to over demand forecast

• Is there other energy options? Renewable energy in their area instead?

Page 7: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

ค่�า ใ ช้� จ่�ายด้�านพลั งงานต่�อปี�แลัะ สั ด้สั�วนต่�อค่�า ใ ช้� จ่�ายทั้ � งหมด้ของค่รั วเรั�อนไ ทั้ย ปี�พ.ศ. 2533-2549

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

2533 2535 2537 2539 2541 2543 2545 2547 2549

ปี�

บาทั้ต่

�อค่รั ว

เรั�อนต่

�อปี�

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

รั�อยลั

ะ ค�าใ ช"จ่�ายเก๊�*ยวีก๊�บพล�งงานท��งหมุดีต�อป&

สั�ดีสั�วีนข้องค�าใ ช"จ่�าย

Reference : National Statistic Office

Energy expenses and their burden onThai households 1990-2006

Triggering the changes: consumer groups who are questioning about the unfair electricity tariff

Page 8: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Academic contributions andpublic communication

• Information and analysis on the electricity sector- to create basic understanding for different social sector and

to get their attentions on various issues about PDP

• Development and impact assessment on Alternative Power Development Plans

- to create ‘Choice Awareness’ on many energy options andthese can be discuss deliberately as a social learning process

• Electricity Governance Assessment- focus on transparency, public participation, and accountability in the

Thai power sector

Page 9: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

GWh

GWh3 Huge Shopping Malls VS. The Whole Province

Inequality of Electricity Consumption

Page 10: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

8,000

12,000

16,000

20,000

24,000

28,000

32,000

36,000

40,000

44,000

48,000

1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020

Jun-93

Dec-94

Oct-95

Apr-96

Oct-96

Jun-97

Sep-97

Sep-98(MER)

Feb-01

Aug-02

Jan-04(LEG)

Jan-04(MEG)

Apr-06 (MEG)

Jan-07

ACTUAL

Question on Systematic Over-Demand Forecast

Page 11: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

The figures of over demand forecast

YearPDP2

004PDP2

007

Actual peak

demand (MW)

Over forecast (MW)

PDP2004

PDP2007

2547

196,

00  -

1932

5

2

7

5  -

2548

211,

43  -

2053,

8

6

0

6  -

2549

227,

38  -

2106,

4

1,6

7

4  -

2550

243,

44

225,

86

2258,

6

1,7

5

8 -

2551

260,

48

2395

7

2256,

8

3,4

8

0

1,38

9

Page 12: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

• Using Return on Invested Capital (ROIC) as the main criteria for setting electricity tariff may lead to over investment

• since more investment means more profit

• Strong regulation on investment plans is needed, but the Regulators still lack of data, knowledge, and human resources to check and balance

ROIC and Investment Efficiency

ROIC = Net profit after tax Investment EGAT 84. %

MEA PEA

48.%

Result :Over Demand Forecast and prefer high investment

options

Page 13: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

The cycle of supporting more investment under ‘monopoly’ power

OverDemand ForecastPower Planning

that preferhigh investment

options

Electricity tariff that allowthe pass on of excess costs to consumers

Benefits of

utilities, energy

companies, etc.

11

22

33

Page 14: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Ft : Fuel Adjustment Charge• EGAT: a part of the electricity tariff that increase or

decrease automatically, according to changes in fuel costs and other uncontrol costs

• The mechanism to pass on the costs to consumers, which includes

– Fuel costs

– Electricity price for private producers and import (including profit guarantee, compensation for inflation and exchange rate)

– Expenses according to government policies (e.g. Community Development Funds, ‘Adder’ for renewable energy, etc.)

– Compensation for lower sale (or over investment)

Page 15: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

DSM and Energy DSM and Energy Efficiency areEfficiency are

the cheapest energy the cheapest energy optionsoptions

ทั้$%มา: World Bank, World Development Report 2010

Page 16: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

16

DSM in PDP2010

ปี� 2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW 240 240 240 240 240 240 240 240 240 240 240 240

Saving target of T5 high efficiency light bulb program 2010-2019

ปี� 2010 2011 2012 2013 2014 2015 2016 2017 2018

MW 43 129 215 344 473 584 498 369 198

Saving target of DSM program for 2020-2030

Save 0.3% ofthe peak demand in

20 years

Page 17: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Fast Growth of Fast Growth of Renewable Energy in Renewable Energy in

ThailandThailandการัเพ'%มข(�นของก)าลั งการัผลั'ต่ต่'ด้ต่ �งจ่ากพลั งงานหม+นเว$ยน

SPP-Firm

SPP Non-Firm

VSPP

0

200

400

600

800

1,000

1,200

1,400

2537 2538 2539 2540 2541 2542 2543 2544 2545 2546 2547 2548 2549 2550 2551 2552

MW

1994 2009

Page 18: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Example of PDP-Alternative

Page 19: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

PDP201

0

15%-Nuk

e

15%-NoN

uke

30%-Nuk

e

30%-NoN

uke

Max

imum

Installed Capacity in 2030 from Different

Technology Deployment in Various PDP Options

DSM

Nuclear

Renewables

Co-generation

Import

Hydro

Oil

Lignite

Coal

Natural Gas

Installed Capacity of Different PDP Options

Page 20: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

32.3

14.5

17.9

10.78.87.50.4

30.5

8.4

17.5

10.58.67.39.3

29.0

8.0

16.6

9.9

14.4-14.7

29.8

2.9

12.8

10.2

14.87.115.1

31.4

2.8

12.510.0

17.7-18.5

25.7

2.8

12.510.0

17.7

7.0

18.4

-

20.0

40.0

60.0

80.0

100.0

PDP201

0

15%-Nuk

e

15%-NoN

uke

30%-Nuk

e

30%-NoN

uke

Max

imum

Share of Installed Capacity in 2030 from

Different Technology Deployment in

DSM

Nuclear

Renewables

Co-generation

Import

Hydro

Oil

Lignite

Coal

Natural Gas

GHG reduction measures1 . increase DSM2. increase Renewables3. decrease coal

GHG reduction measures1 . increase DSM2. increase Renewables3. decrease coal

Share of Installed Capacity in Different PDP Options

Page 21: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

PDP201

0

15%-Nuk

e

15%-NoN

uke

30%-Nuk

e

30%-NoN

uke

Max

imum

Energy Generations from Different Technology Deployment

in Various PDP Options

DSM

Nuclear

Renewables

Co-generation

Import

Hydro

Oil

Lignite

Coal

Natural Gas

Energy Generation in Different PDP Options

Page 22: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Comparative Impact Assessment on various

Alternative PDPs

Economics

Environment Social

Page 23: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Total GHG Emission of Different PDP Options

0.00

50.00

100.00

150.00

200.00

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

Year

Millio

n To

ns

PDP2010

15%-Nuke

15%-NoNuke

30%-Nuke

30%-NoNuke

MaximumReduce GHG

by 40%

Significant Reduction of GHG Emission

Page 24: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

SOx Emission in Different PDP Options

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

500.00

Year

Thou

sand

Ton

s

PDP2010

15%-Nuke

15%-NoNuke

30%-Nuke

30%-NoNuke

MaximumReduce SOx by 50%

Good for Reducing Air Pollution (SOx)

Page 25: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Good for Reducing Pollution (Hg)Total Hg Emission in Different PDP Options

0.00

5.00

10.00

15.00

20.00

25.00

30.00

Year

Ton

PDP2010

15%-Nuke

15%-NoNuke

30%-Nuke

30%-NoNuke

Maximum

Reduce Hg by 75%

Page 26: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

5,114.2

3,160.6

5,012.6

3,039.0

5,206.4

2,682.1

5,227.0

3,077.2

5,385.5

2,627.7

5,404.1

3,142.7

0.0

1,000.0

2,000.0

3,000.0

4,000.0

5,000.0

6,000.0

7,000.0

8,000.0

9,000.0

Billio

n TH

B

PDP2

010

15%-Nuk

e

15%-NoN

uke

30%-Nuk

e

30%-NoN

uke

Maxim

umOptions

Overall Costs of Different PDP Options

Imported Cost

GDP Contribution

increase GDP by 5.6%

Reduce import

by 16.9%

Higher GDP Contribution and Lower Imported Cost

Page 27: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

5,114.2

3,160.6

7,177.3

5,012.6

3,039.0

6,707.9

5,206.4

2,682.1

6,465.1

5,227.0

3,077.2

6,078.6

5,385.5

2,627.7

5,932.2

5,404.1

3,142.7

5,999.3

-

2,000.0

4,000.0

6,000.0

8,000.0

10,000.0

12,000.0

14,000.0

16,000.0

Billio

n TH

B

PDP2

010

15%-Nuk

e

15%-NoN

uke

30%-Nuk

e

30%-NoN

uke

Maxim

umOptions

Overall Economic Costs of Differrent PDP Options

External Cost

Imported Cost

GDP Contribution

Good for the Economy and Environment

Page 28: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Job Creation in Different PDP Options

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

Year

Perso

ns

PDP2010

15%-Nuke

15%-NoNuke

30%-Nuke

30%-NoNuke

Maximum

Create more jobs

by18800

0 persons

Good for Society, More Job Creation

Page 29: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Institutional Improvements on PDP:The policy network

• Expanding from mainly local communities against projects, NGOs, and some academics

• To different parts of the society, for example, consumer networks, community energy movement, National Human Rights Commission, several Ministries, Senate committee, the regulators, as well as EGAT and Ministry of Energy

• The network itself was transformed from ‘physical’ network to ‘coordinate by contents’ and more open aiming at social learning process on PDP

Page 30: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Institutional Improvements on PDP:The role of private sector

• The group on renewable energy, SPP and VSPP, was rather active, but conservative on pushing for change.

• The large power companies, IPP, have been passive to push for changes.

Page 31: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Outcomes on PDP process and key features

1. Goals for the PDP

not a clear step as it was done by the same group of authorities and experts

The routine goals on energy security and least cost

Plus lower CO2 emission and, to some extent, renewable energy and social acceptance of PDP

2. Future demand forecast

Systematic over-estimation

Lower the forecast of 4,207 MW in 2030 during public participation, equals to 4,800 million USD investment

Page 32: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Outcomes on PDP process and key features

3. DSM and EE Not consider in the planning process

Integrate DSM in load forecast and the generation expansion (but with extremely low figure)

4. Renewable energy

Not consider majority of RE projects as dependable capacity

Include the re-estimated RE target and approved dependable capacity of each RE technology

5. Combined Heat and Power (CHP)

Problems in the continuity of the policy on buying electricity from new CHP projects

Include CHP of 7,177 MW within 2030

Page 33: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Outcomes on PDP process and key features

6. Centralized supply options – coal, natural gas, large hydropower, nuclear

Being the key candidate plants and usually with bias assumptions to favor these options

Still being the key candidate plants, but with more reasonable assumptions, particularly natural gas

7. Public Hearing in the planning process and draft PDP

no public hearing on the draft PDP

Only in 2009 and 2010 that the public hearing on the draft PDP was arranged

Page 34: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Future challenges1) Sharpen the analysis and more effective communications,for example- improve from Forecast to Foresight and more detail analysis for peak and off-peak period, and base-intermediate-peaking supply options- improving dependable capacity and load factor of renewable energy2) Proactive participation of local communities and policy networks in PDP process as well as other policy and planning process3) Promote good governance and solving Conflict of Interests of the senior staffs in the Ministry of Energy4) Ensure accountability of the government on PDP decision-making process as well as share and fair responsibility of each electricity user category

Page 35: ‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy

Thank youThank youfor your attentionfor your attention