Status of the ILC, issues Status of the ILC, issues for the LCTPC design and for the LCTPC design and their feedback to the R&D their feedback to the R&D
programprogram
OUTLINE of TALKOUTLINE of TALK
•Overview ILC Overview ILC •LCTPC Design Issues in the DODsLCTPC Design Issues in the DODs•Next steps:Next steps:
•More work with Small Prototypes (SP) More work with Small Prototypes (SP) •Build the Large Prototype (LP) Build the Large Prototype (LP)
•LCTPC LCTPC R&D plans R&D plans
OUTLINE of TALKOUTLINE of TALK
•Overview ILC Overview ILC •LCTPC Design Issues in the DODsLCTPC Design Issues in the DODs•Next steps:Next steps:
•More work with Small Prototypes (SP) More work with Small Prototypes (SP) •Build the Large Prototype (LP) Build the Large Prototype (LP)
•LCTPC LCTPC R&D plans R&D plans
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
22
LDC/GLD/4th Conceptsor
A TPC for a Linear Collider Detector
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
33
The Global Design The Global Design Effort Effort
Formal organization begun at LCWS 05 at Stanfordin March 2005 when Barry became director of the GDE
Technically Driven Schedule
ACFA’07 Beijing:
RDR(+cost), DCR
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
44
International Linear ColliderInternational Linear Collider
Aug 2004: Technology decision: COLD superconducting à la TESLA chosen
Baseline: Baseline: 200 GeV < √s < 500 GeV 200 GeV < √s < 500 GeV Integrated luminosity ~ 500 fbIntegrated luminosity ~ 500 fb-1-1 in 4 years in 4 years80 % e- beam polarisation80 % e- beam polarisationUpgrade to 1TeV, Upgrade to 1TeV, L = 1 abL = 1 ab-1-1 in 3 years in 3 years2 interaction regions2 interaction regionsConcurrent running with the LHC from Concurrent running with the LHC from 20152015
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
55
Physics Overview @ Snowmass’05 by
Peter Zerwas
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
66
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
77
e.g.with precision measurements of theHiggs
e.g.with precision measurements of theHiggs
cmE recHM Expt (GeV) Decay
Channel (GeV/c2) ln(1+s/b)
115 GeV/c2
1 ALEPH 206.7 4-jet 114.3 1.73
2 ALEPH 206.7 4-jet 112.9 1.21
3 ALEPH 206.5 4-jet 110.0 0.64
4 L3 206.4 E-miss 115.0 0.53
5 OPAL 206.6 4-jet 110.7 0.53
6 Delphi 206.7 4-jet 114.3 0.49
7 ALEPH 205.0 Lept 118.1 0.47
8 ALEPH 208.1 Tau 115.4 0.41
9 ALEPH 206.5 4-jet 114.5 0.40
10 OPAL 205.4 4-jet 112.6 0.40
Goal: to revisit the Higgs…Goal: to revisit the Higgs…
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
88
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
99
The value of precision measurements…
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1010
Polarization
Multipole expansion
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1111
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1212
Where are we with the Higgs? CERN Courier, Nov 2005Where are we with the Higgs? CERN Courier, Nov 2005
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1313
Why do we think these indirect, precision meas. are telling us anything??? CERN Courier, Nov 2005 :
Why do we think these indirect, precision meas. are telling us anything??? CERN Courier, Nov 2005 :
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1414
SUperSYmmetrySUperSYmmetrySymmetry between
Fermions Bosons(Matter) (Force carriers)
...now we have doubled the particle spectrum...
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1515
... BUT solves several SM problems:
♥ Link to gravity
♥ lightest SUSY particle stable
Dark matter candidate
♥ Solves fine tuning problems
♥ Predicts light Higgs
♥ Unification of forces
SupersymmetrySupersymmetry
Energy in GeV
with Supersymmetry
without Supersymmetry
1 TeV
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1616
From my talk at the Arlington LC Workshop January 2003:
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1717
Need highest luminosityPrecision for 1 ab-1 :
%20
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1818
10-3
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
1919
2018
2019
2021
2024
+y
2027
+y
25
ILC
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2020
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2121
HISTORY
1992: First discussions on detectors in Garmisch-Partenkirschen (LC92). Silicon? Gas?1996-1997: TESLA Conceptual Design Report. Large wire TPC, 0.7Mchan.1/2001: TESLA Technical Design Report. Micropattern (GEM, Micromegas) as a baseline, 1.5Mchan.5/2001: Kick-off of Detector R&D11/2001: DESY PRC proposal. for TPC R&D(European & North American teams)2002: UCLC/LCRD proposals2004: After ITRP, WWS R&D panelEurope Chris Damerell (Rutherford Lab. UK) Jean-Claude Brient (Ecole Polytechnique, France) Wolfgang Lohmann (DESY-Zeuthen, Germany)
Asia HongJoo Kim (Korean National U.) Tohru Takeshita (Shinsu U., Japan) Yasuhiro Sugimoto (KEK, Japan)
North America Dean Karlen (U Victoria, CAN) Ray Frey (U. of Oregon, USA) Harry Weerts (Fermilab, USA)
GOALGOAL
To design and build an To design and build an ultra-high performance ultra-high performance
Time Projection Time Projection ChamberChamber
……as central tracker for as central tracker for the ILC detector,the ILC detector,
where excellent vertex, where excellent vertex, momentum andmomentum and
jet-energy precision jet-energy precision are requiredare required
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2222
LCTPC/LP Groups (19Sept06)LCTPC/LP Groups (19Sept06) AmericasAmericasCarleton Carleton MontrealMontrealVictoriaVictoriaCornellCornellIndianaIndianaLBNLLBNL
Purdue (observer) Purdue (observer)
EuropeEuropeLAL OrsayLAL Orsay IPN OrsayIPN Orsay
CEA SaclayCEA SaclayAachenAachenBonnBonnDESYDESY
U HamburgU HamburgFreiburgFreiburg
MPI-MunichMPI-MunichTU Munich TU Munich (observer)(observer)
RostockRostockSiegenSiegenNIKHEFNIKHEF
NovosibirskNovosibirskLundLundCERNCERN
AsiaAsiaTsinghuaTsinghua
CDC:CDC:HiroshimaHiroshima
KEKKEKKinki UKinki USaga Saga
KogakuinKogakuinTokyo UA&TTokyo UA&T
U TokyoU TokyoU TsukubaU Tsukuba
Minadano SU-IITMinadano SU-IIT Other groups
MITMITMIT (LCRD)MIT (LCRD)Temple/Wayne State (UCLC)Temple/Wayne State (UCLC)YaleYaleKarlsruheKarlsruheUMM KrakowUMM KrakowBucharest Bucharest
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2323
-5
Large Detector Concept example
3x10-5
.30Particle Flow
(N.B. below are TDR dimensions, which have changed for latest LDC iteration)
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2424GLD
LDC
HCalECal
TPC
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2525
Physics determines Physics determines detector designdetector design
momentum: d(1/p) momentum: d(1/p) ~~ 10 10-4-4/GeV(TPC /GeV(TPC only) only)
~ ~ 0.6x100.6x10-4-4/GeV(w/vertex)/GeV(w/vertex) (1/10xLEP)(1/10xLEP)
ee++ee--ZHZHllllX goal: X goal: MM<0.1x <0.1x
dominated by beamstrahlungdominated by beamstrahlung
tracking efficiency: 99% (overalltracking efficiency: 99% (overall) ) excellent and robust tracking efficiency by excellent and robust tracking efficiency by
combining vertex detector and TPC, each combining vertex detector and TPC, each with excellent tracking efficiencywith excellent tracking efficiency
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2626
Are TPC’s Good for Tracking?
• ZH events
• Standalone TPC reconstruction (LD design)
Dan Peterson, Cornell
Answer: Yes.
Gaseous Tracking R&D
Next questions: what about resolution, ion feedback, track separation resolution, neutron backgrounds?
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2727
Motivation/Goals
• Continuous tracking throughout large volume
• ~98% tracking efficiency in presence of backgrounds
• Timing to 2 ns together with inner silicon layer
• Minimum of X_0 inside Ecal (<3% barrel, <30% endcaps)
• σ_pt ~ 100μm (rφ) and ~ 500μm (rz) @ 3,4T for right gas if diffusion limited
• 2-track resolution <2mm (rφ) and <5-10mm (rz)
• dE/dx resolution <5%
• Full precision/efficiency at 30 x estimated backgrounds
Motivation/Goals
• Continuous tracking throughout large volume
• ~98% tracking efficiency in presence of backgrounds
• Timing to 2 ns together with inner silicon layer
• Minimum of X_0 inside Ecal (<3% barrel, <30% endcaps)
• σ_pt ~ 100μm (rφ) and ~ 500μm (rz) @ 3,4T for right gas if diffusion limited
• 2-track resolution <2mm (rφ) and <5-10mm (rz)
• dE/dx resolution <5%
• Full precision/efficiency at 30 x estimated backgrounds
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2828
R&D program
• gain experience with MPGD-TPCs, compare with wires
• study charge transfer properties, minimize ion feedback
• measure performance with different B fields and gases
• find ways to achieve the desired precision
• investigate Si-readout techniques
• start electronics design for 1-2 million pads
• study design of thin field cage
• study design thin endplate: mechanics, electronics, cooling
• devise methods for robust performance in high backgrounds
• pursue software and simulation developments
R&D program
• gain experience with MPGD-TPCs, compare with wires
• study charge transfer properties, minimize ion feedback
• measure performance with different B fields and gases
• find ways to achieve the desired precision
• investigate Si-readout techniques
• start electronics design for 1-2 million pads
• study design of thin field cage
• study design thin endplate: mechanics, electronics, cooling
• devise methods for robust performance in high backgrounds
• pursue software and simulation developments
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
2929
R&D PlanningR&D Planning1) Demonstration phase1) Demonstration phase– Continue work with small prototypes on mapping out Continue work with small prototypes on mapping out
parameter space, understanding resolution, etc, to prove parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS-based pixel TPC feasibility of an MPGD TPC. For CMOS-based pixel TPC ideas this will include proof-of-principle tests.ideas this will include proof-of-principle tests.
2) Consolidation phase2) Consolidation phase– Build and operate the Large Prototype (LP), Ø ~ 80cm, Build and operate the Large Prototype (LP), Ø ~ 80cm,
drift ~ 60cm, with EUDET infrastructure as basis, to test drift ~ 60cm, with EUDET infrastructure as basis, to test manufacturing techniques for MPGD endplates, fieldcage manufacturing techniques for MPGD endplates, fieldcage and electronics. LP design is starting and electronics. LP design is starting building and building and testing will take another ~ 3-4 years.testing will take another ~ 3-4 years.
3) Design phase3) Design phase– During phase 2, the decision as to which endplate During phase 2, the decision as to which endplate
technology to use for the LC TPC would be taken and final technology to use for the LC TPC would be taken and final design started.design started.
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3030
What have we been doing in Phase 1 ?
What have we been doing in Phase 1 ?
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3131
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3232
Gas-Amplification Systems: Gas-Amplification Systems: Wires & Wires & MPGDsMPGDs
GEM: Two copper foils separated by kapton, multiplication takes place in holes, uses 2 or 3 stages
Micromegas: micromesh sustained by 50μm pillars, multiplication between anode and mesh, one stage
S1
S1/S2 ~ Eamplif / Edrift
P~140 μm
D~60 μm
S2
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3333
Pixel TPC Pixel TPC DevelopmeDevelopme
ntnt
NikhefFreiburg
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3434
Examples of Prototype TPCsExamples of Prototype TPCs
Carleton, Aachen, Cornell/Purdue,Desy(n.s.) for B=0or1T studies
Saclay, Victoria, Desy (fit in 2-5T magnets)
Karlsruhe, MPI/Asia, Aachen built test TPCs for magnets (not shown), other groups built small special-study chambers
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3535
FacilitiesFacilities Saclay 2T magnet, cosmics
Kek 1.2T, 4GeV
hadr.test-b
eam Desy 1T, 6GeV e- test-beam
Desy 5T
magnet,
cosmics, laser
Cern test-beam (not
shown)
EUDET
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3636
TPC R&D summary to date
• Now 4 years of MPGD experience gathered • Gas properties rather well understood• Limit of resolution being understood• Resistive foil charge-spreading demonstrated• CMOS RO demonstrated• Work starting for the Large Prototype
TPC R&D summary to date
• Now 4 years of MPGD experience gathered • Gas properties rather well understood• Limit of resolution being understood• Resistive foil charge-spreading demonstrated• CMOS RO demonstrated• Work starting for the Large Prototype
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3737
Phase 2• Basic Idea: LP should be a prototype LP should be a prototype for the LC TPC design and test as many for the LC TPC design and test as many of the issues as possible (like, e.g., of the issues as possible (like, e.g., TPC90 @ Aleph). This will take at least 2 TPC90 @ Aleph). This will take at least 2 iterations, we call them LP1 and LP2.iterations, we call them LP1 and LP2.
• The Eudet infrastructure gives us a The Eudet infrastructure gives us a starting basis for the LP workstarting basis for the LP work
• The general LCTPC/LP R&D issues and The general LCTPC/LP R&D issues and been divided up into workpackages (WP) been divided up into workpackages (WP) more later…more later…
Phase 2• Basic Idea: LP should be a prototype LP should be a prototype for the LC TPC design and test as many for the LC TPC design and test as many of the issues as possible (like, e.g., of the issues as possible (like, e.g., TPC90 @ Aleph). This will take at least 2 TPC90 @ Aleph). This will take at least 2 iterations, we call them LP1 and LP2.iterations, we call them LP1 and LP2.
• The Eudet infrastructure gives us a The Eudet infrastructure gives us a starting basis for the LP workstarting basis for the LP work
• The general LCTPC/LP R&D issues and The general LCTPC/LP R&D issues and been divided up into workpackages (WP) been divided up into workpackages (WP) more later…more later…
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3838
PerformancePerformance
– Momentum precision needed for overall Momentum precision needed for overall tracking? tracking?
– Momentum precision needed for the TPC? Momentum precision needed for the TPC? – Good dE/dx resolution, Vº detectionGood dE/dx resolution, Vº detection– Requirements forRequirements for
2-track resolution (in r2-track resolution (in rφφ and z)? and z)? track-gamma separation (in rtrack-gamma separation (in rφφ and z)? and z)?
– Tolerance on the maximum endplate Tolerance on the maximum endplate thickness? thickness?
– Tracking configurationTracking configurationCalorimeter diameter Calorimeter diameter TPC TPC Other tracking detectors Other tracking detectors
– TPC OD/ID/length TPC OD/ID/length
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
3939
LCTPC resolution in the DODsLCTPC resolution in the DODsLCTPC resolution in the DODsLCTPC resolution in the DODs
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4040
Physics determines Physics determines detector designdetector design
Momentum resolution: Momentum resolution: d(1/p) d(1/p) ~~ ????? ?????
ee++ee--ZHZHllllXX couplings, couplings, ??
Redo study at Redo study at s = 220 GeVs = 220 GeV and using vertex and using vertex
constraint!constraint!
BIG IS
SUE!
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4141
Prototype ResultsPrototype Results
Point Point resolution, resolution,
GemGem--Three examples of σ_pt measured for Gems and 2x6mm^2 pads.
--First, in Desy chamber (triple Gem), resolution using “triplet method”.
--Second, in Victoria chamber (double Gem), unbiased method used: track fit twice, with and without padrow in question, σ determined for each case; geometric mean of the two σ’s gives the correct result.
--See next page…30cm
B=4T
Gas:P5
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4242
ACFA8--July2005
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4343
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4444
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4545
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4646
PerformancePerformance
– Momentum precision needed for Momentum precision needed for the TPCthe TPC
– What is the best we can do?What is the best we can do?
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4747
Keisuke Fujii, PRC report
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4848
Momentum resolution Momentum resolution neededneeded……
“Club sandwich” possible in GLD because of large size. We will study performance & feasibility of this option in case the momentum precision is required.
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
4949
LC TPC EndcapsLC TPC EndcapsLC TPC EndcapsLC TPC Endcaps
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5050
GLD
GLDAkira Sugiyama
GLDAkira Sugiyama
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5151
Arrangements of detectors on the active area of the end cap (2/2)Trapezoidal shapes assembled in iris shape
Annotations: Px is the type number of PADS boards or frames
Page 2
By rotation of 15° around the axe, these frames are the same
P1
12 sectors (30° each) as super modules are defined
On each, 7 modules are fixedThe sizes of detectors are varying from 180 to 420 mm
P2 P3 P4
P2
P3
P4
These arrangement seems to be the best as only 4 different PADS are necessary
LDCRS/Joel Pouthas/Philippe Rosier
LDCRS/Joel Pouthas/Philippe Rosier
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5252
Aleph endplateAleph endplate
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5353
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5454
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5555
Some features• Zigzag structure prevented loss of tracks > θ~22°• Sectors mounted from inside using a “handling tool” to minimize the dead space between sectors. This straight-forward operation which was performed at least 30 times during the lifetime of Aleph. • Alu sandwich structure stiff, lightweight to
- contain 7mb overpressure- provide forced-air thermal insulation between electronics and TPC volume
• Water cooling of 1kW electronics/side in addition- 22K channels per side
• Combination water/air cooling blocked all heat to TPC• Overall thickness ~ 25%Xo (average) w/o cables• Bending of endplate
- 20 micrometers due to 7mb overpressure- 5 micrometers due to wire tension
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5656
Design Design
– Gas-amplification technology Gas-amplification technology input from input from R&D projects R&D projects
– Chamber gas candidates: crucial decision! Chamber gas candidates: crucial decision! – Electronics design: Electronics design: LP WPLP WP
Zeroth-order “conventional-RO” design Zeroth-order “conventional-RO” design Is there an optimum pad size for momentum, Is there an optimum pad size for momentum, dE/dx resolution and electronics packaging? dE/dx resolution and electronics packaging? Silicon RO: proof-of-principle Silicon RO: proof-of-principle
– Endplate design Endplate design LP WPLP WPMechanics Mechanics Minimize thicknessMinimize thicknessCoolingCooling
– Field cage design Field cage design LP WPLP WP
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5757
Backgrounds/alignment/distortion-Backgrounds/alignment/distortion-
correctioncorrection
– Revisit expected backgroundsRevisit expected backgrounds– Maximum positive-ion buildup tolerableMaximum positive-ion buildup tolerable– Maximum occupancy tolerableMaximum occupancy tolerable– Effect of positive-ion backdrift: gating planeEffect of positive-ion backdrift: gating plane
– Tools for correcting inhomogeneous B-field Tools for correcting inhomogeneous B-field
or space charge effects in bad backgroundsor space charge effects in bad backgrounds
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5858
LC TPC Chamber gasLC TPC Chamber gas(b) Ion buildup(b) Ion buildup
LC TPC Chamber gasLC TPC Chamber gas(b) Ion buildup(b) Ion buildup
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
5959
LC TPC Chamber gasLC TPC Chamber gas(c) ion backdrift/gating(c) ion backdrift/gatingLC TPC Chamber gasLC TPC Chamber gas
(c) ion backdrift/gating(c) ion backdrift/gating
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6060
LC TPC ElectronicsLC TPC ElectronicsLC TPC ElectronicsLC TPC Electronics
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6161
LC TPC BackgroundsLC TPC BackgroundsLC TPC BackgroundsLC TPC Backgrounds
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6262
This is for infrastructure for detector R&D, but not yet the R&D itself, to which all of the TPC R&D groups will have to
contribute if the LP is going to be successful.
This will provide a basis for the LC TPC groups to help get funding for the LP and other LC TPC work.
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6363
Work Packages for the LCTPC/LPWork Packages for the LCTPC/LP 0) Workpackage:0) Workpackage: TPC R&D program/performance goalsTPC R&D program/performance goals
To be worked out by the LCTPC collaborationTo be worked out by the LCTPC collaboration
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6464
Work Packages for the LCTPC/LPWork Packages for the LCTPC/LP 1) Workpackage1) Workpackage MECHANICSMECHANICS
Groups expressing interest to date(others?)Groups expressing interest to date(others?)
a) LP design (incl. endplate structure) Cornell, Desy, IPNOrsay, MPI,a) LP design (incl. endplate structure) Cornell, Desy, IPNOrsay, MPI, +contribution from Eudet +contribution from Eudet
b) Fieldcage, laser, gas Aachen, Desy, St.Petersburg, b) Fieldcage, laser, gas Aachen, Desy, St.Petersburg,
+contribution from Eudet +contribution from Eudet c) GEM panels for endplate Aachen, Carleton, Cornell, c) GEM panels for endplate Aachen, Carleton, Cornell,
Desy/HH,Desy/HH, Karlsruhe, Kek/XCDC, Novosibirsk, Karlsruhe, Kek/XCDC, Novosibirsk,
Victoria Victoria d) Micromegas panels for endplate Carleton, Cornell, Kek/XCDC, d) Micromegas panels for endplate Carleton, Cornell, Kek/XCDC,
Saclay/Orsay Saclay/Orsay e) Pixel panels for endplate Cern,Freiburg,Nikhef,Saclay,Kek/XCDC, e) Pixel panels for endplate Cern,Freiburg,Nikhef,Saclay,Kek/XCDC,
+contribution from Eudet +contribution from Eudet f) Resistive foil for endplate Carleton, Kek/XCDC, Saclay/Orsay f) Resistive foil for endplate Carleton, Kek/XCDC, Saclay/Orsay
Ron Settles
Dan Peterson
Ties Behnke
Akira Sugiyama
Paul Colas
Jan Timmermans
Madhu Dixit
convener inwhite color
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6565
Work Packages for the LCTPC/LPWork Packages for the LCTPC/LP 2) Workpackage2) Workpackage ELECTRONICSELECTRONICS
Groups expressing interest to Groups expressing interest to date(others?)date(others?)
a)"Standard" RO/DAQ for LP: Aachen, Desy/HH, Cern, Lund, a)"Standard" RO/DAQ for LP: Aachen, Desy/HH, Cern, Lund, Rostock, Montreal, Tsinghua, Rostock, Montreal, Tsinghua,
+contribution from Eudet +contribution from Eudet
b) CMOS RO electronics: Freiburg, Cern, Nikhef, Saclay, b) CMOS RO electronics: Freiburg, Cern, Nikhef, Saclay, +contribution from Eudet +contribution from Eudet
c) Electr.,powerswitching,cooling Aachen, Desy/HH, Cern, Lund, c) Electr.,powerswitching,cooling Aachen, Desy/HH, Cern, Lund, for LC TPC: Rostock, Montreal, St.Petersburg, for LC TPC: Rostock, Montreal, St.Petersburg,
Tsinghua,Tsinghua, +contribution from Eudet +contribution from Eudet
Leif Joennson
Leif Joennson + ?
Harry van der Graaf
Luciano Musa
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6666
Work Packages for the LCTPC/LPWork Packages for the LCTPC/LP
3) Workpackage3) Workpackage SOFTWARESOFTWARE
Groups expressing interest to Groups expressing interest to date(others?)date(others?)
a) LP SW+simul./reconstr.framework: Desy/HH,Cern,Freiburg, Carleton, a) LP SW+simul./reconstr.framework: Desy/HH,Cern,Freiburg, Carleton, Victoria, +contribution from Victoria, +contribution from
Eudet Eudet
b) TPC simulation, backgrounds Aachen, Carleton, Cornell, b) TPC simulation, backgrounds Aachen, Carleton, Cornell, Desy/HH,Desy/HH,
Kek/XCDC, St.Petersburg,Victoria Kek/XCDC, St.Petersburg,Victoria
c) Full detector simulation Desy/HH, Kek/XCDC, LBNL c) Full detector simulation Desy/HH, Kek/XCDC, LBNL
Peter Wienemann
Peter Wienemann
Stefan Roth
Keisuke Fujii
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6767
Work Packages for the LCTPC/LPWork Packages for the LCTPC/LP 4) Workpackage4) Workpackage CALIBRATIONCALIBRATION
Groups expressing interest to date(others?)Groups expressing interest to date(others?)
a) Fieldmap Cern, a) Fieldmap Cern, +contribution from Eudet +contribution from Eudet
b) Alignment Kek/XCDC b) Alignment Kek/XCDC
c) Distortion correction Victoriac) Distortion correction Victoria
d) Rad.hardness of material St.Petersburg d) Rad.hardness of material St.Petersburg
e) Gas/HV/Infrastructure Desy, Victoria, e) Gas/HV/Infrastructure Desy, Victoria, +contribution from Eudet +contribution from Eudet
Dean Karlen
Lucie Linssen
Takeshi Matsuda
Dean Karlen
Anatoliy Krivchitch
Desy Postdoc
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6868
Here are some ideas for the evolution up to the Design Phase
3(under discussion with the collab.)
• 2006-09: SP (small prototype) tests, LP1 = two endplates: Gem+pixel, Microm.+pixel adiabatic developm. LP1->LP1.5->LP2• 2010: LP2 = real LCTPC prototype endplate: Gem or μMegas + carbon-fibre sandwich, gating grid, sector/panel shape, LCTPC electronics, gas, etc
Here are some ideas for the evolution up to the Design Phase
3(under discussion with the collab.)
• 2006-09: SP (small prototype) tests, LP1 = two endplates: Gem+pixel, Microm.+pixel adiabatic developm. LP1->LP1.5->LP2• 2010: LP2 = real LCTPC prototype endplate: Gem or μMegas + carbon-fibre sandwich, gating grid, sector/panel shape, LCTPC electronics, gas, etc
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
6969
TPC R&D breakdown (prel.)• Gem, Micromegas, Pixel LP1@Desy
• Large, small, odd-shaped panels LP1@Desy
• Endplate alignment and stability LP1,LP2@Desy
• Fieldcage LP1@Desy
• Sandwich structure SP/LP2
• Gating/max. space charge SP/LP2
ion feedback rate
• Point/2-track resolution LP1@Desy
• Momentum meas. in inhomog. B-field LP1@Desy
• dE/dx measurement LP1@Desy
• Gas studies SP
• Pad shapes SimulationLP1,LP2
• Jet environment SP@Cern/FermiLab • Beams
• 1-6 GeV/c electrons LP1@Desy
• 1-20 GeV/c hadrons (+dE/dx) LP2@Cern/FermiL • 100 GeV hadrons (+jets) LP2@Cern/FermiL
TPC R&D breakdown (prel.)• Gem, Micromegas, Pixel LP1@Desy
• Large, small, odd-shaped panels LP1@Desy
• Endplate alignment and stability LP1,LP2@Desy
• Fieldcage LP1@Desy
• Sandwich structure SP/LP2
• Gating/max. space charge SP/LP2
ion feedback rate
• Point/2-track resolution LP1@Desy
• Momentum meas. in inhomog. B-field LP1@Desy
• dE/dx measurement LP1@Desy
• Gas studies SP
• Pad shapes SimulationLP1,LP2
• Jet environment SP@Cern/FermiLab • Beams
• 1-6 GeV/c electrons LP1@Desy
• 1-20 GeV/c hadrons (+dE/dx) LP2@Cern/FermiL • 100 GeV hadrons (+jets) LP2@Cern/FermiL
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7070
Some of the topics discussed at Some of the topics discussed at WP bi-weekly phonemeetings…WP bi-weekly phonemeetings…
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7171
AGENDAAGENDA
-Fieldcage for the LP (Ties Behnke, Peter Schade)-Fieldcage for the LP (Ties Behnke, Peter Schade)
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7272
FC length ~ 60-80 cm
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7373
Madhu Dixit proposes for the LCTPC electronics:
-preamp 25ns Trise (10%-90%)-no shaper-integrator-25MHz 10to12-bit FADC
(2-track resolution can benefit from the somewhat faster Trise if the noise is still acceptable)
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7474
EndplateEndplate
Dan Peterson
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7575
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7676
Geometry details Geometry details by Dan Petersonby Dan Peterson
File:EndplateFieldCageGeometry5
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7777
TPC milestonesTPC milestones
2006-2010 Continue LCTPC R&D via small-prototypes
and LP tests
2010 Decide on all parameters
2011 Final design of the LCTPC
2015 Four years construction
2016 Commission/Install TPC in the LC Detector
2006-2010 Continue LCTPC R&D via small-prototypes
and LP tests
2010 Decide on all parameters
2011 Final design of the LCTPC
2015 Four years construction
2016 Commission/Install TPC in the LC Detector
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7878
No conclusions…No conclusions…Backup slides…Backup slides…
No conclusions…No conclusions…Backup slides…Backup slides…
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
7979
Two other LC-TPC features
will be compensated by good design…
• ~ 50 μs drift time integrates over 150 BX
design for very large granularity: ~ 2 – 20 x 109 voxels
(two orders of magnitude more if CMOS pixel version)
• ~ end caps with large density of electronics (several million
pads) are a fair amount of material
design for smallest amount: ~ 30%X0 or less is feasible
• design for full precision/efficiency at 30 x estimated backgrounds
Two other LC-TPC features
will be compensated by good design…
• ~ 50 μs drift time integrates over 150 BX
design for very large granularity: ~ 2 – 20 x 109 voxels
(two orders of magnitude more if CMOS pixel version)
• ~ end caps with large density of electronics (several million
pads) are a fair amount of material
design for smallest amount: ~ 30%X0 or less is feasible
• design for full precision/efficiency at 30 x estimated backgrounds
21/12/200621/12/2006 Ron Settles MPI-Munich TUM DeRon Settles MPI-Munich TUM Dec 2006 -- ILC, LCTPC Design Issues: R&D Plc 2006 -- ILC, LCTPC Design Issues: R&D Planninganning
8080
Keisuke Fujii, Takeshi Matsuda, WP mtg#2