Transcript
Page 1: Case Studies for moving apps to the cloud - DLD 2013

Four Case Studies for Moving Mission Critical Apps to the

Cloud

Page 2: Case Studies for moving apps to the cloud - DLD 2013

Enterprises are moving to Cloud

In 2 years

in 5 years

in Saving

5% able to migrate successfully

26%

44%

16.B$

So far only

BUT..

Page 3: Case Studies for moving apps to the cloud - DLD 2013

Managing Big Data on the Cloud

• IaaS First- It’s the apps stupid!

• CM Tools (Chef, Puppet, etc.) - Setup Only, but apps are a living organism

• PaaS - Good for new, relatively simple apps

Current Approaches

Page 4: Case Studies for moving apps to the cloud - DLD 2013

Reality Check..

Page 5: Case Studies for moving apps to the cloud - DLD 2013

My Cloud is Better than Your Cloud!

Page 6: Case Studies for moving apps to the cloud - DLD 2013

Cloud Maturity

Page 7: Case Studies for moving apps to the cloud - DLD 2013

Cloud Is Evolving .. Cope With It!

Virtualization Public Cloud Hybrid, Open CloudPrivate Cloud

Page 8: Case Studies for moving apps to the cloud - DLD 2013

Cloud Is Evolving .. Cope With It!

Page 9: Case Studies for moving apps to the cloud - DLD 2013

Bring App- Management

and Infrastructure- Management

Together

:// . . /2013/02/ -http www allthingsdistributed com aws.opsworks html

Page 10: Case Studies for moving apps to the cloud - DLD 2013

Cloudify provide the equivalent of Amazon OpsWork on OpenStack

App Centric Devops – the AWS way…

Page 11: Case Studies for moving apps to the cloud - DLD 2013

Migrating apps – the Cloudify way…1 Upload your recipe

2 Cloudify creates VMs & installs agents

3 Agents install and manage your app

4 Cloudify automates monitoring, healing and scaling

Page 12: Case Studies for moving apps to the cloud - DLD 2013

1. Moving from existing Data Center to the Cloud

Existing Data Center OpenStack Cloud

Cloud Driver

Page 13: Case Studies for moving apps to the cloud - DLD 2013

® Copyright 2013 GigaSpaces Ltd. All Rights Reserved

• To 100 Investment Bank

Industry :Banking

Primary Challenge :Cloud-enable thousands of application (in and out-facing) and on board then to the Bank private cloud environment in a cost efficient manner

Solution :Leverages Cloudify and Puppet as a foundation for the self-service configuration, deployment and on going management and scaling of a range of applications in the bank, on top of Bankexisting private cloud infrastructure

Results :So far a few tens of applications converted, with plans to expand the offering to a few hundreds of apps by the end of the year

Enterprise Private Cloud

Page 14: Case Studies for moving apps to the cloud - DLD 2013

2. Carrier Grade Cloud

Page 15: Case Studies for moving apps to the cloud - DLD 2013

®Copyright 2013 GigaSpaces Ltd. All Rights Reserved

Industry :Telecommunications

Primary Challenge :Build a carrier grade PaaS offering that can a wide range of mission critical legacy Telco apps and services on top the Alcatel-Lucent CloudBand ™ Cloud infrastructure product

Solution :Leverages Cloudify as a foundation for the configuration, deployment and on going management and scaling of a wide range of Telco services

Results : CloudBand ™ is Alcatel-Lucent’s flagship product for next generation Telco services, and is in advanced deployment stages in a few major carriers across the globe

With Cloudify we have a solidfoundation for our carrier grade PaaS offering and the realization of our vTelco vision

Carrier cloud: Alcatel-Lucent

Page 16: Case Studies for moving apps to the cloud - DLD 2013

3. BigData On OpenStack Cloud

Page 17: Case Studies for moving apps to the cloud - DLD 2013

® Copyright 2013 GigaSpaces Ltd. All Rights Reserved

Moving Big Data to the Cloud

• To Tier System Integrator

Industry: IT services (Business Intelligence & Analytics)

Primary Challenge: Provide BI and analytics for big data, as a service for enterprise customers, based on an IBM stack.

Solution: Leverages Cloudify and Chef to automate the deployment and management of complete IBM BI stack (including WebSphere & Cognos) for each of their customers on top of the OpenStack based RackSpace cloud

Current Status: Going to production in 2 months, most of the recipes already implemented and beta tested

Page 18: Case Studies for moving apps to the cloud - DLD 2013

4. Multi Cloud DR

Page 19: Case Studies for moving apps to the cloud - DLD 2013

19

• Technology-based concrete process control and information service

• Deployments across North America, Latin America, Asia, and Europe for nearly a decade

• Part of W.R. Grace & Co , $6.3 B Company.

• The problem: On-Demand HA/DR over multiple Cloud regions.

Case Study: VErifi

High Availability

Data Replication

Disaster Recovery

Page 20: Case Studies for moving apps to the cloud - DLD 2013

Managing Big Data on the Cloud

• Be ready to accept changes as they happen..

• Automation First

• Decouple the Application from the infrastructure

• Use Plug-In approach to plug the right cloud for the Job

Putting it All Together:

Application Centric Approach

Page 21: Case Studies for moving apps to the cloud - DLD 2013

Thank You!