    MBA661 - POMS

    POMS PROJECT REPORT

    Layout Study at Zorba International

    SUBMITTED ON 4/29/2012

    Chetan Kusram (11125015)

    Nitin Bharadwaj (11125036)

    Sagar Agarwal (11125047)

    Sanjeet Kumar (11125051)

    Samreen Jamal (11125049)

    Taruna Birthalia (11125062)

    Vijayta Fulzele (11125064)

  • 7/31/2019 Poms Report - Final

    2/20

    1

    Contents

    Executive Summary ................................................................................................................................ 2

    Products: ............................................................................................................................................. 3

    Dog Products ................................................................................................................................... 3

    Cat Products .................................................................................................................................... 3

    Problem Statement .................................................................................................................................. 4

    Objective ................................................................................................................................................. 4

    Physical Plant Layout .............................................................................................................................. 4

    Factors affecting plant layout ............................................................................................................... 5

    TYPES OF PLANT LAYOUT ............................................................................................................ 5

    Product oriented plant layout ........................................................................................................... 5

    Process oriented plant layout (Functional Layout) ............................................................................ 6

    Cellular layout ................................................................................................................................. 6Existing Layout ....................................................................................................................................... 7

    Precedence DiagramCollars and Belts .............................................................................................. 7

    Individual process time .................................................................................................................... 7

    Precedence DiagramWhip Process ................................................................................................... 8

    Individual Process Time................................................................................................................... 9

    Current Layout Design ........................................................................................................................ 9

    Processes: ........................................................................................................................................ 9

    Assembly Line Diagram .................................................................................................................... 11

    Improved Layout ............................................................................................................................... 13

    Assembly Line Diagram in New Layout ............................................................................................ 14

    Changes In New Layout: ................................................................................................................... 14

    Individual Process Time................................................................................................................. 15

    Apparel Precedence Diagram ............................................................................................................. 16

    Individual Processes ...................................................................................................................... 16

    Layout at New Plot ................................................................................................................................ 17

    Process layout for Apparels ............................................................................................................... 17

    Left side working hall .................................................................................................................... 17

    Process layout for Collars, Belts and Whips ....................................................................................... 18

    Right side working hall .................................................................................................................. 18

    .............................................................................................................................................................. 18

    Expected Result ..................................................................................................................................... 19

  • 7/31/2019 Poms Report - Final

    3/20

    2

    Executive Summary

    Zorba international was started in 2000 with an aim to create a highly focused company

    dedicated to Leather dog Collars. Gupta family owns all the activities of Zorba with their wild

    passion for dogs. Dogs became the integral part of their family. Zorba in their four floor first unit

    at Krishnapuram, Kanpur manufacture Leather dog accessories which is one of the focused

    companies for dogs. Zorba sources best leather skins from different parts of India on a contract

    tanning and developing basis thus matching the standards. Zorba gets all ornaments from the

    Mumbai a fashion capital of India from our friend who is in women jewellery business since

    ages. Zorba develops all hardware in making a collar at their one of metal crafting unit managed

    by our relative who is highly specialized in the metal segment.

    Figure 1 Figure 2

    Comfort is liberation each and every product in Zorba is focused towards comfort which gives

    birth to a newdesign. Zorba has 50 to 60 people who are devoted craftsmen and women involved

    in their traditional art since years. Subhash gupta and Sudhir gupta being an animal graduate

    involved 24x7 answering all the inquiries regarding manufacturing, Custom designing, pricing

    and timely shipping, Sanjay gupta having a technical background is highly focused on Quality

    control of each and every product which is shipped to our customer friends all over the world.

  • 7/31/2019 Poms Report - Final

    4/20

    3

    Products:

    Dog Products

    Figure 3: Lamb Leather Collar, Figure 4: Matching Dog Leash,

    Cat Products

    Figure 4: Crystal Collars

    Figure 5: Leash

    Figure 6: Harness

  • 7/31/2019 Poms Report - Final

    5/20

    4

    Problem Statement

    Studying the current process and suggesting improvements to make it more organized and effective. They are also establishing one more plant for similar products, so by studying process from here

    making a process effective layout for the upcoming plant.

    ObjectiveThe objectives of this project were as follows:

    To study and analyse the manufacturing process of collars, belts, whips, etc. To suggest improvements in the current process To suggest a new layout for the Zorbas new plant

    Physical Plant Layout

    Plant layout planning includes decisions regarding the physical allocation of the economic

    activity centers in a facility. A facility layout is an arrangement of everything needed for

    production of goods or delivery of services.

    An economic activity center is any entity occupying space.The objective of plant layout planning is a more effective work flow at the facility, allowing

    workers and equipment being more productive.

    To make a decision about layout planning, 4 different questions must have an answer:

    1. Which centers do we have to consider?2. How much space and capacity is required for each center?

    If there is not enough space, productivity may be reduced.

    Too much space is expensive and may also reduce productivity.

    3. How must the space be configured at each center?Space quantity, shape and the elements of the work center are related to each other.

    4. Where should each center be located at within the facility?The allocation of the different centers may affect productivity.

  • 7/31/2019 Poms Report - Final

    6/20

    5

    Factors affecting plant layout

    Materials

    The layout of the productive equipment will depend on the characteristics of the product

    to be managed at the facility, as well as the different parts and materials to work on.

    Labor

    Labor has to be organized in the production .

    Material Handling

    Material handling does not add value to the product; its just waste.

    The building

    If it has been already selected, its characteristics will be a constraint at the moment ofdesigning the layout, which is different if the building has to be built.

    Future changes

    One of the main objectives of plant layout is flexibility.

    Its important to forecast the future changes to avoid having an inefficient plant layout in

    a short term.

    TYPES OF PLANT LAYOUT

    The production process normally determines the type of plant layout to be applied to the facility:

    Product oriented plant layout

    Machinery and Materials are placed following the product path. This type of plant layout is useful when the production process is organized in a

    continuous or repetitive way.

    Advantages:

    Reduced material handling activities. Work In Process almost eliminated. Minimum manufacturing time. Tasks simplification.

  • 7/31/2019 Poms Report - Final

    7/20

    6

    Disadvantages:

    No flexibility in the production process. Low flexibility in the manufacturing times. High capital investment. Monotonous work

    Process oriented plant layout (Functional Layout)

    This type of plant layout is useful when the production process is organized in batches.

    Personnel and equipment to perform the same function are allocated in the same area.

    Cellular layout

    Work cells: Group of equipment and workers that perform a sequence of operations over

    multiple units of an item or family of items.

    Looks for the advantages of product and process layouts:

    Product oriented layout: Efficiency Process oriented layout: Flexibility

  • 7/31/2019 Poms Report - Final

    8/20

    7

    Existing Layout

    Precedence DiagramCollars and Belts

    Individual process time

    A1.5 + 1 = 2.5 min

    B0.5 min

    C - 1.2 min

    D1+1 = 2 min

    E1+1.5 = 2.5 min

    F1 min

    G0.5 min

    H1.8 min

    I0.5 min

    J0.8 min

    K1+1.5 = 2.5min

    L1+3 = 4min

    M1 min

    N1min

    o- 1.5+1.5 = 3 min

    Leather

    Cutting - A

    Applying

    Adhesive - B Folding - C

    Roughing

    surface - D

    Punching - EBead

    Attachment - FTape Sticking -

    GEdge Shaping -

    H

    White TapeSticking - I

    BacksideLeather - J

    collarstitching- K

    buckleattachment - L

    hole punching- M

    Final finishing -N

    packaging - o

    Figure 7: Precedence Diagram Collars and Belts

  • 7/31/2019 Poms Report - Final

    9/20

    8

    Precedence DiagramWhip Process

    Store

    Jhallar Cutting - A

    Stick Rolling B

    Stick Rolling - C

    Hand Sewing - D

    Knotting - E

    Packaging - F

    Finished Goods

    FirstFloor

    Basement

    Basement

    Figure 8: Precedence Diagram Whips

  • 7/31/2019 Poms Report - Final

    10/20

    9

    Individual Process Time

    A1.5 + 1 = 2.5 min

    B6 min

    C - 6 min

    D5 min

    E10 min

    F1.5 min + 1.5 min = 3 min

    Current Layout Design

    Processes:

    A: Leather Cutting: Here the skin or the leather is cut in order to start the process of collar manufacture.

    This is done on 2nd floor. The time taken for this process is 1.5+1 i.e. 2.5 minutes. The extra one minute is

    taken to compensate for the time lost in taking the leather ( i.e. the skin used) to the second floor.

    B: Adhesive Applying: Here adhesive is applied to the cut leather from process A in order to fold it and

    give it the desired shape. Time taken for this process is 0.5 minutes.

    Terrace

    Collars

    D

    2nd Floor

    A, B, C

    E, F, G, H, I, J

    L, M, N

    1st Floor

    Apparel and Accessories

    Ground Floor

    K

    Figure 9: Current Layout Design

  • 7/31/2019 Poms Report - Final

    11/20

    10

    C: Folding: Here the leather is folded and shaped into a collar. Time taken for this process is 1.2 minutes.

    D: Roughing surface: Here the surface of leather is roughened using a machine so that it might not create

    further problems while sticking. Time taken for this process is 1+1 i.e. 2 minutes. The extra time is added

    because this process is being done on the terrace.

    E: Punching: This is the stage where the collar is punched in order to attach beads and other such

    decorative items to it (done by hand). Time taken for this process is 1+1.5 i.e. 2.5 minutes. Extra time is

    added to account for the time taken to bring it back to the previous floor.

    F: Bead Attachment: In this process, beads are attached to the collar by hand. Time taken for this process

    is 1 minute.

    G: Tape sticking: To support the beads and the collar, tape is stuck to the collar. Time taken for this

    process is 0.5 minutes.

    H: Edge Shaping: The edges of the collar are given a proper shape by scaling. Time taken for this process

    is 1.5 minutes.

    I: Thick Tape Sticking: A thick tape is stuck to the collar at this stage in order to provide it stiffness and

    avoid damage to the stitching done later on. Time taken for this process 0.5 minutes

    J: Backside leather sticking: Sticking leather to the backside of the collar. At this stage adhesive is applied

    to the backside of the leather and then a second piece of leather is stuck in order to provide it more

    strength. Time taken for this process is 0.8 minutes.

    K: Collar stitching: This is the process in which the stuck leather at the back of the collar is stitched to

    provide it even more strength (by hand). Time taken for this process is 1+1.5 i.e.2.5 minutes. Extra time is

    taken into consideration as this process is done on the ground floor

    L: In this process, buckle is stitched to the collar by hand. Time taken for this process is 1+3 i.e. 4

    minutes.This process is done again on the 2nd

    floor, hence time is added.

  • 7/31/2019 Poms Report - Final

    12/20

    11

    M: Holes are punched to the collar using a pattern. Time taken for this process is 1 minute.

    N: Final Finishing: In this process, final touch is given by removing the threads and Time taken for this

    process is 1 minute.

    O: Packaging: this is the final process where the final sorting of collar and the packaging is done in order

    to send the product for final shipping. Time taken for this process is 1.5+1.5 minutes. This process is done

    in the basement.

    Assembly Line Diagram

    A,B,C-

    4.2min

    D -

    2min

    E,F -

    3.5min

    G,H,I,J

    -3.6min

    K-

    2.5min

    L,M,N-

    6min

    O-3

    min

    Figure 10: Assembly Line Diagram

  • 7/31/2019 Poms Report - Final

    13/20

    12

    Total flow time = 4.2 + 2 + 3.5 + 3.6 + 2.5 + 6 + 3 = 24.8 min

    Estimated cycle time = No. Of working hours * 60 / Total production per day of collars

    Here we have

    No. Of working hours = 8 hrs. ( as approximated by zorba)

    Total production per day of collars = 100

    So,

    Estimated cycle time = 8*60/ 100 = 4.8 min

    Now,

    Efficiency of the current layout = Total flow time / No. Of workstations * estimated cycle time

    = 24.8/(8*4.8)

    = 64.6 %

  • 7/31/2019 Poms Report - Final

    14/20

    13

    Improved Layout

    Terrace

    2nd Floor

    Apparels and Accessories

    1st Floor

    collars

    A, B,C, D

    E, F, G, H, I,J

    Ground Floor

    Collars & Whips, Office

    K L, M, N

    Basement

    Inventory & Invoicing

    O

    Figure 11: Improved Layout

  • 7/31/2019 Poms Report - Final

    15/20

    14

    Assembly Line Diagram in New Layout

    Changes In New Layout:

    We have moved apparel section from Ist floor to 2nd floor to keep it separate since it is notrelated to collar making process.

    We have moved process D i.e. Rouging process from terrace to 1st floor to reduce the time inshifting unfinished goods to and fro from 2

    ndfloor to terrace.

    We have moved collar making process (A, B, C and E, F, G, H, I,J) altogether to 1st floor toreduce the timing of moving inventory from basement to 2nd floor.

    Processes L, M,N are moved from 2 nd floor to ground floor and this will make the space ofkeeping Rough surface making machine which is shifted from terrace to 1 st floor. And utilizing

    the free space available in ground floor where just whip making process is going on.

    There are no change in packaging and inventory keeping since it is little a private materials ofZorba which they want to keep it secured.

    A, B, C,

    D- 4.7

    min

    E, F, G,

    H, I, J-

    4.8 min

    K- 3.5

    min

    L, M,

    N- 4

    min

    O-

    3 min

    Figure 12: Assembly Line Diagram in New Layout

  • 7/31/2019 Poms Report - Final

    16/20

    15

    Individual Process Time

    This individual process time excludes the time it takes for a part to move between floors.

    A1+1= 2 min

    B- 0.5 min

    C- 1.2 min

    D- 1min

    E- 1 min

    F- 1 min

    G- 0.5 min

    H- 1 min

    I0.5 min

    J- 0.8 min

    K- 0.5 +3 = 3.5 min

    L2 min

    M1 min

    N1 min

    O- 1+1.5 =2 min

    Total flow time = 4.7 + 4.8 + 3.5 + 4 + 3 = 20 min

    Estimated cycle time = No. Of working hours * 60 / Total production per day of collars

    Here we have

    No. Of working hours = 8 hrs. (as approximated by Zorba)

    Total production per day of collars = 100

    So,

    Estimated cycle time = 8*60/ 100 = 4.8 min

    Now,

    Efficiency of the new layout = Total flow time / No. Of workstations * estimated cycle time

    = 20/(5*4.8)

    = 83.33 %

    Hence, new layout has more efficiency as compared to current layout.

  • 7/31/2019 Poms Report - Final

    17/20

    16

    Apparel Precedence Diagram

    The entire apparel stitching process is performed on the first floor right from cutting of cloth uptil final

    packaging. This floor also houses some of the various accessories that Zorba International provides. Few

    examples are dog shoes, raincoats, jackets, ties, bathrobes, towels , etc.

    Individual Processes

    1) CuttingIn this process the cloth for apparel is cut into a proper shape using a pattern with accurate

    dimensions. This process is done by hand using scissors. This process takes around 10 min

    2) StitchingThe stitching process comes next. Here the entire cloth piece which was previously cut is

    stitched into nice apparel for pets. This is done on electric sewing machines. Time taken for this process is

    around 20 minutes.

    Cutting Stitching Finishing

    Figure 13: Apparel Precedence Diagram

  • 7/31/2019 Poms Report - Final

    18/20

    17

    3) FinishingThe final finishing of the apparel involves removal of threads, stitching the Zorba tags and

    packing it .This process takes around 5 minutes.

    Layout at New Plot

    As seen in the new plot layout in picture we put all apparel section on left side working hall while all

    belts, collars and whips making section on right side working hall. In picture below we show the

    magnified look at left side working.

    Process layout for Apparels

    Left side working hall

    tr

    InventoryFinished Goods Inventory

    Cutting

    Stitching

    Finishing

    27 Feets

    74 Feets

    Figure 14: Process layout for Apparels

  • 7/31/2019 Poms Report - Final

    19/20

    18

    Process layout for Collars, Belts and Whips

    Right side working hall

    37 Feets

    Inventory

    27 Feets

    Finished Good Inventory

    A

    B

    C

    D

    E

    F

    B

    C

    D

    E

    H I

    K

    L

    M

    N

    O

    F

    G J

    A

    7 Feet

    5 Fe37 Feets

    try

    Figure 15: Process layout for Collars, Belts and Whips

  • 7/31/2019 Poms Report - Final

    20/20

    19

    Expected ResultWith above suggestion to the current process it is expected that the process transfer time and cost will

    reduce and overall efficiency of the system will increase. With the suggested new layout optimized

    process flow can be achieved at minimum changes to the current process flow.


Recommended