Instructions to Fill-in Project Document
A. Project Information:
• Indicate name and location of the project;• Provide name of District/Province;• Attach a map of the area, clearly indicating the Project location.• Contact Person’s information;• Project Start and end dates;• Cost of the project;• Information regarding organizations/authorities responsible for
sponsoring, execution, operation and maintenance.
B. Organizational Background;• Provide a brief background of the implementing organization;• Provide collaborative history if any;• What prior experience the organization has in the project area?
C. Project Description
1. Goal & Objectives:
• The Overall Goal and Objectives of the project be explained here;
• Indicate objectives of the project and develop a linkage between proposed project and the sector to which it contributes;
• Where possible, the project objectives should be alligned with women development/empowerment, Govt’s policies concerning gender equality and attainment of MDGs.
2. Project Rationale, Description & Justification:
• Provide project background and rationale;• Describe the project and indicate existing facilities (for male &
female separately) in the area and justify the establishment of the Project;
• Provide estimated number of male & female beneficiary of the project;
• Provide technical parameters of the project in quantifiable terms. Also discuss technology aspect of the Project;
• Provide the details of civil works, equipment, I.T infrastructure, and other physical facilities required for the project.
• Indicate governance issues of the sector relevant to the project and strategy to resolve them.
3. Project Strategic Relevance:
• Indicate Primary Thematic Area;• Indicate secondary thematic area.
In addition to above, the following sector specific information be provided
Social Aspects with Gender Perspective ;• Effect of project on the quality of life of residents of the
area. • Gender integration in project goal, purpose, objectives and
activities;• Gender disaggregated data is given in the project
document;• Gender based employment opportunities, closely linked to
income distribution;• Has sufficient budget been assigned for the development of
both men and women;• Has women participation been given due consideration
during planning and implementation stages.
Education, Training and Manpower
• Give student-teacher ratio for the project and the national average for the proposed level of education.
• Year-wise proposed enrolment of the institution for 5 years.
• Provide Teachers strength in relevant discipline in case of expansion of facilities.
• Indicate the extent of library and laboratory facilities available in case of secondary, college and university education.
• Provide details of technical staff required for operation & maintenance of laboratories.
6
Research
• Indicate benefits of the research to the economy.
• Mention number of studies/papers to be produced.
• Indicate whether these studies would result in commercial application of the process developed (if applicable);
• Linkages with industry.
7
For I.T. project
• Provide Backbone switch & Router specification;• Distribution & Edge Switches specs;• Networking cable system and specs;• Networking/LAN diagram;• Software requirements;• Availability of services (DSL, Dial-ups, wireless)
Health and Family Planning Projects
• Indicate whether the proposed facilities are preventive or curative.
• Population/Patients-Doctor Ratio;• Beds per ward• Bifurcate the facilities between:
– In-door
– Out door; and
– Department-wise
Agriculture Sector Projects
• Soils in the region of the project. • Potential for agricultural development.• Availability of water, both natural and supplied. • Crop varieties and livestock species.• Potential and desirability of mechanization.• Pests epidemic and the kinds of control .• Determine the potential yields.• Cropping pattern & possibilities for multiple
cropping. • Marketing and storage facilities
Livestock Projects
• Give the livestock situation of the country and mention any problems connected therewith;
• Potential for Livestock development.• Present and future herd size;• Land required per animal for feed.• Their species age characteristics and production
capacity;• Determine the potential of livestock breeding.• Vaccination issues.
Other Production Sector Projects
Fisheries Projects: Give area for fishing and the legal rights to that area; the availability of trawlers; amount and type of fish likely to be available.
Forestry Projects:
Indicate nature and state of existing forests their growth rate and any problems connected therewith. Give details of species; rotation and anticipated rotation and volume yield. Indicate availability of complementary services, e.g., access roads, saw mills etc.
Water Supply & Sewerage Projects
• Present and projected population and water availability/ demand.
• Indicate source and water availability (mgd) during next 5,10,20 years.
• For waste water/sewerage, provide present and future disposal requirements, gaps if any and proposed treatment methods and capacity.
• Indicate present and proposed per capita water supply in the project area, comparison be made with water supply in similar localities.
D. Project Budget & Annual Phasing:
1. Capital cost estimates
• Basis of determining the capital cost be provided. It includes market survey, estimation on the basis of previous work done;
• Abstract of cost.
2. Physical Phasing:• Provide year-wise estimation of Physical activities by main
components as per following:
Component-wise, year-wise physical phasing
Items/Description Unit Year I Year II Year III Total
A.
B.
C.
3. Financial Phasing:
Capital cost be worked out on the basis of each item of work as stated above and provide information as per following.
Year-wise/component-wise financial phasing
Items Year I Year II Year III____ Total_ Total Local FEC Total Local FEC Total Local FEC Total Local FEC
A.
B.
C.
D.
Total
4. Annual Operating Cost;
• Item-wise annual operating cost for 5 years. .
5. Demand Supply Analysis • Existing capacity of services and its supply
• Projected demand for ten years
• Capacity of projects being implemented both in the Public & Private sector
• Supply – demand gap
• Designed capacity & output of the proposed project
06. Financial PlanSources of financing(a)Equity:
Indicate the amount of equity to be financed from each source
• Federal Government• Provincial Government• Foreign Equity (indicate partner agency)• NGO’s;• Beneficiaries
(b) Debt:• Indicate the Local & Foreign debt, Interest rate, Grace period and
repayment period for each loan separately. The loan repayment schedule be also annexed.
c) Grants:
• Local and Foreign
07. Project Benefits/Costs Analysis:
• Financial: Income to the Project along with assumptions.
• Social: Quantify benefit to the target Group
• Environmental: Environmental impact assessment negative/ positive.
• Quantifiable output of the project• Unit cost analysis• Employment generation (direct and indirect)• Impact of delays on project cost and viability
08.Implementation of the Project
a) Implementation Schedule
• Indicate starting and completion date of the project:• Implementation time in months.• Item-wise/year-wise implementation schedule in line
chart correlated with the phasing of physical activities.
08.Implementation of the Project
b. Result Based Management (RBM) Indicators
• Indicate Result Based Management (RBM) framework indicators in quantifiable terms in the following table.
Input Output
OutcomeTargeted ImpactBaseline
IndicatorTargets at
Completion
9.Management Structure and Manpower Requirement
• Administrative arrangements for implementation of the project.
• Manpower requirements during execution and operation of the project be provided by skills/profession.
• Job description, qualification, age and salary of each job be provided.