What’s New in PowerCenter and PowerExchange
Presented by Sachin Chawla, Todd Goldman & Lalitha Sundaramurthy, Informatica
Data Integration Update
Safe Harbor
The information being provided today is for informational purposes only. The development, release and timing of any Informatica product or functionality described today remain at the sole discretion of Informatica and should not be relied upon in making a purchasing decision. Statements made today are based on currently available information, which is subject to change. Such statements should not be relied upon as a representation, warranty or commitment to deliver specific products or functionality in the future.
3
Bridging the Gap
Gap in departmentalproduct offering
PowerCenter
PowerCenterBig Data Edition
Cloud
On Premise
Complexity of Integration
4
Informatica Cloud
New Products to Meet Departmental & Mid-market needs
5
PowerCenterBig Data Edition
Complexity of Integration
On Premise
Data Analyst
Informatica Cloud Designer
PowerCenter Express
PowerCenter
NEW
NEW
Cloud
Informatica Cloud
Informatica Data Integration Portfolio
6
Virtual Data Machine
SaaS Application Integration for Cloud and Hybrid IT environments
Enterprise-class solution for the complex data
integration challenges
InformaticaCloud
Departmental, entrylevel and mid-market
data-integration
NEW
Enterprise
Data Integration Areas of Focus
Informatica Confidential 7
Design Once, Deploy Anywhere, Integrate Everywhere
DEPLOYMENT FLEXIBILITY MANAGEMENT
CONFIDENCEDEVELOPMENT
AGILITY
Development Agility
9.6: DI Analyst and DQ Analyst are now one product:
• Business user oriented interface
• Web based GUI
• Business and IT Collaboration
• Shared projects between Data Analyst and PowerCenter Designer, DQ Designer,IDE Designer
• 5 seats now included with:
• PowerCenter
• Informatica Data Explorer
• Informatica Data Quality
9
DI Analyst Demo
DEMO
Data Virtualization + Physical Data Integration = Accelerated Development
• Rapid self-service BI prototyping through virtual access
• Security, profiling and cleansing at thevirtual layer
• Convert virtual to physical in a few clicks
11
TraditionalIntegration
AgileIntegration
Go to break out room xyz at abc time
Core PowerCenter Updates: 9.6
• Parameterization
• Transformation memory attributes can be parameterizedand set via a file
• No more hassle opening and manually changingthe attributes
• 508 Compliance
• Accessibility for motor and dexterity, vision andhearing impairment
12
• Omni-present Business Glossary for Business Users
• Business Glossary Desktop
• Business Term Revision
• Actionable Lineage & Impact Summary
• Lineage 5x performance improvement
• Impact Summary for PowerCenter objects
• Universal Connectivity
• New XConnect for Informatica Platform (Data Services, Data Quality, Data Explorer)
• Enhancements to the newtemplate-based XConnect for custom metadata
13
9.5.1 reminder: Features by theme
PowerCenter AE Metadata Manager & Business Glossary
BG Desktop 9.5.1
• Business Glossary lookup client for Windows desktop
• Client is designed for Windows 7 64-bit, should also workfor 32-bit
• Performs lookups onto same glossary content as is in MM&BG product (no need to browse to MM&BG)
• Overall goal is to bring your existing Glossary to desktop users in context of their day-to-day work
14
BG lookups within work context
• Highlight a string in most any desktop app, e.g. a Word document
• Press hot key (default is shift-Ctrl-G) to raise Business Glossary Desktop and perform lookup on selection
15
9.5.1 Lineage Performance
Problem
• Customers with a large MM repository struggle with performance of lineage.
• A single lineage diagram used to take several minutes,up to hours, causing user frustration
Solution
• Average Lineage Time more than 5x improved
16
Metadata Manager xConnect Portfolio
Metadata Manager Repository
Relational and DW:• Oracle
• DB2
• SQLServer
• Sybase ASE
• Informix
• Teradata
• Netezza
• ODBC
• JDBC
Data Modelling Tools:• CA/Erwin
• Embardadero ER/Studio
• Sybase PowerDesigner
Business Intelligence• IBM Cognos
• MS-SQL Analysis & Reporting Services
• Microstrategy
• Oracle BI Enterprise Ed
• SAP BO
• SAP BW (new in 9.5.1)
Mainframe:• DB2/zOS
ERP:• SAP ESS
Custom xConnect Framework• New in 9.5
17
9.6: Business Glossary User Friendliness
Improved BusinessUser Friendliness
• Search for terms
• Collaborate on terms
• Publish terms
• Audit Terms
• Creation of a true taxonomy
• Describes the nature of relationships between terms
18
The Data Validation and Testing Dilemma
Informatica has over 4,500 PowerCenter Customers who believe using a metadata driven, graphical tool to move data is better than writing SQL and hand coding.
19
Coding
There has to be a better way…
15 years later, 99% of those customers still use SQL and Excel to test the data they have moved in data integration products.
Data Validation: 50%-80% QA savings
Development & Test
• Provide automation for unitand regression testing of integration logic.
Production Reconciliation
• Protect the integrity of data that is loaded into production systems.
• Erroneous data due to failed loads, faulty logic or operational issues is caught in a proactive automated manner and can be addressed as needed
20
Go to break out room xyz at abc time
21
Flexible Deployment
PowerExchange: New Connectivity Roadmap
9.5 – June 2012
• Microsoft Dynamics CRM
• Social Media
• Twitter & Twitter Streaming
• Kapow Katalyst
• EMC Greenplum
• SAP HANA
• Hadoop Distributed File System (HDFS)
• Hive (Hadoop)
• Oracle Exadata & Exalogic
9.5.1 – Dec 2012
• JDBC (PCE)
• Teradata (for IDQ/IDS/BDE)
• Datasift
• SFDC (for IDQ/IDS)
• Web Services Reliable Messaging protocol (HF1)
• Cloud DB: Google BigQuery, Amazon Redshift
9.5.1 HF2 Q2 2021
• NoSQL DB connectivity
• Mongo DB
9.6 – Dec 2013
• REST
• JDBC
• NoSQL DB connectivity
• Hbase
• Cassandra
• HANA –XS interface integration
• Greenplum HD (Pivotal DB???)
• Oracle Fusion
• Microsoft Office 365
22
Virtual Data Machine: Integration Flexibility via Map Once. Deploy Anywhere.
23
• Key integration fabric for Informatica
• Abstraction layer on top of current and future data platforms
• Hadoop
• Data virtualization
HADOOP
Cloud ServerDesktop DataVirtualization
Embedded DQ in apps
DataIntegration Hub
DataVirtualization
Embedded DQ in apps
24
Start small. Start now. Scale fast.PowerCenter Express
New PowerCenter Express Edition
• Personal Edition: Free• Professional Edition: $8K/user/year • Purchase and download from Informatica Marketplace
• Fast, easy installation with embedded database
• Easy-to-use, graphical design and development environment
• Video training + built in “Cheat Sheets”
• High performance data integration engine (Informatica VDM)
• In-line data profiling
• Compatible with enterprise class PowerCenter editions
25
Management Confidence
Core PowerCenter Updates: 9.6
• High Availability
• PowerCenter HA now supported on a wide range offile systems
26
Security Trends
• Security concerns began in Federal Government and Financial institutions
• Has rapidly grown in importance for all customers
• Key trends:
• Vulnerability testing and scans done on systems traditionally behind the firewall
• Increasing need for stronger authentication andauthorization systems
• Conforming to security regulations & policies by using3rd party solutions to augment product capabilities
27
Informatica’ s Continued Focus on Security• Ongoing security tests against our products
• AppScan
• Check against National Vulnerability DataBase (NVD)
• Etc.
• Core components upgraded within ourinfrastructure architecture
• Address and prepare for future security vulnerabilities
• Examples: TLS communication, Tomcat 7
• Continuous improvement of coding and testing guidelines within our products division
28
9.6 Security Enhancements
• Industry Standard Single Sign On
• Kerberos Authentication & SSO for Informatica clients& connectivity
• Authentication
• Two factor authentication: Windows auth. integration – smartcard & USB tokens
• Audit & Compliance
• Audit reports for domain activity
• Fine grained access control for IDE, IDQ, IDS, Hadoop and PC Express
29
• Prebuilt Rules to Monitor Informatica PowerCenter
• Delivers Alerts to people, dashboards and systems
• Complete Operational and Best Practices
• Extensible – build unlimited number of new rules
Detailed Insight into the Runtime Data Integration ProcessProactive Monitoring for PowerCenter Operations:
30
Go to break out room xyz at abc time
Proactive Monitoring of PowerCenter Development
• Automated Best Practice Enforcement
• Better DevelopmentQuality and Consistency inPowerCenter Development
• Understand production impact of development choices
• Fewer Production Errorsand Downtime
• Monitor Everyone, Everywhere Allthe Time
• Easily Monitor Remote and Offshore Development Work
• Quantify and Monitor Development Efforts – less Subjective
31
Go to break out room xyz at abc time
32
1
2
3
Join our exclusive Potential at Work Communities. Visit the kiosk.
Get a PowerCenter Express demo!Visit the Pavilion kiosk.
Tell us what you think. Click on Evaluations in the IW13 Mobile App.