4
Panel discussion: I4MS PHASE 2 – "Growing the ecosystem" 23rd and 24th of June – Amsterdam Markus Korn Programme Officer (European Commission)

Markus Korn, Project Officer, Components and Systems, EC

  • Upload
    i4mseu

  • View
    198

  • Download
    6

Embed Size (px)

Citation preview

Page 1: Markus Korn, Project Officer, Components and Systems, EC

Panel discussion: I4MS PHASE 2 – "Growing the ecosystem"

23rd and 24th of June – Amsterdam

Markus KornProgramme Officer (European Commission)

Page 2: Markus Korn, Project Officer, Components and Systems, EC

I4MS 2016: FOSTERING DIGITAL INDUSTRIAL INNOVATION IN EUROPE · 23rd and 24th of June – Amsterdam

I4MS PHASE 2 – "Growing the ecosystem"

2013 2014 2015 2016 2017 2018 2019 2020 2021

Phase 1 – FP7 WP2013Start-up the I4MS Ecosystem

Phase 2 – H2020 WP 2014/15Organically grow the I4MS Ecosystem

Phase 3 – H2020 WP 2016/17Nurture the ecosystem:

Concentrate on EU added value

Organically grow the I4MS ecosystem Building upon and stabilising the success of Phase 1 Addressing additional technologies (CPS/ IoT) FSTP scheme – a very light accession procedure tailored to SMEs Increased support to SMEs and Mid-caps: 70% as opposed to 60%

of the EC funding in Phase 1 Launch of a Mentoring & Sponsorship programme for new hubs

Page 3: Markus Korn, Project Officer, Components and Systems, EC

I4MS 2016: FOSTERING DIGITAL INDUSTRIAL INNOVATION IN EUROPE · 23rd and 24th of June – Amsterdam

I4MS PHASE 2 – "Growing the ecosystem"

Competence Centres and Digital Innovation HubsPhase 1 Phase 1 and 2

red bullet:Phase 2 hubs

CPS/ IoT

Robotics

HPC/ Cloud-Based Modelling

Laser

Page 4: Markus Korn, Project Officer, Components and Systems, EC

I4MS 2016: FOSTERING DIGITAL INDUSTRIAL INNOVATION IN EUROPE · 23rd and 24th of June – Amsterdam

7 Open calls:• FORTISSIMO 2 – 2 open calls• BEinCPPS – 2 open calls• HORSE – 1 open call• ReconCell – 1 open call• Digital Innovation Hubs – 1 open call

I4MS PHASE 2 – "Growing the ecosystem"

1.3 mil EUR (open call 1) + 2.3 mil EUR (open call 2)

1.4 mil EUR

1.4 mil EUR0.2 mil EUR

0.8 mil EUR (open call 1) + 1.2 mil EUR (open call 2)