MINERA ESCONDIDA LTDA.
PROYECTO LIXIVIACIÓN DE SÚLFUROS
MEMORIA DE CÁLCULO Nº 2325-0000-265-CS-0007
MALLAS DE PUESTA A TIERRA
Preparado por:
FLUOR CHILE S.A.
APROBACIONES TÉCNICAS:
Jefe de Disciplina Roberto Falck Gerente de Área Sergio Meza/John Bertoia/Mike Friese Gerente de Ingeniería Carlos Astorga Cliente Robert Jaedecke
REVISIÓN POR EMISIÓN FECHA REVISADO POR
APROBADO POR
B J. Muñoz Emitido para Información del Cliente 02-Dic.-04 R. Falck C. Astorga 0 J. Muñoz Emitido para Construcción 04-Ene.-05 R. Falck C. Astorga
COMENTARIOS DEL CLIENTE
®
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Página 1 de 5 PROYECTO N° 232500 Enero, 2005 REV. 0 FLUOR
TABLA DE CONTENIDOS
1.0 INTRODUCCIÓN............................................................................................................. 2
2.0 ALCANCE ......................................................................................................................... 2
3.0 DESCRIPCIÓN DE LAS INSTALACIONES................................................................ 2
4.0 ANTECEDENTES ............................................................................................................ 3
5.0 NORMAS ........................................................................................................................... 4
6.0 BASES DE CÁLCULO..................................................................................................... 4
7.0 METODOLOGÍA DE CÁLCULO .................................................................................. 4
8.0 RESULTADOS.................................................................................................................. 4
9.0 CONCLUSIONES ............................................................................................................. 5
10.0 RECOMENDACIONES ................................................................................................... 5
ANEXOS: ANEXO 1 RESUMEN DE RESULTADOS.
(1 HOJA) ANEXO 2 REPORTES DEL ETAP.
(33 HOJAS) ANEXO 3 RESUMEN MEDICIONES DE RESISTIVIDAD EN ESCONDIDA
(MARZO 2004- MAYO 2004). (1 HOJA)
ANEXO 4 RESULTADOS DEL ANALISIS DE LA INTERCONEXION DE MALLAS DE
PUESTA A TIERRA. (CORREO ELECTRONICO DE INGENDESA) (2 HOJAS)
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Página 2 de 5 PROYECTO N° 232500 Enero, 2005 REV. 0 FLUOR
1.0 INTRODUCCIÓN
El Proyecto Lixiviación de Súlfuros, de Minera Escondida Ltda., considera la construcción de todas las instalaciones para las nuevas plantas de Electroobtención (EW) y de Extracción por Solventes (SX), en las actuales instalaciones de Minera Escondida Ltda., ubicadas en la segunda región, al norte de Chile, 180 [km] al sureste de la ciudad de Antofagasta, en el desierto de Atacama, a una altitud de 3200 [m.s.n.m.].
Además, considera instalaciones en el Puerto de Coloso, aproximadamente a 16 [km] al sur de Antofagasta, a una altitud de 10 [m.s.n.m.], y en las estaciones de bombeo de agua Nos. 2, 3 y 4, ubicadas a lo largo del nuevo acueducto entre Coloso y la planta, a una altitud de 710, 1460 y 2300 [m.s.n.m.] respectivamente.
2.0 ALCANCE
El objetivo de esta memoria de cálculo es dimensionar las mallas de puesta a tierra requeridas en las instalaciones del Proyecto.
Las mallas de puesta a tierra cumplirán con las exigencias indicadas en la Norma IEEE Std. 80, año 2000, en lo referente a voltajes de paso y de contacto.
Además, las mallas cumplirán con la restricción de alcanzar una resistencia de 25 [Ohm] máximos, establecidos en el documento No. 2325-0000-265-DC-0001, “Criterio de Diseño Eléctrico”.
Para las mallas de puesta a tierra de las bombas en las Estaciones de bombeo Nos. 2, 3 y 4, se consideró una extensión de la malla calculada por Ingendesa, para el patio de alta tensión y sala eléctrica, utilizando el mismo reticulado. La misma consideración se hizo para las instalaciones en Coloso, (Planta Desaladora y Estación de bombeo No. 1), con una extensión de la malla de puesta a tierra existente.
3.0 DESCRIPCIÓN DE LAS INSTALACIONES
Las instalaciones involucradas en esta memoria de cálculo son los siguientes:
• Salas eléctricas Nos. 608, 609, 610, 611, 612, 613, 614 y 615, en la Planta EW.
• Salas eléctricas Nos. 601, 602 y 606, en la Planta SX.
• Switch house y subestación móvil en la pila de lixiviación de la Planta SX (Típico).
• Sala eléctrica No. 627, Planta de Inoculación.
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Página 3 de 5 PROYECTO N° 232500 Enero, 2005 REV. 0 FLUOR
4.0 ANTECEDENTES
Los antecedentes utilizados en esta memoria de cálculo son los siguientes:
• Mediciones de resistividad de terreno realizadas por Ingendesa. (Ver Anexo 3)
• Plano 2325-3100-265-DW-4301, Rev. 0 (Switch House - Típico)
• Plano 2325-3100-265-DW-4302, Rev. 0 (Subestación Móvil - Típico)
• Plano 2325-3100-265-DW-4303, Rev. 0 (Sala eléctrica # 627 – Planta Inoculación)
• Plano 2325-3300-265-DW-4302, Rev. 0 (Sala eléctrica # 601)
• Plano 2325-3300-265-DW-4303, Rev. 0 (Sala eléctrica # 602)
• Plano 2325-3500-265-DW-4301, Rev. 0 (Sala eléctrica # 606)
• Plano 2325-3600-265-DW-4301, Rev. 0 (Sala eléctrica # 608)
• Plano 2325-3600-265-DW-4302, Rev. 0 (Sala eléctrica # 609)
• Plano 2325-3700-265-DW-4301, Rev. B (Sala eléctrica # 610)
• Plano 2325-3700-265-DW-4302, Rev. B (Sala eléctrica # 613)
• Plano 2325-3700-265-DW-4303, Rev. B (Sala eléctrica # 612)
• Plano 2325-3700-265-DW-4304, Rev. B (Sala eléctrica # 615)
• Plano 2325-3700-265-DW-4305, Rev. B (Sala eléctrica # 611)
• Plano 2325-3700-265-DW-4306, Rev. B (Sala eléctrica # 614)
• Plano 2325-6930-265-DW-4301, Rev. 0 (Estación de bombeo # 1, ER # 101)
• Plano 2325-6940-265-DW-4301, Rev. 0 (Estación de bombeo # 2, ER # 102)
• Plano 2325-6950-265-DW-4301, Rev. 0 (Estación de bombeo # 3, ER # 103)
• Plano 2325-6960-265-DW-4301, Rev. 0 (Estación de bombeo # 4, ER # 104)
• Criterio de Diseño Eléctrico, documento No. 2325-0000-265-DC-0001, Rev. 0.
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Página 4 de 5 PROYECTO N° 232500 Enero, 2005 REV. 0 FLUOR
5.0 NORMAS
Norma IEEE Std. 80, año 2000
6.0 BASES DE CÁLCULO
Las mallas del área EW y SX son calculadas en forma individual. En el área de pilas de LX se considera, para el cálculo, que las mallas de puesta a tierra de las subestaciones móviles están conectadas con la malla de la subestación principal SX, a través del cable de guardia de la línea de 13.8 [kV].
Los valores de cortocircuito utilizados para el diseño de las mallas corresponden al nivel de 13.8 [kV]. En el área EW, la corriente de falla a tierra esta limitada a 200 [A] por los reactores Zig-Zag. En el área de SX, la corriente de falla a tierra esta limitada a 200 [A] por las resistencias de neutro de los transformadores de poder.
Adicionalmente, la corriente de falla a tierra considera el efecto limitador de la propia resistencia de la puesta a tierra y del cable de guardia donde sea aplicable. Los valores finalmente utilizados en el cálculo de las mallas se indican en el Anexo 1.
El tiempo de despeje de falla es 1.0 [s]. Corresponde a la protección de respaldo en la sala eléctrica correspondiente. (Cuatro pasos de coordinación de 0.25 [s] cada uno).
Para la Planta de Inoculación, el tiempo de despeje de falla está limitado a 0.1 [s] por el reconectador Tag No. 7100-7W15-602.
En EW, se utilizó el valor de 2,000 [Ohm-m] como resistividad de la capa superior, considerando que habrán movimientos de tierra y rellenos compactados. Como espesor de la capa superior se consideraron 7.0 [m] como promedio. Como resistividad del sustrato se utilizó el valor medido (230 [Ohm-m]).
En SX, se utilizó el valor de 2,000 [Ohm-m] como resistividad de la capa superior, considerando que habrán movimientos de tierra y rellenos compactados. Como espesor de la capa superior se consideraron 2.0 [m] como promedio. Como resistividad del sustrato se utilizó el valor medido para la tercera capa (200 [Ohm-m]).
7.0 METODOLOGÍA DE CÁLCULO
El programa de cálculo utilizado es el ETAP Power Station, Versión 4.7.0C, utilizando la metodología y procedimientos de cálculo desarrollados en la Norma IEEE Std. 80, año 2000.
8.0 RESULTADOS
El resumen de las mallas de puesta a tierra calculadas, se entrega en el Anexo 1 (1 hoja).
El resultado entregado por el ETAP para cada malla de puesta a tierra calculada, se entrega en el Anexo 2 (3 hojas por cada cálculo de malla).
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Página 5 de 5 PROYECTO N° 232500 Enero, 2005 REV. 0 FLUOR 9.0 CONCLUSIONES
Las mallas de puesta a tierra diseñadas, cumplen con las exigencias de seguridad sobre tensiones de paso y de contacto, establecidas en la Norma IEEE Std. 80, año 2000.
Los valores obtenidos para las resistencias de cada malla son menores a los 25 [Ohm] establecidos en el documento No. 2325-0000-265-DC-0001, “Criterio de Diseño Eléctrico”, con excepción de las salas # 608 y # 609 de la Planta EW, donde se calcularon 34.90 [Ohm]. Se estima que al utilizar el producto KAM, esta resistencia deberá quedar bajo los 25 [Ohm], de acuerdo con la información técnica del producto.
Ingendesa realizó un estudio de la interconexión de las mallas de puesta a tierra, tanto para la planta EW como SX. El resultado obtenido confirma el buen comportamiento de las mallas interconectadas. (Ver Anexo 4).
10.0 RECOMENDACIONES
La totalidad de la superficie de las mallas deberán estar cubiertas por una capa de grava de 15 [cm] de espesor, con una resistividad mínima de 5000 [Ohm-m].
Debido a los malos valores de resistividades del terreno, y aunque las mallas calculadas cumplen con el valor de resistencia de malla máxima de 25 [Ohm] sin considerar aditivos, (ver párrafo 8), es recomendable el uso del producto KAM, consistente en un tratamiento artificial reductor de resistencias de puesta a tierra.
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Enero, 2005 PROYECTO N° 232500 REV. 0 FLUOR
ANEXO 1 RESUMEN DE RESULTADOS
MINERA ESCONDIDA LTDA. MEMORIA DE CALCULO No. 2325-0000-265-CS-0007PROYECTO LIXIVIACION DE SULFUROS 04/01/05PROYECTO No. 2325 REV. 0
RESUMEN DISEÑO DE MALLAS DE TIERRA Salas Eléctricas EW Salas Eléctricas SX Móviles SX
DESCRIPCION Unidad 610, 611-612,613 y 614-615 608 609 606 601 602 627 S. House
NorteS. House
SurS/E Móvil
NorteS/E Móvil
Sur
Longitud X Lx m 82 35 35 30 30 25 25 16 21 26 25.7
Longitud Y Ly m 20 24 24 25 20 42 15 12 8 19.3 27.3
Conductores en X Nx c/u 4 7 7 7 6 9 5 5 4 4 5
Conductores en Y Ny c/u 9 8 8 8 9 5 10 6 8 6 6
Area de la malla S m2 1,640 840 840 750 600 1,050 375 192 168 502 702
Radio equivalente r m 22.8 16.4 16.4 15.5 13.8 18.3 10.9 7.8 7.3 12.6 14.9
Longitud total conductor L m 508 437 437 410 360 435 275 152 148 220 292
Resistividad del suelo capa superior Rho Ohm-m 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Espesor capa superior e m 7.0 7.0 7.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Resistividad del suelo capa inferior (sustrato) Rho Ohm-m 230 230 230 200 200 200 200 200 200 200 200
Resistencia de Malla (Laurent) Rm Ohm 25.8 35.2 35.2 37.2 41.7 31.9 53.0 77.1 81.9 48.7 40.3
Cantidad barras (copperweld de 19 mm x 3 metros) N c/u 4 4 4 4 4 4 4 4 4 4 4
Resistencia combinada Malla+Barras (<25 Ohm) Rm Ohm 23.54 34.90 34.90 18.64 19.60 17.07 21.71 24.85 24.95 20.68 19.16
Voltaje del sistema Vs kV 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8
Sobrevoltaje sistema pu 1 1 1 1 1 1 1 1 1 1 1
Resistencia de neutro sistema Rn Ohm 40 40 40 40 40 40 40
Rectancia (Zig-Zag) Xn Ohm 40 40 40
Corriente de falla máxima Ig A 199 199 199 200 200 200 2100 200 200 200 200
Corriente de falla ajustada con resistencia de PAT Ig A 172 150 150 136 134 140 367
Resistencia cables de guardia Rc Ohm 10 10 10 10
Corriente de falla considerando interconexión (*) Ig A 49 49 56 59
Tiempo despeje de falla s 1.0 1.0 1.0 1.0 1.0 1.0 0.1 1.0 1.0 1.0 1.0
Factor de diseño 1 1 1 1 1 1 1 1 1 1 1
Corriente de Falla para diseño A 175 155 155 160 150 160 400 80 80 80 80
(*) : Se considera la conexión con la malla de tierra de la subestación principal a través de los cables de guardia.
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Enero, 2005 PROYECTO N° 232500 REV. 0 FLUOR
ANEXO 2 REPORTES DEL ETAP
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SALA#608
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #608
IEEE Std 80-2000
Number of Ground Conductors: 15
Number of Ground Rods: 4
Total Length of Ground Conductors: 437.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SALA#608
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\EW-Sala#608\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SALA#608
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #608
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.150 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 7.00 Dry soil 230.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 35.0 24.0 7 8 Shape: Rectangular 5.0 4.0 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
15 437.0 $43,700 4 12.0 $400 $44,100
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SALA#608
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #608
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
34.897 5235.3 761.6 865.5 555.8 3114.2 88.0 17.8
Total Fault Current: 0.150 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.150 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SALA#609
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #609
IEEE Std 80-2000
Number of Ground Conductors: 15
Number of Ground Rods: 4
Total Length of Ground Conductors: 437.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SALA#609
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\EW-Sala#609\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SALA#609
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #609
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.150 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 7.00 Dry soil 230.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 35.0 24.0 7 8 Shape: Rectangular 5.0 4.0 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
15 437.0 $43,700 4 12.0 $400 $44,100
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SALA#609
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #609
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
34.897 5235.3 761.6 865.5 555.8 3114.2 88.0 17.8
Total Fault Current: 0.150 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.150 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SALAS#610-a-615
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
MALLA DE TIERRA SALAS ELECTRICAS #s 610, 611-612, 613 Y 614-615
IEEE Std 80-2000
Number of Ground Conductors: 13
Number of Ground Rods: 4
Total Length of Ground Conductors: 508.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SALAS#610-a-615
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\EW-Salas#610-a-615\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SALAS#610-a-615
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
MALLA DE TIERRA SALAS ELECTRICAS #s 610, 611-612, 613 Y 614-615
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.150 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 7.00 Dry soil 230.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 82.0 20.0 4 9 Shape: Rectangular 10.3 6.7 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
13 508.0 $50,800 4 12.0 $400 $51,200
Location: MINERA ESCONDIDA - PLANTA EW
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SALAS#610-a-615
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
MALLA DE TIERRA SALAS ELECTRICAS #s 610, 611-612, 613 Y 614-615
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
23.542 3531.9 730.6 865.5 334.7 3114.2 84.4 10.7
Total Fault Current: 0.150 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.150 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SALA#601
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #601
IEEE Std 80-2000
Number of Ground Conductors: 15
Number of Ground Rods: 4
Total Length of Ground Conductors: 360.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SALA#601
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-Sala#601\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SALA#601
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #601
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.150 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 30.0 20.0 6 9 Shape: Rectangular 3.7 4.0 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
15 360.0 $36,000 4 12.0 $400 $36,400
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SALA#601
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #601
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
19.597 2940.0 855.0 865.5 694.5 3114.2 98.8 22.3
Total Fault Current: 0.150 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.150 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SALA#602
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #602
IEEE Std 80-2000
Number of Ground Conductors: 14
Number of Ground Rods: 4
Total Length of Ground Conductors: 435.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SALA#602
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-Sala#602\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SALA#602
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #602
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.160 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 25.0 42.0 9 5 Shape: Rectangular 6.3 5.3 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
14 435.0 $43,500 4 12.0 $400 $43,900
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SALA#602
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #602
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
17.074 2732.3 847.7 865.5 508.5 3114.2 97.9 16.3
Total Fault Current: 0.160 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.160 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SALA#606
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #606
IEEE Std 80-2000
Number of Ground Conductors: 15
Number of Ground Rods: 4
Total Length of Ground Conductors: 410.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SALA#606
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-Sala#606\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SALA#606
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #606
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.160 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 30.0 25.0 7 8 Shape: Rectangular 4.3 4.2 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
15 410.0 $41,000 4 12.0 $400 $41,400
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SALA#606
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SALA ELECTRICA #606
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
18.638 2982.6 842.6 865.5 644.4 3114.2 97.4 20.7
Total Fault Current: 0.160 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.160 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: INOCULACION
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - PLANTA DE INOCULACION
IEEE Std 80-2000
Number of Ground Conductors: 15
Number of Ground Rods: 4
Total Length of Ground Conductors: 275.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: INOCULACION
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-Inoculacion\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: INOCULACION
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - PLANTA DE INOCULACION
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.400 0.10 0.10 0.10 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 25.0 15.0 5 10 Shape: Rectangular 2.8 3.8 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
15 275.0 $27,500 4 12.0 $400 $27,900
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: INOCULACION
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - PLANTA DE INOCULACION
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
21.705 8695.8 2709.9 2,737.1 2497.9 9847.8 99.0 25.4
Total Fault Current: 0.400 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.401 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.002
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename:
SWITCH-HOUSE-NORTE
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SWITCH HOUSE PLATAFORMA NORTE
IEEE Std 80-2000
Number of Ground Conductors: 11
Number of Ground Rods: 4
Total Length of Ground Conductors: 152.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SWITCH-HOUSE-NORTE
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-SwitchHouse-Norte\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename:
SWITCH-HOUSE-NORTE
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SWITCH HOUSE PLATAFORMA NORTE
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.080 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 16.0 12.0 5 6 Shape: Rectangular 3.2 3.0 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
11 152.0 $15,200 4 12.0 $400 $15,600
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename:
SWITCH-HOUSE-NORTE
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SWITCH HOUSE PLATAFORMA NORTE
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
24.848 1988.2 828.6 865.5 756.5 3114.2 95.7 24.3
Total Fault Current: 0.080 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.080 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename:
SWITCH-HOUSE-SUR
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SWITCH HOUSE PLATAFORMA SUR
IEEE Std 80-2000
Number of Ground Conductors: 12
Number of Ground Rods: 4
Total Length of Ground Conductors: 148.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SWITCH-HOUSE-SUR
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-SwitchHouse-Sur\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename:
SWITCH-HOUSE-SUR
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SWITCH HOUSE PLATAFORMA SUR
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.080 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 21.0 8.0 4 8 Shape: Rectangular 3.0 2.7 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
12 148.0 $14,800 4 12.0 $400 $15,200
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename:
SWITCH-HOUSE-SUR
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SWITCH HOUSE PLATAFORMA SUR
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
24.951 1996.4 820.6 865.5 798.5 3114.2 94.8 25.6
Total Fault Current: 0.080 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.080 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SE-MOVILES-NORTE
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SUBESTACIONES MOVILES PLATAFORMA NORTE
IEEE Std 80-2000
Number of Ground Conductors: 10
Number of Ground Rods: 4
Total Length of Ground Conductors: 220.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SE-MOVILES-NORTE
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-SE-Moviles-Norte\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SE-MOVILES-NORTE
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SUBESTACIONES MOVILES PLATAFORMA NORTE
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.080 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 26.0 19.3 4 6 Shape: Rectangular 5.2 6.4 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
10 219.8 $21,980 4 12.0 $400 $22,380
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SE-MOVILES-NORTE
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SUBESTACIONES MOVILES PLATAFORMA NORTE
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
20.676 1654.4 716.9 865.5 404.0 3114.2 82.8 13.0
Total Fault Current: 0.080 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.080 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 1
SN: 88FDI30132
Filename: SE-MOVILES-SUR
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SUBESTACIONES MOVILES PLATAFORMA SUR
IEEE Std 80-2000
Number of Ground Conductors: 11
Number of Ground Rods: 4
Total Length of Ground Conductors: 292.00 m
Total Length of Ground Rods: 12.00 m
Frequency: 50.0
Unit System: Metric
Project Filename: SE-MOVILES-SUR
Output Filename: D:\ETAP470\PowerStation\2325-Mallas de tierra\SX-SE-Moviles-Sur\Grid1_Untitled.GR1
Ground Grid Systems
ETAP PowerStation
Electrical Transient Analyzer Program
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 2
SN: 88FDI30132
Filename: SE-MOVILES-SUR
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SUBESTACIONES MOVILES PLATAFORMA SUR
Ground Grid Input Data
System Data:
kg
for
Factor
Fault
Factor
CpSf TsTc
kA
Total
Body CurrentConductorsDuration °C
Available
for
Tf
Ground
for Sizing
Total Fault
Fault Duration (Seconds)
%
Projection
%
Division
X/R
Short-Circuit Current
Current
Ambient
Temp.WeightFreq.
Hz
50.0 50 40.00 0.10 0.080 1.00 1.00 1.00 100.0 100.0
Soil Data:
mmW.m W.mW.m
Resistivity
Lower Layer Soil
Resistivity Depth
MaterialTypeMaterial Type
Upper Layer Soil
DepthResistivity
Surface Material
Material Type
Gravel 5000.0 0.15 Dry soil 2000.0 2.00 Dry soil 200.0
Type %
Conductivity
1/°C
@ 20 °C
ar Factor
K0 @
0 °C
Temperature
Fusing
°C
Resistivity of
Ground Conductor
@ 20°C
mW.cm
Capacity
Per Unit Volume
J/(cm³.°C)
Thermal
Conductor/Rod
Material Constants:
Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42Conductor & Rod
Rod Data:
m Rods $/Rod
Cost
Arrangement
No. ofLength
cm
Diameter
1.9 3.0 4 Rods in Grid Corners 100.0
Grid Configuration:
mm² Lx Ly Direction
Grid Length m
Depth
m
Size
Conductor
in X
Direction
in Y
Number of Conductors
Direction
in X
Direction
in Y
Separation m
$/m
Cost
95 0.7 25.7 27.3 5 6 Shape: Rectangular 5.1 6.8 100.00
Cost:
Total
CostCostm
Total LengthTotal
No.
RodConductor
Costm
Total LengthTotal
No.
11 292.3 $29,230 4 12.0 $400 $29,630
Location: MINERA ESCONDIDA - PLANTA SX
Engineer: FLUOR CHILE S.A. Study Case: GRD1
4.7.0C
Page: 3
SN: 88FDI30132
Filename: SE-MOVILES-SUR
Project: LIXIVIACION DE SULFUROS
ETAP PowerStation
Contract: 2325
Date: 12-01-2004
DISEÑO DE MALLA DE TIERRA - SUBESTACIONES MOVILES PLATAFORMA SUR
Ground Grid Summary Report
%
Calculated
%
CalculatedPotential Rise
Rg
Step PotentialTouch Potential
VoltsVoltsVoltsVolts
Tolerable CalculatedTolerable Calculated
Volts
Ground
GPR
Ohm
Resistance
Ground
19.162 1533.2 582.1 865.5 329.6 3114.2 67.3 10.6
Total Fault Current: 0.080 kA Reflection Factor (K): -0.429
Maximum Grid Current: 0.080 kA Surface Layer Derating Factor (Cs): 0.862
Decrement Factor (Df): 1.000
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Enero, 2005 PROYECTO N° 232500 REV. 0 FLUOR
ANEXO 3 RESUMEN MEDICIONES DE RESISTIVIDAD EN ESCONDIDA
Sondeo Lugar ρ1 e1 ρ2 e2 ρ3 e3 ρ4 e4 ρ sustrato e sustrato
[Ωm] [m] [Ωm] [m] [Ωm] [m] [Ωm] [m] [Ωm] [m]
1 S/E Bombeo 2 55 k 0,95 m 8,5 k 2,85 m 2,0 k 0,95 m - - 20 infinito
2 S/E Bombeo 2 180 k 0,50 m 1,8 k 5,00 m - - - - 110 infinito
3 S/E Bombeo 3 700 k 0,90 m 9 k 4,50 m 50,0 k 2,70 m - - 700 infinito
4 S/E Bombeo 3 900 k 1,20 m 22 k 7,20 m - - - - 1.500 infinito
5 S/E Bombeo 4 30.000 k 0,80 m 800 k 1,60 m 100,0 k 8,00 m - - 4.000 infinito
6 S/E Bombeo 4 18.000 k 2,00 m 1.000 k 4,00 m - - - - 3.500 infinito
7 N-118.300 E-15.500 13 k 0,60 m 2,8 k 1,20 m 5,5 k 4,20 m - - 1.400 infinito
8 N-116.800 E-14.000 18 k 0,80 m 6,5 k 2,40 m 1,2 k 4,00 m - - 300 infinito
9 N-115.300 E-13.000 6,5 k 0,40 m 0,1 k 0,80 m 0,8 k 4,80 m - - 200 infinito
10 N-113.000 E-14.200 6,0 k 0,50 m 1,4 k 1,00 m 5,0 k 4,00 m - - 100 infinito
11 N-111.600 E-13.700 6,5 k 0,60 m 0,3 k 3,00 m - - - - 800 infinito
12 S/E Súlfuros N-S 15 k 0,50 m 5,0 k 2,50 m 2,5 k 2,50 m - - 230 infinito
13 S/E Súlfuros E-O 15 k 0,30 m 5,0 k 2,10 m 2,5 k 5,40 m - - 230 infinito
14 N-112.300 E-14.500 6,5 k 0,60 m 0,3 k 3,00 m - - - - 800 infinito
15 N-111.500 E-17.000 100 k 0,50 m 1,4 k 5,00 m - - - - 200 infinito
16 N-111.500 E-19.000 0,05 k 0,90 m 4,5 k 1,80 m - - - - 25 infinito
17 N-111.500 E-20.500 4,5 k 1,00 m 5,0 k 3,00 m 2,0 k 5,00 m - - 120 infinito
18 N-111.500 E-21.500 10 k 0,50 m 6,0 k 1,50 m 0,8 k 2,50 m 3,0 k 10,00 m 200 infinito
19 N-110.500 E-22.300 4,6 k 0,60 m 1,1 k 6,00 m 0,4 k 1,80 m - - 150 infinito
20 N-109.000 E-22.700 2,6 k 0,80 m 0,73 k 4,80 m - - - - 220 infinito
21 S/E Lixiviación (1) 0,6 k 0,60 m 1,6 k 1,80 m 0,2 k 4,80 m - - 60 infinito
22 S/E Lixiviación (2) 0,55 k 2,00 m 0,3 k 4,00 m - - - - 60 infinito
Nota: Sustrato es la capa más profunda del corte geoeléctrico.
La resistividad está expresada en [ ohm m ]. El sufijo "k" representa a [ kilo ohm m ].
S/E Lixiviación (1) y (2) son dos posiciones, separadas unos 50 [m] entre sí, en el sector asignado a dicha subestación.
RESULTADOS CAMPAÑA DE MEDICIÓN DE RESISTIVIDAD EN ESCONDIDA (marzo - mayo 2004)
MINERA ESCONDIDA LIMITADA Memoria de Cálculo N° 2325-0000-265-CS-0007 PROYECTO LIXIVIACIÓN DE SÚLFUROS Enero, 2005 PROYECTO N° 232500 REV. 0 FLUOR
ANEXO 4 RESULTADOS DEL ANALISIS DE LA INTERCONEXION DE MALLAS DE PUESTA A
TIERRA (CORREO ELECTRONICO DE INGENDESA)
Cesar Pontt10-06-2004 15:44
To: Jaime Munoz/SN/FD/FluorCorp@FluorCorp
cc: Roberto Falck/SN/FD/FluorCorp@FluorCorp
Subject: Envío del resultado del análisis de la Interconexión de Mallas de Tierra.Lixiviación de sulfuros.
.....
----- Forwarded by Cesar Pontt/SN/FD/FluorCorp on 06/10/2004 03:51 PM -----
"Jofre Olate, Guillermo Reinaldo, INGENDESA" <gjo@ingendesa.cl>06/10/2004 03:55 PM
To: cesar.pontt@fluor.com
cc: "Gonzalez Gomez, Sergio Ivan, INGENDESA" <sigg@ingendesa.cl>
Subject: Envío del resultado del análisis de la Interconexión de Mallas de Tierra.Lixiviación de sulfuros.
.....
César:
A continuación nuestros comentarios de las mallas interconectadas deSulfuros y Lixiviación.
1. Malla interconectada de Sulfuros.
Se ha simulado en CYMGRD, la totalidad de las mallas presentadas en losplanos de Fluor N°2325-4700-265-DW-4303 "Proyecto lixiviación de sulfuros.Electrobtención. Interconexión malla de puesta a tierra. Planta." El valorcalculado de resistencia de puesta a tierra de las mallas interconectadases: 2.50 ohm.
Adicionalmente, se han verificado las condiciones de seguridad de latotalidad de las mallas interconectadas y hemos detectado que en la Sala deCalentadores y en el Edificio de Electrobtención la tensión de contacto estapor sobre lo permitido por la norma IEEE Std 80. En este sentido, cuandosimulamos las mallas del plano N°2325-4700-265-DW-4303, agregando losconductores indicados en el plano revisado, las tensiones de contacto detodos los sectores interconectados quedan dentro de lo permitido por lanorma IEEE Std 80.
Se concluye que de acuerdo al plano N°2325-4700-265-DW-4303, para cumplircon lo exigido en la norma IEEE Std 80, se deben realizar las modificacionesindicadas en el.
2. Malla interconectada de Lixiviación.
Se ha simulado en CYMGRD, la totalidad de las mallas presentadas en losplanos de Fluor N°2325-4700-265-DW-4304 "Proyecto lixiviación de sulfuros.Area planta SX - Piscinas PLS / Refino. Interconexión malla de puesta atierra. Planta." El valor calculado de resistencia de puesta a tierra de lasmallas interconectadas es: 2.20 ohm.
Adicionalmente, se han verificado las condiciones de seguridad de latotalidad de las mallas interconectadas, comprobándose que todos lossectores interconectados cumplen con los requisitos de seguridad de la normaIEEE Std 80.
Se concluye que de acuerdo al plano N°2325-4700-265-DW-4304, se cumple conla norma IEEE Std 80 y no sería necesario modificarlo.
Atentamente,
Guillermo Jofré OlateTeléfonos: 634 7266 (anexo 4286) 630 8286 (directo)Faxes : 635 4070 (central) 665 1810 (directo)