Final presentation Intelligent distribution station (IOP-EMVT 06101)

Josco Kester

Presented at Alliander, December 21st, Arnhem,The Netherlands

ECN-L--11-015 January 2011

IOP-EMVT 06101 intelligent distributie station

Josco C.P. Kester (MSc)ECN Intelligent Energy Grids (kester@ecn.nl)

Final presentation Intelligent distributie station(IOP-EMVT 06101)

IOP-EMVT 06101 intelligent distributie station 2kester@ecn.nl

Smart Substation

by improving• load profile• reliability• power quality

supports LV grids

with distributed generation

and demand peaks

IOP-EMVT 06101 intelligent distributie station 3kester@ecn.nl

Project phases

• Requirements

• Functional Design

• Detailed Design

• Assembly

• Laboratory test

• Field demonstration

IOP-EMVT 06101 intelligent distributie station 4kester@ecn.nl

Load profile

Peak load: - 30% (simulation)

PowerMatcherSupply Demand Matching

IOP-EMVT 06101 intelligent distributie station 5kester@ecn.nl

Reliability

• Decrease peak loads

• Coordination of local supply

• UPS function

IOP-EMVT 06101 intelligent distributie station 6kester@ecn.nl

Power Quality

Resonances: - 70% (simulation)

Harmonic CompensationusingVirtual Resistive Harm. Dampening (VRHD)

IOP-EMVT 06101 intelligent distributie station 7kester@ecn.nl

Inside the prototype

LV Cabinet MV Cabinet

IOP-EMVT 06101 intelligent distributie station 8kester@ecn.nl

LV-cabinet

IOP-EMVT 06101 intelligent distributie station 9kester@ecn.nl

MV cabinet

IOP-EMVT 06101 intelligent distributie station 10kester@ecn.nl

Lab tests in FPG-Lab

May 2009 – February 2010

IOP-EMVT 06101 intelligent distributie station 11kester@ecn.nl

FPG-Lab: fault ride through (anti-islanding mode)

<1ms, 100%, 10kV, symmetrical three-phase, voltage dipat IntDS passive load of 470kVA (115kW) and ESI charging at 7kVA

IOP-EMVT 06101 intelligent distributie station 12kester@ecn.nl

FPG-Lab: islanding

ESI System operating in islanding mode after removal of MV supply(passive resistive load of 20kW applied)

IOP-EMVT 06101 intelligent distributie station 13kester@ecn.nl

Tests FPG-Lab: results

• safe operation possible

• harmonic compensation reduces harmonics

• intDS supports island operation

• protection issues in laboratory set-up

• APPROVED for field operation

IOP-EMVT 06101 intelligent distributie station 14kester@ecn.nl

Field demonstration

Apeldoorn, Het Kasteel (Jun 2010 - )

IOP-EMVT 06101 intelligent distributie station 15kester@ecn.nl

Field demonstration

IOP-EMVT 06101 intelligent distributie station 16kester@ecn.nl

Field demonstrationTested:• stable operation• harmonic compensation• voltage stability• flicker reduction

Not tested:• controlling microCHPs• active power control (in preparation)

IOP-EMVT 06101 intelligent distributie station 17kester@ecn.nl

Field demonstration: PQ classification

17

A - very goodC - sufficientF - very bad

IOP-EMVT 06101 intelligent distributie station 18kester@ecn.nl

Field demonstration: Reference PQ (wk20)

18

V (dips) Δfreq flicker THD unbalance

Not available

Connection.error

IOP-EMVT 06101 intelligent distributie station 19kester@ecn.nl19

Field demonstration: Reference harmonics (wk20)

THD 3rd 5th 7th 11th 13th

All PQ characteristics within limits

IOP-EMVT 06101 intelligent distributie station 20kester@ecn.nl

Field demonstration: PQ

V (dips) Δfreq. Flicker THD Unb.

17-19 prep

20 ref

21-26 V

29 harm

30 ref

35-39 V

42-43 flicker

IOP-EMVT 06101 intelligent distributie station 21kester@ecn.nl

Field demonstration: harmonics

THD 3rd 5th 7th 11th 13th

17-19 prep

20 ref

21-26 V

29 harm

30 ref

35-36 V

42-43 flicker

IOP-EMVT 06101 intelligent distributie station 22kester@ecn.nl

Field demonstration: THD

Reference Harmonic compensation

THD reduced by 15%

IOP-EMVT 06101 intelligent distributie station 23kester@ecn.nl

Field demonstration: 3rd Harmonic

Reference Harmonic compensation

3rd harmonic not reduced (very low)

IOP-EMVT 06101 intelligent distributie station 24kester@ecn.nl

Field demonstration: 5th harmonic

Reference Harmonic compensation

5th harmonic reduced by 20%

IOP-EMVT 06101 intelligent distributie station 25kester@ecn.nl

Field demonstration: 7th harmonic

Reference Harmonic compensation

7th harmonic reduced by 15%

IOP-EMVT 06101 intelligent distributie station 26kester@ecn.nl

Field demonstration: flicker

Reference Flicker reduction

Flicker reduced from max 0.4 to max 0.2

IOP-EMVT 06101 intelligent distributie station 27kester@ecn.nl

Field demonstration: voltage stabilityReference Voltage Control

Voltage excursions reduced from +/- 4 V to +/- 0.8 V

IOP-EMVT 06101 intelligent distributie station 28kester@ecn.nl

Spin-off

• Imtech: Smart Trafo

• Exendis: ESI

• KEMA: FPG-Lab

• Alliander: test environment

• ECN: PowerMatcher

• Eaton, Alfen: sustainable electricity supply

IOP-EMVT 06101 intelligent distributie station 29kester@ecn.nl

Spin-off

• Imtech: Smart Trafo

• Exendis: ESI

• KEMA: FPG-Lab

• Alliander: test environment

• ECN: PowerMatcher

• Eaton, Alfen: sustainable electricity supply

IOP-EMVT 06101 intelligent distributie station 30kester@ecn.nl

Conclusions

• Lab tests• anti-islanding and islanding tested and approved• specifications tested and documented • approved for field operation

• Field demonstration • tests with microCHPs not possible • active power control not yet working• smart substation has operated without incidents since June 2010• voltage stability improved • THD improved• flicker improved

• International interest for intDS and components

Recommended