Upload
blessings-chiepa
View
1.021
Download
0
Tags:
Embed Size (px)
DESCRIPTION
this presentation is about how waste management is done in Blantyre and it has developed a plan which is for efficient waste management in the same city. the presentation was made by University of Malawi students-the polytechnic, prepared by Blessings Chiepa
Citation preview
GROUP 1
BLESSINGS CHIEPA
EVARLY NEMBELE
ESTHER CHILIGO
TAPIWA G. MKWANDA
BRENDA KAULEMBE
JOHN DUSABE
JOHN M. KENALA
WASTE MANAGEMENT GROUP PRESENTATIONS
WASTE MANAGEMENT PLAN FOR BLANTYRE
PURPOSE OF THIS PRESENTATION PRESENT CURRENT CHALLENGES OF WASTE MGT. IN
BT HOW CITY AUTHORITIES ARE DEALING WITH THEM PRESENT A WASTE MGT PLAN FOR EFFICIENT WASTE
MGT EXPLAIN CHALLENGES LIKELY TO AFFECT THE
IMPLEMENTATION OF THE PLAN HOW TO DEAL WITH SUCH CHALLENGES
INTRODUCTION
BT HAS A POPULATION OF 661 256 WITH ANNUAL GROWTH RATE OF 2.6% AS OF 2008 (NSO,2009)
OVER 70% OF THE POPULATION LIVE IN INFORMAL SETTLEMENTS (UNHABITAT,2011)
ONLY FORMAL AREAS HAVE ACCESS TO URBAN SERVICES
INFORMAL & THAs HAVE LITTLE OR NO ACCESS TO BASIC URBAN SERVICES
MAP 1: FORMAL AND INFORMAL SETTLEMENTS IN BLANTYRE
Source:UN-HABITAT (2011). Malawi: Blantyre Urban Profile
MAJORITY OF INFORMAL SETTLEMENT RESIDENTS DISPOSE OF THEIR WASTE IN A HAPHAZARD MANNER THAT IS HARMFUL TO
THEIR HEALTH AND DANGEROUS TO THE ENVIRONMENT.
Informal Dumpsite in Ndirande
Source: BCC/S. Berman
WHO MANAGES WASTES IN BLANTYRE?
BLANTYRE CITY COUNCIL IS IN CHARGE OF WASTE MGT
CARRIED OUT BY THE DEPARTMENT OF HEALTH AND ENGINEERING SERVICES
MALAWI HOUSING COOPERATION & OTHER TRASH COLLECTORS.
CURRENT CHALLENGES POOR ROAD ACCESS ESP. IN INFORMAL/POOR HOUSING AREAS LACK OF EQUIPMENT TO CARRY OUT WASTE SEPERATION PROCESS THERE IS ONLY ONE DUMPING SITE FOR THE WHOLE BLANTRYE
KNOWN AS MZEDI LACK OF EQUIPMENT AND SKILLED PERSONNEL BLANTYRE HAS GOT 5 WASTEWATER TREATMENT PLANTS 3 OF
THEM ARE NOT WORKING & NEED MAJOR REPAIRS-CHIRIMBA, LIMBE, MAONE WHEREAS TWO ARE WORKING-BLANTYRE, SOCHE
AS A RESULT, LIQUID WASTE THAT IS SUPPOSED TO BE TREATED AT THE PLANTS ENDS FLOWING UP INTO RIVERS UNTREATED
MANASE INDUSTRIAL TREATMENT PLANT FOR EXAMPLE FLOWS UNTREATED WASTEWATER INTO MUDI RIVER DUE TO POOR MAINTENANCE WHICH AFFECTS THE TREATMENT PROCESS.
WASTE MANAGEMENT IN BLANTYRE IN PICTURES
WHAT BCC IS DOING TO ADRESS CHALLENGES
PROVISION OF WASTE STORAGE BINS ALONG MAIN ROADS & MARKETS
PROVISION OF SKIPS IN ALL MARKET PLACES WHICH ARE EMPTIED WEEKLY
PARTNERED WITH FOREIGN CITY COUNCILS TO SHARE KNOWLEDGE
GOV. RECENTLY NEGOTIATED WITH JAPAN WHICH WILL GIVE CITY COUNCILS VEHICLES FOR WASTE COLLECTION & TRANSPORTATION
EXTENDED CITY CLEANING TO MORE AREAS ESP. SWEEPING
OUR PLAN/STRATEGYINTEGRATED WASTE MANAGEMENT AND PLANNING WHICH WILL INCLUDE WASTE
INFORMATION SYSTEMS, WASTE MINIMIZATION, RECYCLING, WASTE COLLECTION AND
TRANSPORTATION, WASTE TREATMENT AND WASTE IMPLEMENTING INSTRUMENTS.
WASTE INFORMATION SYSTEMS
-database, new waste to be identified WASTE MINIMIZATION
-priority waste lists identified; minimization strategies discussed
WASTE RECYCLING
-privatization; Waste to energy conversions e.g. Chinhoyi, Zim
WASTE COLLECTION AND TRANSPORTATION
- priority given to the unserved and poorly serviced residential areas;safe collection & transp of hazardous wastes
WASTE TREATMENT
-natural treatment systems should be developed e.g anaerobic digestion,lagoon & wetlands successful in Brazil, India etc
WASTE DISPOSAL SITES SHOULD BE REGISTERED- permitted with operational agreements and also private
entities be allowed to participate,- maintained at intervals e.g Accra, Ghana
CHALLENGES IN IMPLEMENTATION OF THIS PLAN
WILL REQUIRE HEAVY FINANCING, DIVERT OTHER RESOURCES TO WASTE MGT
LACK OF POLITICAL WILL COMMUNITIES MAY NOT UNDERSTAND THEIR
ROLE IN WASTE MGT. THUS MAY NOT RESPOND/PARTICIPATE
LACK OF ENTHUSIASM & COMMITMENT BY GOV.
OVERCOMING THE CHALLENGES FORMULATING THE INSTITUTIONAL FRAMEWORK TO
GUIDE THE WHOLE PROCESS E.G AN ACT INTERSIFY AWARENESS CAMPAIGNS USE A DECENTRALISED APPROACH TO WASTE MGT,
PROBABLY INVOLVE THE LOCAL LEADERS
-used in the Orangi Pilot Project of Karach Pakistan MONITOR AND EVALUATE FREQUENTLY THE PROGRESS
OF THE PLAN IMPLEMENTATION FUNDING MECHANISM SOULD BE PUT IN PLACE CAPACITY BUILDING INCLUDING HUMAN RESOURCE
TRAINING
JUSTIFICATION FOR ITS EFFECTIVENESS
it has involved managing waste from the time they are produced,
incorporated recycling (element of sustainable development) & public participation,
treatment & finally safe disposal It has also considered the socio-economic
status of Blantyre City. thus an all in one approach
CONCLUSION THIS IS A COMPREHENSIVE WASTE MANAGEMENT
PLAN WHICH JUST NEEDS WILLINGNESS & DEDICATION
ISSUES TO DEAL WITH WASTE MANAGEMENT SHOULD NOT BE DONE BY GOV. ONLY; OTHER STAKEHOLDERS E.G THE PUBLIC,PRIVATE SECTOR, CSOs ETC NEEDS TO STEP IN & HELP
IF NOTHING IS DONE TO THE STATUS QUO, CITIES WILL NOT SERVE ITS FUNCTIONS, RURAL AREAS WILL BE DESIRABLE TO LIVE
BLANTYRE IS GROWING AND DEVELOPING RAPIDLY HENCE REQUIRES THIS KIND OF EFFICIENT & COMPREHENSIVE WASTE MANAGEMENT PLAN
REFERENCES
UN-HABITAT (2011). Malawi: Blantyre Urban Profile (Nairobi: UN-HABITAT).
National Statistics Office [NSO] (2009). 2008 Population and Housing Census: Final Report (Zomba: Government of Malawi).
Berman, S. (2011). “Living with Garbage.” http://thestar.blogs.com/africa/author-sarah-berman/
END OF PRESENTATION
THANK YOU FOR YOUR ATTENTION!!!ANY QUESTIONS, COMMENTS, ETC????
CHIEPA INC. 2013