PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

CONTENT

• MAIN FINDINGS

• P&ID’s MARK-UPS

• SEPARATOR “B” RATING

• CONCLUSIONS

3

PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

Main Findings

• The Separator B, oily water level control valve LDV31160B shall be increased in the port size diameter flow capacity from CV=56 to a New valve CV= 150, in order to cover the de-rating pressure to 22.5 Barg.

• A new set point was provided to be 32 barg for the PSV’s of separator B, New Datasheet has been calculated (IFR) and the results are pointing out a change in the following items:

3 New PSV’s (1,2,3) Type according API526 is: 8T10

Inlet pipeline reducer: 12”x8”

Outlet full bore block valve: 10”

Outlet pipeline expander 20”x10”

4

PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

Main Findings

• The Separator B, Pressure Control valve gas to Flare header PV31111B shall be increased in the port size diameter flow capacity from CV=260 to a New valve CV= 900, in order to cover the de-rating pressure to 22.5 Barg.

• The Separator B, Oil level control valve LV31105B and the Flow control valve FV31113B do not need a change/replacement for the de-rating pressure to 22.5 Barg.

• Separator B capacity Datasheet (IFR) shows the separator capacity suitable for the de-rating pressure to 22.5 barg.

DW TS - ECP – AKPO debottlenecking– 16.01.15 5

PROJECT STATUS 07-02-2015

P&ID’s Mark-Ups

6

PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

P&ID’s Mark-Ups

7

PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

Separator B de-rating

12 Hydrocarbon Gas and Liquid3 N/A4 m³ N/A5 barg Note 66 barg 93/FV7 ºC 518 ºC 93 / -209 ENGINEERING DATA DESIGN

10 Inside diameter mm 4408 NOTE 1 & NOTE 211 Height tan/tan mm 15816.304.1 APPLIED SEE12 Elevation mm CALC. SHEET13 Corrosion allowance mm14 Insulation mm15 Personal Protection16 PROCESS CASE Note 117 RATING18 Operating Pressure barg 22.5 22.519 Hydrocarbon Liquid20 Flow Rate kg/hr kg/hr(bbopd) 361790 (69127) bbopd 7499621 Density at T & P kg / m3 779.322 Viscosity cP 0.804523 Surface Tension dyn / cm 18.7824 API 47.4225 Gas / Vapour26 Flow Rate kg / hr (MMscfd) kg/hr(MMscfd) 195796(261.3) MMscfd 62727 Molecular Weight 15.0428 Density at T & P kg / m3 13.9629 Viscosity cP 0.010330 Water31 Flow Rate kg/hr kg/hr(bbwpd) 100775(15243) bbwpd 1566632 Specific Gravity @ 15.6 °C N/A33 Density at T & P kg / m3 988.234 Viscosity cP 0.535335 Notes 1, 2, 3, 4 and 7

167000.00N/A1005

0.36

76

237000 (227.7)20.8566.67

0.015

79

53600.00681.0

1.10-

Design temperature

4,40015,800

DESIGN

55850.03

YESN/A

MAX IMUM CAPACITY

Max. spec. Gravity @ 15.6 °COperating volumeOperating pressure 22.5Design pressureOperating temperature

DESIGN DATAContents

8

PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

CONCLUSIONS

• Separator B capacity check DATASHEET (IFR) at 22.5 barg, shows no limitation for a maximum of 4 lines from loops 10, 20 and 30, reservoir A.

• PSV 1,2,3 on Separator B, have been designed to protect the vessel for a block outlet scenario with Set Point=93 barg. The request change in Set Point to 32 barg, needs the following equipment list to change/replace :

• 3 New PSV’s (1,2,3) Type according API526 is: 8T10.

• Inlet pipeline reducer: 12”x8”

• Outlet full bore block valve: 10”

• Outlet pipeline expander 20”x10”

9

PROJECT STATUS 07-02-2015

DW TS - ECP – AKPO debottlenecking– 07.02.15

CONCLUSION CONT…

• The Separator B, PV31111B and LDV31160B shall be increased in the port size diameter flow to cover the de-rating pressure at 22.5 Barg.