20
EC/IST MAESTRO SDMB system overview ITU-R SG8 Seminar - 9 September 2004 UDCAST

EC/IST MAESTRO SDMB system overview ITU-R SG8 Seminar - 9 September 2004

  • Upload
    hisoki

  • View
    33

  • Download
    3

Embed Size (px)

DESCRIPTION

EC/IST MAESTRO SDMB system overview ITU-R SG8 Seminar - 9 September 2004. UDCAST. Agenda. Context SDMB system overview Trials Relation to WRC-07 preparatory work. SMS. MMS. Perceived value per bit. Java Games. Internet Browsing. Video/AudioStreaming. Bit volume/intensity. - PowerPoint PPT Presentation

Citation preview

Page 1: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

EC/IST MAESTRO

SDMB system overview

ITU-R SG8 Seminar - 9 September 2004

UDCAST

Page 2: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 2

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Context

SDMB system overview

Trials

Relation to WRC-07 preparatory work

Agenda

Page 3: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 3

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

SMS

MMS

Java Games

Internet Browsing Video/

AudioStreamingPe

rcei

ved

valu

e pe

r bit

Bit volume/intensity

Pull services on unicast mode in cellular networkLimited capacity for mobile video on wide scaleTraffic fee too high for consumer acceptance (0,5 €/Mbytes in 2010, Bear&Stearns 2003Perceived value per bit for broadband application is decreasing

Push services using broadcast modeon dedicated radio resources combined with local storageSubscription with unlimited usageUnlimited audience, low traffic feeQuasi on demand content usageEnabling Internet snow ball effect

• point to multipoint for initial content distribution then point to point for content circulation

One to many distribution: an efficient way to serve Mobile multimedia content to mass market

Page 4: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 4

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Mobile broadcast implementations

Initiatives Players Remarks Status

– Japan: KDDI, , MBco, Toshiba,Toyota

– South-Korea: SKT, TU Media, Samsung

– DMB (satellite+terrestrial) mobile broadcast

– 6 TV + 10 radio channels– 8-20€/month

– Samsung (handsets) – Free analog TV service – Available but handset consumption issues

– Commercial launch in July 2004

– Commercial launch in May 2004

– Sprint PCS, Comcast, Idetic (content optimization)

– CDMA 2000 live TV streaming (14 channels)

– Launched April 2004– 10$/month

– Vodafone, Nokia, Philips, Universal Studio

– Combines DVB-H and GSM/UMTS networks

– Pilot testing since early 2004

– T-System, T-Mobile, broadcasters ZDF & BR, SCM Microsystems

– Platform integrating DAB, DVB-T and UMTS channels (content converted into XML)

– DVB-T in commercial launch in North Germany in May ‘04

– Pilot testing since early 2004

– Digita (TDF), local broadcasters, Nokia, TeliaSonera, Elisa

– Test of mobile TV using DVB-H in Helsinki

– Pilot testing starting fall 2004

– Alcatel Space, Agilent, Monaco Telecom

– Test of hybrid satellite & terrestrial SDMB architecture

– Pilot testing

– DoCoMo, SKY PerfectTV – 3G live TV streaming – Pilot from June to November 2004

• Analog TV in South Korea

• DMB in Japan & Korea

• MobiTV in USA

• FOMA 3G streaming TV in Japan

• BMCO project in Berlin

• MMD (Mobile Media Distribution) platform in Germany

• Finnish Mobile TV

• MODIS project in Monaco

Page 5: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 5

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Context

SDMB system overview

Trials

Relation to WRC-07 preparatory work

Agenda

Page 6: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 6

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

The SDMB architecture: a satellite overlay network for 3G and beyond 3G network

3G Mobile Network3G Base

station

Content provider

s

Hub basedon 3G equipment

ContentNetwork

High powerGeo-stationary

satellite

3G handset

Interactive link in IMT2000 mobile terrestrial

band

MBMS Broadcast/Multicast

Service Centre

Example of umbrella cells coverageover Europe

Satellite distribution link in IMT2000 mobile

satellite band3G Air interface

Page 7: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 7

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

2G/3G HANDSET with extended

frequency agility in Satellite IMT2000

band

512 Mbytes Memory card

with integrated DRM

Terrestrial repeaters integrated in 3G base stations for dense urban area coverage

STORE

REPLAY

PUSHSELEC

T

S-DMB: key design principles

Satellite IMT2000 FDD European allocationTerrestrial IMT2000 FDD European allocationTerrestrial IMT2000 TDD European allocation

1900 1980 2010 2170 2200 MHz1920 21102025

Hybrid satellite/terrestrial architecture: Global coverage for Outdoor & Indoor usage

Low cost impact on 3G handheld terminal• Satellite frequencies are adjacent to IMT2000 terrestrial ones• Satellite waveform compliant to 3GPP UTRA FDD WCDMA standard• High reception margin, hence no form factor impact

Concurrent evolution with 3GPP architecture

Return link: PPDR, safety

Page 8: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 8

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Umbrella cell per spot beam1 carrier, 2 codes

Hybrid & cost effective satellite/terrestrial architecture

to achieve a Single Frequency Network outdoor & indoor

Terminal’s rake receiver combines the Satellite & terrestrial repeaters signalsas echos of the same signal

Coveragehole

Coveragehole

Terrestrial repeaters: gap filler coveragesame carrier, same codes

Page 9: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 9

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

3 - SECURITY SERVICES•Population alert and awareness•Network dependability•Ubiquitous coverage

S-DMB: Open Technology that can address an increasing range of market opportunities

1 - MULTIMEDIA SERVICES• Mobile TV• Interactive broadcast• Content delivery

2 - VEHICULAR APPLICATIONS•Telematics•Entertainment

Page 10: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 10

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

High power GEO satellite to accommodate 3G handheld terminal RF characteristics

Satellite & Payload characteristics• 15 years Lifetime• Launch mass: up to 5900 Kg• P/L DC power consumption: 12 kW• Up to 6 beams per satellite• EIRP (EOC): up to 76 dBW/beam over

1.2°

IMT2000 Satellite bandTX/RX Antenna

Ø 7.5 m

Ka bandTX AntennaØ < 1.5 m

Ka bandRX AntennaØ < 1.2 m

Mirror or subreflector Example of 1.2° Beams

Satellite flexibility• Coverage (beam selection

and beam size)• Power sharing among active

beams• Transparent architecture

towards 3GPP air interface (e.g. W-CDMA & Beyond 3G waveform)

Page 11: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 11

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Terrestrial repeater

Rx antenna dish 20-30 cm

Ka band

RF filter

Power Amplifie

r

* RF cable to Node B antenna(Signal is 3GPP TS 25.106 compliantin IMT2000 satellite band)

Low Nois

e Bloc

k CellularMode

m

Frequency conversion terrestrial repeaterBlock architecture

O&M controll

erRx Antenna

Tx antenna

Tx antenna

Repeater

On the rooftop

Typical installation in tri-sectorised site

Site sharing with2G/3G base station site* cost effective* environment friendly

Page 12: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 12

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

S-DMB enabling features in 3G user equipment

3GPP & OMA features• HW: Local memory storage• SW

– MBMS (including Power saving management)– Streaming service and related codecs– Digital Right Management– Mobile broadcast services (service discovery, service

protection, electronic service guide, etc...)SDMB specific

• HW: Radio frequency agility extension to IMT2000 satellite band

• SW– Reliable transport protocol (File FEC, Interleaving,

Carrousel)– Dual operation mode: SDMB reception while

attached to UMTS or GSM network– SDMB Service management

1900 1980 2010 2170 2200 MHz1920 21102025

Page 13: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 13

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Spot beam capacity can be progressively improved up to 10Mb/s along with mobile content usage• Increased number of Terrestrial repeaters• Additional satellites• Full 30 MHz allocation• Use of Beyond 3G waveform

Also direct satellite return link for Voice and messaging services for telematics and public safety

2007 2008 2009 2010 2011 2012

ACH

IEVA

BLE

BITR

ATE

PER

SPO

T BE

AM

64-128 Kb/S

384-768 Kb/S

768 - 2200 Kb/S

5 - 10 Mb/S(depending

on available spectrum)

MBMSin

cellularnetwor

k

SDMB:Single

satellite

configuration

SDMB:Multi-

satellite

configuration

SDMB: B3G waveform

Smooth and seamless growth of S-DMB system

Page 14: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 14

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Context

SDMB system overview

Trials

Relation to WRC-07 preparatory work

Agenda

Page 15: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 15

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

IST/FP5 MoDiS project Trial: MONACO July/Sept 2004

SatelliteEmulator

Terrestrialrepeater

Terrestrialrepeater

3

2

1

Proof of S-DMB concept: W-CDMA efficiency in broadcast mode with hybrid satellite/terrestrial transmission

Measurement campaign for system cost & performances assessment Service demonstration: streaming, download , alert & Peer2peer www.ist-modis.org

Page 16: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 16

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

EC IST MAESTRO integrated project in short

FP6: Strategic objectives: EC/IST FP6: Mobile and wireless systems beyond 3G

MAESTRO: Mobile Applications & sErvices based on Satellite & Terrestrial inteRwOrking

Duration: 24 months with T0 = 01/01/2004 Budget 10.15 Meuros, EC funding: 5.2 Meuros Project Web page: http://ist-maestro.dyndns.org 20 partners from satellite and terrestrial mobile industry

as well as media industry Main objectives

• Define role mode• Define the system architecture• Validate key SDMB functions and performances with a test bed• Investigate potential evolutions: OFDM, Return Link (robust

mode),...• Carry out standardisation and regulatory activities

Page 17: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 17

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

ReplaceUpgrade

IST FP6 MAESTRO project test bedbased on MoDiS platform

Add

SGSN

GGSN

Terrestrial repeaters

HLR

Experimental 3G BM-SC

MSC

Satellite emulator based on 3G Node

B

Hub emulator based on RNC

emulator

2.5 GNetwork

Integrated SDMB/GPRS handsets

Content sourceMultimedi

a contents

SDMBPropagation channelemulator

Validation of architecture & performance

Trials in 2005 in France

Page 18: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 18

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

Context

SDMB system overview

Trials

Relation to WRC-07 preparatory work

Agenda

Page 19: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

ITU-R SG8 Seminar20040909, page 19

European Commission, 6th R&D Frame work program: IST MAESTRO integrated project

The information enclosed in this slide is the property of the EC FP6 IST MAESTRO Integrated Project consortium

WRC-07 preparatory activities S-DMB is a typical “satellite component” of IMT-2000 WRC-07 Agenda Item 1.4: Requirements for evolutions of IMT-

2000, and systems beyond IMT-2000.• Emerging concepts (S-DMB, others): Satellite has an important

role to play in the future of IMT-2000• Satellite may not be suited for all mobile applications, but it is

excellent for some (multicast, coverage complement, reliable communications)

Technological evolutions• Trend towards integration between terrestrial/satellite mobile

systems: system, waveforms• Higher satellite power, bigger antenna technology enables

seemless terrestrial/satellite access on the same terminal !• The role of satellite should be fully recognised in WRC-07 A.I 1.4

preparation WP8F and WP8D cooperation should continue to enable

satellite to fully play its role in future mobile systems

Page 20: EC/IST MAESTRO  SDMB system overview ITU-R SG8 Seminar - 9 September 2004

Thank you for your attention !