Environmental Monitoring Report
# Annual Report (January – December 2018)
April 2019
Indonesia: Neighborhood Upgrading and Shelter
Project – Phase 2
Prepared by the Directorate General of Human Settlements, Ministry of Public Works and
Housing for the Republic of Indonesia and the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 30 April 2019)
Currency unit – rupiah currency name in lowercase (RP) Rp 1.00 = $ 0.00007
$1.00 = Rp 14,215
ABBREVIATIONS
ADB – Asian Development Bank APBD – Anggaran Pendapatan dan Belanja Daerah (Regional
Budget Income and Expenditure) DGHS – Directorate General of Human Settlements
NOTE
(i) The fiscal year (FY) of the Government of Indonesia and its agencies ends on 31 December. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2011 ends on 31 December 2011.
(ii) In this report, "$" refers to United States dollars
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
1
Table of Contents
Table of Contents ............................................................................................................................ 1
List of Appendices ........................................................................................................................... 2
List of Tables ................................................................................................................................. 3
List of Figures ................................................................................................................................. 3
ABBREVIATIONS ........................................................................................................................... 4
CHAPTER 1. INTRODUCTION ...................................................................................................... 5
CHAPTER 2. KEY PROJECT ACTIVITIES AND PROGRESS .................................................... 7
2.1. Community Contracts .............................................................................................................. 7
2.2. Complex Civil Work Contracts ................................................................................................ 9
2.3. New Site Development (NSD) ............................................................................................... 11
CHAPTER 3. ENVIRONMENTAL MITIGATION AND MONITORING STATUS ......................... 15
3.1. Requirements of Environmental Safeguards ........................................................................ 15
3.2. Key Roles and Responsibilities ............................................................................................. 15
3.3. Community Contracts ............................................................................................................ 18
3.4. Complex Civil Work Contracts .............................................................................................. 20
3.5. New Site Development Contracts ......................................................................................... 20
CHAPTER 4. PUBLIC CONSULTATION AND DISCUSSION .................................................... 22
CHAPTER 5. INFORMATION DISCLOSURE ............................................................................. 24
CHAPTER 6. GRIEVANCE REDRESS MECHANISM ................................................................ 25
CHAPTER 7. PROJECT STAFFING AND CAPACITY BUILDING ............................................. 27
CHAPTER 8. KEY ISSUES AND CORRECTIVE ACTIONS ....................................................... 29
CHAPTER 9. CONCLUSIONS AND RECOMMENDATIONS ..................................................... 32
APPENDICES ............................................................................................................................... 34
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
2
List of Appendices
Appendix 1. List of SPPL of Community Contracts ................................................................. 35
Appendix 2. Evidences of Mitigation Measures in Semarang and Makassar ........................ 36
Appendix 3. List of SPPL of Complex Civil Work Contracts ................................................... 38
Appendix 4. Environmental Screening and Assessment for Batua Community Work
Package, Makassar City .................................................................................... 39
Appendix 5. Evidences of Public Consultation for Community Contract in Batua
Neighborhood, Makassar City ............................................................................ 50
Appendix 6. Evidences of Public Consultation for Complex Civil Work in Tambakrejo
Neighborhood, Semarang City ........................................................................... 54
Appendix 7. Evidences of Training of Trainers Workshop ...................................................... 57
Appendix 8. Evidences of Mid-Term Review Workshop ......................................................... 64
Appendix 9. Evidences of the Year-End Review Workshop ................................................... 70
Appendix 10. Evidences of the Year-End National Coordinating Meeting ............................... 76
Appendix 11. Picture of Ad-Hoc Meeting Between DGHS and NMC at NMC Office, Jakarta
(June 2018) ........................................................................................................ 82
Appendix 12. Picture of field checking by PPK of Semarang City in Mangkang Wetan
Neighborhood (27 August 2018) ........................................................................ 83
Appendix 13. An Example of O&M Mechanism in Bontorannu, Makassar .............................. 84
Appendix 14. O&M Mechanism has been formulated in the Major’s Decree on NSD’s Management Board of Palopo ........................................................................ 86
Appendix 15. An Example of RMC Safeguard Specialist’s QPR .............................................. 90
Appendix 16. An Example of Approved Community Contract SPPL of 2017 from Beting Kuala
Kapias Neighborhood, Tanjung Balai City ......................................................... 92
Appendix 17. An Example of Approved Complex Civil Works SPPL of 2017 and its related
Environmental Permit Act from Bone District .................................................... 95
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
3
List of Tables
Table 1. Community Contracts Awarded in 2018 ....................................................................... 8
Table 2. Complex Civil Works Contracts Awarded in 2018 ...................................................... 10
Table 3. Agency and Community Organization Responsibilities .............................................. 15
Table 4. The Status of UKL-UPL and IEE of New Site Development ...................................... 21
Table 5. Key Issues and the Corrective Actions ....................................................................... 29
List of Figures
Figure 1. NUSP-2 Project Location ............................................................................................. 5
Figure 2. Construction of Drainage Channel in Kelurahan Cipocok Jaya (Serang City)........... 7
Figure 3. Construction of Concrete Road in Kelurahan Sungai Pelunggut (Batam City) ........... 7
Figure 4. Asphalt Road Constructed at Kelurahan Kandang Panjang (Pekalongan City) ......... 9
Figure 5. Drainage Channel Constructed at Kelurahan Kabil (Batam City) ............................. 10
Figure 6. Work Completed in Purirano NSD, Kendari City ....................................................... 11
Figure 7. Work Completed in Sampoddo NSD, Palopo City..................................................... 12
Figure 8. Work Progress in Jatiwangi NSD, Bima City ............................................................. 13
Figure 9. Work Progress in Handil Berkat Makmur NSD, Kapuas District ............................... 14
Figure 10. Dissemination Posters of NUSP-2 Project.............................................................. 24
Figure 11. Grievance Redress Mechanism ............................................................................... 25
Figure 12. Information Disclosure for GRM ............................................................................... 26
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
4
ABBREVIATIONS
ADB Asian Development Bank
AP Affected People
CA Community Advisor
CAP Community Action Plan
CC City Coordinator
CIO Community Implementing Organization (or BKM Badan Keswadayaan
Masyarakat)
CPMU Central Project Management Unit
DGHS Directorate General of Housing Settlements
DLH Dinas Lingkungan Hidup (Environmental Agency)
EA Executing Agency
EARF Environmental Review and Assessment Framework
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMS Environmental Management System
FY Fiscal Year
GRC Grievance Redress Committee
GRM Grievance Redress Mechanism
IEE Initial Environmental Examination
IPAL Instalasi Pengolahan Air Limbah (Communal Wastewater Treatment Plant)
KPP Kelompok Pemanfaat dan Pemelihara (Operation and Maintenance Group)
KSM Kelompok Swadaya Masyarakat (Community Self-Help Group)
LCO Local Coordinating Office
MDG Millennium Development Goals
MPWH Ministry of Public Work and Housing
Muskel Musyawarah Kelurahan (neighborhood assembly meeting)
NMC National Management Consultant
NSD New Site Development
NUSP-2 Neighborhood Upgrading and Shelter Project Phase 2
O&M Operation and Maintenance
PIP Pengembangan Infrastruktur Permukiman (Settlement Infrastructure
Development)
PIU Project Implementing Unit (Satker or Satuan Kerja)
PMU
PPK
Project Management Unit
Pejabat Pembuat Komitmen (Commitment Officer)
RAB Rencana Anggaran Belanja (Budget Planning)
RMC Regional Management Consultant
Satker Satuan Kerja (Project Implementing Unit)
SKS Survey Kampung Sendiri or Community Self Survey
SPPL Surat Pernyataan Kesanggupan Pengelolaan dan Pemantauan Lingkungan
(Statement Letter for Environmental Management and Monitoring)
TIPP Tim Inti Perencanaan Partisipatif (Core Team for Participatory Planning)
UKL-UPL Upaya Pengelolaan Lingkungan – Upaya Pemantauan Lingkungan
(Environmental Management Effort - Environmental Monitoring Effort
Document)
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
5
CHAPTER 1. INTRODUCTION
1. Project Background. The Neighborhood Upgrading and Shelter Project – Phase 2
(NUSP-2) is aimed to upgrade basic public infrastructure in slum settlements, and contribute
to meeting Millennium Development Goal (MDG) targets for achieving significant improvement
in the lives of slum dwellers (MDG target 7D) and halving the proportion of urban households
without sustainable access to safe drinking water and basic sanitation (MDG target 7C).1 The
NUSP-2 also contributes to the implementation of Cities without Slums Program launched by
the Indonesian Government.2
2. The NUSP-2 is an ADB-funded project, particularly upgrading and/or developing basic
infrastructure and facilities for selected slum areas at 99 neighborhoods (kelurahan). These
neighborhoods are distributed in 20 districts (kabupaten) and municipalities (kota) located
across Sumatra, Java, Kalimantan, Sulawesi, Nusa Tenggara and Maluku Islands as shown
in Figure 1. The executing agency of the NUSP-2 is the Directorate General of Human
Settlements (Direktorat Jenderal Cipta Karya) of the Ministry of Public Works and Housing
(MPWH).
Figure 1. NUSP-2 Project Location
1 The 2015 MDG target for the proportion of the urban population living in slums is 6%; in 2011, 12.6% of the
urban population lived in slums. The 2015 MDG target for the proportion of households with sustainable access to an improved water source is 75.5%; in 2011, 40.5% of urban households had access to an improved water source, 72.5% had access to basic sanitation. The proportion of households with access to safe water and basic sanitation in slum areas is assumed to be much lower.
2 The Cities without Slums Program is incorporated in the National Long-Term Development Plan, 2005–2025. It aims to reduce slum areas in cities by 2025 by promoting concerted initiatives by the central and local governments, private sector, and civil society.
Tanjung
Balai
Bengkulu
Serang
Sukabumi
Semarang
Pasuruan
Bima
Tanjung
Jabung Barat
Kapuas
Bandar
Lampung
Makassar
Kendari
Ambon
Batam
Palembang
Banjarmasin
Pekalongan
Palangkaraya
Bone
Palopo
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
6
3. The NUSP-2 assists the local governments in upgrading and/or developing basic
infrastructure and facilities at selected neighborhoods in order to achieve the following: Output
1: Institutional capacities for managing pro-poor urban development strengthened; Output 2:
Infrastructure in slum neighborhoods upgraded; and Output 3: New settlements for poor
families established.
4. There are seven types of infrastructures and facilities built under the NUSP-2, among
others, construction of road, bridge, basic sanitation facilities, and communal wastewater
treatment plant; installation of clean water supply and street lighting; and provision of
municipal solid waste handling facility and transportation as well as basic fire-fighting
equipment.
5. Objective and Scope of the Monitoring Report. This Annual Environmental
Monitoring Report is developed by NMC Safeguard Team/Project Management Unit of the
NUSP-2 to describe the project activities and environmental safeguards implementation in
2018. This report describes the compliance status of environmental mitigation and monitoring
conducted against the EARF requirements. Further, corrective actions identified in the ADB
Review Mission in 2018, if any, are elaborated in this report to improve compliance in the
upcoming year.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
7
CHAPTER 2. KEY PROJECT ACTIVITIES AND PROGRESS
6. This chapter summarizes key project activities and progress associated with the
NUSP-2 implementation in 2018. These include the community and complex civil work
contracts awarded as well as the construction of neighborhood infrastructure and facilities to
be constructed as part of the New Site Development (NSD) during the reporting period.
2.1. Community Contracts
7. In 2018 the NUSP-2 awarded 215 community contracts (skala lingkungan) in 99
neighborhoods/kelurahans for neighborhood upgrading civil works to local Community
Implementation Organizations (CIO or Badan Keswadayaan Masyarakat/BKM). Construction
works that are considered technically modest and can be conducted by the community without
using specialized or heavy equipment qualify for the community-typed contracts mentioned
earlier. Figure 2 (Construction of Drainage Channel in Kelurahan Cipocok Jaya, Serang City)
and Figure 3 (Construction of Concrete Road in Kelurahan Sungai Pelunggut, Batam City)
are examples of the construction works awarded under the community contract scheme.
Figure 2. Construction of Drainage Channel in Kelurahan Cipocok Jaya (Serang City)
Figure 3. Construction of Concrete Road in Kelurahan Sungai Pelunggut (Batam City)
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
8
Table 1 provides information on 215 community contracts awarded in 2018 as part of the
NUSP-2 implementation at 20 cities or districts throughout Indonesia.
Table 1. Community Contracts Awarded in 2018
No City/District (Province)
Number of
Neighborhoods
Involved
Construction and/or Installation Conducted
1 Tanjung Balai City
(North Sumatra Province)
5 Drainage channel, purchase of garbage collector
vehicle, concrete road, green open space, public
toilet, retaining wall and street lighting.
2 Tanjung Jabung Barat
District (Jambi Province)
4 Drainage channel, concrete road and installation of
box culvert.
3 Palembang City
(South Sumatra Province)
10 Concrete road, drainage channel, concrete bridge,
street lighting, installation of clean water pipeline and
purchase of garbage collector vehicle.
4 Bengkulu City
(Bengkulu Province)
6 Drainage channel, concrete road, street lighting,
purchase of garbage collector and retaining wall.
5 Bandar Lampung City
(Lampung Province)
10 Paved and concrete road, drainage channel,
floodgate, culvert, solid waste collection area,
purchase of garbage collector vehicle, street lighting,
installation of plat deucker, green open space, public
toilet, retaining wall and installation of clean water
pipeline.
6 Batam City
(Riau Islands Province)
5 Drainage channel and concrete road.
7 Sukabumi City
(West Java Province)
4 Communal septic tank and waste water treatment,
paved road, drainage channel, public toilet, street
lighting, green open space, installation of plat
deucker, culvert, purchase of garbage collector and
installation of clean water pipeline.
8 Semarang City (Central
Java Province)
11 Paved road, drainage channel, solid waste collection
area, street lighting, purchase of garbage collector,
concrete bridge, communal septic tank and public
toilet.
9 Pekalongan City
(Central Java Province)
6 Purchase of garbage collector, culvert, paved road,
drainage channel, retaining wall, installation of clean
water pipeline, street lighting and green open space.
10 Pasuruan City
(East Java Province)
5 Paved road, communal septic tank, drainage channel
and purchase of garbage collector vehicle.
11 Serang City
(Banten Province)
4 Concrete and paved road, drainage channel, solid
waste collection area, public toilet, bore well, retaining
wall, communal waste water treatment plant and
culvert.
12 Kapuas District (Central
Kalimantan Province)
3 Concrete road, wooden trails road, drainage channel,
green open space and public toilet.
13 Palangkaraya City (Central
Kalimantan Province)
4 Wooden trails road, concrete road, drainage channel,
purchase of garbage collector and communal septic
tank.
14 Banjarmasin City (South
Kalimantan Province)
2 Drainage channel, concrete road, public toilet,
communal septic tank and solid waste collection area.
15 Bima City (West Nusa
Tenggara Province)
3 Concrete and paved road, drainage channel,
installation of plat deucker, street lighting, solid waste
collection area, purchase of garbage collector and
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
9
No City/District (Province)
Number of
Neighborhoods
Involved
Construction and/or Installation Conducted
green open space.
16 Bone City (South Sulawesi
Province)
2 Concrete, paved and wooden trails road and drainage
channel.
17 Makassar City (South
Sulawesi Province)
5 Drainage channel, paved and concrete road, concrete
bridge, communal waste water treatment plant, green
open space and purchase of garbage collector.
18 Palopo City
(South Sulawesi Province)
3 Drainage channel, street lighting, green open space
and concrete road.
19 Kendari City
(South East Sulawesi)
4 Solid waste collection area, concrete and paved road,
drainage channel, concrete bridge, purchase of
garbage collector, green open space and street
lighting.
20 Ambon City
(Maluku Province)
3 Concrete road, drainage channel, installation of plat
deucker, retaining wall, purchase of garbage collector
and solid waste collection area.
Source: NUSP-2 Infrastructure (2018).
2.2. Complex Civil Work Contracts
8. The complex civil work contracts are awarded to companies (instead of community
groups) through bidding process, particularly for construction works involving multiple
neighborhoods and specific materials and heavy and/or specialized equipment that may need
to be mobilized from other areas. In 2018 NUSP-2 awarded complex civil work contracts for
constructing facilities and infrastructure in 8 (eight) cites or districts in Indonesia. On the next
page the Figure 4 shows the Asphalt Road Construction at Kelurahan Kandang Panjang
(Pekalongan City) and Figure 5 shows the Drainage Channel Constructed at Kelurahan Kabil
(Batam City) that have been constructed under the complex civil work contract.
Figure 4. Asphalt Road Constructed at Kelurahan Kandang Panjang (Pekalongan City)
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
10
Figure 5. Drainage Channel Constructed at Kelurahan Kabil (Batam City)
9. The types of community facilities and infrastructure in 2018 under the complex civil
works contracts (skala kawasan) have been constructed or installed through 9 packages
distributed in 8 cities/districts and presented in the following table.
Table 2. Complex Civil Works Contracts Awarded in 2018
No City/District (Province) Construction and/or Installation Conducted
1 Kelurahan Kabil, Batam City (Riau Islands
Province).
Paved and concrete road and drainage channel.
2 Kelurahan Sawah Lebar, Bengkulu City
(Bengkulu Province)
Drainage channel and asphalt road.
3 Kelurahan Kandang Panjang, Pekalongan City
(Central Java Province)
Asphalt road, green open space, drainage channel
and installation of box culvert.
4 Kelurahan Tambakrejo, Semarang City
(Central Java Province)
Drainage channel, solid waste collection area and
road.
5 Kelurahan Selat Dalam, Kapuas District
(Central Kalimantan Province)
Retaining wall, green open space, concrete bridge,
construction of archway and street lighting
6 Kelurahan Batua, Makassar City (South
Sulawesi Province)
Paved road and drainage channel.
7 Kelurahan Borong, Makassar City (South
Sulawesi Province)
Paved road and drainage channel.
8 Kelurahan Batu Merah, Ambon City (Maluku
Province)
Installation of clean water pipelines, drainage channel
and concrete road.
9 Kelurahan Dara and Jatibaru, Bima City (West
Nusa Tenggara Province)
Asphalt road and drainage channel.
Source: NUSP-2 Infrastructure (2018).
10. The implementation of 1 (one) complex civil work package in Kelurahan Tambakrejo
Semarang City was delayed due to : (i) the replacement of the government official (Satker and
Commitment Officer or Pejabat Pembuat Komitmen/PPK), and (ii) the design stressing on
collaboration approach with the board for river management (Balai Besar Wilayah
Sungai/BBWS). The BBWS is responsible for the river normalization and construction of
retaining wall using concrete sheet pile; whereas the NUSP-2 project is responsible for the
construction of roads along the retaining wall. The road construction process will be started
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
11
once the retaining wall is completed. These processes caused insufficient time of
implementation during 2018. Thus, this work package in Semarang City is managed through
multi-year contract which will be completed in April 2019.
2.3. New Site Development (NSD)
11. For the NSD progress, the Initial Environmental Examination (IEE) of Purirano NSD in
Kendari City and Sampoddo NSD in Palopo City have been endorsed by ADB on 12 March
2018 (for Purirano NSD) and 26 April 2018 (for Sampoddo NSD). The Purirano NSD
infrastructure construction contract has been started in May 2018, and Sampoddo NSD in July
2018, and are now completed. The pictures of construction work process can be seen in
Figure 6 (Work Completed in Purirano NSD, Kendari City) and Figure 7 (Work Completed in
Sampoddo NSD, Palopo City).
Figure 6. Work Completed in Purirano NSD, Kendari City
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
12
Figure 7. Work Completed in Sampoddo NSD, Palopo City
12. The IEE of Jatiwangi NSD in Bima City and the NSD Handil Berkat Makmur in Kapuas
District have been reviewed and approved by ADB on 11 September 2018 (for Jatiwangi
NSD) and 13 November 2018 (for Handil Berkat Makmur NSD). The Jatiwangi NSD
infrastructure construction contract has been started in October 2018, and Handil Berkat
Makmur NSD in November 2018 and both are now progressing. The pictures of construction
work process can be seen in Figure 8 (Work Progress in Jatiwangi NSD, Bima City) and
Figure 9 (Work Progress in Handil Berkat Makmur NSD, Kapuas District).
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
14
Figure 9. Work Progress in Handil Berkat Makmur NSD, Kapuas District
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
15
CHAPTER 3. ENVIRONMENTAL MITIGATION AND MONITORING STATUS
3.1. Requirements of Environmental Safeguards
13. According to the ADB’s Safeguard Policy Statement (2009), the NUSP-2 is classified
as the Category B Project, i.e. the project could have some adverse environmental impacts,
but of lesser degree or significance than those in category A, but the impacts are site specific
and can be readily addressed through common mitigation measures. The NUSP-2 creates
positive impacts on the environment and improves the wellbeing of the community through
alleviation of slum areas in emerging cities in Indonesia.
14. The Environmental Assessment and Review Framework (EARF) document has been
prepared in 2014, and it provides screening procedure and checklist to review environmental
implications of the infrastructure and facility to be constructed as part of the NUSP-2. The
EARF requires that:
• An initial environmental examination (IEE) document according to the ADB requirement is
prepared and endorsed by DGHS and ADB as part of the new site development (NSD)
proposal; and
• Environmental Mitigation and Monitoring Plan (UKL-UPL) or Statement Letter to Conduct
Environmental Mitigation and Monitoring (SPPL) is prepared and endorsed by DGHS
according to the Ministry of Environment Regulations No. 5/2012 on Types of Activities
and/or Projects Requiring Environmental Impact Assessment (AMDAL) and No. 16/2012
on the Guidance for the Preparation of Environmental Documents; and Ministry of Public
Work Regulation No. 10/PRT/M/2008 on Types of Activities and/or Projects in the Public
Work Sector Subject to be Completed with the Environmental Management Effort-
Environmental Monitoring Effort (UKL-UPL) document.
3.2. Key Roles and Responsibilities
15. Table 3 summarizes the key roles and responsibilities of the executing and
implementing agencies as well as community organizations involved in the implementation of
the NUSP-2 including their respective environmental responsibilities. Related evidences as
some examples on the undertaking of these roles and activities, particularly at the city/district
level, Community Implementing Organization (CIO), and neighborhood level are provided in
the appendices.
Table 3. Agency and Community Organization Responsibilities
Institutions and Responsibilities
Activities and Status Compliance
Directorate General of Housing Settlement (Executing Agency)
• Overall coordination,
supervision,
monitoring.
The coordination, supervision and monitoring by the
PMU/EA were mostly done through workshops,
coordinating and review meetings, in which safeguard
issues were discussed, including collecting evidences.
These events were also a means of capacity building for
the RMC Technical Assistants, CC, and CAs. Some
supervision meetings were conducted on ad hoc basis
and on the sites.
Complied
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
16
Institutions and Responsibilities
Activities and Status Compliance
• Preparation and
submission of
quarterly progress and
evaluation reports.
In 2018 the PMU submitted 4 quarterly progress and
evaluation reports to ADB (QPR 1 January – March; QPR
2 April – June; QPR 3 July - September; QPR 4 October –
December).
Complied
• Prepare guidelines for
the environmental due
diligence and
monitoring of
environmental
management plan.
The DGHS had published a Technical Guideline on Social
and Environmental Management in September 2016. Up
till 2018, the City Satker, CCs and CAs has been using
this guideline for reference to implement and monitor the
environmental and social safeguard components through
screening using forms of checklists and templates
provided.
Complied
Public Works (Local Coordinating Officer) at City or District Level
• Provide overall
coordination,
supervision,
monitoring and
approval of
neighborhood
proposals including
environmental
checklists.
In all 20 cities, the LCO at the Local Planning Agency
oversees the overall implementation of NUSP-2
intervention, including approval of the neighborhood
proposals. The supervision and monitoring by the LCO
and City Satker conducted through the finalization process
of the Community Action Plan (CAP).
Complied
• Prepare quarterly
progress reports
including
environmental.
The LCO provided inputs to the PMU on the quarterly
progress reports of the NUSP-2 intervention. Some
reports included monitoring on infrastructure progress on
50% and on 100%, which were also uploaded in
Management Information System (MIS).
Complied
• Provide technical
support to community
advisors and
BKMs/CIOs.
The technical support provided by LCO through
consultation and coordination when the Badan
Keswadayaan Masyarakat (BKM or Commuity
Implementing Organization/CIO) presents their CAP.
Along the process of construction, the Local Public Work
Agency was reviewing, controlling and improving the
works as part of technical support, coaching and
empowerment.
Complied
• Carry out
environmental due
diligence.
• For the community contract, the environmental due
diligence was carried out using the environmental
screening checklist. Subsequently, this information is
utilized to develop the SPPL for submission to the Local
Environmental Agency.
• For the complex civil work contract, the SPPL is
prepared by City Satker and contractor assisted by the
CCs.
• For the NSD, IEE and UKL-UPL are prepared for
ADB/DGHS endorsement and local government
respectively.
The list of SPPL and IEE prepared in 2018 is included in
Appendix 1, 2, and 4. There are 215 community
contracts, 9 complex civil works and 4 NSDs.
• Complied
• Complied
• Complied
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
17
Institutions and Responsibilities
Activities and Status Compliance
• Monitor the
implementation of the
environmental
management plan.
The LCO has been monitoring the implementation of
environmental management plan in ad-hoc basis.
Complied
Environmental Agency at City or District Level (Dinas Lingkungan Hidup/DLH)
• Provide guidance on
environmental
checklists.
The Environmental Agencies used the checklists provided
in the Technical Guidelines mentioned above as the
reference for issuing the approval for SPPL document for
each CAP.
Complied
• Coordinate with
community advisors to
conduct site visits to
validate the
screening/assessment
results.
The Environmental Agencies conducted site visits to
validate the environmental screening results on 0% point
of infrastructure during the community meeting, and
validate monitoring results on 50% and 100% of
infrastructure progress to verify the requirement of budget
disbursement.
Complied
• Review the
engineering design
and environmental
checklists and provide
permit for construction
of a deep well.
There is no deep well constructed as part of the NUSP-2
in 2018.
Not applicable
• Conduct random
checking during
construction and after
completion to inspect
environmental
procedures and
impacts.
Random checking was done by the Environmental
Agencies during construction and after completion to also
make sure of infrastructure quality and gave technical
inputs for improvement where needed.
Complied
Health Agency at City or District Level
• Test collected water
quality samples to
determine if collected
water sources meet
the drinking water
standards.
This water testing was not conducted, as most of the
clean water source for the NSD sites will be supplied from
treated water from the municipal water company (known
as Perusahaan Daerah Air Minum or PDAM).
Not applicable
Community Implementation Organization (CIO)
• Responsible for
establishing project
implementation units.
The CIO established the project implementing units in the
form of community self-help group (Kelompok Swadaya
Masyarakat or KSM) to implement the NUSP-2 activities.
Complied
• Responsible for
conducting
environmental
checklists assisted by
community
advisors/safeguard
specialist.
The CIO, assisted by the CA and CC, conducted
environmental screening by visual inspection and review
of the CAP using the checklist forms included in the
Technical Guideline for Social and Environmental
Management (2016).
Complied
• Formulate O & M
mechanisms.
The O&M mechanism was formulated during finalization
of the CAP. At the same time the CIO established the
Complied
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
18
Institutions and Responsibilities
Activities and Status Compliance
O&M group (Kelompok Pemanfaat dan Pemelihara/KPP)
to be responsible for maintenance of the neighborhood
facility and infrastructure constructed. Later on, the KPP
groups were empowered through O&M training between
July-August 2018 for each city.
• Responsible for
monitoring
construction activities
and conducting
inspection for
completed
interventions.
CIOs together with respective PPK monitored and
evaluated the activities when construction achieved 50%
and 100% progress, and made necessary intervention or
improvement based on the results. The monitoring results
then were uploaded into the NUSP-2 website/SIM.
Complied
• Disclose, on the
neighborhood board,
neighborhood
proposals and
contracts including
environmental
checklists.
The discussion to develop and finalize the neighborhood
proposals was conducted through series of neighborhood
discussion (musyawarah kelurahan/Muskel II - III).
However, the proposals, contracts, and checklists were
not disclosed on the neighborhood board.
Partially
complied
• Responsible for taking
any negative feedback
related to site,
construction, and
operation from other
neighborhood
members and
organizing meetings to
solve problems.
This responsibility was conducted through those series of
neighborhood discussions (Muskel IV - V), women group
meetings (Rembug Khusus Perempuan), and other ad-
hoc meetings to take-up feedbacks and complains from
other neighborhood members.
Complied
• Responsible for
reporting
environmental
monitoring to LCOs
The environmental monitoring is reported using the Form
SG-5 completed with the minutes of meeting of the
monitoring at 50% and 100% of construction progress.
The minutes and pictures of this activity were uploaded
into the NUSP-2 website/MIS and included in the
Technical and Financial Report (Laporan Pertanggung-
Jawaban/LPJ) after completion of infrastructure.
Complied
3.3. Community Contracts
16. Environmental Mitigation. For every community contract package, prior to
construction the CIO prepared a Community Action Plan (CAP) including the environmental
and social screening using the forms/checklists provided in the NUSP-2 Technical Guidelines
on Social and Environmental Management. Based on this Technical Guidelines, there are 5
types of forms/checklists that should be applied along the project for each type of
infrastructure. The first form (SG-1 form) is for the negative list screening. The second (SG-2)
is for identifying both social and environmental impacts, and the third (SG-3) is for analyzing
those potential impacts and related mitigation actions to cope with the impacts. The SG-4 is to
provide a recapitulation of those screening results, while the SG-5 is for monitoring the
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
19
process at the point of 0%, 50% and 100% of construction work progress. Examples of the
use of these forms of SG-1 till SG-5 are shown in Appendix 4.
17. Assisted by the Community Adviser (CA), the CIO conducted neighborhood meeting
(Musyawarah Kelurahan or Muskel III) to disseminate the screening result and discuss the
CAP. The results of the environmental and social screening were incorporated into the SPPL
that was subsequently submitted to the local environmental agency (Dinas Lingkungan
Hidup/DLH) for registration. The SPPL contains identified potential environmental impacts and
measures to mitigate these impacts during the construction work. The total of SPPL
formulated for slum upgrading through community contract in 2018 was 215 packages. The
list of SPPL submitted for the community contract activities is presented in Appendix 1.
18. As of end of December 2018, almost all of community contracts in the first, second and
third cycle had completed their SPPL documents, except those from the Semarang City which
are still in the registration process at the Investment and One Stop Services Office (Dinas
Penanaman Modal dan Pelayanan Terpadu Satu Pintu) due to many bureaucracy
requirements.
19. Some mitigation measures mentioned in the SPPL to cope with environmental impacts
usually were: water spraying for dust suppression; covering the construction materials using
tarpaulin; stockpiling the construction materials properly on the road side; putting the warning
signboard around the construction works; and providing the workers with personnel protective
equipment. The documentation pictures of these mitigation measures are provided in the
Appendix 2.
20. Environmental Monitoring. The CA/CIO visually monitored the implementation of the
mitigation measures to make sure that they complied with the SPPL during the project up to
hand over to the Local Coordinating Office (LCO) and subsequently to the local community as
the beneficiary of the NUSP-2. They monitored the progress of infrastructure being built by
visual inspection and made some documentation pictures of the progress on 0%; 50% and
100%, and filled up the form of SG-5. These processes were being uploaded into the website
of Management Information System through application by the CA. The City Coordinator
would check the uploaded files and gave approval. Subsequently, the Safeguard Specialists
at the Regional Management Consultant (RMC of west, central and east regions) collected
and reviewed the status of the process, made some analysis and recapitulation to be reported
to the Safeguard Team of NMC. The NMC incorporated this report into the quarterly and
annually reports and submitted to ADB.
21. In general, the monitoring results on community contract packages in 2018 showed
that most of the mitigation measures were properly applied by the KSM as committed in the
SPPL documents. Since the scale of subproject was manageable by the communities
themselves, the impacts were not too hard to cope with. For this is the third years of the
project implementation, the KSM have becoming more experienced in applying the
environmental safeguard. However, the key issue here was that communities were still not
used to properly make good quality records or documentation on what they have done.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
20
3.4. Complex Civil Work Contracts
22. Environmental Mitigation. Based on the initial screening using the form of SG-1-3, all
of the complex civil work contracts in 2018 required the SPPL document, not the UKL-UPL.
The environmental mitigation implemented for the complex civil work contracts is similar to
that of the community contract in that SPPL, which is required for construction activities of the
neighborhood infrastructure and facilities. The list of SPPL submitted for the community
contract activities is presented in Appendix 3. There were 8 cities/district involved in complex
civil work contracts, but only 1 (Tambakrejo) of Semarang City have not completed the SPPL
documents yet due to bureaucracy obstacles.
23. Similar to the community contract package, some mitigation measures mentioned in
the SPPL document of complex civil works to cope with environmental impacts were: water
spraying for dust suppression; covering the construction materials using tarpaulin; stockpiling
the construction materials properly on the road side; putting the warning signboards around
the construction works; and providing the workers with personnel protective equipment. The
documentation pictures of these mitigation measures are provided in the Appendix 2.
24. Environmental Monitoring. For the complex civil work contracts, the City
Coordinators (CCs) in coordination with LCO were responsible for the day-to-day
environmental monitoring during the construction activities done by the contractor firms. They
monitored the progress of infrastructure being built by visual inspection, and made some
documentation pictures of the progress (0%; 50% and 100%). The SG-5 form, provided in the
Technical Guideline, was used to do the monitoring for both social and environmental
safeguard for each activity. The day-to-day monitoring during the construction activities were
recorded in the logbook.
25. Even though the monitoring result of the complex civil works was generally good, the
key challenge here was the coordination responsibility between the City Satker and the LCO
in monitoring the contractor firm as the developer of infrastructure. The CCs played an
important role in assuring the mitigation measures were taken in place during the construction
process.
3.5. New Site Development Contracts
26. In 2018, the construction of infrastructure and facilities at the four NSD sites in
Kendari, Palopo, and Bima cities and Kapuas District have been commenced and the
environmental mitigation and monitoring have been occurring. The types of infrastructure are
neighborhood road, drainage system, clean water supply, solid waste management system,
landscape, and street lighting. The report of implementation and monitoring of environmental
mitigation will be reported on separate monitoring report of each IEE. The status of IEE
document for the NSD is provided in Table 4 below.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
21
Table 4. The Status of UKL-UPL and IEE of New Site Development
No NSD Sites UKL-UPL IEE
1 Purirano NSD –
Kendari City
(Southeast Sulawesi
Province)
• UKL-UPL approval No. 191 year 2016 (dated
29 December 2016), issued by the
Environmental Agency of Kendari City.
• Environmental Permit No. 192 year 2016 (dated
29 December 2016) issued by the same
environmental agency.
Approved by ADB on 12
March 2018
2 Sampoddo NSD –
Palopo City (South
Sulawesi Province)
• UKL-UPL approval No. 660/047/DLH/XII/2017
(dated 16 December 2017) issued by the
Environmental Agency of Palopo City
• Environmental Permit No. 660/48/DLH/XII/2017
(dated 16 December 2017) issued by the same
environmental agency.
Approved by ADB on 26
April 2018
3 Jatiwangi NSD, Bima
City (West Nusa
Tenggara Province)
• UKL-UPL recommendation No
880/32/DLH/XII/2017 (dated 21 December
2017) issued by the Environmental Agency of
Bima City.
• Environmental Permit No. 435/2018 (dated 15
May 2018) issued by the Major (Walikota) of
Bima City.
Approved by ADB on 11
September 2018
4 Handil Berkat
Makmur NSD,
Kapuas District
(Central Kalimantan
Province)
• UKL-UPL approval No. 660/364/DLH/X/2017
(dated 18 October 2017) issued by the
Environmental Agency of Kapuas District
• Environmental Permit No. 627/DPMPTSP/ year
2017 (dated 29 December 2017) issued by the
Head (Bupati) of Kapuas District.
Approved by ADB on 13
November 2018
Source: NSD Technical proposals and copies of UKL-UPL documents from NUSP-2 subprojects 2017.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
22
CHAPTER 4. PUBLIC CONSULTATION AND DISCUSSION
27. The NUSP-2 project conducted public consultation as an integral part of the
identification, selection and implementation of neighborhood infrastructure interventions. For
the community contract packages, several stages of neighborhood meetings were conducted
to openly discuss the whole process of development from assessing environmental and social
safeguard checklist, formulating and consolidating the investment plan Into Community Action
Plan (CAP), preparing the construction implementation and selecting the Implementing Unit
(Kelompok Swadaya Masyarakat/KSM). Through these meetings, all community members
and concerned stakeholders would have such forum to raise their complaints to be resolved.
So far, there is no report of any concerns or complaints addressed to the Implementing Units.
28. In 2018, similar to previous years, public consultations and discussions were done
through series of neighborhood meetings (Musyawarah Kelurahan or Muskel) aforementioned
in previous Chapter. As an example of this public consultation and discussion, the CAP
drafting process for a community contract package in Batua neighborhood of Makassar City is
presented in Appendix 5.
29. For the complex civil works, at the pre-construction phase, the City Coordinator (CC)
and City Satker conducted public consultation with the representatives of local communities,
heads of Kelurahan and the contractor firms to discuss the plan for the infrastructure and
identifying potential impacts by screening and reviewing the checklist forms and later
developed the UKL-UPL or SPPL documents based on the screening results. These events
were documented in the minutes of meetings, list of participants, and some pictures, and
uploaded into the NUSP-2 website/MIS by the CCs for public viewers. An example of such
public consultation for complex civil works package in Tambakrejo neighborhood of Semarang
City is presented in Appendix 6. The discussion was about drafting report of initial screening
results using SG-1 till SG-3 forms to be included into the SPPL. The community members and
concerned stakeholders could have used this forum to raise their complaints to be resolved.
So far, there is no report of any concerns or complaints addressed to the related City Satker.
30. As for the NSD sites, at the pre-construction phase, there would be two types of public
consultation. The first one is for disseminating information about the NSD project to the local
communities, potential beneficiaries, and job or business opportunities for the locals, as well
as seeking for local community’s perception on the NSD project. The second one is for discussing and reviewing environmental and social screening checklists to prepare the UKL-
UPL document, which later to be further developed as IEE and social DDR documents. This
event would be attended by potential affected communities, the heads of Kelurahan, related
agencies or stakeholders, the contractor firms, the CC and the sub-specialists (for monitoring
evaluation for NSD implementation) and facilitated by the City Satker.
31. Since the construction works at the four NSD sites have been started, the first public
consultation and dissemination events have also been conducted. In Purirano NSD (Kendari),
it was held at the site (temporary) office on May 11, 2018, attended by 30 participants,
including local community members, the City Satker, the contractor, and the sub-specialist.
Similarly, the public consultation for Sampoddo NSD (Palopo) was held on June 11, 2018 at
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
23
the site office, attended by the City Satker, the contractor, the technical consultants and the
potential beneficiaries. Whereas in Jatiwangi NSD (Bima), it was held on November 2018,
attended by 14 people of local community members, the City Satker, the contractor and the
sub-specialist. And the public consultation for the Handil Berkat Makmur (Kapuas) was held
on December 12, 2018 in Kelurahan Office of Selat Utara, attended by about 30 participants
from almost the same kind of stakeholders. The results of these events were that the local
communities understood about the NSD planning, and that there were some job or business
potentials in the new site development, and there were some local communities and suppliers
involved in the construction process either as work force or provider of goods and services.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
24
CHAPTER 5. INFORMATION DISCLOSURE
32. Information on public consultation, discussion, and neighborhood meetings related to
the implementation of community and complex civil work contracts are documented and
uploaded into the NUSP-2’s website/MIS (www.nusp2.id). However, information related to
monitoring of environmental mitigation measures is lacking.
33. For the NSD, the IEE documents (including the EMP) and the annual environmental
monitoring report are disclosed on ADB’s website and NUSP-2’s websites. The IEE
documents for Purirano and Sampoddo NSDs have been translated into Bahasa Indonesia
and the translation has been shared with the respective LCOs and City Satkers to be made
available to public, including the affected people and interested stakeholders. The IEE
documents for Jatiwangi NSD (Bima) and Handil Makmur Jaya (Kapuas) are still in translation
process into Bahasa Indonesia.
34. The project also published about six posters explaining the NUSP-2 project and one
special poster on NSD. These posters dissemination is another strategy to reach out the
potential beneficiaries. These posters have been distributing gradually in 2016 till 2018 and
mentioning the email address and mobile contact number to redress grievance or complains
from communities. Two of these posters are shown below in Figure 10.
Figure 10. Dissemination Posters of NUSP-2 Project
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
25
CHAPTER 6. GRIEVANCE REDRESS MECHANISM
35. The NUSP-2 has established a grievance redress mechanism (GRM), which basically
consists of three levels, i.e. at the neighborhood, at the city/district, and at the national levels
as shown in Figure 11 (Grievance Redress Mechanism). This leveling system is expected to
timely address any complaints during project implementation. Local communities or affected
people will have the right to file complaints and/or queries related to disturbance /
environmental impacts due to the project activities.
36. The GRM should handle any complaints and/or queries which emerge during
construction process of the subprojects. Any affected people/party will have the right to file
complaints. It is anticipated that all grievances related to benefits and other assistance will be
resolved at the project level.
37. The procedure for filing complaints and/or grievance during construction is established
as follows:
(i) The complaint will be filed to the Community Implementing Organization (CIO) or Badan
Keswadayaan Masyarakat (BKM) members and local government at the neighborhood
level for an immediate solution when possible;
Figure 11. Grievance Redress Mechanism
(ii) If the problem cannot be solved, the BKM members and local government staff will
facilitate the APs (affected peoples) to submit their complaints to the Projects’ grievance
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
26
redress committee (GRC) at the district level, and to the national level if needed.
Community advisor then will record the complaint and report it to the LCOs. The project
will dedicate a staff at city/district and national levels to be in-charge of handling and
following up on AP’s complaints.
(iii) The members of the GRC should involve the representatives of vulnerable affected
people (i.e. affected women, poor and minority groups) and other affected people along
with relevant government officials who have functional and legal authority. The committee
will then review grievances involving all land acquisition benefits or issues, except for
disputes related to ownership.
(iv) Grievances will be addressed within 2 to 4 weeks from the date of filing the complaints at
the district level and within 8 weeks at the national levels.
38. To disseminate information of the GRM, in 2016 the project had published a guideline
on grievance redress handling mechanism and distributed to all LCO and City Satker. In
addition, the project had also published a poster especially on GRM or PPM (Penanganan
Pengaduan Masyarakat), as shown in Figure 12 below. So far, there was no complaint or
grievance raised by the the community about the NUSP-2 project in 2018.
Figure 12. Information Disclosure for GRM
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
27
CHAPTER 7. PROJECT STAFFING AND CAPACITY BUILDING
39. The consulting services are provided at the national, regional, city and kelurahan level.
At the national level, a team of consultants assist the CPMU, namely the National
Management Consultant (NMC) based in Jakarta. Part of this NMC, a safeguard specialist
and the two safeguard assistants were recruited to assist the PMU in preparing social and
environmental management guidelines, checking supporting data and documents from the
field in the project’s Management Information System (MIS) website, incorporating
environmental monitoring in the quarterly progress reports and environmental survey results
in the monitoring and evaluation framework, prepare reports on annual environmental
monitoring and prepare the IEE for the NSD proposals.
40. At the regional level, a safeguard specialist was also recruited at each of three
regional management consultant (RMC) teams, based in Palembang (for West Region),
Semarang (Central) and Makassar (East). These RMC safeguard specialists were responsible
for assisting the NMC safeguard team in reviewing environmental monitoring management by
BKMs/CIOs, reviewing the completion of safeguard documents, preparing the environmental
monitoring reports, dissemination of the guidelines, assisting and training the city/district
coordinators and community advisors to review the environmental screening carried out by
BKMs/CIOs.
41. In addition to each NSD subproject, there are four sub-specialists responsible to assist
in day-to-day monitoring and evaluation for the implementation of the NSD. This also includes
assisting the City Satker, the LCO and the related RMC Safeguard Specialists in collecting
data for monitoring the implementation of mitigation measures set forth in the EMP of the IEE.
They are based in the NSD sites of Kendari, Palopo, Bima, and Kapuas.
42. And there are city/district coordinators (CCs) based in 20 cities/districts of the NUSP-2
project, responsible in assisting the city/district Satker (Project Implementing Unit/PIU), the
LCOs, and the community advisors. The CCs also responsible for conducting review and
screening of the environmental and social safeguard checklist using forms of SG-1 till SG-5
provided in the Technical Guidelines of NUSP-2, both for community contracts and complex
civil work packages. Further, they review the completion of necessary safeguard documents,
and review the quality of documentations uploaded by CCs or CIOs/BKMs in the NUSP-2
website/MIS.
43. Under the city/district coordinators (CCs), at the kelurahan level there are Community
Advisors (CAs) who may cover up to 2-3 kelurahans, and responsible for assisting each
BKM/CIO for day-to-day management of the community contract works; facilitating the
establishment of CIO/BKM and user groups; facilitating the preparation of CAPs; providing the
community with technical guidance in book-keeping, documentation and report preparation;
and assisting the user groups in formulating and implementing facility operation and
maintenance. Together with the CCs, the CAs assist the CIO/BKM in reviewing and screening
the environmental and social safeguard checklists. The CAs and CCs also responsible for the
preparation of documentation of each activity and supporting documents as the evidence,
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
28
such as minutes of meetings, notes, list of participants, pictures, other related documents. The
Technical Guidelines of NUSP-2 also provided various document templates for documentation
purposes. The CAs and CCs were responsible to assist the CIO/BKM to upload all of these
documents and pictures into MIS website of the NUSP-2 project for further monitoring by the
RMC and NMC safeguard specialists for reporting and public disclosure.
44. To improve monitoring quality, in 2018 several capacity buildings were done through
events such as regional coordination meeting, training for trainers, and coaching. Brief
information on each event is described below, whereas the reports proceedings of these
events were documented and compiled at the PMU and NMC offices.
45. In early July 2018 the Safeguard Team joined the NMC’s Capacity Building Team in conducting the Training of Trainers Workshop in Ambhara Hotel, Jakarta, for the CCs and
CAs. The specific module on safeguards was developed especially for the CIO/BKM to
refresh their knowledge and skills on safeguard aspects of the project, as well as to improve
the quality of supporting data for safeguard monitoring reports. Simultaneously, the NMC’s Safeguard Team also held special sessions with the NSD’s sub-specialists to brief them with
the Environmental Management Plan (EMP) for each NSD, so that they can help with the
implementation, monitoring and reporting of the EMP on each NSD site. List of attendance,
invitation letter and pictures of these events can be seen in Appendix 7.
46. In mid-September 2018, the NMC and RMC Safeguard Team joined the NMC-RMC
mid-term review workshop in Semarang to discuss the progress of the projects with all CCs
and CAs. At this event, the safeguard team presented important points as a reminder of
safeguard aspects to be implemented, monitored, reviewed and reported. The safeguard
team also took advantage of this gathering to collect all supporting documents needed for
safeguard reports in 2018. List of attendance, invitation letter and pictures of this workshop
can be seen in Appendix 8.
47. On November 27-30, 2018, the Safeguard Team joined the NMC-RMC year-end
review workshop in Jakarta to evaluate the results of the project with all CCs and CAs, and to
collect all supporting documents needed for safeguard reports in 2018. Later, the Safeguard
Team also joined the year-end National Coordinating Meeting in Yogyakarta on December 18-
21, 2018 to finalize the annual technical and financial reports from each sub-project
conducted at the neighborhood level. List of attendance, invitation letter and pictures can be
seen in Appendix 9 and 10.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
29
CHAPTER 8. KEY ISSUES AND CORRECTIVE ACTIONS
48. As the NUSP-2 is a community based driven project, the challenge in implementing
safeguard aspects was that not all community members, particularly the construction workers,
had proper knowledge in implementing the mitigation measures. To address this issue, the
NMC and RMC (particularly CCs and CAs) carried out close monitoring and assistance to the
community in 2018. As the result, most of these measures had been done, and the CIOs were
able to formulate safeguard monitoring reports for each neighborhood, although some of
these reports lacking quality and necessary supporting documents. The CIO’s reports have been submitted to the RMC and NMC and used as the reference in formulating this 2018
AEMR.
49. The corrective actions on the gaps of EMP implementation identified in the 2017
AEMR have been followed up in 2018, and reported in Table 5.
Table 5. Key Issues and the Corrective Actions
No Key Issues / Gaps Corrective Actions PIC & Schedule Status/Progress
up to Dec 2018
1 Lacking documentation
(e.g. minutes of meeting)
on the monitoring and
evaluation of
environmental safeguards
implementation at the
Executing Agency.
Evaluate the
environmental
safeguards
implementation on a
regular basis and
document the results of
this implementation.
PIC: DGHS/NPMU
Schedule: Evaluation
to be conducted
periodically
(monthly).
Completed - The EA
(DGHS) conducted several
ad-hoc and monthly
meetings to monitor and
evaluate the safeguards
implementation. Moreover,
reviews on safeguard
implementations were also
done through workshops
and coordination meetings
(evidences of these events
are included in Appendix 7,
8, 9, 10, and 11).
2 The LCOs (Local Public
Work office) have not
monitored the
implementation of
Environmental
Management Plan (EMP)
associated with the
community and complex
civil work contracts.
PMU (assisted by NMC)
should conduct an
empowering or capacity
building event for the
LCOs to remind them
about this responsibility
PIC: LCO at
respective local
Public Work offices.
Schedule: During
site visits, regional
workshop or other
ad-hoc events in Q4
of 2018 or Q1 of
2019:
Completed – The PMU
empowered the LCOs during
Mid-Term Review Workshop
in Semarang in September
2018 (see Appendix 8). The
PMU also required the LCOs
to carry out field checking
(including evaluation on the
implementation of EMP)
prior to processing the 2nd
term of payment. Evidence
of this activity can be seen in
Appendix 12.
3 The Local Environmental
Agencies (DLH) have not
yet conducted random
checking during
construction and after
completion to inspect
environmental procedures
and impacts.
The DLHs should
undertake random
checking during
construction and after
completion of the
construction works.
PIC: DLHs
Schedule:
During site visits and
ad-hoc events in Q4
of 2018 and Q1 of
2019
Partially achieved - Some
DLHs did this but no
recorded documents
reported. All mitigation
measures and the
monitoring process were
carried out intensively by the
NUSP-2’s consultants along with local governments,
including the DLHs.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
30
No Key Issues / Gaps Corrective Actions PIC & Schedule Status/Progress
up to Dec 2018
4 There is no record or
documentation of the O&M
mechanism formula.
The CIO/BKM assisted
by CC and CA should
make the record or
documentation of the
O&M mechanism
formula.
PIC:
• BKM/CIO assisted
by CA/CC for
community
contracts.
• City/District Satker
for complex civil
works and for
NSDs.
Schedule:
• Q4 of 2018 for
community
contracts and
complex civil
works.
• Q4 of 2018 for
Kendari and
Palopo NSD.
• Q1 of 2019 for
Bima and Kapuas
NSD.
Partially achieved - For the
community contracts and
complex civil works, these
had been incorporated into
integral part of the CAP. The
example of O&M mechanism
can be seen in Appendix
13.
For the NSD, the O&M
mechanism has been
formulated in the Major’s Decree on NSD’s Management Board of
Palopo (see Appendix 14),
whereas that for Kendari
NSD is being processed.
5 There is no environmental
safeguard monitoring
report from the RMC to be
incorporated to NMC
annual monitoring report.
The RMC Safeguard
specialists and the CCs
in coordination with City
Satker and LCO should
prepare regular
environmental
monitoring reports
including any
complaints raised
before, during and after
implementation of
construction works.
PIC:
RMC Safeguard
Specialists, CCs in
coordination with
City Satker
Schedule:
Q4 of 2018 and Q1
of 2019
Completed - Each RMC
Safeguard specialist has
submitted four quarterly
progress reports on
safeguard activities within
2018 to the NMC. The
example of the mentioned
report is included in
Appendix 15.
6 Incomplete SPPL, UKL-
UPL and Environmental
Permit for community
contracts in Palembang
City, Tanjung Balai City,
Sukabumi City,
Banjarmasin City and
Kendari City
The RMC Safeguard
specialists and the CCs
in coordination with City
Satker should recheck
the process of and
obtain the incomplete
SPPL and UKL-UPL
documents.
PIC: RMC Safeguard
Specialists, related
CCs in coordination
with respective City
Satker of
Palembang, Tanjung
Balai, Sukabumi,
Banjarmasin and
Kendari.
Schedule:
Q4 of 2018
Completed - SPPL, UKL-
UPL & Environmental Permit
for the mentioned
community contracts have
been completed. An
example of SPPL of Tanjung
Balai is included in
Appendix 16.
7 Incomplete SPPL, UKL-
UPL and Environmental
Permit for complex civil
work packages in
Bengkulu City and Bone
City
The RMC Safeguard
specialists and the CCs
in coordination with City
Satker and LCO should
recheck the process of
and obtain the
incomplete SPPL, UKL-
UPL and Environmental
Permit documents.
PIC:
RMC Safeguard
Specialists, related
CCs in coordination
with respective City
Satker of Bengkulu
and Bone.
Schedule:
Q4 of 2018
Completed - SPPL, UKL-
UPL & Environmental Permit
for the mentioned
community contracts have
been completed. Examples
of SPPLs and Environmental
Permit of Bone are included
in Appendix 17.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
31
No Key Issues / Gaps Corrective Actions PIC & Schedule Status/Progress
up to Dec 2018
8 Twenty four (24) SPPL of
community contracts and
one of complex civil work
in Semarang City are still
in the registration process
due to bureaucracy
obstacles.
The City Satker
acknowledged all
formulated SPPLs and
gave recommendation
for these SPPLs as the
basis for the mitigation
measures, so that the
construction works can
keep proceeding even
though without
recommendation from
the DLH. Thus, the City
Satker took the
responsibility to make
sure that mitigation
measures were
implemented and
monitored and the
construction works were
on schedule.
City Satker
Schedule:
Q1-2019
Partially achieved - As this
online registration process
takes a lot of requirements
and unpredicted long time,
the construction works keep
proceeding with
recommendation from the
City Satker. All construction
works of community
contracts was completed
now. Only one complex civil
work in Tambak Rejo has
been continuing through
multi-years contract and will
be reported in the next
report.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
32
CHAPTER 9. CONCLUSIONS AND RECOMMENDATIONS
50. Conclusions. In 2018, there were a total of 228 subprojects of NUSP-2 conducted in
99 neighborhoods (kelurahan) located in a total 20 cities and districts throughout Indonesia.
These include 215 community contracts (skala lingkungan), 9 complex civil work contracts,
and four 4 New Site Development packages in Kendari, Palopo, Bima cities and Kapuas
District.
51. Based on Environmental Assessment and Review Framework (EARF), the project
implementation is required to comply with several requirements. Paragraph 26 and 28 of the
EARF mentioned the preparation of SPPL and IEE documents for each subproject. There
were 224 subprojects (125 packages of community contract and 9 packages of complex civil
work) that required the SPPL documents; of which 189 SPPLs for community contracts and 8
SPPLs for complex civil works have been registered and accepted by respective
Environmental Agency or related agency. 25 SPPL in Semarang city have not been published
yet. As for the NSD, four IEEs (for Kendari, Palopo, Bima and Kapuas District) have been
formulated and approved by ADB.
52. In addressing the Environmental Assessment and Review Framework requirement, the
NUSP-2 has adopted the screening list mechanism using series of checklist forms (SG 1 – 5)
from which potential impacts of the project/sub-project are identified and mitigated, and these
measures are incorporated into the SPPL, UKL-UPL, and IEE. The monitoring of
environmental mitigation was conducted in a participatory and consultative manner, involving
the related stakeholders particularly the community. Monitoring of environmental mitigation on
the projects/sub-projects implemented has generally improved over the previous year with
regards to the capacity building conducted, completeness and quality of supporting
documents provided for this 2018 monitoring report.
53. As for the responsibility of the agencies and community organizations presented in
Table 3, the only partially complied status is about the proposals, contracts, and checklists
which were not disclosed on the neighborhood boards. However, the process of preparing
these checklists, proposals and contracts were conducted in a participatory and transparent
manner through series of neighborhood meetings.
54. The NUSP-2 is a community-driven development project involving extensive and
transparent neighborhood meetings (Musyawarah Kelurahan) in Q1 of 2018. These meetings
raise community understanding towards the project and gather community’s proposal and agreement on the priority of infrastructure constructed in 2018, as well as on the timeline and
workloads. Subsequently, the construction of infrastructure started in Q2 of 2018. As the
result of this approach, the NUSP-2 did not receive complaints or grievances for the reporting
period of 2018.
55. Some corrective actions for pending or key issues identified in 2017 and 2018 in Table
5 were completed and some are still partially achieved. Those which were completed are:
providing documentation on the monitoring and evaluation of environmental safeguard
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
33
implementation by the Executing Agencies; empowering the LCOs for monitoring the
implementation of EMP associated with the community contract and complex civil works; each
RMC Safeguard Specialist submitted four QPRs on safeguard activities in 2018 to the NMC;
and providing completed missing SPPLs of community contracts from six cities (Palembang,
Tanjung Balai, Sukabumi, Banjarmasin and Kendari), and of complex civil works from two
cities (Bengkulu and Bone). Those corrective actions which are still partially achieved will be
included in the recommendation below
56. As there are still few challenges to complete the good quality data or to support with
documents required to comply with the EARF, we still need to put more attention on this
discrepancy. It seems that capacity building on safeguard compliance activities through direct
practice still need to be conducted until the end of the project to ensure the sustainability of
the project.
57. Recommendations. Some key issues that need corrective and further actions in 2019
are:
i. The Local Environmental Agencies needs to conduct random checking during and
after completion of the construction works in 2019;
ii. Monitoring the formulation of O&M mechanism for Kendari, Bima and Kapuas NSD
in the Q1 2019;
iii. Monitoring the continuation of multi-years contract in Tambak Rejo neighborhood,
Semarang City (to be reported in the next report);
iv. Monitoring the implementation of safeguard screenings in all planning and
implementation of infrastructure works in 2019; and
v. Monitoring the Environmental Management Plan of IEEs for Bima and Kapuas NSDs
to be reported in separate reports.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
35
Appendix 1. List of SPPL of Community Contracts
No City / District (Province)
Number of
Neighborhoods
Involved
List of SPPL* for Community Contracts
1 Tanjung Balai city, North
Sumatera
5 All SPPLs are received by DLH on 9 April 2018 (First
Cycle)
All SPPLs are received by DLH on 21 August 2018
(Second and Third Cycle)
2 Tanjung Jabung Barat
District (Jambi Province)
4 All SPPLs are received by DLH on 24 April 2018 (First
and Second Cycle)
3 Palembang City (South
Sumatra Province)
10 All SPPLs are received by DLH on July and August
(First, Second and Third Cycle)
4 Bengkulu City (Bengkulu
Province)
6 All SPPLs are received by DLH on June (First, Second
and Third Cycle)
5 Bandar Lampung City
(Lampung Province)
10 The SPPL recommendation was issued by DLH on 11
July 2018 (First, Second and Third Cycle)
7 Batam City (Riau Islands
Province)
5 All SPPLs are received by DLH on 20 August 2018
(First, Second and Third Cycle)
7 Sukabumi City (West
Java Province)
4 All SPPLs are received by DLH (First, Second and
Third Cycle)
8 Semarang City (Central
Java Province)
11 All SPPLs have been provided but not yet gotten
recommendation, as the online process application
takes long time (First, Second and Third Cycle)
9 Pekalongan City (Central
Java Province)
6 All SPPLs are received by DLH (First, Second and
Third Cycle)
10 Pasuruan City (East Java
Province)
5 All SPPLs are received by DLH on 10 April 2018 (First,
Second and Third Cycle)
11 Serang City (Banten
Province)
4 The SPPL recommendation was issued by Investment
and Integrated Services Office on 30 July 2018 (First,
Second and Third Cycle)
12 Kapuas District (Central
Kalimantan Province)
3 All SPPLs are received by DLH (First and Second
Cycle)
13 Palangkaraya City
(Central Kalimantan
Province)
4 All SPPLs are accepted by DLH on 18 May 2018
(First, Second and Third Cycle)
14 Banjarmasin City (South
Kalimantan Province)
2 All SPPLs are received by DLH on 23 March 2018
(First, Second and Third Cycle)
15 Bima City (West Nusa
Tenggara Province)
3 All SPPLs are received by DLH on 18 May 2018 (First
and Second Cycle)
17 Bone City (South
Sulawesi Province)
2 All SPPLs are received by DLH on 18 April 2018 (First,
Second and Third Cycle)
17 Makassar City (South
Sulawesi Province)
5 All SPPLs are received by DLH on 18 May 2018 (First,
Second and Third Cycle)
18 Palopo City (South
Sulawesi Province)
3 All SPPLs are received by DLH on 16 April 2018 (First
and Second Cycle)
19 Kendari City (South East
Sulawesi)
4 All SPPLs are received by DLH on 25 May 2018 (First
and Second Cycle)
20 Ambon City (Maluku
Province)
3 All SPPLs are received by DLH on 30 May 2018 (First
Cycle)
Note: *SPPL – statement letter to conduct environmental management and monitoring.
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
36
Appendix 2. Evidences of Mitigation Measures in Semarang and Makassar
2.a. Materials covered with tarpaulin in Kelurahan Batua, Makassar
2.b. Road signage in Kelurahan Tambakrejo, Semarang
2.c. Stockpiling the construction materials properly on the road side in Kelurahan
Tambakrejo, Semarang
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
37
2.d. Construction workers wearing PPE in Kelurahan Batua, Makassar
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
38
Appendix 3. List of SPPL of Complex Civil Work Contracts
No City/District (Province) Construction and/or Installation
Conducted SPPL for Complex Civil Work
1 Kelurahan Kabil, Batam City
(Riau Islands Province).
Paved and concrete road and
drainage channel.
SPPL receipt No.
0021/DLH/SPPL/M/VIII/2018 and
0022/DLH/SPPL/M/VIII/2018 (dated
20 August 2018) issued by the DLH
of Batam City
2 Kelurahan Sawah Lebar,
Bengkulu City (Bengkulu
Province)
Drainage channel and asphalt road. SPPL receipt No.
660.1/209/RK.SPPL/DLH-II/X/2018
(dated 12 October 2018) issued by
the DLH of Bengkulu City
3 Kelurahan Kandang Panjang,
Pekalongan City (Central Java
Province)
Asphalt road, green open space,
drainage channel and installation of
box culvert.
SPPL is received by DLH of
Pekalongan City on 10 September
2018.
4 Kelurahan Tambakrejo,
Semarang City (Central Java
Province)
Drainage channel, solid waste
collection area and road.
SPPLs have been provided but not
yet gotten recommendation, as the
online process application takes
long time
5 Kelurahan Selat Dalam,
Kapuas District (Central
Kalimantan Province)
Retaining wall, green open space,
concrete bridge, construction of
archway and street lighting
SPPL receipt No.
661/098/Reg./DLH/IX/2018 (dated
17 September 2018) issued by the
DLH of Kapuas District
6 Kelurahan Batua, Makassar
City (South Sulawesi Province)
Paved road and drainage channel. SPPL receipt No. 64 (dated 18 May
2018) issued by the DLH of
Makassar City
7 Kelurahan Borong, Makassar
City (South Sulawesi Province)
Paved road and drainage channel. SPPL receipt No. 65 (dated 18 May
2018) issued by the DLH of
Makassar City
8 Kelurahan Batu Merah, Ambon
City (Maluku Province)
Installation of clean water pipelines,
drainage channel and concrete
road.
SPPL receipt No. 660/244a/DLHP,
660/244b/DLHP, 660/244c/DLHP
issued by the DLH of Ambon City
9 Kelurahan Dara and Jatibaru,
Bima City (West Nusa
Tenggara Province)
Asphalt road and drainage channel. SPPL receipt No.
800/21/DLH/IX/2018 (dated 7
September 2018) issued by the
DLH of Bima City
Note: DLH – Local Environmental Agency (Dinas Lingkungan Hidup)
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
39
Appendix 4. Environmental Screening and Assessment for Batua Community Work
Package, Makassar City
4a. The Use of Form SG-1 to Screen Out Negative Investment List Activities for
Complex Civil Work Packages in Batua, Makassar City
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
41
4.b. The Use of Form SG-2 to Identify Social and Environment Impacts
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
43
4.c. The Use of Form SG-3 to Identify Potential Negative Impact and Mitigation
Measures for Road and Drainage
17 Juli 2018
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
44
4.d. The Use of Form SG-5 for Monitoring at 0%, 50% and 100% Progress
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
46
4.e. Pictures of Safeguard Monitoring on 0%; 50% and 100% of Road and Drainage
Infrastructure in Batua Neighborhood, Makassar City
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
47
4.f. SPPL Sample of Community Contract in Bram Itam Kiri Neighborhood, Tanjung
Jabung Barat District
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
48
4.g. SPPL Sample of Complex Civil Work Contract in Selat Dalam Neighborhood,
Kapuas District
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
50
Appendix 5. Evidences of Public Consultation for Community Contract in Batua
Neighborhood, Makassar City
5.a. Pictures of Public Consultation
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
54
Appendix 6. Evidences of Public Consultation for Complex Civil Work in Tambakrejo
Neighborhood, Semarang City
6.a. Pictures of Public Consultation
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
57
Appendix 7. Evidences of Training of Trainers Workshop
7.a. Invitation Letter
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
62
7.d. List of Attendance of Training of Trainers Workshop
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
64
Appendix 8. Evidences of Mid-Term Review Workshop
8.a. Invitation Letter
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
70
Appendix 9. Evidences of the Year-End Review Workshop
9.a. Invitation Letter
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
73
9.d. List of Attendance of the Year-End Review Workshop
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
76
Appendix 10. Evidences of the Year-End National Coordinating Meeting
10.a. Invitation Letter
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
77
10.b. Rundown of the Year-End National Coordinating Meeting
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
78
10.c. Pictures of the Year-End National Coordinating Meeting
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
79
10.d. List of Attendance of the Year-End National Coordinating Meeting
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
82
Appendix 11. Picture of Ad-Hoc Meeting Between DGHS and NMC at NMC Office,
Jakarta (June 2018)
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
83
Appendix 12. Picture of field checking by PPK of Semarang City in Mangkang Wetan
Neighborhood (27 August 2018)
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
84
Appendix 13. An Example of O&M Mechanism in Bontorannu, Makassar
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
86
Appendix 14. O&M Mechanism has been formulated in the Major’s Decree on NSD’s Management Board of Palopo
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
90
Appendix 15. An Example of RMC Safeguard Specialist’s QPR
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
92
Appendix 16. An Example of Approved Community Contract SPPL of 2017 from Beting
Kuala Kapias Neighborhood, Tanjung Balai City
ANNUAL ENVIRONMENTAL MONITORING REPORT 2018
95
Appendix 17. An Example of Approved Complex Civil Works SPPL of 2017 and its
related Environmental Permit Act from Bone District
17.a. SPPL for Bone