Environmental Monitoring Report __________________________________________ Bi-annual Environment Monitoring Report January 2015 PAK: Power Distribution Enhancement Investment Program, Tranche 2 Prepared by Quetta Electric Supply Company, Balochistan for the Asian Development Bank.

Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Environmental Monitoring Report

__________________________________________

Bi-annual Environment Monitoring Report

January 2015

PAK: Power Distribution Enhancement Investment

Program, Tranche 2

Prepared by Quetta Electric Supply Company, Balochistan for the Asian Development Bank.

Page 2: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and

its agencies ends on 30 June.

(ii) In this report “$” refer to US dollars.

This social monitoring report is a document of the borrower. The views expressed herein do not

necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be

preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any

designation of or reference to a particular territory or geographic area in this document, the

Asian Development Bank does not intend to make any judgments as to the legal or other status

of any territory or area.

Page 3: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Page 1 of 1

L-2727 PDEIP: QESCO BAEMR (Jul-Dec 2014) approved for disclosure

Safia Shafiq

to: Liaqat Ali

28/01/2015 02:25 PM

Cc:

Adnan Tareen, Zehra Abbas, "Jeffrey Bowyer", Jocelyn M. Cabrera, Judy A. Vermudo. Maria Ava Golda A. Destura, Rizwan Haider

Hide Details

From: Safia Shafiq/Consultants/ADB Sort List... To: Liaqat Ali/PRM/ADB@ADB,

Cc: Adnan Tareen/CWRD/ADB@ADB, Zehra Abbas/CWRD/ADB@ADB, "Jeffrey Bowyer"

<[email protected]>, Jocelyn M. Cabrera/Consultants/ADB@ADB, Judy A.

Vermudo/CWRD/ADB@ADB, Maria Ava Golda A. Destura/CWRD/ADB@ADB, Rizwan Haider/Contractors/ADB@ADB

1 Attachment

nit QESCO BAEMR (Jul-Dec 2014).pdf

Dear Liaqat Sb.,

The attached BAEMR (Jul-Dec 2014) of QESCO under L-2727 PDEIP is approved for disclosure. Please have it uploaded on ADB's website and share the weblink with me.

Thanks and regards,

Safia Shafiq

Environment Specialist (Consultant) Pakistan Resident Mission Asian Development Bank

Level 8, North Wing, Serena Office Complex,

Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan. Tel: +92-51-2087300, Ext: 344 Fax: +92-51-2087397-8 & 2600365-6 Cell: +92-333-2154462

file :///ClUsers/alt/AppData/Local/Temp/notesBDE916/—web4739.htm 28/01/2015

Page 4: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

ADB

Bi-annual Environmental Monitoring

Project Number: ADB Loan No. 2727 — Pak Tranche II

Jul - Dec, 2014

Islamic Republic of Pakistan: Power Distribution

Enhancement Investment Programme — Tranche III

(Multi-tranche Financing Facility)

Prepared by: Environmental and Social Safeguard Section PMU QESCO

Quetta (Pakistan)

This report does not necessarily reflect the views of ADB or the Government concerned, ADB and the Government cannot be held liable for its contents.

Asian Development Bank

Page 5: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

ABBREVIATIONS

A Augmentation

ADB Asian Development Bank

BPI British Power International

BEPA Balochistan Environmental Protection Agency

BOQs Bill of Quantities

C Conversion

CSC Construction supervision Consultant

DGS Distribution Grid System

E Extension

EIA Environmental Impact Assessment

EMP Environmental Management Plan

EMS Environmental Management System

SSEMP Social safeguard and Environmental Management Plan

GOP Government of Pakistan

GSC Grid System Construction

HSE Health Safety & Environment

IEE Initial Environmental Examination

LARF Land Acquisition & Resettlement Framework

LARP Land Acquisition & Resettlement Plan

MC&C Monitoring, Controlling & Coordination

MFF Multi-tranche Financing Facility

MM Mitigation Measures

MVA Mega Volts Ampere

PPEs Personal Protection Equipments

PMU Project Management Unit

PDEIP Power Distribution Enhancement Investment Program

PS&C Planning. Scheduling &Coordination

QESCO Quetta Electric Supply Company

STG Secondary Transmission Grid

T/LINE Transmission Line

Page 6: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Table of Contents

1 Part I (Introduction) Page No.

1.1 Company 1

1.2 Project Management Unit 1

1.3 Detail of Project 1

1.4 Location of the Project 2

1.5 Objective of the Project 2

1.6 Construction activities and project progress during previous 6 months of Tranche 2 2

1.7 Scope of Work 3

1.8 Changes in Project Organization and Environmental Management Team 4

1.9 Relationship with Contractors , and owner lenders etc 4

Part II (Environmental Monitoring ) 5

2 Environmental Monitoring Summary 5

Part Ill (Environmental Management ) 5

3 EMS, SSEMP & Work plan 5

3.1 Site Inspection & Audits 5

3.2 Non Compliances Notices 5

3.3 Issues Covered 5

3.4 Corrective action Plans 5

3.5 Consultation and Complaints 5

3.6 Implementation Report on EIA/IEE Mitigation Requirements of QESCO Sub Projects 6

(Annexes & Tables)

NOC issued by BEPA (Annex A) 8

Organization Chart (Annex B) 9

Lay out Plan of QESCO Subprojects of Tranche 2 (Annex C) 10

Photographs of the Project Site (Annex D) 11

Extension/ augmentation subproject Tranche 2 (Table No. 1)

Physical status of subprojects Tranche 2 (Table No. 2)

Asian Development Bank

3

Page 7: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Part 1- Introduction

1.1 Company:-

Quetta Electric Supply Company (QESCO) is a Public Limited Utility Company,

established in 1998 under Companies Ordinance 1984 and is responsible for distribution of

Electric Power within its territorial jurisdiction and presently serving approximately over 0.5

Million Customers (Domestic, Commercial, Agricultural, Industrial and others) in the thirty

districts of Balochistan.

1.2 Project Management Unit (PMU)

To effectively plan. execute and monitor the project loan No 2727 Power Distribution

Enhancement Investment Program (Tranche 2), a Project Management Unit (PMU) has

been established under General Manager/Chief Engineer (Development) comprising of four

sections i.e. Planning, Scheduling & Coordination, Procurement. Finance, and Environment

& Social Safeguard section along with Project Director (GSC).

1.3 Detail of Project

Existing conditions of the QESCO power distribution and transmission system are

inadequate to meet rapidly growing demand for electrical power. To cope with this situation,

the existing power infrastructure has to be improved and upgraded. The overall contribution

of power infrastructure requires institutional arrangements, capacity building that support

strategic management of the sector, planning and management of investments.

The basic information of the loan No. 2727 is here as under:-

Loan Number:- ADB-2727 PAK

Project Title:- Power Distribution Enhancement Investment Program- Multi Tranche

Financing Facility (PDEPMFF)_Tranche-2 (STG)

Page 8: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

1.4 Location of the Project:-

This project covers extension & augmentation work in 12 Districts of Balochistan in

QESCO territory that are Quetta, Pashin. Qila saifullah. Loralai. Khuzdar, Mastung, Sibi,

Jafarabad, Kharan Turbat, Kalat, & Gwadar.

Borrower:-GOP/ QESCO

Executing Agency:-PEPCO

Implementing Agency:-QESCO

Date of Signing Agreement:-28-01-2011

Date of Effectiveness:-08-10-2011

Date of Loan Closing:-30-09-2015

Date of Last ADB Review Mission: - 17 June, 2014

Amount of Loan: - 19.760 Million US $

1.5 Objectives of the Project

QESCO through GOP has undergone a Project Financing agreement with Asian

Development Bank for:

• Strengthening the capacity of Power Distribution and Transmission networks

• To meet the increasing electricity demand in the selected areas more efficiently

• To upgrade the existing power infrastructure.

1.6 Construction activities and project progress during previous 6 months of

Tranche 2

During the reporting period completions works of subprojects were undertaken. All

Augmentation and Extension subprojects are now complete except for Quetta Industrial.

Asian Development Bank

Page 9: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

1.7 Scope of Work

There are 15 Nos. of QESCO-Extension and Augmentation approved

subprojects under Tranche 2. The details are as follows:

Table No 1: EXTENSION/ AUGMENTATION SUB PROJECTS TRANCHE 2

Sr. No GRID STATION TYPE CAPACITY(MVA)

1 YARU A 1 X 26

2 KHANOZAI A 1 X 26

3 MUSLIM BAGH E 1 X 26

4 KILLA SAIFULLA A+ E 2 X 40 +1 X 40

5 WADH E 1 X 26

6 KHUDKUCHA A 1 X 26

7 QUETTA INDUSTRIAL A+ E 2 X 40 + 1 X 40

8 SIBI A 2 X 26

9 ZEHRI E 1 X 26

10 KHARAN A 1 X 26

11 TURBAT A 1 X 26

12 SURAB A 1 X 26

13 SUHBATPUR A 1 X 26

14 DUKI A 1 X 26

15 GAWADAR A 1 X 26

Rating of Power Transformers T/F (MVA)

Augmentation of T/F (Replacement

at existing

foundation) (No)

Extension of T/F ( addition through new foundation)

(No)

Power Total No of

Transformer

40 4 2 6

26 11 3 14

Total 15 5 20

Asian Development Bank

6

Page 10: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Table No.2: PHYSICAL STATUS OF QESCO SUB PROJECTS TRANCHE-2

Sr. No

GRID STATION TYPE CAPACITY(MVA) Physical Progress

%age Progress

Date of Completion/Remarks

1 YARU A 1 X 26 Completed 100 26.03.2012

2 KHANOZAI A 1 X 26 Completed 100 15.04.2012

3 MUSLIM BAGH E 1 X 26 Completed 100 30.07.2013

4 KILLA SAIFULLA A + E 2 X 40 +1 X 40 Completed 100 21.07.2012 & 26.11.2012 installation & erection is completed but yet to be energized

5 WADH E 1 X 26 Completed 100 05.10.2012

6 KHUDKUCHA A 1 X 26 Completed 100 04.05.2012

7 QUETTA INDUSTRIAL A + E 2 X 40 + 1 X 40 In Progress 80 17.01.2012 & 11.11.2012 Extension is in

Progress

8 SIBI A 2 X 26 Completed 100 24.01.2012 & 08.07.2013

9 ZEHRI E 1 X 26 Completed 100 23.06.2012

10

11

KHARAN A 1 X 26 Completed 100 28.04.2014

'TURBAT A 1 X 26 Completed 100 01.10.2012

12 SURAB A 1 X 26 Completed 100 31.08.2013

13 SUHBATPUR A 1 X 26 Completed 100 03.02.2013

14 DUKI A 1 X 26 Completed 100 12.04. 2013

15 GWADAR A 1 X 26 Completed 100 05.12.2013

1.8 Changes in Project Organization and Environmental Management Team

Environmental and Social officers have been appointed within effective date but

Deputy Manager (E&S) yet to be appointed. However, the post of Deputy Manager (E&S)

has been upgraded as Manager (E&S). Manager from Civil Engineering is working on the

post of Manager (E&S).

Asian Development Bank

7

Page 11: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Up to date organization chart is attached as Annex B

1.9 Relationships with Contractors, Owner, lenders etc.

Relationship between contractors, owners and lenders were found excellent. No

dispute reported during the completed sub projects.

Part II Environmental Monitoring

2. Environmental Monitoring Summary:-

All subprojects are within the Boundaries of the existing grid stations. More than

80% work of sub projects have been completed while less than 20% will be completed in

next six months hopefully. No significant environmental impact has been observed/reported

during the environmental monitoring, if so that will be communicated accordingly.

Part Ill Environmental Management

3 EMS, SSEMP and work plans:..

As all subprojects are within the Boundaries of the existing grid stations, therefore

EMS, SSEMP and work plans is implemented as per IEE Report of subprojects.

3.1 Site Inspection and Audits:-

Site inspections and audits of the sub projects are being performed with the time of

physical work.

3.2 Non Compliances Notices:-

If any environmental impact observed at construction and operational stage of

subprojects, the non compliance notices will be communicated accordingly.

3.3 Issues Covered:-

No major environmental issue has been observed and if found will be

communicated/ covered accordingly

Asian Development Bank 8

Page 12: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

3.4 Corrective Action Plans:-

No Corrective Action Plans were required to be formulated during the reporting

period.

3.5 Consultation and Complaints:-

Regular consultations were undertaken with stakeholders. No complaints related to

environmental aspects have been lodged during the reporting period.

Asian Development Bank 9

Page 13: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Implementation report on EIA/IEE mitigation requirements of QESCO Subprojects

C.0

Action required/

Comments

'Li 1

')co

0

a) 4

- c

21

c; _

v

cE

m

8c

•5 o

3 c =

a - °

4,5

o , -

a) o 6

co ■- o

,- ‘-- u)

c

_ o

45 44L.

ca w 0

a) a3

- u)

C --

_c -0 ,-

„cf_) a)

co co

-t 2 -

'E' c D

®

5 00

7.— .5

S -0

0 0

— — 0

t 0 0

Z

2 0

(o

-a co

Maximum safety

precautions for workers

have been provided. No any further act ion or

mitigation measure is

required.

No further action is

required.

1.

QESCO has a fully functional E&S Sect ion,

which conducts monitoring activities regularly.

2.

Special briefings and on site tra ining have been

conducted for the managers, staff and workers on

environmental requirements of the project.

3.

There are no critical areas: all the sub projects

are within the boundaries of existing grid stations,

so there is no need of any agreement on critical

areas.

4.

E& S Section of PMU QESCO follows the

continuous progress and review the p roject

activities

1.

All the warning s igns are installed at project

site.

2.

All workers are provided with Personal

Protection Equipments (PPEs)

3.

No c ivil work is involved in Tranche 2

subprojects. However, workers are instructed for

health and safety matters.

4.

All relevant safety measures as required by

law and good engineering pract ices have been

established as ser uidelines. 1. No civil work is involved in Tranch-2 sub

projects therefore no waste has been generated

for sa id period.

2.

No waste is being reused by any party.

3.

All the sub projects are within the boundaries of

exist ing grid stations. and no civil work is involved.

therefore no such site for safe disposal is

applicable.

4.

The environmental condition for safe dis •osal

Requirements

1. QESCO to engage environmental specialist to monitor

and progress a ll environmental statutory and recommended

obligat ions.

2 Conduct special briefing for managers and / or on-site

training for the contractors and workers on the environmental requirement of the project. Record

attendance and achievement test.

3.

Agreement on critical areas to be considered and

necessary mitigation measures, among all parties who are

involved in project act ivities.

4.

Cont inuous progress review and refresher sessions to be

followed

1. Providing adequate warning signs

2. Providing workers with skull guard or hard hat and hard

toe cap shoes. 3. Contractor shall instruct his workers in health and safety

matters, and require the workers to use the provided safety

equipment 4. Establish all relevant safety measures as required by law

and good Engineering pract ices.

1.

Est imating the amounts and types of construction waste

to be generated by the project.

2.

Investigat ing whether the waste can be reused in the

project or by other interested part ies.

3 Identifying potential safe disposal sites close to the

project, or those designated sites in the contract.

4 Investigating the environmental conditions of the disposal

sites and recommendation of most suitable and safest sites.

5. Pilin. us of loose material should be done in se•re•ated

References

a

i.:

0

0

-..Z 11

V2 fl3

CV 0.)

..... ,..

_„ c

.... ,_

a) c -0

.-

I- o

= °

(15- o

0 to

an

0

—Z.

112 =

a)

a) >

, cu z ...v

r D (..) ..-J

i... 4—

o

0 '-

o

u) C

L ••

...a.

CO

,,, CO

' i.t 0

v)

,....._co .0

S I-1 -

Page 14: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

0

.-4 >

, -0

.=

-75

ci)

,

t5 °r ' 7_ a)

2 -o

.723

Mg) § —'-

u)

n

co

.-

a) 7.- 4-- _c

ch "(T5 —

a, E

6

4-• ,._

-

,_ ,-

cri a) -c

" (1)

,. , >

2 c

,....,

o

E 5 c

Ci) ° 0

c

(.1:5 C.0

'112 .1_- a)

E

at most suitable site is verified before disposal of

any type of waste.

5.

No pilling up of material is done during the

execution of work.

6.

Needful is done with full compliance with

nat ional & local regulat ions.

7.

Needful is done.

8.

No power transformer oil is being reused or

reconditioned at p roject site or other facility.

9.

All vehicles and machinery being used during

construction are maintained properly to avoid oil

spills at the site.

10.

Needful is don with good environmental

pract ices.

areas to arrest washing out of soil. Debris shall not be left where it

may be carried by water to down stream flood plains. dams. lagoons

etc.

6.

Used oil and lubricants shall be recovered and reused or

removed from the site in full compliance with the national

and local regulations.

7.

Oily wastes must not be burned. Disposal location to be

agreed with local authorities/EPA.

8.

Waste transformer insulat ing oil to be recycled,

reconditioned, or reused at an appropriate SS or other

facility.

9.

Machinery should be properly maintained to minimize oil

spill during the construction.

10 Solid waste should be disposed at an approved solid

waste facility open burning is illegal and contrary to good

environmental practice

Asian Development Bank

Page 15: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Annex A

OFFICE OF THE DIRECTOR GENERAL

BALOCHISTAN ENVIRONMENTAL PROTECTION

AGENCY GOVERNMENT OF BALOCHISTAN

SAMUNGLI ROAD QUETTA. O11ice: 081-9201840 Fax. 081-9201180

No.DCi(EPA)/ z<- /2011

NO OBJECTION CERTIFICATE

Mr. Javaid Aftab

Road Chief Engineeri(Dev)

P1‘11.; QESCO, Head Quarter.

Zarghoon Quetta Cant:.

Name of project & Description /

Location of the project

Date of IEE

PAK: NIEL' for Power Distribution

Enhancement Program (Tranche 2) in

Balochistan.

Dated Nov , 2011

Dated en, / /,"2. //2011

After thorough review of the subject Initial Environmental

Examination (IEE), the Balochistan Environmental Protection Agency has

decided to accord it approval / No Objection Certificate in favour of

NUS QESCO, subject to the following terms and conditions as laid down in

Section-17 & 18 of EIA i IEE Regulation, 2000: -

I. Mitigation measures and Environmental Management Plan (EMP) as included in the IEE report should he strictly implemented. Techniques should be adopted to minimize nose pollution, oil spill and environmental problems during the Extension and Augmentation of Power Transformers.

3. All precautionary measures should be strictly adhered to minimize any negative impacts in the area.

4. Any kind of wastage (oil and lubricants) generated / produced should be appropriately. disposed off during extension, augmentation and maintenance. Oil' residues, fuel and any contaminated soil should be captured at source by installing builds and refueling and maintenance should take place in dedicated areas away from surface water resources.

O. The proponent of the project shall resolve all disputes (if any) related to land prior to start of the transformers installation.

The QESCO shall be liable for compliance of Section-17 and IS of EIA / IEE Regulation, 2000.

3. This approval will not absolve the QESCO from obtaining any other approval that may be required under any law,

9. This approval shall be treated as null and void if the conditions are not complied

rhe proponent ut the project is bound to submit completion report of the project.

(Env. NI- tat_ a"Itt' n t<4* thmankhail)

Dept, griepodf)feeh./Lab)

7opy for information to: /

I I. P.S to the Director General. EPA Balochistan, Quetta /

/Master File

/

Deputy Director (Tech./Lab)

Page 16: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

• c <

C • aS

< • E

Oc , CO 1-

CZ • 7.5

62 _c

a)<

O) a) as a) c

as °

ro

otS •

> • - r- -0 W

k j

(1.5 CI) -CS r- (T3

as as

0 U)

o 2 0 61 E

~~N < <

a) E O C • as O• ct

a_

0 0 C (-) ct

a) > co

Ct

O (t) O >

CO

Q_

00

o -c

-o co

0 .7c

0

a

0 0(1) 0•

- E

cu

> N _c

o .o)

x Z in

Lfi

N

a

0

Consu

lta

nts

U)

a. - 0 • ca

<

Asia

n D

eve

lop

men

t B

an

k

Page 17: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

160 PANWAR

(Th. tussidA

WAGS!

Lay out Plan QESCO Subprojects of Tranche 2 (Annex-C)

Page 18: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Photograps of the Subproject Sites/ Area Annex D

A 'w - the you' Of Qsla SatiotaJTCWITI ,•.n

Asian Development Bank 1 -7

Page 19: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Open •..pace at Khudlocba Crttd Stetson

Augmentation at Industrial Grid Station Quetta

Asian Development Bank 16

Page 20: Environmental Monitoring Report › sites › default › files › project-document › ... · 2015-01-30 · Environmental Monitoring Report _____ Bi-annual Environment Monitoring

Augmentation at Quetta Industrial Grid station

Augmentation at Quetta Industrial Grid Station

Asian Development Bank 17